Technical Specs Improvement of Fontana - bcda.gov.ph · Refer to DPWH Bluebook & Standard...

Post on 27-Jul-2018

235 views 6 download

Transcript of Technical Specs Improvement of Fontana - bcda.gov.ph · Refer to DPWH Bluebook & Standard...

Technical Specs

Improvement of Fontana

Masonry Works/Acoustic Wall Partition

Masonry Works/Acoustical Wall Partition Page 1

MASONRY WORKS/Acoustic Wall Partition

Refer to DPWH DO No. 230, DPWH Standard Specifications for Item 1046 – Masonry works in 20mm thk.

in fabric finish/acoustic treatment

Basis of Payment The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for installation masonry units which price and payment shall be full compensation for furnishing and placing all materials, including all labor, equipment, tools and incidentals necessary to complete the work prescribed in this Item. Payment will be made under: Pay Item Number Description Unit of Measurement 1046 Masonry Units/Acoustic Treatment lump sum

Canopy

Canopy Page 1

Canopy

Concrete canopy with Ficem board fascia under sheeting in woven thatched finish.

Basis of Payment The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for installation of windows which price and payment shall be full compensation for furnishing and placing all materials, including all labor, equipment, tools and incidentals necessary to complete the work prescribed in this Item. Payment will be made under: Pay Item Number Description Unit of Measurement 405 Canopy Lump Sum

Capiz Accent Finish

Capiz Accent Finish Page 1

Capiz Accent Finish Refer to plans for Capiz Accent Finish.

Basis of Payment The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for installation of metal rails for stairs which price and payment shall be full compensation for furnishing and placing all materials, including all labor, equipment, tools and incidentals necessary to complete the work prescribed in this Item. Payment will be made under: Pay Item Number Description Unit of Measurement 1003 Capiz Accent Finish Sq. m.

Carpet Flooring

Carpet Flooring Page 1

Carpet Flooring

Carpet sheet in plain textured patterned styles 46OZ weight Construction: Woven Carpet Sheet Pile Content: Blended yarn 80% Wool and 20% Nylon Density: 7 x 10 Backing Materials: Polypropylene weft and polyester warp Backing Finish: Fray resistant latex The actual/existing condition of the flooring in the Fontana Convention Center is a raised floor.

Basis of Payment The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for installation of metal rails for stairs which price and payment shall be full compensation for furnishing and placing all materials, including all labor, equipment, tools and incidentals necessary to complete the work prescribed in this Item. Payment will be made under: Pay Item Number Description Unit of Measurement 1 Carpet Flooring Sq. m.

Caseworks

Caseworks Page 1

Caseworks

Marine plywood in hpl finish.

Basis of Payment The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for installation masonry units which price and payment shall be full compensation for furnishing and placing all materials, including all labor, equipment, tools and incidentals necessary to complete the work prescribed in this Item. Payment will be made under: Pay Item Number Description Unit of Measurement 1 Caseworks Lump sum

Ceiling

Ceiling Page 1

Ceiling

12mm thk moisture resistant gypsum board on metal furring w/ 20mm thk. in fabric finish/acoustic treatment in Tramato paint finish.

Basis of Payment The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for installation of metal rails for stairs which price and payment shall be full compensation for furnishing and placing all materials, including all labor, equipment, tools and incidentals necessary to complete the work prescribed in this Item. Payment will be made under: Pay Item Number Description Unit of Measurement 1003 Ceiling Sq. m.

Concrete Ledge

Concrete Ledge Page 1

Concrete Ledge

Basis of Payment The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for installation of windows which price and payment shall be full compensation for furnishing and placing all materials, including all labor, equipment, tools and incidentals necessary to complete the work prescribed in this Item. Payment will be made under: Pay Item Number Description Unit of Measurement 405 Concrete Ledge Lump Sum

Countertop Finishes

Countertop Finishes Page 1

Countertop Finishes

20mm thk. granite countertop.

Basis of Payment The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for installation masonry units which price and payment shall be full compensation for furnishing and placing all materials, including all labor, equipment, tools and incidentals necessary to complete the work prescribed in this Item. Payment will be made under: Pay Item Number Description Unit of Measurement 1 Countertop Finishes Sq.m.

Demolition/Dismantling of Existing Structures and Obstructions

Page 1

Demolition/Dismantling of Existing Structures Refer to DPWH Bluebook & Standard Specifications 2004 Volume II

101.4 Basis of Payment The accepted quantities, measured as prescribed in Section 101.3, shall be paid for at the Contract unit price or lump sum price bid for each of the Pay Items listed below that is included in the Bill of Quantities which price and payment shall be full compensation for removing and disposing of obstructions, including materials, labor, equipment, tools and incidentals necessary to complete the work prescribed in this Item. The price shall also include backfilling, salvage of materials removed, their custody, preservation, storage on the right-of-way and disposal as provided herein. Payment will be made under: Pay Item Number Description Unit of Measurement 101 (1) Demolition/Dismantling of Existing Structures sq. m.

Electrical Works

Electrical Works Page 1

Electrical Works Refer to the plan for the installation of electrical wirings devices and switches. Use materials of premium brand of quality. Entrance of line is underground.

Basis of Payment The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for installation of electrical devices, switches and utilities which price and payment shall be full compensation for furnishing and placing all materials, including all labor, equipment, tools and incidentals necessary to complete the work prescribed in this Item. Payment will be made under: Pay Item Number Description Unit of Measurement 1100/1/2 Electrical switches/devices/utilities Lump Sum

Tileworks (Granite Tiles)

Tileworks (Granite Tiles) Page 1

Tileworks (Granite)

Basis of Payment The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for installation and setting of tiles which price and payment shall be full compensation for furnishing and placing all materials, including all labor, equipment, tools and incidentals necessary to complete the work prescribed in this Item. Payment will be made under: Pay Item Number Description Unit of Measurement 1008 Granite Tiles Square meter

Mirrors

Mirrors Page 1

Mirrors

6mm thk Mirror on marine plywood backing.

