MYS TLB B/I failures from NOV-10 TO APR-11Section Gear Nature TD CAUSE REMARKS
D/L
NOV-10
1
Block
2
KDO-NTW Block
3
Block
DEC-10
JAN-11
4
Block
FEB-11
MAR-11
APR-11
5
Block
Sl.No
INTime /Date
RTTime/Date
Remarksfrom SE/TR
KRNR-HAH
On arrival of 266pass unable to
close the sectionat HAH
20.30
17/11
22.4517/11
Due to Line close buttonpusher spring cut same
replaced & restored byMCM/KRNR at HAH.
LDM: 12/11/2010LDMI: 30/10/10 D/C
No: 0068
Pusher springcut
Material withCSI/MYS
Section could notbe closed @ KDOon arraival of 201pass.
05.5021/11
10.1521/11
LCT204
Subsiquenlty got right. Oninvestigation found at KDO1CR relay 6C5 contact offeringhigh resistance (pertaining toinitial pick up of CTR ckt)Relay replaced & restored byESM/AP.
contactoffering highresistance
Material withCSI/MYS
KRNR-HAH
TGT could not beestablished @HAH TCF @KRNR for 265pass
08.1520/11
10.3020/11
LCT265
262
At KRNR TAR relay notdelatched since LCCPR frontcontact No. 3D4 offering highresistance (0.3kohms) samerelay replaced & restored byJE/S/MYS (LCCPR frontcontact pertaing to TAR relayCircuit)
D/C:0095
Make: PTJ Sl.No: 355518Mfd: 11/07 LDM: 17/11/10
LDMI:18/10/10
relay contactOffering highresistance
(As per TR D/LTCFPR-HAH dnat 06.11 butTAR not dn atthat time atKRNR)
Relay receive& sent toSE/SRM @6/12/2010
MGF-AKK
Section couldnot be closed@ MGF onarrival of 56265 pass
20.0015/01
01.3016/01
LCT1730116517
At MGF block instrumentBell code button pusher spring cut. Same replaced& restored by ESM/KRNR.
LDM : 10.01.11LDMI : 07.12.2010
D/C No. : 00085As
per TR datalogger atHLN :
TCFR Up at11.17HRS
TAR-MGF up at11.56.57LCCPRUp at 12.15hrs
TAR - MGF dnat 12.15.12TCFR Dn at 12.15hrs
Defectivematerial
As per TRdatalogger atHLN :
TCFR Upat 11.17HRS
TAR-MGF up at11.56.57
LCCPRUp at12.15hrs
TAR- MGF dn at12.15.12
TCFRDn at 12.15hrs
Material withCSI/MYS
HLN-MVC
TOL notappeared atMVC for 12781expMVC - TCF
HLN -TGT+TOL
22.5315/4
07.20
16/04
PLCT-17301-5"16517,16518
At HLN TOLAR not pickedup due to t TOLTR relay2B1 contact offering highresistance (R-48 ohms).Same relay replaced &restored by JE/S/MYS.
Make:PTJ8F/8B SL.No: 345421mfd: 09/07 d/c no: 00066
LDM: 12/4/11 LDMI:9/3/11
At HLN:o/g I-68ma
V-49.5v
i/c I-69ma V-17.38v
relay contactOffering highresistance
TOLAR-MVC Dn21.52.37 up@ 06.18 of 16/04
Material withCSI/MYS
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 2/205
HAS
Section Gear Nature TD CAUSE REMARKS D/L
Nov-10
1
Block
2
Block
3
Block
Dec-10
4
BLOCK
Jan-11
Sl.No
INTime /Date
RTTime/Date
RemarksSE/TR
BNTL-PADL
Section couldnot be closed @
BNTL on arrivalof 637pass
19.0613/11
21.3013/11
LCTNIL
Due to heavy rain &lightning at BNTL block
instrument UNIT No.1burnt. Unit No.1 replaced &restored by ESM/KBPR
D/C No. : 000669LDM :
03.11.10 LDMI : 28.10.10
Defectivematerial
Material withCSI/HAS
ALUR-BLLT
Section couldnot closed @
BLLT for goods
12.2024/11
13.3024/11
6515-16" @ALUR
for path
Due to TGT delatched coilNSN problem TGT could otbe delatched @ BLLTsame relay replaced &restored by JE/SKLR
Make: S&T PTJ Sl.No:20081 Contact:8F/6BMfd: 06/06 D/C:01725
Relay coilproblem
Relay received& sent toSE/SRM @02/02/2011
SBHR-YDM
Unable to closethe section atSBHR.
00.5530/11
07.15
30/11
CLE-PLCT
At YDM, TGTR relay notdelatched same relayreplaced & restored byESM/SBHR at YDM. Make:PTJ. Sl. No:18490 Mfd:08/04 D/CNo:000676. LDM:21/11/10 LDI:10/11/10R3 &R4 coil R: 145 ohms.
Relaydefective
Relay received& sent toSE/SRM @27/12/2010
ALUR-BLLT
Premature TOL@ BLLT for 6518.
01.2519/12
5.0019/12
Local Battery-28v, LineBattety: I/P- 24v, O/p-56v,I/c current- 70ma, O/gcurrent-70ma,
As per sitedatalogger after takingLine Clear ASR relaymomentarily dropped.
Checked all in stick circuitof ASR, PCR andASTRrelay changed byJE/S/SKLR at BLLT andblock restored.
LDM:8/12/10,LDMI:29/11/10,
D/C:000029.
Relaydefective
Material with
CSI/HAS
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 3/205
5
Block
6
Block
11-Feb
7
Block
11-Mar NIL
11-Apr
8
Block
YDK-SVGL
section couldnot be closed atSVGL for 6518exp.
04.3014/01
10.3014.01
TGTR relay notdelatched( TGTR ckt).Same relay replaced andrestored by JE/SBHR &ESM SBHR@SVGL.
D/C No: 03726Sl. No: 7606Style: QL1
Contact : 8F/6BMfd:06/99 .LDMI: 27/12/10
Relaydefective
Relay received& sent toSE/SRM @27/01/2011
YDK-SVGL
TGT could notbe establishedfor LE at YDK.TCF not set atSVGL.
16.2015/01
22.2015/01
At SVGL TAR notdelatched circuit LCCPRrelay 4D3 contact offerringhigh resistance (2Kohms)relay replaced andrestored by JE/S/SBHR.Make: PTJ Sl. No.:308/39 Mfd: 12./06LDM:08/01/11LDI:27/12/10 D/C No:3728
relay contactoffering highresistance
Material withCSI/HAS
YDK-SVGL
Section couldnot be closed onarrival of 16518@ YDK
00.50
06/02
04.00
06/02
PLCT
TOKN
At YDK PCR relay notpicked up due to TAR relayD2 contact clip sulphationformed, same attended &restored by ESM/YDK,
D/C-01315, LDM-1/2/11, LDI-20.01.11
Relaycontact clipsulphation
At SVGL
1.TGTPRup-22.08hr
2. LCCPRup-00.50hrs.
Material withCSI/HAS
YDM-SBHR
TOL buzzer notarrested for 56647 passg.
13.3025/04
16.3025/04
At YDM, due to blockinsrument bell code buttonpusher spring cut. Same
attended & restored byESM/SBHR D/C No:000698 LDM: 13/04/11LDMI: 17/04/20111
bell codebutton pusher spring cut
Material withCSI/HAS
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 4/205
ASK
nov-2010Section Gear Nature TD CAUSE REMARKS
D/L
1
Block
DEC-2010
NIL
JAN-2011
2
Block
FEB-2011
NIL
MAR-2011
NIL
APR-2011
3
Block
Sl.No
IN Time / Date
RTTime/Date
AMSA-SPGR
Section couldnot be closed at
SPGR on arrivalof 6507exp
01.5020/11
05.3020/11
LCT6228
6536
At SPGR TCKR relay contact No.2A1 & 3A4 carbonised (offering
high resistance) Relay replaced &restored by JE/TK @ SPGR
Make: PTJ Sl.No:3101 Mfd: 03/99D/C No: 000208
resistence :2A1 - 0.3-75ohms
Resistance : 3A4 - 0.3- 5ohms(TCKR front contact pertaining toPTR & NTR circuit & LR cct)
(As per TR D/LTGTPR picked up 01.34 hrs & dnat 01.47 hrs Line closedcode frequently gone at AMSA.
TCFPR pickedup at 05.11 hrs dn at 05.13 hrs. atAMSA. TAR pickedup at 01.46 hrs SNR frequently up& dn other relays not operated.)
Contactoffering high
resistance
AMSA-SPGR
TGT could notestablished for 16590 exp.
5.28
11.1
5.5011.1
LCT-16590
AT AMSA, bell code buttonpusher spring cut, samereplaced and restored byESM/AMSA. D/C:-00038LDM;05.01.11
LDMI:28.12.10 LDQI:30.11.10Accd. to D/L at TR,
at AMSA 1A ASRcontineously Chatering
bell code buttonpusher spring cut
Accd. to D/L atTR, at AMSA
1A ASRcontineouslyChatering
RRB-DRU
Line Clear couldnot be cancelledfor EBCN goods
at RRB.
9.00
21/4
10.10
21/4
LCTEBCN
At RRB TCKR relay contactNo: 1A2 offering highresistance pertaining to NTRckt., same relay replaced andrestored by ESM/RRB &ESM/DRU at RRB. D/CNo:00043LDM:09.4.2011LDMI:11.3.2011 Relay Make:S&T PTJ SlNo:10534 Mfd:04/031A2 resistance: 0.99ohms
relay defectiveSHKR-DRUchattering
NTR, PTR,SCKR notprovied
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 5/205
Remarks SE/S/TR
Material withCSI/ASK
Material withCSI/ASK
Material withCSI/ASK
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 6/205
RRB
Section Gear Nature TD CAUSE REMARKS
Nov-10
1
Block
2
Block
3
Block
Dec-10
Sl.No
IN Time /Date
RT Time/Date
AJP-SHV
TGT Couldnot beestablished atSHV for 2080exp
( TCFset at AJP)
18.10
10/11
18.5010/11
PLCT2080
TCKR relay not picked updue to NTR Relay 4C3contact offering highresistance (7 ohms) (frontcontact) same relay inter changed to LCBR relay &restored by ESM/SHV @AJP. Make: PTJ.
Style: QN1.contact: 8F/8B.volt: 24V.
Sl.no: 385666Mfd:
08/2008 LDM:01/11/10 LDMI:14/10/2010 D/C No:002229
Relaycontactofferinghighresistance
HLK-RGI
On arrival of 6536 sectioncould not beclosed at RGI.
04.02
11/11
09.3011/11
PLCT
7301
587
283
CLE
At HLK SHKR stick notavailable due to Unit No:2condenser burst(1000micro farad) samereplaced & restored byESM/SHV.
