Post on 31-Dec-2015
description
19/04/2023 brenergy@leabrook.co.uk 1
THE NEED FORSMALL FUSION REACTORS
Brendan McNamara, Leabrook Computing,2008
Lawrence Livermore National Laboratory
19/04/2023 brenergy@leabrook.co.uk 2
GLOBAL NUCLEAR ENERGY
12345678910
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
0
500
1000
1500
2000
2500
3000
3500
GLOBAL NUCLEAR GROWTH
GEN II PWR GEN III PWR GT-MHR BREEDER
YEAR
GIG
AW
AT
T-Y
EA
RS
GW
Ye
GEN II PWRs
GEN III PWRs
GT-MHRs
SFRs
19/04/2023 brenergy@leabrook.co.uk 3
NUCLEAR ENERGY STALLS
0 5 10 15 20 25 30 35 40 45 501E+00
1E+01
1E+02
1E+03
1E+04
1E+05
1E+06
BREEDER STARTUP FROM SPENT PWR FUEL
SPENT PWR RECYCLE TRU SPENT SFR
YEARS FROM 2000
TO
NN
ES
RECYCLE PWR FUEL
TRU STOCK
SFR REFUEL
PWR SPENT FUEL
19/04/2023 brenergy@leabrook.co.uk 4
SLOWER GROWTH MISSES ALL TARGETSLOW GROWTH IN RECESSION
LEAVES NUCLEAR AS MINOR PLAYER AT ~20%
MEDIUM GROWTH LEADS TOTIGHT MARKETS FOR MINED URANIUMENERGY INDEPENDENCE FOR A FEW
MASSIVE USE OF WIND & SOLAR AT 3X$OR
COAL + RUNAWAY GLOBAL WARMING
RECYCLING + FUSION FUEL BREEDING CHANGES ALL SCENARIOS
19/04/2023 brenergy@leabrook.co.uk 5
BREEDING FISSILE FUEL • 1T PLUTONIUM 1000 GWTH-days• 1T D-T FUEL 5000 GWTH-days
& 16 X NEUTRONS ALL AT 14.1 MeV
• 1 FUSION FROM HOT FUEL 17.1 MeV• 1 FISSION from a COLD NEUTRON 200 Mev
• TRANSMUTATION OF U-238 ……• 1 kg FUSION NEUTRONS 239 kg Pu
OR, WITH MULTIPLIER 360 kg Pu
HOT NEUTRONS IS THE PRIMARY PRODUCT!
19/04/2023 brenergy@gmail.com 6
DEPLETED URANIUMDEPLETED URANIUMA MAJOR RESOURCE
ENOUGH DU IN UK TO RUN ALL ELECTRIC ECONOMY
FOR 500 YEARS
19/04/2023 brenergy@leabrook.co.uk 7
START @ CULHAM
19/04/2023 brenergy@leabrook.co.uk 8
NSTX PRINCETON
19/04/2023 brenergy@leabrook.co.uk 9
TOKAMAK CONFINEMENT
19/04/2023 brenergy@leabrook.co.uk 10
MAST & NSTX PERFORMANCE
• IPB98: tE = 0.0562 Ip0.93 Bt
0.15 R1.97 (a/R)0.58 M0.19 ne0.41 k0.78 P_in-0.69
• NSTX: Kaye et al. B SCALING MUCH STRONGER THAN ITER• Valovic et al., CULHAM: SIMILAR FOR COMBINED MAST/NSTX
DATA
• Kaye-Valovic: (MAST-type):
tE = Cp Ip 0.51-0.59 Bt
1.08-1.6 R1.97 (a/R)0.58 M0.19 ne0.0-0.44 k0.78
Pin-0.73
• McNAMARA: SELF CONSISTENT POINT MODEL FOR
I , B, T, n , P-fusion & tE,
WITH PLASMA PROFILES & GIVEN MAGNETIC GEOMETRY
19/04/2023 brenergy@leabrook.co.uk 11
MICRO-INSTABILITY
19/04/2023 brenergy@leabrook.co.uk 12
ST DESIGN SPACESPlasma N, Te, Ti Profiles
02
468
10
121416
1820
0 0.2 0.4 0.6 0.8 1
Radius
Prof
ile
10*N Te Ti Ion Energy
Fusion Profile
0.000E+00
2.000E-01
4.000E-01
6.000E-01
8.000E-01
1.000E+00
1.200E+00
1.400E+00
1.600E+00
1.800E+00
2.000E+00
0 0.2 0.4 0.6 0.8 1
Fusion Profile
-5
-4
-3
-2
-1
0
1
2
3
4
5
-4 -2 0 2 4
Chamber Wall Plasma Boundary
50% Fusion core
19/04/2023 brenergy@leabrook.co.uk 13
BIG & COOL 25MW REACTORMAGNETICFIELD
R=1.50a= 0.94Kappa= 3.00Eps= 0.63 Delta=0.40 Bt=3.25
PLASMA
Ip=6.00Beta=5.54N20-peak=0.65 Ti-peak=10.01Te-peak= 7.68 H=1.10
2.00 2.20 2.40 2.60 2.80 3.00 3.20 3.40 3.60 3.80 4.000
1
2
3
4
5
6
7
8
9
10
SST-Pu BIG & COOL @ P-f=25 R=1.5, a=.94alf_n=0.75, alf-Ti=0.75,alf-Te=0.6, Ti=5.72,Te=4.8
I-p 0.1*Beta% QIPB(1.6) Q-KV(1.1) 0.1*P-in KV
Toroidal Field B-t
Te
sla
or
Ra
tio
s
19/04/2023 brenergy@leabrook.co.uk 14
FIRST WALL NEUTRON DAMAGE
Sergei Dudarev, ITER Materials Chair, Imperial College & Culham
19/04/2023 brenergy@leabrook.co.uk 15
DEPLETED URANIUM TOPLUTONIUM REACTOR FUEL
MOIR 1985
Cleanest fuel Breeding cycleEver.