Basis of Payment The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for installation of windows which price and payment shall be full compensation for furnishing and placing all materials, including all labor, equipment, tools and incidentals necessary to complete the work prescribed in this Item. Payment will be made under: Pay Item Number Description Unit of Measurement 1008(a) Mirrors Lump Sum

Painting Works

Painting Works Page 1

Painting Works

Wall Painting - Low-sheen acrylic latex paint Accent painting, Espresso Ceiling Painting - Flat latex paint finish Exterior Painting - Liquid-applied elastomeric wall coating Velo Accent Finish Basis of Payment The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for painting works for each area and furniture which price and payment shall be full compensation for furnishing and placing all materials, including all labor, equipment, tools and incidentals necessary to complete the work prescribed in this Item. Payment will be made under: Pay Item Number Description Unit of Measurement 1032 Painting Square meter

Masonry Works/Partition Walls

Masonry Works/Partition Walls Page 1

MASONRY WORKS/Partition Walls

Refer to DPWH DO No. 230, DPWH Standard Specifications for Item 1046 – Masonry works

Basis of Payment The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for installation masonry units which price and payment shall be full compensation for furnishing and placing all materials, including all labor, equipment, tools and incidentals necessary to complete the work prescribed in this Item. Payment will be made under: Pay Item Number Description Unit of Measurement 1046 Masonry Units/Partition Walls lump sum

Plumbing/Sanitary & Fixtures

Plumbing/Sanitary & Fixtures Page 1

Plumbing/Sanitary and Fixtures Refer to the plan for the installation of plumbing and sanitary and for bathroom fixtures. Provide air vent and clean out for every unit. Use materials of premium brand of quality. Includes connection to the nearest tapping point. Basis of Payment The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for installation of plumbing, sanitary and bathroom fixtures and accessories which price and payment shall be full compensation for furnishing and placing all materials, including all labor, equipment, tools and incidentals necessary to complete the work prescribed in this Item. Payment will be made under: Pay Item Number Description Unit of Measurement 1002 Plumbing/Sanitary/Fixtures Lump Sum

Removal and Replacement of Existing Carpet

Page 1

Removal and Replacement of Existing Carpet Refer to DPWH Bluebook & Standard Specifications 2004 Volume II

Basis of Payment The accepted quantities, measured as prescribed in Section 101.3, shall be paid for at the Contract unit price or lump sum price bid for each of the Pay Items listed below that is included in the Bill of Quantities which price and payment shall be full compensation for removing and disposing of obstructions, including materials, labor, equipment, tools and incidentals necessary to complete the work prescribed in this Item. The price shall also include backfilling, salvage of materials removed, their custody, preservation, storage on the right-of-way and disposal as provided herein. Payment will be made under: Pay Item Number Description Unit of Measurement (1) Removal and Replacement of Existing Carpet Sq. m.

Removal and Replacement of Existing Ceiling

Page 1

Removal and Replacement of Existing Ceiling Refer to DPWH Bluebook & Standard Specifications 2004 Volume II

Basis of Payment The accepted quantities, measured as prescribed in Section 101.3, shall be paid for at the Contract unit price or lump sum price bid for each of the Pay Items listed below that is included in the Bill of Quantities which price and payment shall be full compensation for removing and disposing of obstructions, including materials, labor, equipment, tools and incidentals necessary to complete the work prescribed in this Item. The price shall also include backfilling, salvage of materials removed, their custody, preservation, storage on the right-of-way and disposal as provided herein. Payment will be made under: Pay Item Number Description Unit of Measurement (1) Removal and Replacement of Existing Carpet Sq. m.

Toilet Partition

Toilet Partition Page 1

Toilet Partition

Tempered frosted glass with decorations on stainless steel.

Basis of Payment The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for installation masonry units which price and payment shall be full compensation for furnishing and placing all materials, including all labor, equipment, tools and incidentals necessary to complete the work prescribed in this Item. Payment will be made under: Pay Item Number Description Unit of Measurement 1046 Toilet Partitions Lump sum

Metalworks (Ventanillas)

Metalworks (Ventanillas) Page 1

Metalworks (Ventanillas) Refer to DPWH Bluebook & Standard Specifications 2004 Volume II

2mm thk Stainless Steel Cutouts with stainless steel angular frame and accessories in stainless steel tubular supports Basis of Payment The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for installation of metal rails for stairs which price and payment shall be full compensation for furnishing and placing all materials, including all labor, equipment, tools and incidentals necessary to complete the work prescribed in this Item. Payment will be made under: Pay Item Number Description Unit of Measurement 401 Decorative Panels Sq. ft.

Windows

Windows Page 1

Windows

10mm thk tempered clear glass in standard aluminum section in powder coated finish.

Basis of Payment The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for installation of windows which price and payment shall be full compensation for furnishing and placing all materials, including all labor, equipment, tools and incidentals necessary to complete the work prescribed in this Item. Payment will be made under: Pay Item Number Description Unit of Measurement 1008 Windows Sq. ft.

Woven Thatch Finish

Woven Thatch Finish Page 1

Woven Thatch Finish

Synthetic woven thatch finish. Basis of Payment The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for installation masonry units which price and payment shall be full compensation for furnishing and placing all materials, including all labor, equipment, tools and incidentals necessary to complete the work prescribed in this Item. Payment will be made under: Pay Item Number Description Unit of Measurement 1 Woven Thatch Finish Lump sum