Tozzi Yard Presentation

Post on 22-May-2015

547 views 1 download

Tags:

description

Our Construction Yard

Transcript of Tozzi Yard Presentation

CONTENTS

1. YARD DESCRIPTION

2. FABRICATION ACTIVITIES

3. INSTALLATION ACTIVITIES

4. LOAD OUT

5. MAN HOUR

Tozzi Sud S.p.A.

1. YARD DESCRIPTION

Tozzi Sud S.p.A.

Tozzi Sud S.p.A. Yard is located in San Vitale Port, close to Ravenna (Italy).

Yard was founded in 2006, following the acquisition of order for the design and construction of modules used as Electrical Rooms (Local Equipment Room - LER), for the project:

"Agip KCO - KASHAGAN Experimental Development Program - Offshore Complex D ".

In 2009 new yard has been arranged, close to the existent yard, following the acquisition of order for the design and construction of Process modules and Temporary Refuge (Process and Utilities Building - PUB Italian SOW ), for the project: "Agip KCO - KASHAGAN Experimental Development Program - Offshore Complex D ".

Tozzi Sud S.p.A. YARD DESCRIPTION

Tozzi Sud S.p.A. YARD DESCRIPTION

Vista aerea

YARD AERIAL VIEW

SURFACE AREA: 55.000 sqm

Tozzi Sud S.p.A. YARD DESCRIPTION

Tozzi Sud S.p.A. YARD DESCRIPTION

YARD POSITION INSIDE

SAN VITALE PORT – RAVENNA

WORKSHOP LOCATED CLOSE TO YARD

(ABOUT 1.000 mt)

Tozzi Sud S.p.A. YARD DESCRIPTION

Tozzi Sud S.p.A. YARD DESCRIPTION

TYPICAL WORKSHOP USED FOR

FABRICATION OUTSIDE THE YARD

YARD FACILITIES

COVERED STORAGE AREA

INSIDE YARD

(300 sqm)

OFFICES

(1500 sqm)

COVERED STORAGE AREA

CLOSE TO YARD

(1.000 sqm)

Tozzi Sud S.p.A. YARD DESCRIPTION – YARD FACILITIES

2. FABRICATION ACTIVITIES

Tozzi Sud S.p.A.

Tozzi Sud S.p.A. FABRICATION ACTIVITIES

Local Equipment Room

Size (DxWxH meter) Weight (T)

LER HVAC LER HVAC

1 Drilling Island – Complex D 55,1 x15,2 x8,4 36,0 x 11,2 x10,4 1024 493

2 Island A - Complex A 36,2 x15,2 x10,4 / 801 /

3 PSA1 - Complex D 48,5 x15,2 x8,4 42,5 x 15,2 x 10,4 943 816

4 Riser Island - Complex D 48,5 x15,2 x8,4 24,5 x 15,2 x 10,4 922 471

5 PSA2 - Complex D 48,5 x15,2 x8,4 42,5 x15,2 x 10,4 942 771

6 PUA - Complex D 57,5 x15,2 x8,4 43,7 x 15,2 x 10,4 1090 900

7 LSA - Complex D 52,5 x15,2 x8,4 36,5 x15,2 x10,4 1000 657

8 Drilling Island East - Complex D 66,5 x15,2 4x8,4 48,5 x15,2 x10,4 1188 955

9 EDG - Complex D 43,5 x15,2 x10,4 48,5 x15,2 x10,4 0 1550 950

10 LSA IBEEV- Complex D 33,7 x16,2 x11,7 800

TOTAL 16.273 tons

Tozzi Sud S.p.A. FABRICATION ACTIVITIES

Process and Utilities Building Size (DxWxH meter) Weight (T)

1 PSA1 OIL EXPORT PUMP HOUSE - Complex D Composed by n° 2 buildings

21.6 x 25.2 x 9.5 652

2 PSA1 OIL BOOSTER PUMP HOUSE - Complex D 28 x 15 x 9.5 433

3 PUA COMPRESSOR BUILDING - Complex D Composed by n° 2 buildings

38 x 14.8 x 10.7 736

4 PUA CHEMICAL INJ. PUMP HOUSE - Complex D 13 x 45.3 x 5.9 515

5 PUA METHANOL INJ. PUMP HOUSE - Complex D 38 x 14.8 x 10.7 585

6 LSA WABAS - Complex D 46.7 x 9.2 x 13.8 561

7 PSA2 OIL EXPORT PUMP HOUSE - Complex D Composed by n° 2 buildings

21.6 x 25.2 x 9.5 724

8 PSA2 OIL BOOSTER PUMP HOUSE - Complex D 28 x 15 x 9.5 441

9 DI TEMPORARY REFUGE IBEEV CREW FACILITIES - Complex D 14.2 x 42 x 9.5 916

10 DI TEMPORARY REFUGE EQUIPMENT MODULE - Complex D 14.2 x 42 x 9.5 1177

TOTAL 6.740 tons

Tozzi Sud S.p.A. FABRICATION ACTIVITIES

Tozzi Sud S.p.A. FABRICATION ACTIVITIES

Tozzi Sud S.p.A. FABRICATION ACTIVITIES

Tozzi Sud S.p.A. FABRICATION ACTIVITIES

FABRICATION ACTIVITIES

Tozzi Sud S.p.A.

Tozzi Sud S.p.A. FABRICATION ACTIVITIES

Tozzi Sud S.p.A. FABRICATION ACTIVITIES

Tozzi Sud S.p.A. FABRICATION ACTIVITIES

Tozzi Sud S.p.A. FABRICATION ACTIVITIES

Tozzi Sud S.p.A. FABRICATION ACTIVITIES

Tozzi Sud S.p.A. FABRICATION ACTIVITIES

3. INSTALLATION ACTIVITIES

Tozzi Sud S.p.A.