LDM:30/10LDMI: 09/11
D/C No: 001464
Defectivemeterial
SHV-AJP
On arrvial of PQRS sectioncould not beclosed & NoSNR @ AJP
12.1520/11
13.3020/11
LCT
587
PNKIgoods
At AJP SNR cct 32ZR @relay room 5D6 contactoffering high resistance(14ohms) same repalced& restored by ESM/SHV@ AJP
Make: ELDYNESl.No: 299526Mfd: 01/09
D/C :002233LDM: 1.11.10
LDMI:14.10.10LDQI:10.09.10
(As per TR D/L 32 TARpicked up 12.07 & dn at12.08)
Offering highresistance
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 7/205
4
Block
Feb-11
5
Block
6
Block
11-Mar
7
Block
8
Block
Apr-11
HLK-RGI
Section couldnot be closedat RGI Onarrival of 7302Exp.
(HLK-
TGT+TOLRGI-
TCF+TOL)
01.5005/12
03.3505/12
PLCT
263065906536
At RGI Bell code buttonpusher spring brokensame replaced & restoredby ESM/HLK.
LDM: 28/11/10LDQI: 29/11/10
LDMI: 03/12/10D/C No: 001536.
Bell codebuttonpusher springbroken
HLK-RGI
TGT could notbe establishedat HLK fo12726 exp
09.2502/02
10.0502/02
LCT12726
At HLK TGT buttonpusher spring cut. Samereplaced & restored byESM/HLK D/C :0001494 LDM :19.01.11 LDMI :24.01.11 LDQI :07.01.11 Last replaced
on : 03/2010
TGT buttonpusher spring cut.
AJP-NVF
No out goingbell at NVFhence Unableto take lineclear for 16589 Exp.
02.0016/02
03.1516/02
LCT16589
17302
At NVF bell code buttonpusher spring cut andsame replaced andrestored by JE/S/RRB @NVF. LDM:07/02/11
LDMI:24/01/11D/C No.:001051
Block relays not proved inD/L
bell pusher spring
broken
DRU-RRB
On arrival of 56270 unableto close thesection @RRB.
15.2521/03
16.2521/03
Due to Line ClosedButton pusher spring cut.Same replaced andrestored by ESM/II/DRU@ RRB. D/C No:002056.
LDM: 21-02-2011LDI: 11-03-2011
Bell codebuttondefective/spring broken
HLK -RGI
TGT could notbe establishedfor 56913pass @ RGI.
13.4029/03
14.3029/03
Due to bell code buttonpusher spring cut at RGI.Same attended &restored by ESM/HLK
D/C No: 001572 LDM:19/03/11 LDI: 21/03/11
Bell codebuttondefective/spring broken
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 8/205
9
Block
10
Block
RRB-DRU
Line Clear could not becancelled for EBCN goods
at RRB.
9.0021/4
10.1021/4
LCTEBCN
At RRB TCKR relaycontact No: 1A2 offeringhigh resistance pertainingto NTR ckt., same relayreplaced and restored byESM/RRB & ESM/DRU atRRB. D/C No:00043
LDM:09.4.2011LDMI:11.3.2011 RelayMake: S&T PTJ
Sl No:10534Mfd:04/03 1A2resistance: 0.99ohms
SHKR-DRUchattering
NTR, PTR,SCKR notprovied
RRB-NVF
Unable to takeline clear for 16535 exp atRRB
23.4528/04
00.5529/04
PLCT
16535
At RRB due to bell codebutton pusher springcut.Same replace dandrestored by ESM/RRB.
D/C No:000355LDM: 20/4/11
LDI:6/4/11
bell codebuttonpusher spring cut
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 9/205
RemarksSE/S/TR
Relay received& sent to
SE/SRM @06/12/2010
Material withCSI/RRB
Relay received& sent toSE/SRM @06/12/2010
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 10/205
Material withCSI/RRB
Material withCSI/RRB
Material withCSI/RRB
Material withCSI/RRB
Material withCSI/RRB
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 12/205
JRUSection Gear Nature TD CAUSE REMARKS
Nov-10
1
Block
DEC-10
2
Block
11-Jan NIL
Feb-11 NIL
11-Mar NIL
Sl.No
IN Time /Date
RT Time/Date
JRU-SLU
Unable to close thesection at SLU Onarrival of 6589 Exp.
02.5003/11
04.2003/11
LCT
6210
6536
6535
At SLU bell codebutton pusher springbroken, same
replaced & restoredby ESM/JRU.LDM:28.10.10,LDQI:28.10.10,
D/CNO:00004.
Defectivematerial
Material withCSI/JRU
MYK-KAG
TGT could not beestablished at MYKfor HVR spl.
22.1029/12
05.3030/12
LCT730265356590
At KAG CTR 4D3contactcarbonised(CTR stickpath) inside relay.Relay replaced &restored by JE/S/JRUat KAG. LDM :
17.12.10LDMI : 17.12.10
contactcarbonised
Material withCSI/JRU
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 13/205
HRR
Section Gear Nature TD CAUSE REMARKS D/L
10-Nov
1
Block
2
Block
3
Block
10-Dec
4
BLOCK spring cut
5
Block
Sl.No
IN Time /Date
RTTime/Date
KNO-SNH
TGT could not beestablished @
SNH for 1018Exp. TCFindicationavailable @ KNO
16.1026/11
16.1826/11
LCT1018
Due to LCCPR 4D3 contacthigh resistance (156 ohms)
Same relay replaced &restored by ESM/ KNOMake:urban mfd: 05 /2005LDM:16/11/10 LDMI:23/11/0
D/Cno:SNH /2010/000193.
Relaycontact
highresistance
KNO-S.UBL
Unable to closethe section at S.UBL or 587 pass.
18.0230/11
21.4030/11
Due to, ASR relay 5C6contactoffering High resistance(700ohms) of TCFRdelatching ckt. Same relayreplace and restored @ S.UBLby ESM/KNO. Relay- Make :Urban.MFD:05/2005 Sl.No.:B5198LDM:25/11/10LDMI:12/11/10 DCNo.: 000175
relaycontactofferingHighresistance
KNO-S.UBL
Unable to takeLine Clear atS.UBL for 6590
23.0530/11
00.3501/12
PLCT-6590-
2"
Due to, P2R (pertainingTOLAR circuit) relay 2D1contact offerring highresistance (6.67 ohms) atKNO, same relay replace andrestored. Make: Urban Sl.No.: 8675 LDM :25/11/10 LDMI: 12/11/10
DC No.: 000180
relaycontactofferingHighresistance
KJG-SVNR TGT could not beestablished for 581 pass.TGT notavailable @KJG.TCFavailable @SVNR
18.2018/12 21.2018/12 LCT-581,586
Due to TGT button spring cut@ KJG. Same replaced &restored by Esm/HVR.LDM:- 08/12/10 by ESM/HVRLDI:- 22/11/10 by JE/HVR.24 V local-29.2 V
SVNR-YLG
TOL buzzer couldnot be arrested atSVNR for HAS-Ngoods.
20.4022/12
23.5022/12
LCT-17302
At SVNR bell code buttonpusher spring cut. Samereplaced & restoredbyESM/YLG.LDM:01/12/10,LDMI:13/12/10 (Blockrelays not proved in TRDatalogger at SVNR & YLG)
d/c no: 000214
pusher spring cut
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 14/205
6
Block
7
Block
8
Block
11-Jan
9
Block
11-Feb
SVNR-KJG
TGT could notestablished @KJG for 16589exp. TCF also notset @ SVNR
5.1023/12
09.4523/12
LCT12726
At SVNR CTPR relay2B1contact offering highresistance pertaining to PTRcircuit. Same relay replaced &restored by Esm/HVR @SVNR. Make:S&T
Sl/No:244675contact:8F/8B QN1
Mfd:06/05 D/cNo:000 195 LDM:18/12/10
LDI:22/11/10Resistance: 5Ω (At TR D/Lblock relay not proved)
contactofferinghighresistance
KJG-SVNR
TGT could notestablished @KJG for 11036exp. TCF also notset @ SVNR
13.0023/12
14.2523/12
LCT11036
SHKR relay not picked upatSVNR due to PR relay 1A2contact sulphation, relayreplaced & restored byJE/HVR. Sl.No:B8670Make:Urban engg. Mfd :Aug-2009 P2R A1A2resistance: 5Ω
LDM:18/12/2010LDI:22/11/10 D/C No:000196.
contactsulphation
SVNR-KJG
TGT could not beestablished atSVNR for 12726
07.45
25/12
10.5025/12
PLCT
12726
56516
PCR relay contact 5C6 offeringhigh resistance (Pertaining toPTR circuit) relay replaced &restored by JE/S/HVR @KJG
contact Resistance - 4 ohmsMake: PTJ. Mfd:
06/05 sl.no: 244465contact: 8F/8B LDM:
22.12.2010 LDI:21&22.11.2010D/C No: 000196
( In SVNR &KJG dataloggers block relaysnot proved .)
contactofferinghighresistance
KJG-SVNR
infd toTR @03.40
TGT could not beestablished for 06535 at KJG(SVNR-TCF)
03.15
30/01
09.4530/01
PLCT
0653573012726
At SVNR TOLTR relaycontact 7B8 offering highresistance (7omhs) using inCTR circuit for answer back.Same relay replaced andrestored by JE/S/KNO.
8B contacthaving -27v and 7Bcontact having-13v at failuretime
Relay Make : PTJ,
Sl. No.:244680,MFD: 06/05 D/C No.:000223LDM:16/01/11 LDI:17/01/11
Relaycontactoffering highresistance.
At KJG24V EXT-34.07V24V INT-29.5v
up TAR up at03.20.19
up TAR dn at03.20.56
Other blockrelays not proved.
At SVNR24V EXT-
31.787V 24VINT-30.98v upTAR up at 03.39.13
up
TAR dn at 03.39.42Other block relays notproved.
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 15/205
10
Block
11
Block
11-Mar
12
Block
13
Block
DVG-AVC
Unable to close thesection @DVG for 11017Exp.
AVC-TGT
DVG-TCFAt AVC-
section closed
15.5011.02
16.50
11.02
PLCT
12080
CLE
From AVC answer back code notprogressed due to PTR relay notpicked up because of PCR relayback contact 5C6 contact offeringhigh resistance(12ohm) & 7B8contact offering highresistance(1K ohms).Same relayreplaced & block restored byESM/HRR
Relay perticulars:-Make-C.G
Sl.No-205323MFD-11/2005
,8F/8B , QN1 LDM-10/02/11LDI-05/02/11(Q/I)
D/C-AVC/00031
contactofferinghighresistance
Block relays notproved
DAD-BYD
No O/Gbell@DAD. TOLbuzzer notarrested @ DADfor 12726 Exp.
08.00
16/02
10.30
16/02
LCT-
56911
56516
2777
At BYD Block instrumentMagneto telephone coil shortwith line ckt. Same magnetophone replaced & restored byESM/HVR .
