Post on 20-Jan-2018
description
THEMIS Instrument Pre-Environmental Review 1 UCB 5/02/2005
THEMISInstrument Pre-Environmental Review
Project StatusMay 2, 2005
Peter R. HarveyTHEMIS Project Manager
University of California - Berkeley
THEMIS Instrument Pre-Environmental Review 2 UCB 5/02/2005
Agenda/Purpose
Start Description Presenter8:30 Project Overview P. Harvey8:45 Instrument Verification Overview P. Turin9:15 IDPU M. Ludlam10:00 EFI J. Bonnell11:00 FGM M. Ludlam11:30 SCM M. Ludlam12:00 Mag Booms D. Pankow12:30 LUNCH13:30 SST D. Larson14:00 ESA C. Carlson14:30 Instrument Suite M. Ludlam15:00 Quality Assurance R. Jackson15:15 EMC/MAG M. Ludlam15:45 Thermal Vac Suite R. Sterling16:15 TOUR AND OPEN DISCUSSION17:00 ADJOURN
THEMIS Instrument Pre-Environmental Review 3 UCB 5/02/2005
Instrument Payload
IDPU: Instrument Data Processor UnitSPB : Spin Plane Booms (4x)AXB : Axial Booms (2x)SST : Solid State Telescope (2x)ESA : Electrostatic Analyzer FGM : Fluxgate MagnetometerSCM : Search Coil Magnetometer
THEMIS Instrument Pre-Environmental Review 4 UCB 5/02/2005
Instrument Status
Unit Completion Probe I&T Start Slack (w)F1 05/12/05 07/08/05 8.2F2 06/23/05 12/01/05 23.1F3 06/30/05 12/09/05 23.1F4 08/08/05 01/09/06 22.1F5 08/08/05 01/19/06 23.5
Comparison of Completion .v. Need Date
THEMIS Instrument Pre-Environmental Review 5 UCB 5/02/2005
Mission ScheduleCY 2005
MILESTONESCY 2004
THEMIS Bus, Instrument & Mission I&T Schedule STATUS AS OF: 4/28/05MISSION MGR. : FRANK SNOW
MAJOR REVIEWS
CY 2006
1 P1 INTEGRATION & TEST
BUS/INSTRU MECH & ELEC I&T & C/O (UCB)
BUS MECH & AVIONICS BUILD UP (Swales)
N D J F M A
PROBE SUBSYSTEM HARDWARE
2 P2 INTEGRATION & TEST
3 P3 INTEGRATION & TEST
4 P4 INTEGRATION & TEST
5
P5 INTEGRATION & TEST
7/08
BAU EDU#2
MECH BUILDUP
7 SETUP / PROBE VIB / PCA INTEGR. (JPL)
8 PCA VIB / ACOUSTICS / THERMAL (JPL)
9
11 LAUNCH PROCESSING/LAUNCH
INSTRUMENT CDR 4/19-20 MISSION CDR6/14-18
CRR 2/04
4/06-08
CR @ HQ
FGM/SCM CDR
4/22
INSTRU COMPL
INSTRU COMPL
INSTRU COMPL
5/12
6/23
8/08
PROJECT MGR. : PETER HARVEY
5/02
INSTRU COMPL8/08
P1 PER10/03
ENVIRONMENTAL TEST & CLOSEOUTS (JPL)
2/24-27
P2-P5 PER
5/12-15
PSR
10
MECH H/W
-- Critical Path H/W
-- Project Reserve
-- Instrument Slack
LEGEND-- Intermediate Slack
51 DAYS 10/1910 DAYS
7/31
3/21
7/28
FLT 1 BAU9/02
6 P2- P5 SHIP TO JPL
PROBE SUBSYSTEM HARDWARE
PROBE SUBSYSTEM HARDWARE
M J J A N D J F M A M J J AS O S O
5/17
MECH7/19
ELEC
8/10
SHIP to JPL
12/08-12/16
MECH BUILDUP 6/13
MECH 1/04 1/27
12/16P1 Test Review
INSTRU COMPL6/30
12/09MECH BUILDUP 9/01
10/18 AVIONICS BUILDUP
MECH 1/10
ELEC & C/O
2/03
MECH& ELEC H/W
MECH BUILDUP 11/29
1/23 2/14
1/19MECH BUILDUP
10/13 12/13
MECH 1/31 2/23
PROBE SUBSYSTEM HARDWARE
PROBE SUBSYSTEM HARDWARE
3/02
MISSION RESERVE
MAG & MASS PROP (JPL) / SHIP