Tozzi Sud S.p.A. INSTALLATION ACTIVITIES

Tozzi Sud S.p.A. INSTALLATION ACTIVITIES

Tozzi Sud S.p.A. INSTALLATION ACTIVITIES

Tozzi Sud S.p.A. INSTALLATION ACTIVITIES

Tozzi Sud S.p.A. INSTALLATION ACTIVITIES

Tozzi Sud S.p.A. INSTALLATION ACTIVITIES

Tozzi Sud S.p.A. INSTALLATION ACTIVITIES

Tozzi Sud S.p.A. INSTALLATION ACTIVITIES

Tozzi Sud S.p.A. INSTALLATION ACTIVITIES

Tozzi Sud S.p.A. INSTALLATION ACTIVITIES

Tozzi Sud S.p.A. INSTALLATION ACTIVITIES

Tozzi Sud S.p.A. INSTALLATION ACTIVITIES

Tozzi Sud S.p.A. INSTALLATION ACTIVITIES

Tozzi Sud S.p.A. INSTALLATION ACTIVITIES

Tozzi Sud S.p.A. INSTALLATION ACTIVITIES

Tozzi Sud S.p.A. INSTALLATION ACTIVITIES

Tozzi Sud S.p.A. INSTALLATION ACTIVITIES

Tozzi Sud S.p.A. INSTALLATION ACTIVITIES

Tozzi Sud S.p.A. INSTALLATION ACTIVITIES

Tozzi Sud S.p.A. INSTALLATION ACTIVITIES

Tozzi Sud S.p.A. INSTALLATION ACTIVITIES

Tozzi Sud S.p.A. INSTALLATION ACTIVITIES

Tozzi Sud S.p.A. INSTALLATION ACTIVITIES

Tozzi Sud S.p.A. INSTALLATION ACTIVITIES

INSTALLATION ACTIVITIES

Tozzi Sud S.p.A.

Tozzi Sud S.p.A. INSTALLATION ACTIVITIES

Tozzi Sud S.p.A. INSTALLATION ACTIVITIES

Tozzi Sud S.p.A. INSTALLATION ACTIVITIES

Tozzi Sud S.p.A. INSTALLATION ACTIVITIES

Tozzi Sud S.p.A. INSTALLATION ACTIVITIES

Tozzi Sud S.p.A. INSTALLATION ACTIVITIES

Tozzi Sud S.p.A. INSTALLATION ACTIVITIES

Tozzi Sud S.p.A. INSTALLATION ACTIVITIES

Tozzi Sud S.p.A. INSTALLATION ACTIVITIES

Tozzi Sud S.p.A. INSTALLATION ACTIVITIES

Tozzi Sud S.p.A. INSTALLATION ACTIVITIES

Tozzi Sud S.p.A. INSTALLATION ACTIVITIES

INSTALLATION ACTIVITIES

Tozzi Sud S.p.A.

4. LOAD OUT

Tozzi Sud S.p.A.

LOAD OUT

Tozzi Sud S.p.A.

Tozzi Sud S.p.A. LOAD OUT

Tozzi Sud S.p.A. LOAD OUT

Tozzi Sud S.p.A. LOAD OUT

Tozzi Sud S.p.A. LOAD OUT

Tozzi Sud S.p.A. LOAD OUT

Tozzi Sud S.p.A. LOAD OUT

Tozzi Sud S.p.A. INSTALLATION ACTIVITIES

5. MAN HOUR

Tozzi Sud S.p.A.

Tozzi Sud S.p.A. MAN HOUR

2006 – 2011

LER Project - Total Worked Hour

about 3.000.000

2006 – 2011

PUB Project - Total Worked Hour

about 2.450.000

Tozzi Sud S.p.A. MAN HOUR

TOTAL MANHOUR 2010

832.000 Hr

0

10000

20000

30000

40000

50000

60000

70000

80000

90000

100000

Jan -

2010

Fe

b -

2010

Mar

- 2010

Apr

- 2010

May -

2010

Jun -

2010

Jul -

2010

Aug -

2010

Oct -

2010

Nov -

2010

Dec -

2010

LER PROJECT - WORKED HOURS 2010

LER PROJECT - WORKED HOURS 2010

Tozzi Sud S.p.A. MAN HOUR

TOTAL MANHOUR 2011

200.000 Hr

0

5000

10000

15000

20000

25000

30000

35000

Jan -

2011

Feb -

2011

Mar

- 2011

Apr

- 2011

May -

2011

Jun -

2011

Jul -

2011

Aug -

2011

LER PROJECT - WORKED HOURS 2011

LER PROJECT - WORKED HOURS 2011

Tozzi Sud S.p.A. MAN HOUR

TOTAL MANHOUR 2010

1.165.000 Hr

0

20000

40000

60000

80000

100000

120000

140000

160000

Jan -

2010

Feb -

2010

Mar

- 2010

Apr

- 2010

May -

2010

Jun -

2010

Jul -

2010

Sep -

2010

Oct -

2010

Nov -

2010

Dec -

2010

PUB PROJECT - WORKED HOURS 2010

PUB PROJECT - WORKED HOURS 2010

Tozzi Sud S.p.A. MAN HOUR

TOTAL MANHOUR 2011

426.000 Hr

41000

42000

43000

44000

45000

46000

47000

48000

49000

50000

Jan -

2011

Feb -

2011

Mar

- 2011

Apr

- 2011

May -

2011

Jun -

2011

Jul -

2011

Sep -

2011

PUB PROJECT - WORKED HOURS 2011

PUB PROJECT - WORKED HOURS 2011