D/C No-000066
LDM-12/02/2011LDI:-27/01/2011I/C V: 58V I/C I: 101mA.
O/G V: 56V O/G I:71mA.
Defectiveequipment
block relay notproved in D/L
GDI-SNH
On arrival of 16209 Exp TARbuzzer notappeared at GDI.
GDI-TCF+TOL
SNH-TGT+TOL
18.2505/03
21.1505/03
PLCT -56515,56913,NMGSP,56912
At GDI, due to 4D3 contact of SHKR relay on TAR latchingckt offering high resistance(R=13.5 V), same relayreplaced and restored byESM/KNO. Relay: Make-CG, Sl. No.:AC295342 Mfd-8/07 D/C No:00214LDM:26.02.11 LDMI:12.02.11
relaydefective -Contacthighresistance
At GDI :
Dn TAR Up at19.08.26hrs3 RR Dn at19.09.50hrs
Dn TAR Dnat 19.09.50hrs
1/2/3ASPR119.09.51hrsBlock relays
not proved.
HRR-KMPS
TGT could not beestablished @HRR for 56911
07.30
05/03
09.00
05/03
PLCT -
56911
At KMPS 7B8 contact of ASRrelay & 5D6 contact of TCFPRrelay offering high reisistancepertaining to TAR delatchingcircuit. So that TAR notdelatched. Both relays replaced
& block restored by MCM/HRR.R=4.2
V D/C No: 00020.ASR : Make-CG, SlNo:31943 Mfd: 07/99
TCFR : Make-CG, Sl No:31942 Mfd: 07/99
relaydefective -Contacthighresistance
Last TAR-HRRUp at7.08.33hrs
lastTCFR-HRR Dn07.09.06hrsTAR-HRR Dn at07.09.10hrs
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 16/205
14
Block
16
Block
17
Block
KMPS-HRR
Unable to set TGT@ KMPS
08.1706/03
10.0506/03
PLCT12726
5627356911
At KMPS TAR relay notdelatched because in TARdelatching ckt TGTPR 7D8contacts offering highresistance. Same relayreplaced & restored byESM/CLI. R:- 6.6 Ω
Relay: Make:CG
Style:QN1 Sl.NO:31944Mfd:07/99LDM:23/02/11 LDI:17/02/11
D.CNo:KMPS/2011/000037
relaydefective -Contacthighresistance
At KMPS
TCFcodetransmittedfrom KMPS toHRR at08.15.22 hrs.
TOLAR-HRRUp at 08.15.28TOLAR-HRRDn 08.15.30hrs. Blockrelays notproved in HRRD/L.
SVNR-KJG
TGT could not beestablished atSVNR for 11017
14.2013/03
17.2013/03
PLCT-11017,56274,56913,56515,
16507,56912
At SVNR TGTR not picked updue to TGBR relay contactNo. 4B3 offering highresistance. Same relayreplaced and restored byJE/S/KNO. R=10ohms.D/C No:0234 LDM:10.3.11LDMI:26.2.11 Relay
Make:PTJ Mfd:06/05 SlNo:244727 (Block relays notproved in Data Logger)
Relaycontactofferinghighresistance
Block relay notproved
HVR-BYD
TGT could not beestablished atHVR for CLE
04.0018/03
04.3018/03
LCTCLE
At HVR Bell code buttonpusher spring cut. Samereplaced & restored byJE/S/HVR. D/C : 00001 LDM: 04.3.11 LDMI: 07.3.11
Bell codebuttonpusher spring cut
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 17/205
11-Apr
18
BlockDVG-AVC
TOL buzzer notarrested at DVGfor EBRN goods.
At DVG -TCF+TOL
At
AVC - TGT+TOL
15.2025/04
16.5025/04
PLCT
11017
Due to bell code button contactcut at DVG. Same replaced &restored by ESM/HRR.
D/C No:DVG/000037
LDM: 16/4/11LDI:21/4/11
bell codebuttoncontactcut
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 18/205
RemarksSE/S/TR
Relayreceived &sent toSE/SRM @24/12/2010
Relayreceived &sent toSE/SRM @24/12/2010
Material withCSI/HRR
Material withCSI/HRR
Material withCSI/HRR
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 19/205
Relayreceived &sent toSE/SRM @27/12/2010
Relayreceived &sent toSE/SRM @27/12/2010
Relayreceived &sent toSE/SRM @27/12/2010
Relayreceived &sent toSE/SRM @05/02/2011
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 20/205
Relayreceived &sent toSE/SRM @17/02/2011
Material withCSI/HRR
Relayreceived &sent toSE/SRM @
07/03/2011
Relayreceived &sent toSE/SRM @07/03/2011
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 21/205
Material withCSI/HRR
Relayreceived &sent toSE/SRM @
16/03/2011
Material withCSI/HRR
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 22/205
Material withCSI/HRR
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 23/205
TLB FAILURE SUMMARY
1 Relay failure
QN1 29
LATCH 11
Baised 02 Unit Defective 2
3 Spring cut
BCB 11
LC 2
TCF/TGT 2
4 Other failure 66
Total 123
Type of TLB Failures
1 Premature TOL 18
2 TAR not picked up 4
3 TAR not delatched 10
4 37
5TCF Not set
0
6 25
7 4
8 8
9 TOL buzzer not come 2
10 TAR buzzer failed 10
11 No SNR 4
12 No Free indication 1
TOTAL 123
TGT could not beestablished
Line closed could not beestablished
Unable to take/cancelLine clear
TOL/TAR buzzer notarrested
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 24/205
MYS TLB B/I failures from NOV-10 TO APR-11Section Gear Nature TD CAUSE
NOV-10
1
MYS-AP Block
2
Block
3
KDO-NTW Block
4
Block
Sl.No
IN Time /Date
RT Time/Date
TGT couldnot be
established for CLEat AP.
03.1513/11
05.0013/11
LCTCLE
Push back cancellationapplied & restored by
ESM/MYS.
KRNR-HAH
On arrivalof 266passunable toclose thesection atHAH
20.3017/11
22.4517/11
Due to Line close buttonpusher spring cut samereplaced & restored byMCM/KRNR at HAH.
LDM:12/11/2010 LDMI:30/10/10 D/C No:
0068Sectioncould notbe closed@ KDOon arraivalof 201pass.
05.5021/11
10.1521/11
LCT204
Subsiquenlty got right. Oninvestigation found at KDO1CR relay 6C5 contactoffering high resistance(pertaining to initial pick upof CTR ckt) Relay replaced& restored by ESM/AP.
KRNR-HAH
TGT couldnot beestablished @ HAH
TCF @KRNR for 265pass
08.1520/11
10.3020/11
LCT265
262
At KRNR TAR relay notdelatched since LCCPRfront contact No. 3D4offering high resistance
(0.3kohms) same relayreplaced & restored byJE/S/MYS (LCCPR frontcontact pertaing to TARrelay Circuit)
D/C: 0095Make: PTJ
Sl.No: 355518 Mfd: 11/07LDM: 17/11/10LDMI:18/10/10
(As per TR D/L TCFPR-HAH dn at 06.11 but TARnot dn at that time atKRNR)
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 25/205
5
Block
DEC-10
6
Block
JAN-11
7
Block
KDO-NTW TGt couldnot beestablished @ NTWfor LE
(TCF @KDO)
15.3419/11
17.0519/11
LCTLE
213
While tracing the cicuit faultdisappeared circuit keptunder observation &restored by JE/S/MYS @KDO D/C: 000065LDM:14.11.10LDQI: 26.10.10 Block local
: 27 Volts I/C : 65 ma &50 V
O/G : 74ma & 56V
KDO-NTW
No SNRat KDO.
5.2501/12
5.3501/12
202-PLCT
On arraival of 202 passat NTW automaticallySNR appeared andBlock restored bytraffic staff.
MGF-HLN
Premature TOLat MGFfor 56270
11.2508/01
12.1508/01
PLCT56720
On arrival of 56270 atHLN TAR buzzer appeared & line closeestablished. checkedthe circuit & blockrestored by ESM/HLN.ESM/HLN nightcamped at stn for observation.
LDM:
21/12/10 LDMI:09/12/10 D/CNo: 0068 At HLN
I/CCurrent: 67 mA
O/G current:70 mAO/C Voltage: 53.5 V
I/Cvoltage: 17.89V.
I/P toDC-DC convertor:20.41
O/P of DC-DC convertor: 75.4V
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 26/205
8
Block
FEB-11
9
Block
10
MGF-AKK
Sectioncouldnot beclosed@ MGFonarrival of 56265pass
20.0015/01
01.3016/01
LCT1730116517
At MGF blockinstrument Bell codebutton pusher springcut. Same replaced &restored byESM/KRNR. LDM :10.01.11LDMI : 07.12.2010D/C No. : 00085
As per TR datalogger at HLN :
TCFR Upat 11.17HRS
TAR-MGF up at 11.56.57
LCCPRUp at
12.15hrsTAR - MGF dn at
12.15.12TCFR Dn at 12.15hrs
MYS-MNGT
Premature TOLappeare
d at Mysfor 12613Exp.
MYS-TGT+TOL
MNGT-TCF+TO
L
11.0513/02
11.2013/02
12613-15" @Sig.
On arrival of 12613Exp. at MNGT. TARbuzzer appeared and
block restored byJE/CN/MYS.@ MNGT.
MGF-AKK
BLOCK
Premature TOL@ MGFfor 56266.
7.07
15/02
10.0015/02
PLCT
56266
Push back cancellationapplied at AKK & blockrestored by ESM/AKK.
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 27/205
MAR-11
11
Block
APR-11
12
Block
MGF-HLN
After arrival of 17301
exp,unableto closethesection@ HLN .
HLN:TOL +TCFMGF:No SNR
00.0511/03
02.1011/03
Fault disappear at HLNwhile tracing thecircuit. Circuit kept
under observation &faul not repeated. ESMcamped at HLND/C No: 0076 LDM:28/02/11 LDMI:24/02/11 At HLN:I/C I : 66mA I/C V :15.3 V O/G I : 70mAO/G V : 55.2V DC-DC converter I/P:24.3V O/P75.4V, Block Local:32.4V.
HLN-MVC
TOL notappeared atMVC for 12781exp
MVC- TCF
HLN -TGT+TOL
22.5315/4
07.2016/04
PLCT-17301-5"16517,16518
At HLN TOLAR notpicked up due to tTOLTR relay 2B1contact offering highresistance (R-48ohms). Same relay
replaced & restored byJE/S/MYS.
Make:PTJ 8F/8BSL.No: 345421mfd: 09/07 d/c no:00066 LDM: 12/4/11LDMI: 9/3/11
At HLN:
o/g I-68ma V-49.5vi/c I-69ma V-17.38v
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 28/205
REMARKS
Pushbackcancellation
Pusher spring cut
contactoffering highresistance
relay contactOfferinghighresistance
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 29/205
Subsequently got right.
