The adoption of BIM For Infrastructure Projects / Assets ...€¦ · BIM Manager at Turner...

Post on 06-Jul-2020

7 views 2 download

Transcript of The adoption of BIM For Infrastructure Projects / Assets ...€¦ · BIM Manager at Turner...

The adoption of BIM For Infrastructure Projects / Assets

Societies Digital Transformation

Issam Elabsi

Consolidated Contractors Company (CCC)

HISTORY AND JOURNEY

240 PROFESSIONAL BIM ENGINEERS

TRACK OF RECORD

IT IS ALL ABOUT INFRASTRUCTURES

IT IS ALL ABOUT INFRASTRUCTURES

General Figures

Built Up Area : 700 000 m2 Project Value : $ 3 Billion Piers Aircraft Capacity : 65 Number of Gates : 106 Passenger Capacity : 8500 / Hour Check in Counters : 165 BHS Capacity : 19000 / Hour BHS Length : 22 Kilometers

MTL MTB

MTА

Towards Facilities Digitization - BIM to Facility Management

BIM INTEGRATION WITH IoT

CCC BIM CENTERS TECHNOLOGY PARTNERS IOT AND SMART CITIES

Member of

Group

ISSAM EL-ABSI

TOWARDS FACILITY DIGITIZATION - BIM INTEGRATION WITH IoT

TOWARDS INFRASTRUCTURES DIGITIZATION - BIM AND SMART CITIES

EDUCATION SIGNIFICANCE CCC BIM ACADEMY

CCC BIM ACADEMY STARTED 2011

CCC BIM ACADEMY STARTED 2011

EDUCATION SIGNIFICANCE CCC BIM ACADEMY

CCC BIM ACADEMY STARTED 2011

EDUCATION SIGNIFICANCE CCC BIM ACADEMY

EDUCATION SIGNIFICANCE CCC BIM ACADEMY

EDUCATION SIGNIFICANCE CCC BIM ACADEMY

EDUCATION SIGNIFICANCE CCC BIM ACADEMY

CCC BIM Academy Graduates

BIM Manager at Turner International Middle East (TiME) BIM Projects Manager - RTA – Dubai - UAE BIM Manager at HBK-CRCC JV

BIM and Design Manager at J&P- AVAX S.A. BIM-Information Manager for Expolink2020 at ACCIONA

Senior Architect, BIM Manager - UAE BIM Project Managers at CCC – Abu Dhabi, Dubai, Muscat, Doha, Egypt, Astana