3/23PCA INTEGRPROBE VIB
4/085/03PCA THERMALPCA VIB/ACOUSTICS
5/11P2-5 PACK & SHIPMAG / MASS PROP
5/16
ENVIRONMENTALS
10/26
FLT BAU11/03
9/26
FLT BAU11/21
FLT BAU
MECH& ELEC H/W
MECH& ELEC H/W
MECH H/W
11/09
8/30
AVIONICS BUILD UP Swap
out
5/26
Swap out
ELEC & C/O
8/17
9/09
9/27
AEB
8/15
AVIONICS BUILD UP
12/01
SHIP to UCB
10/05
12/08BAU EDU#1
SHIP to UCB
FLT BAU
SHIP to UCB
ELEC & C/O
MECH
SHIP to UCB
AVIONICS BUILDUP
ELEC & C/O
AVIONICS BUILDUP
SHIP to UCB
1/07
P1 Test Review
BUS/INSTRU MECH & ELEC I&T & C/O (UCB)
BUS MECH & AVIONICS BUILD UP (Swales)
BUS/INSTRU MECH & ELEC I&T & C/O (UCB)
BUS MECH & AVIONICS BUILD UP (Swales)
BUS/INSTRU MECH & ELEC I&T & C/O (UCB)
BUS MECH & AVIONICS BUILD UP (Swales)
BUS/INSTRU MECH & ELEC I&T & C/O (UCB)
BUS MECH & AVIONICS BUILD UP (Swales)
9/22
10/04
6/02
8/15
THEMIS Instrument Pre-Environmental Review 6 UCB 5/02/2005
Instrument ScheduleCY 2005MILESTONES
CY 2004
THEMIS INSTRUMENT TOP LEVEL SCHEDULE STATUS AS OF 4/07/05MISSION MGR. : FRANK SNOW
1
MAJOR REVIEWS IDPU DEVELOPMENT
IDPU ETU DESIGN, FAB, I&T
IDPU FLIGHT FABRICATION & I&T
2 EFI SPB / AXB DEVELOPMENT
EFI SPB DESIGN, FAB, I&T (ETU & FLT)
EFI AXB DESIGN, FAB, I&T (ETU & FLT)
3 ESA DEVELOPMENT
ESA ETU DESIGN, FAB, I&T
ESA FLIGHT FABRICATION & I&T
4 SST DEVELOPMENT
SST ETU DESIGN, FAB, I&T
SST FLIGHT FABRICATION & I&T
5 FGM DEVELOPMENT
FGM ETU DESIGN, FAB, I&T
FGM FLIGHT FABRICATION & I&T
6 SCM DEVELOPMENT
SCM EM DESIGN, FAB, I&T
SCM FLIGHT FABRICATION & I&T
8 INSTRUMENT I&T
INSTRUMENT INTEGRATION & TEST
MAGBOOM FLIGHT FAB & I&T
FLT 1 BD FAB/ASSY COMPL
BOARD I&T COMPL. IDPU ETU I &T COMPL
1/14
11/1910/06
4/07 5/25 6/08
1 2 3 4 5
INSTRU. CDR 4/19-20MISSION CDR
6/14-18
4/22CR
AJ J A S JO N D J
FLT I&T COMPL6
5/101
ETU INSTRU. I &T COMPL12/10
START FLT INSTRU I&T w/ IDPU, ESA, SST ETU
7
FGM/SCM CDR 4/06-08
MISSION MGR. : FRANK SNOWPROJECT MGR. : PETER HARVEY
F M
2-3
6/216/10
FGE ETU DEL. To GERMANY
PCB/FGE ETU I &T COMPL7/193/19
3/1812/24
1-2 3-4FLT TO IDPU
FGE FLT 1-2 DEL to GER.
11/01
SC/EM I &T COMPL
3/211/05
PA 1-2 4-5CUBE DEL.7/30
4/11 4/224/29
1 2 3FLT I&T COMPL
FAB FLT HINGES
12/07
ETU I &T COMPL
12/063/05
6/155/18 6/01
ETU COMPL
6/079/10 2/04 4/18 5/02 5/17
1 2 3 4FLT I&T COMPL
11/11
FLT FAB/ASSY
ETU COMPL
6/11 2/07 4/13 4/29 5/16 5/30
1 2 3 4 5-6FLT I&T COMPL
7/30
FLT MACH
FLT 1-6 BD FAB/ASSY COMPL
BOARD I&T COMPL. ESA ETU I &T COMPL
DSG COMPL.
3/30
1/0712/223/25
FLT I&T COMPL2/22
1
5-6
BOARD I&T COMPL.
SST ETU I &T COMPLDSG COMPL.
9/176/113/05
5/203/29
4/114/19
4/295/10
1 2 3 4 5FLT 1 BD FAB/ASSY COMPL
12/06
6
A M
68/25
8/30
7/01
12/10
FGE FLT 3-5 DEL to GER.
2/02USING SCM SIM & ESA PreAmp & IDPU BDS
8/30
4-5
FLT I&T COMPL
J
4/27
5-6
4/184/20
4/2226
4/28
23
45
6
FLT IDPU
FLT ESA
2/09
SC 1-2-3
4 5 6
5/065/13
5/27
5/02
6FLT I&T COMPL