OPTG(subsequently gotright)
Subsequently gotright
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 30/205
Defectivematerial
As per TRdatalogger at HLN:
TCFR Upat11.17HRS
TAR-MGF upat11.56.57
LCCPRUp at12.15hrs
TAR- MGF dnat12.15.12
Automaticaly gotright
D/L notconnected.
Push backcancellation
AKK D/Llinkdown
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 31/205
Automatically gotright.
As per TR D/L@ HLN :
TARMGF Up23.49.50hrs
At MGFD/L notprovided
relay contactOfferinghighresistance
TOLAR-MVC Dn21.52.37up @06.18 of 16/04
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 32/205
HAS
Sl. No Section Gear Nature TD
Nov-10
1
Block
IN Time /Date
RT Time/Date
BNTL-PADL
Section could not beclosed @ BNTL onarrival of 637pass
19.0613/11
21.3013/11
LCTNIL
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 33/205
2
BlockALUR-BLLT
Section could notclosed @ BLLT for
goods
12.2024/11
13.3024/11
6515-16" @ALUR
for path
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 34/205
3
Block
Dec-10
SBHR-YDM
Unable to close thesection at SBHR.
00.5530/11
07.1530/11
CLE-PLCT
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 35/205
4
BlockDOGL-KVGL
TGT could notestablished for CLE@DOGL,TCF set@KVGL
12.10
11/01
13.3011/01
LCT-6516
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 36/205
5
BLOCK
Jan-11
ALUR-BLLT
Premature TOL @BLLT for 6518.
01.2519/12
5.0019/12
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 37/205
6
BlockYDK-SVGL
section could not beclosed at SVGL for 6518 exp.
04.3014/01
10.3014.01
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 38/205
7
BlockYDK-SVGL
TGT could not beestablished for LE atYDK. TCF not set atSVGL.
16.2015/01
22.2015/01
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 39/205
8
BLOCKKVGL-DOGL
TGT could not beestablished at KVGL for DKNLPGA goods.TCF set at DOGL.
10.00
27/01
12.5527/01
PLCT
DKNLPGgoods.
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 40/205
9
Block
10
Block
HHT-BGPA
TGT could not beestablished for 56265pass
18.0529/01
22.30
29/01
LCT
56265
YDM-NRJ
No TOL at YDM for HAN goods
19.4530/01
23.3030/01
PLCT-HASN16518
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 41/205
11
Block
11-Feb
KVGL-YDK
TGT could not beestablished for 16517at KVGL (YDK-TCF)
04.00
30/01
09.2030/01
PLCT
16517
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 42/205
12
BlockKVGL-DOGL
TGT could not beestablished @ KVGLfor MNGTN goods
09.0004/02
16.3004.02
PLCTMNGTNgoods
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 43/205
13
BlockDOGL-KVGL
Unable to set TGT for PINKI goods @ DOGL
5.5005/02
08.40
05/02
PLCT
PINKIgoods.
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 44/205
14
Block
15
Block
11-Mar
YDK-SVGL
Section could not beclosed on arrival of 16518 @ YDK
00.50
06/02
04.00
06/02
PLCT
TOKN
DOGL-KVGL
For Hasan 'N' GoodsPremature TOLappeared at KVGL.
KVGL-TGT+TOL
DOGL-TCF
03.4012/02
04.0512/02
PLCTHas'N'&16517
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 46/205
17
Block
11-Apr
SBHR-YDM
(Noentry incontrol)
NO TAR buzzer for 56646 pass.
13.20
14/03
13.55
14/03
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 47/205
18
Block
19
Block
ALUR-BLLT
TGT Could not beestablished @ BLLT for 16518
00.30
07/04
03.15
07/04
PLCT
16518
16517
DN LE
BNTL-NRF
TGT Could not beestablished @ BNTLfor 16518 exp.
20.3007/04
22.1007/04
LCT16518
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 48/205
20
BlockYDM-SBHR
TOL buzzer notarrested for 56647passg.
13.3025/04
16.3025/04
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 49/205
CAUSE REMARKS
Due to heavy rain &lightning at BNTLblock instrument UNITNo.1 burnt. Unit No.1replaced & restored byESM/KBPRD/C No. : 000669
LDM :03.11.10 LDMI :28.10.10
Defectivematerial
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 50/205
Due to TGT delatchedcoil NSN problem TGTcould ot be delatched@ BLLT same relayreplaced & restored byJE/SKLRMake: S&T PTJ Sl.No:20081Contact:8F/6B Mfd:06/06 D/C:01725
Relay coilproblem
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 51/205
At YDM, TGTR relaynot delatched samerelay replaced &restored byESM/SBHR at YDM.Make: PTJ. Sl.No:18490 Mfd: 08/04
D/CNo:000676.LDM: 21/11/10LDI:10/11/10 R3&R4 coil R: 145 ohms.
Relaydefective
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 53/205
Local Battery-28v,Line Battety: I/P- 24v,O/p-56v, I/c current-70ma, O/g current-70ma,
As per sitedatalogger after takingLine Clear ASR relaymomentarily dropped.
Checked all instick circuit of ASR,PCR and ASTRrelaychanged byJE/S/SKLR at BLLTand block restored.
LDM:8/12/10,LDMI:29/11/10,D/C:000029.
Relaydefective
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 54/205
TGTR relay notdelatched( TGTR ckt).Same relay replacedand restored byJE/SBHR & ESMSBHR@SVGL.
D/C No: 03726Sl. No:
7606Style: QL1
Contact : 8F/6B
Mfd: 06/99 .LDMI:
27/12/10
Relaydefective
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 55/205
At SVGL TAR notdelatched circuitLCCPR relay 4D3contact offerring highresistance (2Kohms)relay replaced andrestored byJE/S/SBHR. Make:PTJ Sl. No.:308/39 Mfd: 12./06
LDM:08/01/11LDI:27/12/10 D/CNo: 3728
relaycontactofferinghighresistance
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 56/205
At KVGL in ASR circuitC4 contact clip of TOLAR relay dry solder same resoldered &restored by ESM/YDK.
D/C no:
03529LDMI: 17/01/2011
LDM: 20/01/2011
Drysoldering
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 57/205
On arrival of ESM/HAS checkedthe circuit but faultdisappeared .ESM/HAS nightcamped at HHT for observation.
I/Cv: 49.5v
O/G V:68.5v
I/C I: 70mA
O/G I: 70mA
Block local: 29.3V.D/c
no:02978LDM :
27/01/2011LDMI:27/01/2011
LDQI:28/01/2011
Automatically gotright
As per TR Datalogger @ NRJ found TOLTRnot picked up. ( ASTRDn, ASR Dn @19.44.01 hrs)
Automatically gotright
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 58/205
TAR relay notdelatched at KVGLdue to LCCPR D3contact sulphation.Same clip resoleredand restored byESM/YDK.D/C No.:03530
LDM:17/01/11LDI:20/01/11
ReaycontactSulphation
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 59/205
Due to TAR relay notdelatched @ KVGL.Same several timestested & fault notrepeated. Restored byESM/YDK. R3- R4voltage - 31 V
D/C No:03532
LDM: 20/01/11LDI: 02/02/11
Automatically gotright
AtDOGL
TCFPRup-09.00hrs.TGTcodeprogressed fromDOGL .Ext V:30&25 VInt: 25VBlockLocal:
up: 31 VDn: 31V
KVGLD/L notconnected toTR.
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 60/205
In KVGL, B/I TARrelay not delatcheddue to LCCPR relay4D3 contact drysoldered, same re-sodered & restored byESM/YDK. D/C-03533, LDM-20.01.11,LDI-02.02.11
Relaycontactclip drysolder
KVGLD/L notnetworked
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 61/205
At YDK PCR relay notpicked up due to TARrelay D2 contact clipsulphation formed,same attended &restored by ESM/YDK,
D/C-01315,LDM-1/2/11,LDI-20.01.11
Relaycontactclipsulphation
At SVGL
1.TGTPR up-22.08hr
2.LCCPRup-00.50hrs.
AtYDK
blockdata notavailable.
On arrival of Has'N'goods at DOGL TARbuzzer appeared andblock restored byTraffic staff only.
Automatically gotright
TCFRup @03.23
TOLARdn @03.24
TAR up@ 04.01
LCCPRup @
04.01
TAR dn -04.09
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 62/205
When tracing the cktfault not found ad notrepeated and restoredby ESM/HAS.
LDM:28.2.11LDMI:5/1/211D/C No:03611
AtHAS :
o/g I:78ma o/g V:65v
i/c I: 66ma
Subsequently gotright
HASblockrelaysnotproved.
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 63/205
While tracing the cktfault not found. Duringtesting failue notrepeated. Blockinstrument foundworking in normal.Restored byJE/SBHR.
TARR1,R2-29Volt
24Volt INT-32VoltO/G & IC current-71/70mA LDM-18/02/2011,
LDI-11/03//,D/C No-
000497
Tested &found ok
ATSBHR
1A RRUp-12.39 hr
1TARUp-12.42 hr
TAR-YDM-Not up
1ARR Dn-12.45 hr
1TAR Dn-12.45 hr
TAR-YDMUp-
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 65/205
At YDM, due to blockinsrument bell codebutton pusher springcut. Same attended &restored byESM/SBHR D/C No:000698 LDM:13/04/11 LDMI:17/04/20111
bell codebuttonpusher spring cut
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 66/205
ASK
nov-2010
Sl. No Section Gear Nature TD
1
Block
2
Block
IN Time /Date
RT Time/Date
ADHL-
HVL
Premature TOL @
ADHL for 2079 exp.(HVL-LineclosedADHL-TCF & TOL )
08.20
12/11
11.40
12/11
PLCT
2079
1018
6202-6"@ ADHLK
AMSA-SPGR
(Lateinfor toTR at03.15)
TGT could not beestablished atAMSA.
02.4517/11
07.40
17/11
LCT
584
6590224
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 68/205
5
Block
DEC-2010
6
BLOCK
AMSA-SPGR
Section could notbe closed at SPGRon arrival of 6507exp
01.5020/11
05.3020/11
LCT6228
6536
ASK-ADHL
ADHL-HVL
TOL buzzer notstopped at ASK for 6227 exp
02.55
26/12
03.20
26/12
PLCT
7314
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 69/205
7
BlockASK-ADHL-HVL
TGT could not beestablished @ADHL towards ASK
ASK- TCFestablished
22.2029/12
23.5529/12
LCT56223-10"
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 70/205
8
BlockNTR-GBB
TAR buzzer failedfor LE @ NTR
11.1019/12
11.2519/12
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 71/205
9
BlockBSN-RDI
TGTcould notestablished at BSNfor AVCN goods.TCF done at RDI.
23.3019/12
2.0020/12
LCT-DKNLPG 6589Exp7311Exp
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 72/205
10
BLOCK
JAN-2011
TTR-HVL
TGT could not beestablished at HVLfor DKN goods.