Low radioactivity.
No need forFission Breeders.
Enough DepletedUranium in SellafieldFor 500 years of anAll electric UK!
19/04/2023 brenergy@leabrook.co.uk 16
FUSION NEUTRONS
19/04/2023 brenergy@leabrook.co.uk 17
THORIUM & U-233
19/04/2023 brenergy@leabrook.co.uk 18
CROSS BREEDING FUEL
MHR Tritium Production vs Neutron Fraction
0.00
0.50
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
5.00
0.05 0.1 0.15 0.2
fT, Neutron Fraction for Li-6 Breeding
Tri
tiu
m P
rod
uc
tio
n (
kg
)
6x MHR600s 4x MHR 600s 3x MHR600s
SST P-Fusion vs Breeding Fraction
0
20
40
60
80
100
120
140
1 1.2 1.4 1.6 1.8 2
b-Pu, Pu Breeding per Triton burned
Fu
sio
n P
ow
er (
MW
)
3 x 600MWth MHRs 4 x 600MWth MHRs
19/04/2023 brenergy@leabrook.co.uk 19
5 MISSIONS FORSMALL FUSION REACTORS
1. BREED Pu FROM DU – CLEAN, LOW RADIOACTIVITY
2. BREED U-233 FROM THORIUM
3. BREED TRITIUM FOR SFusR FLEETS
4. DESTROY LONG LIVED FISSION PRODUCTS
5. FUSION-FISSION POWER REACTORS WITH RECYCLED Pu
19/04/2023 brenergy@leabrook.co.uk 20
SCALING1. MULTIPLE UNITS HIGH AVAILABILITY, EASY
MAINTENANCE
2. LOW POWER EXPENSIVE ELECTRICITY
3. ITER MATERIALS REQUIRED FOR FUSION POWER DEVELOPMENT
4. FAST REACTORS UNECCESSARY
5. OPERATED UNDER OUR STRICT NUCLEAR SAFEGUARDS LOCKDOWN.
19/04/2023 brenergy@leabrook.co.uk 21
LASER FUSION BREEDER
19/04/2023 brenergy@leabrook.co.uk 22
Be MULTIPLIER SPECTRUM
19/04/2023 brenergy@leabrook.co.uk 23
LIFE & ST BLANKETS
Seed the startup. Run slowly shifting fuel balance. Thorium version, Moir 2008
19/04/2023 brenergy@leabrook.co.uk 24
LLNL FUSION ACHIEVEMENTS
MAJOR COMPONENTS OF FUSION PROGRAMMES
SUPERB TECHNICAL ABILITY
INVENTIONS
MICROSTABLE PLASMAS
19/04/2023 brenergy@leabrook.co.uk 25
OTHER FUSION HYBRIDS?
• Q~5 FUSION FUEL FACTORIES• A NEW GOALPOST
19/04/2023 brenergy@leabrook.co.uk 26
LIQUID WALL MIRROR
• 10-15M CENTRAL COLUMN 30MW
• VERTICAL FOR EASY LIQUID WALL DESIGN.
19/04/2023 brenergy@leabrook.co.uk 27
10A/20keV NEUTRAL BEAM
19/04/2023 brenergy@leabrook.co.uk 28
BEST US COMPUTING
19/04/2023 brenergy@leabrook.co.uk 29
SUPERCONDUCTING MAGNETS
19/04/2023 brenergy@leabrook.co.uk 30
RESTORE THE
US FUSION PROJECTS!
