Post on 12-May-2022
©Land Survey Solutions Limited 01/01/2010Original Sheet Size A1H
enquiries@survey-solutions.co.ukwww.survey-solutions.co.uk
Ipswich Coventry Yeovil Norwich Perth Nottingham Brentwood
LAND SURVEYING BUILDING SURVEYING UNDERGROUND SURVEYING
REVDESCRIPTION DRAWN
APPRDATE
EASTINGSSTATIONS LEVELNORTHINGS DESCRIPTION
PROJECT TITLE
DRAWING DETAIL
CLIENT
SURVEYOR SURVEY DATE APPROVED BYCHECKED BY
DRAWING NUMBER
REVISION
DWG STATUS
ISSUE DATE
SCALE
Chestnut Paling Fence
Chain Link Fence
Barbed Wire Fence
Close Board Fence
C/L
C/P
B/W
C/B
EP+TransformerET
Floor Board DirectionFBD
DH Door Head Height
Air Valve
Bollard
Belisha Beacon
Bed Level
Bore Hole
Arch Head Height
Bush
Ceiling Level
Box (Utilities)
Bus Stop
Brace Post
Column
Cover Level
Cill Height
Drainage Channel
Drain
Eaves Level
Electric Pole
Earth Rod
Down Pipe
AV
BL
BB
BH
BO
AH
BX
BU
BS
BrP
CH
CL
Col
DC
ER
EL
DR
EP
DP
C-Lev
FH Fire Hydrant
Cable RiserCR
Assumed RouteAR
Flower BedFB
Post & Rail Fence
Panel Fence
Iron Railings
Pan
P/R
I/R
Post & Wire FenceP/W
Overhead Line (approx)OHL
Foul WaterFW
Gas Valve
Flag Pole
Manhole
Lamp Post
Marker Post
Head Height
Kerb Outlet
Invert Level
Gully Grate
Floor Level
Inspection Cover
Road Sign
Partition Wall
Ridge Level
Rodding Eye
Parking Meter
Reflector Post
Roller Shutter Door
Name Board
Floor Board DirectionFBD
FL
IC
FP
GG
GV
HH
LP
MH
MP
KO
IL
Post
P/Wall
PM
RE
PO
RS
RSD
RP
RL
NB
FH Fire Hydrant
PB Post Box
ABBREVIATIONS & SYMBOLS
TOPOGRAPHICAL & MEASURED BUILDING SURVEYS
SURVEY CONTROL CO-ORDINATES
Surface WaterSW
Floor to Ceiling HeightX.XX
Floor to False Ceiling HtX.XX F/C
Survey Control Station
Sign Post
Rolled Steel Joist
Arch Spring Point Height
SI
SP
RSJ
Stop ValveSV
Stay
Trial Pit
Telecom Cover
Threshold Level
Tactile Paving
Universal Beam
Cable TV Cover
Telegraph Pole
Top of Wall
Traffic Light
TH
THL
SY
Tac
TC
UB
TP
TV
ToW
TL
Vent Pipe
Under Side Beam
Unable To Lift
Unknown Tree
Wash Out
Water Meter
Weep Hole
Water Level
Waste Bin
UK
VP
USB
UTL
WM
WO
WH
WL
WB
Unknown CoverUC
Tel No: 0845 0405 969 Fax No: 0845 0405 970
DRAWING NOTE
Topographical Surveys
Trees are drawn to scale showing the average canopy spread. Descriptions and
heights should be used as a guide only.
All building names, descriptions, number of storeys, construction type including
roof line details are indicative only and taken externally from ground level.
All below ground details including drainage, voids and services have been
identified from above ground and therefore all details relating to these features
including; sizes, depth, description etc will be approximate only. All critical
dimensions and connections should be checked and verified prior to starting
work.
Detail, services and features may not have been surveyed if obstructed or not
reasonably visible at the time of the survey.
Measured Building Surveys
Measurements to internal walls are taken to the wall finishes at approx 1m
above the floor level and the wall assumed to be vertical.
Cill heights are measured as floor to the cill and head heights are measured
from cill to the top of window.
General
The contractor must check and verify all site and building dimensions, levels,
utilities and drainage details and connections prior to commencing work. Any
errors or discrepancies must be notified to Survey Solutions immediately.
The accuracy of the digital data is the same as the plotting scale implies. All
dimensions are in metres unless otherwise stated.
The survey control listed is only to be used for topographical surveys at the
stated scale. All control must be checked and verified prior to use.
© Land Survey Solutions Limited holds the copyright to all the information
contained within this document and their written consent must be obtained
before copying or using the data other than for the purpose it was originally
supplied.
Do not scale from this drawing.
DONCASTER ROAD, BARNSLEY
ARDSLEY HALL HOTEL,
Sheet 1 of 2
TOPOGRAPHICAL SURVEY
SOMERSTON CAPITAL
DAP 18/09/2014 PDSPDS
14822cv-01
FINAL
22/09/2014
1:200
S801
93.179
405503.383438336.398
438213.984
S802
S501
405534.065S111
405502.131
405515.747
438271.578
438285.972
438272.079
93.169
93.968
405619.303
ST03
90.731
87.737
438344.901
ST02
94.498
438289.285
438274.097
94.638
ST01
94.305
92.284
91.683405467.353438319.409
405556.186
438322.602
405593.276
405515.043ST05
ST07
ST04 405542.986 94.020
ST06
438268.013
93.495
405492.050
438282.692
92.651
405483.963
ST08
438251.233
94.157
438227.317
405552.929
405504.069ST09
438247.214
93.867ST10 405513.230
ST11
ST13
ST12
405533.951
94.289405534.384
438227.853
438249.513 93.531
Peg
Hilti Nail
Hilti Nail
Hilti Nail
Hilti Nail
Hilti Nail
Hilti Nail
Hilti Nail
Hilti Nail
Hilti Nail
Hilti Nail
Hilti Nail
Hilti Nail
Hilti Nail
Hilti Nail
Hilti Nail
Hilti Nail
The grid is orientated to Grid North with Scale Factor=1.0000.
1. Ordnance Survey National Grid Coordinates have been established
for ST03 using GPS and related to OSTN02(GB) and OSGM02(GB).
2. All levels relate to the Ordnance Survey datum for Control Station
ST03 established with GPS using OSGM02(GB).
NO
RT
H
Indicative