At TTR ---TCF +TOL.
11.20
29/12
11.4829/12
PLCT -DKN
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 73/205
11
Block
12
Block
AMSA-SPGR
TGT could notestablished for 16590 exp.
5.2811.1
5.5011.1
LCT-16590
SPGR-NTR
Premature TOL for RPM goods @SPGR
21.1531/01
21.3831/01
16535Exp- 17"for PLCT @NTR
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 74/205
13
NTR-GBB Block On arrival of 6535 atGBB TAR buzzer failed
07.1605/01
07.3505/01
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 75/205
14
MLSA-TK Block
On arraival of 12079at MLSA Line closednot established atMLSA (but TK- Lineclosed Set) TK-TGT+TOLMLSA- TCF+TOL
07.2508/01
08.0008/01
LCT-11018
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 76/205
15
BLOCKBLKR-VNR
No TOL at BLKR,hence sectioncould not be closedat BLKR on arrivalof 56227 pass.
(BLKR-TCF VNR-TGT-TOL)
22.1005/01
22.4005/01
LCT
56274
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 77/205
16
Block
17
Block
BVR-VNR
On arrival of 16210Exp. At VNRTAR Buzzer failed
01.4026/01
01.5526/01
LCT
12782
DRU-BLKR
No TAR buzzer onarrival of 56273 @DRUDRU-TCF ,BLKR-TGT
06.2020/01
06.4020/01
LCT56228
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 78/205
FEB-2011
18
Block
MAR-2011
BLKR-VNR
Premature TOL @BLKR for 12080exp.VNR-TCFBLKR-TGT+TOL
18.4017/02
18.5517/02
PLCT-12080-2"@stn
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 79/205
19
Block PLCTDRU-BLKR
TGTcould not beestablished atDRU. PrematureTOL at BLKR.
BLKR-TCF+TOLDRU-LC.
06.3008/03
08.3008/03
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 80/205
20
BLOCKRRB-DRU
TOL buzzer notcame at DRU for 12726.
RRB-TGT+TOLDRU- TCF
10.4420/03
11.3020/05
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 81/205
21
Block
APR-2011
HVL-TTR
No SNR @ TTRfor 56224
TTR-TOL+ TCFHVL- Lineclosed
05.2502/04
06.4502/04
LCT5622416536
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 82/205
22
BlockRRB-DRU
Line Clear couldnot be cancelled for
EBCN goods atRRB.
9.0021/4
10.1021/4
LCTEBCN
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 83/205
23
BlockDRU-BLKR
While taking lineclear for 16536 @DRU. PrematureTOL @ BLKR.
BLKR: TCF+TOL DRU: LineClosed
05.2028/04
06.0028/04
PLCT16536@DRU
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 84/205
CAUSE REMARKS
On arrival of 6202 exp at
ADHL TCFR Picked upcondition, TOLAR downcondition after whiletracing the circuit fault notfound subsequently gotright & restored byMCM/ASK.
Subsequ
etnly gotright
At SPGR, CTR relay notpicked up, same removed ,rejacked & Restored by
ESM/AMSALDM: 05/11/2010
LDMI: 27/10/2010
Subsequently gotright
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 85/205
On arrival of 1018 expTAR buzzer appeared &restored by ESM/ASK.Block Charger (off)-26.29v
Block charger (on)-29.08vDC-DC converter -I/P-22.15v o/p-72.63v Line :-o/g- 59v & 73 ma,
I/C- 18.57v & 73 ma.
(datalogger at TR onlySNR relay is proved atBVR)
Subsequently gotright
While tracing the circuitfault disappeared & faultnot repeated. (Onarrival of 2726 exp TARbuzzer appeared @ HVL.Block restored byMCM/ASK at HVL.)
(Asper D/L at TR TCF code
received at HVL , & TGTcode transmitted fromHVL,at ADHL Datalogger not provided.)
Subsequently gotright
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 86/205
At SPGR TCKR relaycontact No. 2A1 & 3A4carbonised (offering highresistance) Relay replaced &restored by JE/TK @ SPGR
Make: PTJ Sl. No:3101Mfd: 03/99 D/C No:
000208resistence :
2A1 - 0.3-75ohmsResistance :
3A4 - 0.3 - 5ohms(TCKR front
contact pertaining to PTR &NTR circuit & LR cct)
(As per TR D/LTGTPR picked up 01.34 hrs
& dn at 01.47 hrsLine closed code frequentlygone at AMSA.
TCFPR picked up at05.11 hrs dn at 05.13 hrs. atAMSA. TARpicked up at 01.46 hrs SNRfrequently up & dn other relays not operated.)
Contactofferinghighresistance
Subsiquently got right.restored by MCM/ASK.Fault not repeated.
D/CNo:000434
Subsequently gotright
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 87/205
While tracing the circuit,fault disappeared. Circuitkept under observation &restored by ESM/ASK.
LDM :25.12.10
As per TR datalogger at ASK Blocklocal : 31VBlock line : 68VInternal : 31V
External : 34V
Subsequently gotright
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 88/205
On arrival of 581pass TARbuzzer appeared and pushback cancellation appliedby SM/NTR & restored byTraffic.Accd. D/L: After takingLine Clear for LE for shunting purpose withformation of 228 pass.
TGTPR-GBB Up at10.54.09
25 DECR Up at 10.55.39
1TPR Dn at 10.56.3955TPR
Dn at 10.58.18
1TPR Up aat 10.58.2325TPR
Dn at 10.58.4925DECR Dn at
10.58.5055TPR Up at
10.58.541TPR Dn at
10.59.561A RR Up at
11.03.16
1A RR Dn at11.03.16 since1TAR not picked up.
pushbackcancellation
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 91/205
AT AMSA, bell code buttonpusher spring cut, samereplaced and restored byESM/AMSA. D/C:-00038 LDM;05.01.11LDMI:28.12.10LDQI:30.11.10Accd. to D/L at TR, at
AMSA 1A ASRcontineously Chatering
bell codebuttonpusher spring cut
Accd. toD/L atTR, atAMSA
1AASRcontineouslyChatering
After arrival of 16535 exp@ SPGR, Push backcancellation applied andrestored by Traffic.
Push backcancellation applied& restored
(Datalogger link dnat TR)
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 92/205
After arrival of 2079 exp at NTRTAR-buzzer appeared at NTR.Section closed & block restoredby Traffic.
Subsequently gotright
As per TRdatalogger at GBB
1. TAR-NTR
Lastly upat07.00hrs.Dn at07.04 hrs.
2. 32TAR up at07.15.03hrs TAR-NTR notup 32ARR Dn at07.16
32TAR Dnat07.16.13hrs
3.TAR-NTRup at09.10hrs.
4.32A/32BTSSLR
not up.
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 93/205
After arrival of 11018 atMLSA subsequently TARbuzzer appeared at MLSAboth side section closed bySM. Block restored byESM/TK. D/CNo.:- 000112,LDM:02.01.11,LDMI:29.12.10
At MLSAI/C
Current: 50 mAO/G current: 50 mA
O/C Voltage: 46.4V I/C
voltage: 16.6V.Local battery V: 27.9 V.
At TK
O/G Voltage:58.7V I/Cvoltage: 13.9V.
Local battery voltage:28.5V
Subsequently gotright
AtMLSA :
1TARUp at
07.22.22hrs
TAR-TK Up at07.22.27hrs1TAR Dnat07.22.43hrs
Lineclosed
plusetransmitted.
TAR-TK Dn at07.57hrs
60v BlkDn- 31-36v
24v Blk-21-23v
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 94/205
Subsequently got right.Push back cancellationapplied by SM/VNR andrestored by Traffic. Accd.TR Datalogger: At VNR
TGTPR-BLKR Up at21.47.08hrs TGTPR-BLKR Dn at 22.39.59hrs
subsequently gotright
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 95/205
On arrival of 12782 Exp. AtBVR TAR buzzer appeared at BVR andapplied push backcancelation and blockcleared and restored byTraffic staff. LDM :14.01.11 LDMI : 19.1.11
24vEXT- 30v24v INT - 29V
Block local - 29Vat failure time
push backcancelation
At VNR :
1ZR Upat01.35.59hrs1TPRUp at01.38.20hrs25TPRUP at01.38.54hrs for this1TAR
notpickedup atR.Room
Subsequently got right,push back cancellationapplied at BLKR and blockrestored by traffic.
Subsequently gotright
At DRU :1A RR-UP
ASR-Dn,1A TARnot up,after 3/4operationof 1ARR, ASR-up
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 96/205
After arrival of 12080 exp@ VNR Line closed @both side & block restoredby traffic ESM/DRU testedthe circuit, fault notrepeated.
Subsequently gotright
BLKRD/L notnetworked.
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 97/205
On arrival of MAQ'N' atBLKR TAR picked up atBLKR, Line closed appliedby SM/BLKR, and blockrestored by Traffic. Thefault disappeared and cktkept under observation.The fault also notrepeated. AtBLKR :
O/G : I - 69maV - 41.45v I/C: I - 65ma
V - 15.23v localBattery (w charg)-30.48v(w/o charg)- 27.12v
LDM:16/02/11LDMI:28/02/11
Automatically got
right
All Blockrelaysnotproved.LastTCFRDn-6.26hr
24Vblocklocal-30V,
BLKRD/L notconnect
ed.
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 98/205
Subsiquently got right.Restored by ESM/DRU
LDM:11.3.11LDI:11.3.11 D/C002055
Subsequntly gotright
At RRB:
TOLAR-DRU :up @10.28.03
dn @10.31.27
UpACPPR
dn @10.31.29
UpACCPRup @10.38.55
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 99/205
On arrival of ESM/TTRchecked the circuit butfault disappeared. Circuitkept under observation &block restored byESM/TTR LDM :13.3.11LDMI : 22.3.11
( Block relays notproved at TTR data logger)
Automaticallypickedup
At TTR :UP ZRUp & Dnfrom05.11.11hrs to05.11.38hrs UpZR Up &Dn frm05.33..09 hrs to05.33.18hrs
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 100/205
At RRB TCKR relaycontact No: 1A2 offeringhigh resistance pertainingto NTR ckt., same relayreplaced and restored byESM/RRB & ESM/DRU atRRB. D/C No:00043
LDM:09.4.2011LDMI:11.3.2011 RelayMake: S&T PTJSl No:10534
Mfd:04/03 1A2resistance: 0.99ohms
relaydefective
SHKR-DRUchattering
NTR,PTR,SCKRnotprovied
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 101/205
On arrival of 16536 toBLKR, TAR buzzer appeared. Same restoredby Traffic @ BLKR. S& Tstaff not attended.
BLKRD/L notnetworked
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 102/205
RRB
Sl. No Section Gear Nature TD CAUSE
Nov-10
1
Block
IN Time /Date
RT Time/Date
JRU-HLK
TGT could notestablished atHLK for 6589 exp.