OBAMA: $150Bn forRenewable Energy & Nuclear?
Yucca Mtn $25Bn diverted?
19/04/2023 brenergy@leabrook.co.uk 31
ANOTHER FUSION FATE
ALIENTECHNOLOGYBURIEDATSECRETGOVERNMENTSITE
19/04/2023 brenergy@leabrook.co.uk 32
GROWING UP WITH FUSION
19/04/2023 brenergy@leabrook.co.uk 33
GROWING UP WITH FUSION
19/04/2023 brenergy@leabrook.co.uk 34
ST POWER REACTORS
19/04/2023 brenergy@leabrook.co.uk 35
SUPPORTING SLIDES
19/04/2023 brenergy@leabrook.co.uk 36
IAEA FUSION CONF., GENEVA
19/04/2023 brenergy@leabrook.co.uk 37
19/04/2023 brenergy@leabrook.co.uk 38
D3D @ GENERAL ATOMIC
19/04/2023 brenergy@leabrook.co.uk 39
TRISO fuel in fuel blocks
Electricity
Hydrogen
LWRSpent Fuel
TRISO
Low-Enriched UraniumTRISO
Common Reactor Core - Ultra Safe Design
Weapons Surplus Pu
TRISO
LithiumBreedsTritium
1.7 kg/GW-y
Heat
MHRs can also use diverse fuels in same core design:because of properties of graphite and helium
19/04/2023 brenergy@leabrook.co.uk 40
RECYCLING ‘SPENT FUEL’PWR
Breeding Ratio 0.6
UREX
93% U
2.5% Fissile
5.5%FP
PWR FUEL
4.5% 235U
95.5% 238U
SPENT FUEL1.1% 235U
92.0% 238U
0.12% Acts.
1.3% Pu
5.5% ASH-Fission
Products
19/04/2023 brenergy@leabrook.co.uk 41
U-235 & Pu-239 FISSION
Shows why thermal reactors are easiest to build,.Plutonium is best for bombs. Fusion and Fast Reactors can burn anything. Australian Uranium Association
Fusion14.1 Mev
19/04/2023 brenergy@leabrook.co.uk 42
DEEP BURN GT-MHR
4842
3630
24
General Atomics: Inflammable – No Meltdown – Burns U, Pu, Actinide Waste –
High Temperature (900 C) – 50% Thermal Efficiency – No Pu leakage –
300 year ILW.Russian Weapons Pu Burner
19/04/2023 brenergy@leabrook.co.uk 43
VI. MILLION YEAR TRISO FUEL
Any enriched Fuel: U, Pu, Actinides
Contains all fission Products for 1 million years
No Pu leakage to contaminate structures No long lived ILW
19/04/2023 brenergy@leabrook.co.uk 44
MOLTEN SALT THORIUM BREEDER
232Th + n 233Pa + b- + g 233U + b-
DBERR BUREAUCRACY
HAS WITHDRAWN THE UK
FROM PARTICIPATION IN
THE GENERATION IV PROGRAMME
2007
• THORIUM:• Good for
another 3000 Years
• France leads Gen IV research on:
• PWRs• MHRs• MSThBR• GCFR• SFR• Recycling
• UK Selling out
19/04/2023 brenergy@leabrook.co.uk 45
UK Committee on Radioactive Waste Management
• Propose geological storage for all spent fuel, depleted Uranium, and ILW.
WRONG
• Should build Nuclear Fuel Vaults good for 1000 years.
• Should build Advanced Fuel Cycle & TRISO reprocessing plants.
• Should reserve all 300 year ‘waste’ of valuable metals.
• Should put the small amounts of ash and long lived waste in deep disposal.
19/04/2023 brenergy@gmail.com 46
URANIUM MARKETSIAEA RED BOOK URANIUM
RANK Mt MINE PWRS
DATE
KNOWN 3.2 2000 207
EXPECTED 5.1 2020 330
SPECULATIVE 12.1 2030 784
MIT GUESS 80 2030 5174
SEAWATER 4000 ???? 258699
MUST EXTRACT FROM ENTIRE GULF STREAM!
19/04/2023 brenergy@gmail.com 47
FUEL ENRICHMENT
Spent fuel is still 95% fuelAll Thorium, Uranium, Plutonium, Neptunium, & higher Actinides
can be transmuted and fissioned.
Each tonne can yield ~1000 GWth-days
Enough Uranium to run 10,000 reactors for 2000 years.