The operator's role in capital improvement planning

Post on 27-Jan-2017

12 views 4 download

Transcript of The operator's role in capital improvement planning

MSA PROFESSIONAL SERVICES, INC. | More ideas. Better Solutions.

THE OPERATOR’S ROLEIN CAPITAL IMPROVEMENT PLANNING

Presentation prepared for the Illinois Rural Water Association Northern ConferenceOctober 28-29, 2014Utica, IL

MSA PROFESSIONAL SERVICES, INC. | More ideas. Better Solutions.

CAPITAL IMPROVEMENT PLANWHAT IS IT?» Forecast of major capital improvements over a

pre-determined period of time» A CIP…• Estimates the capital cost of an improvement• Identifies funding sources for each improvement• Forecasts impacts on current and future budgets

MSA PROFESSIONAL SERVICES, INC. | More ideas. Better Solutions.

DEFINING ‘CAPITAL IMPROVEMENT’

» Improvement Projects• Preliminary Engineering Reports • Pilot Studies• Design Engineering• Construction

» Annual maintenance projects» Utility Rate Studies and Facility Master Plans» Equipment

MSA PROFESSIONAL SERVICES, INC. | More ideas. Better Solutions.

CAPITAL IMPROVEMENT PLANWHY INVEST TIME IN CREATING A CIP?» Help a community effectively allocate limited resources» Improve communication and cooperation » Provide continuity in financial decisions by linking long-

term planning to the programming and budgeting of major projects

» Stabilize local tax rates » Enable community to leverage state and federal grant-

in-aid programs» Establish an objective rating system

MSA PROFESSIONAL SERVICES, INC. | More ideas. Better Solutions.

CAPITAL IMPROVEMENT PLANTO SUM THINGS UP….

“Cities without CIP’s are at a disadvantage because there are no mechanisms in place to forecast all

potential capital projects simultaneously.”

-- Capital Budgeting and Finance, A guide to Local Governments (2009)

MSA PROFESSIONAL SERVICES, INC. | More ideas. Better Solutions.

CAPITAL IMPROVEMENT PLANNINGAN OVERVIEW OF THE PLANNING PROCESS

1. Analyze Community Facility Needs2. Prepare Project Descriptions3. Analyze Fiscal Capacity4. Set Project Priorities5. Develop and Adopt CIP6. Implementation and Annual Updates

MSA PROFESSIONAL SERVICES, INC. | More ideas. Better Solutions.

Operator’s Wish Lists

» Take 7-10 minutes to fill out wish list form for your communities capital needs.

» We’ll later go through the process of prioritizing the list

MSA PROFESSIONAL SERVICES, INC. | More ideas. Better Solutions.

CAPITAL IMPROVEMENT PLANFROM A CITY ADMINISTRATOR’S PERSPECTIVE…

MSA PROFESSIONAL SERVICES, INC. | More ideas. Better Solutions.

THE CITY OF ASBURYA CASE STUDY

» TIF and CIP

MSA PROFESSIONAL SERVICES, INC. | More ideas. Better Solutions.

THE CITY OF ASBURYA CASE STUDY

MSA PROFESSIONAL SERVICES, INC. | More ideas. Better Solutions.

THE BRAINSTORMING PHASE“WHERE DO I START?”

» Reach out to others» Maintain an annual list so items aren’t

forgotten» “What projects or equipment do we need?”

MSA PROFESSIONAL SERVICES, INC. | More ideas. Better Solutions.

THE BRAINSTORMING PHASEREMEMBER…

» These are often political decisions, so don’t be afraid to build support in advance• One-on-one meetings• Offer tours or ride-alongs

MSA PROFESSIONAL SERVICES, INC. | More ideas. Better Solutions.

BUILDING YOUR CASECREATE A CIP PRIORITIZATION MATRIX

MustHaves

QuickWins

Long term needs

Low-HangingFruit

High

Low

Hard Easy

Impact

Ease of Implementation

MSA PROFESSIONAL SERVICES, INC. | More ideas. Better Solutions.

BUILDING YOUR CASEOBTAIN BACKGROUND INFO» Obtain budgetary cost estimates» Obtain product literature

MSA PROFESSIONAL SERVICES, INC. | More ideas. Better Solutions.

BUILDING YOUR CASEGAIN SUPPORT» Work with your local engineer and planning

staff, if available» Continue to build support• Code requirements• Regulatory-driven• Identify hot-button issues that address individual

board member’s agendas, or that address public outcry

MSA PROFESSIONAL SERVICES, INC. | More ideas. Better Solutions.

SUBMITTING YOUR LISTBE PREPARED» Prioritize needs and establish timeline that is

required to implement» Provide brief description of needs sufficient to

allow a board or committee member to understand the project

» Justify expense» Identify potential funding sources

MSA PROFESSIONAL SERVICES, INC. | More ideas. Better Solutions.

PARTICIPATEBE PREPARED» Prioritize needs and establish timeline that is

required to implement» Provide brief description of needs sufficient to

allow a board or committee member to understand the project

» Justify expense» Identify potential funding sources

MSA PROFESSIONAL SERVICES, INC. | More ideas. Better Solutions.

PARTICIPATEGET INVOLVED IN THE PLANNING PROCESS» Request to be present at the CIP meetings» Ask for a vote» Stay involved, don’t just assume that there’s

support for your ideas» Offer to clarify if necessary» Offer to obtain additional information

MSA PROFESSIONAL SERVICES, INC. | More ideas. Better Solutions.

PARTICIPATEGET INVOLVED IN THE PLANNING PROCESS

Project Worksheet Development

MSA PROFESSIONAL SERVICES, INC. | More ideas. Better Solutions.

ASSET MANAGEMENTWHAT IS IT?

• Storm water Regulations

• DNR Wetlands Requirements

• EPA Regulations - CMOM

• Gov’t Reporting Requirements

• FEMA Floodplain Regulations

• Infrastructure History and Maintenance

• User Information

• Equipment Maintenance Tracking

• Work Order/Service Requests

• City Zoning & TIF Planning

• Urban Forestry Management

• Capital Improvement Planning

• Condition & Cost Analysis

• Permits/Building Inspections

• Hazardous Chemical Sites

MSA PROFESSIONAL SERVICES, INC. | More ideas. Better Solutions.

ASSET MANAGEMENTHow Do You Manage – Water System

Wells/Booster PumpWater StorageWater System

Main BreaksWater Metering

MSA PROFESSIONAL SERVICES, INC. | More ideas. Better Solutions.

ASSET MANAGEMENTHow Do You Manage – Sewer System

• WWTF and Lift Stations• Sewer System• Sewer Backups• Sewer Televising &

Smoke Testing• Sewer Repairs

MSA PROFESSIONAL SERVICES, INC. | More ideas. Better Solutions.

ASSET MANAGEMENTHow Do You Manage

» Sign Inventory• Sign Type/MUTCD Codes• Reflective Rating• Replacement Schedule

• Storm Sewer System• Street Maintenance• Sidewalk Maintenance• Tree Inventory

o Tree Species, Condition, Maintenance

MSA PROFESSIONAL SERVICES, INC. | More ideas. Better Solutions.

ASSET MANAGEMENTTHE BENEFITS» Identify age of equipment» Monitor when equipment needs maintenance» Keep track of the cost of replacing equipment» Show your Council, Board and Administrator

your needs – This process leads into the Capital Improvement Planning process

MSA PROFESSIONAL SERVICES, INC. | More ideas. Better Solutions.

QUESTIONS/COMMENTS?