02.3504/11
03.0004/11
LCT6589
Subsiquently gotright. Checkedthe circuit &restored byESM/HLK.
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 103/205
2
BlockAJP-SHV
TGT Could not beestablished atSHV for 2080 exp
( TCF set at AJP)
18.10
10/11
18.5010/11
PLCT2080
TCKR relay notpicked up due toNTR Relay 4C3contact offeringhigh resistance (7ohms) (frontcontact) samerelay inter changed to LCBRrelay & restoredby ESM/SHV @AJP.Make: PTJ.
Style: QN1.
contact: 8F/8B.volt: 24V.
Sl.no: 385666Mfd:
08/2008LDM: 01/11/10
LDMI:14/10/2010D/C No: 002229
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 104/205
3
BlockHLK-RGI
On arrival of 6536section could notbe closed at RGI.
04.02
11/11
09.3011/11
PLCT
7301
587
283
CLE
590
At HLK SHKRstick not availabledue to Unit No:2condenser burst(1000micro farad)same replaced &restored byESM/SHV.
LDM:30/10
LDMI: 09/11D/C
No: 001464
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 105/205
4
Block
Dec-10
SHV-AJP
On arrvial of PQRSsection could not beclosed & No SNR @AJP
12.1520/11
13.3020/11
LCT
587
PNKIgoods
At AJP SNR cct32ZR @ relayroom 5D6 contactoffering highresistance(14ohms) samerepalced &restored byESM/SHV @ AJP
Make:ELDYNE
Sl.No: 299526Mfd:
01/09D/C : 002233
LDM: 1.11.10LDMI:14.10.10
LDQI:10.09.10
(Asper TR D/L 32TAR picked up12.07 & dn at12.08)
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 106/205
5
BlockHLK-RGI
Section could notbe closed at RGIOn arrival of 7302Exp.
(HLK-TGT+TOL
RGI-TCF+TOL)
01.5005/12
03.3505/12
PLCT
263065906536
At RGI Bell codebutton pusher spring brokensame replaced &restored byESM/HLK.
LDM:28/11/10
LDQI: 29/11/10
LDMI: 03/12/10D/C No:
001536.
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 107/205
6
Block
Feb-11
HLK-JRU
Premature TOLfor 1018 @ HLK
(TCF & TOL - JRU& TGT&TOL - HLK)
11.1807/12
11.4707/12
Subsequently gotright . ESMcamped at HLK.Fault notrepeated.
LDM:01/12/10LDMI: 09/11/2010
D/CNo: 001470.
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 108/205
7
BlockHLK-RGI
TGT could not beestablished atHLK fo 12726 exp
09.2502/02
10.0502/02
LCT12726
At HLK TGTbutton pusher spring cut. Samereplaced &restored byESM/HLK D/C :0001494 LDM :19.01.11 LDMI :24.01.11 LDQI :07.01.11 Lastreplaced on :03/2010
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 109/205
8
Block
11-Mar
9
Block
AJP-NVF
No out going bellat NVF henceUnable to take lineclear for 16589Exp.
02.0016/02
03.1516/02
LCT16589
17302
At NVF bell codebutton pusher spring cut andsame replacedand restored byJE/S/RRB @NVF.LDM:07/02/11
LDMI:24/01/11
D/C No.:001051
Block relays notproved in D/L
HSD-SHV
On arrival of LE @HSD unable to
close the section.
15.1308/03
15.3508/03
At SHV on arrivalof 56914 pass.Block workingNormal,Failuresusequently gotright
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 110/205
10
BlockHSD-SHV
Premature TOL atSHV for 12725exp.
HSD : TCF+TOL
17.1517/03
17.2417/03
LCT12725
Subsiquently gotright. Checkedthe circuit but faultnot repeated.Restored byESM/SHV.Block local : 30VI/C : 70ma
O/G :70ma - 42V
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 112/205
12
Block
Apr-11
HLK -RGI
TGT could not beestablished for 56913 pass @RGI.
13.4029/03
14.3029/03
Due to bell codebutton pusher spring cut at RGI.Same attended &restored byESM/HLK D/CNo: 001572LDM: 19/03/11LDI: 21/03/11
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 113/205
13
BlockRRB-DRU
Line Clear couldnot be cancelledfor EBCN goods
at RRB.
9.0021/4
10.1021/4
LCTEBCN
At RRB TCKRrelay contact No:1A2 offeringhigh resistancepertaining to NTRckt., same relayreplaced andrestored byESM/RRB &ESM/DRU atRRB. D/CNo:00043
LDM:09.4.2011LDMI:11.3.2011Relay Make: S&TPTJ
Sl No:10534Mfd:04/031A2 resistance:0.99ohms
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 114/205
14
BlockRRB-NVF
Unable to take lineclear for 16535exp at RRB
23.4528/04
00.5529/04
PLCT
16535
At RRB due tobell code buttonpusher springcut.Same replacedand restored byESM/RRB.
D/C No:000355
LDM: 20/4/11LDI:6/4/11
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 115/205
REMARKS
Subsequently gotright
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 116/205
Relaycontactofferinghighresistance
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 117/205
Defectivemeterial
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 118/205
Offeringhighresistance
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 119/205
Bellcodebuttonpusher springbroken
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 120/205
Subsequently gotright
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 121/205
TGTbuttonpusher springcut.
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 122/205
bellpusher spring
broken
susequently gotright
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 123/205
Subsiquently gotright
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 124/205
Bellcodebuttondefective/springbroken
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 125/205
Bellcodebuttondefective/springbroken
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 126/205
SHKR-DRUchattering
NTR,PTR,SCKRnotprovied
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 127/205
bellcodebuttonpusher springcut
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 128/205
JRUSl. No Section Gear Nature TD
Nov-10
1
Block
2
Block
DEC-10
3
Block
IN Time /Date
RT Time/Date
JRU-
SLU
Unable to close the
section at SLU Onarrival of 6589 Exp.
02.50
03/11
04.20
03/11
LCT
6210
6536
6535
SLU-MYK
TGT Could not beestablished to6210
Exp. at SLU
03.2510/11
05.1010/11
LCT
6536
6210
7302
JRU-SLU
(no entryatSBTCF)
Premature TCF-TOLat JRU for 7312 exp.
00.0503/12
00.1503/12
7312-10" @
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 129/205
4
Block
5
Block
JRU-AMC
TOL buzzer notstopped at JRU for 252 Pass.
JRU- TCF+TOLAMC-
TGT+TOL
13.2521/12
15.4021/12
LCT252
SLU-MYK
TGT could notestablished for 16210 exp at SLU.
03.15
29/12
06.05
29/12
LCT-16210
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 130/205
6
Block
11-Jan
MYK-KAG
TGT could not beestablished at MYKfor HVR spl.
22.1029/12
05.3030/12
LCT730265356590
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 131/205
7
BlockTHKU-CHKE
(infd toTR at06.20hrs)
TGT could not beestablished at THKUfor EBRN.CHKE-TCF set.
06.00
23/01
6.5523/01
PLCT
EBRN
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 132/205
8
BlockSLU-MYK
On arrival of HasBTPN goods unable toclose the section atSLU.SLU-TCF+TOL
MYK-TGT+TOL
15.3025/01
17.3025/01
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 133/205
9
Block
Feb-11
10
Block
MYK-SLU
Premature TOL atMYK for 16590EXP
02.0328/01
02.1628/01
PLCT-16590
JRU-BBH
TAR buzzer notappeared for LE@BBH.
14.2004/02
15.1004/02
PLCT
56252
EBCNgoods.
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 134/205
11
BlockSLU-MYK
TAR buzzer notstopped at SLUhence unable toclear the section.
16.2511/02
18.3011/02
PLCT56515
2080
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 135/205
12
BlockSLU-MYK
TGT could not beestablished for 16535 exp @SLU
01.1002/04
06.0002/04
LCT16535730116589
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 136/205
13
BlockSLU-JRU(S&TConst)
Free indication failedfor cancellationapplied at SLU for 56516
11.50
10/4
12.4510/4
LCT-56516,11018
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 137/205
CAUSE REMARKS
At SLU bell code
button pusher springbroken, samereplaced & restoredby ESM/JRU.LDM:28.10.10,LDQI:28.10.10,
D/CNO:00004.
Defectiv
ematerial
On arrival of MCM/JRU tested
with SM on dutyseveral times foundworking in order.Camped at SLU for observation.
Tested &OK
Subsequently gotright ckt kept under
observation andrestored byESM/JRU.
Subsequently got
right
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 138/205
After arrival of ESM/JRU testedseveral times faultdisappeared andfault not repeatedand restored byESM/JRU.
Subsequently gotright
For previous train atMYK LCCPR relay,4D3 contact clipsulphation. Samecleaned & restoredby ESM/JRU.( pertaining to TARdelatch circuit dueto that TAR at MYK
not delatched).At the time of failuredue to sulphationcontact offering 0.7ohms resistance.
LDM:21/12/2010
LDI: 28/10/2010
D/C No: 000135.
(Accd D/L:MYK D/L at TR
TCFPR-SLU Up at02.45.24hrs
1TAR Up at02.55.00hrs
TAR-SLU Up at02.55.00hrs
contactclipsulphation
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 139/205
At KAG CTR 4D3contactcarbonised(CTRstick path) insiderelay. Relayreplaced & restoredby JE/S/JRU atKAG. LDM :17.12.10LDMI : 17.12.10Make : PTJ - 8F/8B
Sl No. :102307 Mfd :09/1997D/C : 095233
BVlock local : 31.2VI/C :
70ma - 20.1V O/G: 68ma - 49V(KAG block relaysnot proved indatalogger)
contactcarbonised
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 140/205
While tracing thecircuit, faultdisappeared, circuitkept under observation. TGTcode could not
transmit from CHKE.At
CHKE :Block localV:26.7 V I/C V: 19.6VI/C I : 65mA O/GV: 72V O/G I : 67 mA
At THKU: I/CV: 65 V I/C I : 70mAO/G V: 65 V O/G I :70 mA
Subsequently gotright
At bothstndatalogger notnetworked.
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 141/205
On arrival of ESM/JRU both sideTAR picked up samedelatched and clear the section. Sectioncleared and fault
disappeared and infdthe problem toASTE/P/MYS for checking the circuits.
automatically gotright.
As per TRD/L ,AtMYK :SNR-SLU
showingUP & DnAfter completing TGTcode.SNR-SLU Up -15.14.18hrs SNR-SLU Dn -15.14.31
hrs( SNR-SLUchattering ) LastSNR-SLU Dn-14.13 hrs
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 142/205
After arraival of 16590 Exp atSLU,applied pushback cancellationand restored byTraffic.
push backcancellation
At MYK:
ASTRUp at01.49.48hrsTGTPRUp at01.49.58hrsASTRDn at
01.50.02hrs24VBLK-
28.18V24VEXT-31.92V24V INT-33.82V
Push backcancellation applied& restored byESM/JRU @ JRUD/C No: 0094
automatically gotright.
