Transcript of The Rossway Safeway Roof Safety Protection system is installed on top of roof purlins.

The Rossway Safeway Roof Safety Protection system is installed on top of roof purlins.The Rossway Safeway system consists of a platform deck with handrail and toe board to one side, the “leading edge” and fall protection frames to the other “working edge”

Roof Plan

Roof section

Method statement for the Rossway Safeway

system with a composite roof panel

RosswaySafeway system

The first roof tier is placed with crane or other suitable lifting device. Access to de-sling and fix panel is gained from Rossway Safeway system

Roof Plan

Roof section

Method statement for the Rossway Safeway

system with a composite roof panel

The “Rossway SafeEdge” roof perimeter edge protection system is fitted on the first composite panel installed.This provides perimeter fall protection for operatives working at roof level.

RosswaySafeEdge

Roof Plan

Roof section

Method statement for the Rossway Safeway

system with a composite roof panel

RosswaySafeEdge

The Rossway Safeway system is moved on purlin trolleys the width of a roof panel

Roof Plan

Roof section

Method statement for the Rossway Safeway

system with a composite roof panel

RosswaySafeEdge

The next tier of roof panels are laid

Roof Plan

Roof section

Method statement for the Rossway Safeway

system with a composite roof panel

RosswaySafeEdge

Crane slings removed with access from Rossway Safeway system

Roof Plan

Roof section

Method statement for the Rossway Safeway

system with a composite roof panel

RosswaySafeEdge

The Rossway Safeway system is moved on purlin trolleys the width of a roof panel

Roof Plan

Roof section

Method statement for the Rossway Safeway

system with a composite roof panel

The next tier of roof panels are laid

Roof Plan

Roof section

Method statement for the Rossway Safeway

system with a composite roof panel

RosswaySafeEdge

Crane slings removed with access from Rossway Safeway system

Roof Plan

Roof section

Method statement for the Rossway Safeway

system with a composite roof panel

RosswaySafeEdge

A pack of roof panels can be landed on the completed roof area.Edge protection is provided to all edges with the Rossway Safeway Roof Safety protection system to the leading edge and the Rossway SafeEdge to the perimeter

Roof Plan

Roof section

Method statement for the Rossway Safeway

system with a composite roof panel

RosswaySafeEdge

The Rossway Safeway system is moved on purlin trolleys the width of a roof panel

Roof Plan

Roof section

Method statement for the Rossway Safeway

system with a composite roof panel

RosswaySafeEdge

The next tier of roof panels are laid panels can be taken from the pack landed at roof level.

Roof Plan

Roof section

Method statement for the Rossway Safeway

system with a composite roof panel

RosswaySafeEdge

The Rossway Safeway system is moved on purlin trolleys the width of a roof panel

Roof Plan

Roof section

Method statement for the Rossway Safeway

system with a composite roof panel

RosswaySafeEdge

The next tier of roof panels are laid

Roof Plan

Roof section

Method statement for the Rossway Safeway

system with a composite roof panel

RosswaySafeEdge

The Rossway Safeway system is moved on purlin trolleys the width of a roof panel

Roof Plan

Roof section

Method statement for the Rossway Safeway

system with a composite roof panel

RosswaySafeEdge

The next tier of roof panels are laid

Roof Plan

Roof section

Method statement for the Rossway Safeway

system with a composite roof panel

RosswaySafeEdge

At the end of the roof the fall protection frames are removed by removing the fixing brackets on one side which enables the frames to rotate on the other side.The other side can then be released and the frame taken off with access from the platform deck.

Roof Plan

Roof section

Method statement for the Rossway Safeway

system with a composite roof panel

RosswaySafeEdge

With access from the completed roof……

Roof Plan

Roof section

Method statement for the Rossway Safeway

system with a composite roof panel

RosswaySafeEdge

…..the platform deck and handrail can be moved on to the completed roof providing edge protection…….

Roof Plan

Roof section

Method statement for the Rossway Safeway

system with a composite roof panel

RosswaySafeEdge

…from the platform deck……

Roof Plan

Roof section

Method statement for the Rossway Safeway

system with a composite roof panel

RosswaySafeEdge

…the final tier of roof panels are installed

Roof Plan