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 143/205
On arrival of ESM/JRUautomatically gotright. Fault not foundcircuit kept under observation.
ATSLU:-
I/C V: 19V O/GV: 54.1VI/C I: 73 mA O/GI: 78mA BlockLocal : 30.6 V
LDM: 07/02/11LDMI: 24/01/11D/C No: 0035
Subsequently gotright
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 144/205
At SLU ASTR notpicked up due toS&T/Project staff working inconnection withRRI. Same attended& restored byJE/Proj/MYS
TCFPR -SLU Up -1.01.21 hrs TGTcode transmittedfrom MYK
Miscellneous
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 145/205
After arraival of 11018 at JRU pushback canellationapplied at SLU &block restored byESM/JRU. D/CNo: 00047
automatically gotright.
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 146/205
HRR
Sl. No Section Gear Nature TD
10-Nov
1
BLOCK
IN Time /Date
RT Time/Date
GDI-YLG
On arrrival of 585pass TAR Buzzer failed at GDI.
09.28
11/11
10.2011/11
PLCT
585
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 147/205
2
Block
3
Block
SVNR-YLG
No TOL hence TARfailed at YLG onarrival of Millaniumgoods
03.5014/11
08.4514/11
LCT
6589
SVNR-YLG
On arrival of 581pass TARbuzzer failed @YLG
19.2020/11
20.0020/11
LCT2725
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 148/205
4
BlockSNH-KNO
TGT could not beestablished @ SNH(TCF at KNO)
12.0822/11
14.3322/11
Lct28320791018
1017
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 149/205
5
Block
6
Block
DVG-THN
On arrival of 588pass.section couldnot be closed @
THN .
14.3026/11
16.5026/11
LCT10182080
BYD-HVR
No SNR @ HVRfor 1017 Exp.
14.5026/11/
15.2026/11
LCT1017
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 150/205
7
BlockKNO-SNH
TGT could not beestablished @ SNHfor 1018 Exp. TCFindication available@ KNO
16.1026/11
16.1826/11
LCT1018
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 151/205
8
Block
9
Block
KNO-S.UBL
Unable to close thesection at S. UBL or 587 pass.
18.0230/11
21.4030/11
KNO-S.UBL
Unable to take LineClear at S.UBL for 6590
23.0530/11
00.3501/12
PLCT-6590-2"
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 152/205
10-Dec
10
Block
11
Block
HRR-KMPS
Cancellationapplied.FreeIndicationappeared.But
counter not jumpedto higher number atKMPS & Unable toclose the section
07.22
10/12
08.45
10/12
LCT
LE,HASBTPN ,
585
DVG-AVC
Premature TOL @DVG for 6589 exp,
03.0012/12
06.00
12/12
LCT6589-18" atstn
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 153/205
12
BLOCK
13
Block
14
Block
KJG-SVNR
TGT could not beestablished for 581pass.TGT notavailable @KJG.TCF available@ SVNR
18.2018/12
21.2018/12
LCT-581,586
BYD-DAD
Premature TOL for 6535. at BYD
2.4522/12
3.4022/12
LCT-6535
SVNR-KJG
Section could not beclosed on arrival of 12725 exp at SVNR.
20.2222/12
22.4522/12
LCT-56916,17302
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 154/205
15
Block
16
Block
SVNR-YLG
TOL buzzer couldnot be arrested atSVNR for HAS-Ngoods.
20.4022/12
23.5022/12
LCT-17302
SVNR-
KJG
TGT could not
established @ KJGfor 16589 exp. TCFalso not set @SVNR
5.10
23/12
09.45
23/12
LCT
12726
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 155/205
17
BlockKJG-SVNR
TGT could notestablished @ KJGfor 11036 exp. TCFalso not set @SVNR
13.0023/12
14.2523/12
LCT11036
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 156/205
18
BLOCKYLG-SVNR
TGT could not beestablished at YLGfor 56912
TCF indicationavailable at SVNR.
19.20
25/12
21.2025/12
LCT
56912
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 157/205
19
BlockSVNR-KJG
TGT could not beestablished atSVNR for 12726
07.4525/12
10.5025/12
PLCT12726
56516
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 158/205
20
BLOCKSVNR-KJG
TGT could not beestablished @SVNR for 16507
18.5026/12
22.0026/12
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 159/205
21
BLOCK
11-Jan
22
Block
CLI-KMPS-HRR
TGT could not beestablished atKMPS for 12080.
TCF-TOL at HRR.
15.5029/12
17.0029/12
PLCT12080
KJG-SVNR
TGT could not beestablished for 56913 at KJG. TCFset at SVNR
16.5415/01
19.4515/01
LCT-56913
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 160/205
23
Block
11-Feb
KJG-SVNR
infd toTR @03.40
TGT could not beestablished for 06535 at KJG(SVNR-TCF)
03.15
30/01
09.4530/01
PLCT
0653573012726
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 161/205
24
BlockDVG-AVC
Unable to close thesection @DVG for 11017Exp.
AVC-TGTDVG-
TCF
At AVC-section closed
15.5011.02
16.50
11.02
PLCT
12080CLE
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 162/205
25
Block
26
Block
KJG-HVR
TAR buzzer notappeared for KKFgoods @ HVR .
HVR:TOL+TGTKJG:TOL+TCF
11.4514/02
12.5014/02
SVNR-KJG
TAR buzzer notcame at SVNR for BTPNgoods.Section couldnot be closed.
16.2314/02
17.0514/02
PLCT56587
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 164/205
29
BlockGDI-SNH
On arrival of 16209Exp TAR buzzer notappeared at GDI.
GDI-TCF+TOLSNH-
TGT+TOL
18.2505/03
21.1505/03
PLCT -56515,56913,NMGSP,56912
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 165/205
30
BlockHRR-KMPS
TGT could not beestablished @ HRRfor 56911
07.3005/03
09.0005/03
PLCT -
56911
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 166/205
31
BlockKMPS-HRR
Unable to set TGT@ KMPS
08.1706/03
10.0506/03
PLCT127265627356911
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 167/205
32
BlockSVNR-
KJG
TGT could not beestablished for 12630 exp @SVNR. At
KJG:- TCF
23.0510/03
1.4011/03
PLCT12630
exp
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 168/205
33
BlockSVNR-KJG
TGT could not beestablished atSVNR for 11017
14.2013/03
17.2013/03
PLCT-11017,56274,56913,56515,16507,56912
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 169/205
34
BlockGDI-SNH
Unable to Lineclose at GDI for 17301 exp.GDI-TCF(L.C)
SNH-TGT(noL.C)
7.0115/03
7.2915/03
17301-10 for LCT
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 170/205
35
BlockHVR-BYD
TGT could not beestablished at HVR
for CLE
04.0018/03
04.3018/03
LCTCLE
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 171/205
36
Block
11-Apr
KNO-S.UBL
TGT could not beestablished for 12079 exp @ KNO.No SNR @ S.UBL
13 .0021/03
13.2621/03
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 172/205
37
BlockKJG-SVNR
Line close could notbe established onarrival o 16507 atKJG.
19.0008/4
21.3008/4
56515-PLCT
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 173/205
38
BlockSVNR-KJG
TGTcould not beestablished at KJGfor 56273 pass.
SVNR-TCF
11.0812/4
12.1512/4
PLCT-56273,HASSARCD
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 174/205
39
BlockAVC-HRR
while taking lineclear for 11018@AVC PrematureTOL appeared @HRR .
AVC lineclosed condition
13.05
22/04
13.2022/04
11018-6" for PLCT.
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 175/205
40
Signal
41
Block
YLG-SVNR
On arrival of 56516passg to SVNR, NoTAR buzzer @SVNR.
08.5225/04
09.3025/04
PLCT
1730956911
DVG-AVC
TOL buzzer notarrested at DVG for EBRN goods.
AtDVG - TCF+TOL
AtAVC - TGT+TOL
15.2025/04
16.5025/04
PLCT11017
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 176/205
CAUSE REMARKS
On arrival of HASBTPN Goodsautomatically TARbuzzer appeared& restored byESM/KNO. @YLG
LDM:06/11/10LDMI: 22/10/10D/C No:000196
(Relay roombusbar voltage-26V I/P &O/P=26v R1 & R2of TAR=26V inthe B/I.)
subsequentlygot right
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 177/205
On arrival of ESM/YLG fromGDI observed thatTOLAR relay notdelatched at YLGand samedelatched andrestored and faultnot repeatedLDM:13-11-10
LDMI:18-10-10 LDQI:24-10-10
D/C No. :000201
subsequentlygot right
On arrival of 2725TAR buzzer appeared.Checked thecircuit fault notrepeated. Circuitkept under observation &restored by
ESM/HVR. (Asper TR D/L DnTAR picked at19.34.09 & dn at19.34.23)
subsequentlygot right
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 178/205
Due to at SNH,TAR not delatchedduring line closedsame delatched &restored byESM/KNO @SNH. Faultdisappeared. CCtthoroughlychecked. TARdelatching voltage28.7 VoltLDM:16/11/2010
LDMI:20/10/2010
LDQI:10/11/2010
subsequentlygot right
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 179/205
On arrival of SE/II/HRR Severaltime tested theblock foundworking in order fault not repated &restord bySE/S/HRR @DVGD/C:000006LDMI:9&10/11/10
LDM:23/11/10
tested &found ok
On arrival of ESM/HVR tracingthe circuit & faultdisappeared &SNR automaticallyappeared & faultnot repeatedESM/HVR NightCamped at HVR .
Subsequentlygot right
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 180/205
Due to LCCPR4D3 contact highresistance (156ohms) Same relayreplaced &restored by ESM/KNOMake:urban mfd:05 /2005LDM:16/11/10LDMI:23/11/0
D/C no:SNH /2010/000193.
Relay contacthighresistance
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 181/205
Due to, ASR relay5C6contactoffering Highresistance(700ohms) of TCFR delatchingckt. Same relayreplace andrestored @ S.UBLby ESM/KNO.
Relay -Make :Urban.MFD:05/2005Sl. No.:B5198
LDM:25/11/10LDMI:12/11/10
DC No.:000175
relay contactoffering Highresistance
Due to, P2R(pertainingTOLAR circuit)relay 2D1 contactofferring highresistance (6.67ohms) at KNO,same relayreplace and
restored. Make:Urban Sl. No.:8675LDM : 25/11/10LDMI: 12/11/10
DC No.:000180
relay contactoffering Highresistance
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 182/205
At KMPS onarrival of ESM/MCM samecancellation
processed severaltimes & fault wasnot repeated.(circuit was keptunder observation.) Nowcounter restored &block instrument isworking normal.
LDM:
29/11/2010LDMI: 19/11/2010
D/C No:000027.
subsequentlygot right
On arrival of ESM/HRR at DVGapplied push
back cancellationand clear thesection. Testedseveral times butfault not found.
LDM:08/12/10
push backcancellation
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 183/205
spring cutDue to TGT buttonspring cut @ KJG.Same replaced &restored byEsm/HVR.LDM:- 08/12/10 byESM/HVR LDI:-22/11/10 byJE/HVR. 24V local-29.2 V
On arrival of HASN goods,TAR buzzer appear and self restored by Trafficstaff. (ESM notattended).
subsequentlygot right
Subsequently gotright. On arrival of ESM/HVR testedseveral times butfault not repeated.Circuit kept under observation &
restoredbyESM/HVR.
Subsequentlygot right
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 184/205
At SVNR bellcode buttonpusher spring cut.Same replaced &restoredbyESM/YLG.
LDM:01/12/10,LDMI:13/12/10(Block relays notproved in TRDatalogger atSVNR & YLG)
d/c no:000214
pusher springcut
At SVNR CTPR
relay 2B1contactoffering highresistancepertaining to PTRcircuit. Samerelay replaced &restored byEsm/HVR @SVNR.Make:S&TSl/No:244675
contact:8F/8BQN1Mfd:06/05
D/c No:000195LDM:18/12/10
LDI:22/11/10Resistance: 5Ω(At TR D/L blockrelay not proved)
contact
offering highresistance
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 185/205
SHKR relay notpicked upat SVNRdue to PR relay1A2 contactsulphation, relayreplaced &restored byJE/HVR.Sl.No:B8670Make:Urban engg.
Mfd : Aug-2009 P2RA1A2 resistance:5ΩLDM:18/12/2010
LDI:22/11/10D/C No:000196.
contactsulphation
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 186/205
Subsequently gotright . Tested andfound workingin order. ESMnight camped butFault not repeated.
O/G Current: 66maO/G V-49V I/CCurrent-61ma I/C
V- 14.3V Blocklocal-30.6V.
LDM-21.12.10 LDI-05.12.10
LDQI---24/10/2010
D/C No--000206
Subsequentlygot right
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 188/205
For 12726 expTGT established .ESM nightcamped . Fault notrepeated.
AtSVNR
blocklocal batteryvoltage: 25.7V.( charger switchedoff after 30 minsreading taken.)
Line voltage:65.5VO/G V: 44v.
I/C
V: 19.5vO/G I:
73mA.I/C I: 75.8mA
LDM: 18/12/2010LDMI:
13/12/2010D/C No:
000197
Automaticallygot right.
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 189/205
Tested the blockinstrument severaltimes, faultdisappeared &fault not repeated.Restored byESM/HRR.LDM : 02/12/10LDMI : 22/12/10D/C No:HRR/00005
At HRR
I/C V: 15.5 V O/GV: 29.3 V
I/C I : 68mA O/G I : 70
mA
Local battery Vwith charger: 31 V
Localbattery V w/ocharger : 29.1 V (As per TR D/L, 1)At HRR Block lineV : 45.15 V 24 VBlock Local : 31 VExt: 30.33V Int :29.7V 2) Block
Automaticallygot right.
Subsequently gotright. On arraivalof ESM/HVRchecked the cktand faultdisappeared.CMO kept under observation and
restored byESM/HVR. LDM:02/01/11 LDMI:29/12/10 LDQI:04/01/11
Subsequentlygot right
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 190/205
At SVNR TOLTRrelay contact 7B8offering highresistance(7omhs) using inCTR circuit for answer back.Same relayreplaced andrestored byJE/S/KNO.
8B contact having-27v and 7Bcontact having-13v at failuretime
Relay Make : PTJ,Sl.
No.:244680, MFD:06/05D/C No.: 000223
LDM:16/01/11LDI:17/01/11
Relay contactoffering highresistance.
At KJG
24V EXT-34.07V24V INT-29.5vup TAR upat 03.20.19
up TARdn at03.20.56
Other block relaysnot proved.
At SVNR
24V EXT-31.787V
24V INT-30.98v
up TAR upat 03.39.13
up TARdn at03.39.42
Other block relaysnot proved.
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 191/205
From AVC answer back code notprogressed due toPTR relay notpicked up becauseof PCR relay back
contact 5C6 contactoffering highresistance(12ohm)& 7B8 contactoffering highresistance(1Kohms).Same relayreplaced & blockrestored byESM/HRR
Relay
perticulars:- Make-C.G
Sl.No-205323
MFD-11/2005 ,8F/8B ,QN1LDM-10/02/11
LDI-05/02/11(Q/I)
D/C-AVC/00031
contactoffering highresistance
Blockrelays notproved
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 192/205
After departure of 2079 Push backcancellationapplied at KJG.TAR picked upboth side & blockrestored byESM/HVR.
Push backcancellation.
At HVR :
UpTARup@11.02.48Up TARdn @11.03.43for KKF.
After arrival of 56587 pass. @SVNR TARbuzzer appeared& block restoredby traffic.
Subsequentlygot right
At SVNRDN
TAR up@ 16.48Dn TARdn @16.48
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 193/205
At BYD BlockinstrumentMagnetotelephone coilshort with line ckt.Same magnetophone replaced &restored byESM/HVR .
D/C No-000066
LDM-12/02/2011
LDI:-27/01/2011
I/C V:
Defectiveequipment
blockrelay notproved inD/L
Push backcancellationapplied at KJG &block restored byESM/HRR.D/CNo:KJG/2011/02/19
Push backcancellationapplied -MISC
At KJG:
4RECRdn @13.46.20hrs.
4RECRup @14.33.21hrs14.22 -0V
14.22.55- 109V
14.23.24
-111.72V
12Vindicatio
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 194/205
At GDI, due to4D3 contact of SHKR relay onTAR latching cktoffering highresistance(R=13.5 V), samerelay replaced andrestored byESM/KNO.Relay: Make-CG,Sl. No.:AC295342Mfd-8/07
D/C No:00214LDM:26.02.11LDMI:12.02.11
relaydefective -Contact highresistance
At GDI :
DnTAR Upat19.08.26hrs 3RR Dnat19.09.50hrsDn TARDn at19.09.50hrs1/2/3AS
PR119.09.51hrsBlockrelaysnot
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 195/205
At KMPS 7B8contact of ASRrelay & 5D6contact of TCFPRrelay offering highreisistancepertaining to TARdelatching circuit.So that TAR notdelatched. Bothrelays replaced &block restored byMCM/HRR.
R=4.2 VD/C No: 00020.ASR : Make-CG,
Sl No:31943Mfd: 07/99
TCFR : Make-CG, Sl No:31942Mfd: 07/99
relaydefective -Contact highresistance
LastTAR-HRR Upat7.08.33hrs
lastTCFR-HRR Dn07.09.06hrsTAR-HRR Dnat07.09.10hrs
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 196/205
At KMPS TARrelay notdelatchedbecause in TARdelatching cktTGTPR 7D8contacts offeringhigh resistance.Same relayreplaced &restored byESM/CLI.R:- 6.6 Ω
Relay:Make:CGStyle:QN1Sl.NO:31944
Mfd:07/99
LDM:23/02/11LDI:17/02/11
D.CNo:KMPS/2011/000037
relaydefective -Contact highresistance
AtKMPS
TCFcodetransmitted fromKMPS toHRR at08.15.22hrs.TOLAR-HRR Upat08.15.28
TOLAR-HRR Dn08.15.30hrs.Blockrelaysnotprovedin HRRD/L.
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 197/205
While tracing thecircuit, faultdisappeared,circuit kept under observation andblock restored byJE/S/KNO at KJG.ESM camped atKJG & SVNR.
LDM:02.03.11 LDMI:24.02.11 D/CNo: 0222
AtKJG: I/C I : 72mAI/C V : 18.2 V O/G
I : 75mA O/G V :45.34V DC-DCconverter I/P: 28.1V
O/P 65.5V,Block Local: 31V.
As per TRD/L : At SVNR:24V Block local up: 28.19V.Blocklocal Dn-notproved. At KJG:24V Ext: 29.02 @
22.53Hrs
Automaticallygot right.
NoBlockrelay
proved.
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 198/205
At SVNR TGTRnot picked up dueto TGBR relaycontact No. 4B3offering highresistance. Samerelay replaced andrestored byJE/S/KNO.R=10ohms. D/CNo:0234LDM:10.3.11LDMI:26.2.11Relay Make:PTJ
Mfd:06/05 SlNo:244727(Block relays not
proved in DataLogger)
Relay contactoffering highresistance
Blockrelay notproved
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 199/205
MiscellaneousDue to TAR @GDInot de-latched,same delatched &block restored byESM/YLG. Blocktested severaltimes foundworking inorder.Ckt keptunder obsevation.
TAR R1R2-26.78v
D/C-00210LDM:12.3.11
LDI(JE)-
12/16.3.11LDI(SE)-
8/9.3.11
At GDI:-
DN TARUp-6.57hr &
Dn-6.57hr. Blockrelay notproved.
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 200/205
At HVR Bell codebutton pusher spring cut. Samereplaced &restored byJE/S/HVR. D/C :00001 LDM :04.3.11 LDMI:07.3.11
Bell codebutton pusher spring cut
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 201/205
Before arrival of ESM/KNO SNRindicationappeared @S.UBL. CheckedSNR ckt in Blockckt no fault foundand restored byESM/KNO @S.UBL.
D/CNo:S/U/2011/000189LDM: 09-3-11 LDI:22/2/11LDQI: 4/2/11 LDJI:
19/02/11.
Subsequentlygot right
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 202/205
At SVNR:
Blockinstrument testedsevaral times,fault not found andfault also notrepeated andblock restored byJE/S/KNO.D/C No: 000241
LDM:06.4.11LDI:28.3.11JE/S/KNO &ESM/KNO night
camped at SVNR.
Subsequentlygot right.
At KJG:
Blockrelaysnotproved.
UpZR,DnZR, DnTARData notavailable.AnalogBlockLocal &
Linevoltagenotproved.
AtSVNR:
Whiletrainreceivin
g at KJGfrequently power
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 204/205
On arrival of 11018 exp @HRR TAR buzzer appeared & lineclose established.
LDM: 2/4/11LDI: 13/4/11
D/C no:AVC/00063
Automaticallygot right.
At HRR :blockrelaysnotproved.24 V Bl.DN:31.42V@ 12.37hrs.
At AVC:60VBlock.L1HRR -59.02v@ 12.56
hrs 24VExt1:30.88V 24VExt II:30.48V24VBlock ntproved.
8/6/2019 TLB Final 6 Month
http://slidepdf.com/reader/full/tlb-final-6-month 205/205
On arrival of 56911 passg toYLG. TAR buzzer appeared andpush backcancellationapplied and blockrestored by trafficstaff. S& T staff not attended.Several timeschecked, fault notrepeated
LDM:17/04/11 LDMI:24/04/11
Automaticallygot right.