Sustainability vs. Reliability · 16. Project Developer. APR Energy. Equipment Supplier. GE Fast...

Post on 20-Mar-2020

0 views 0 download

Transcript of Sustainability vs. Reliability · 16. Project Developer. APR Energy. Equipment Supplier. GE Fast...

Copyright © 2017 APR Energy. All Rights Reserved. APR Energy, its logo, and “Powering Your Progress” are trademarks of APR Energy.Copyright © 2017 APR Energy. All Rights Reserved. APR Energy, its logo, and “Powering Your Progress” are trademarks of APR Energy.

Sustainability vs. ReliabilityThe Need for a Balanced Approach to Power Generation

Association of Power Utilities of AfricaJuly 12-15, 2017

Copyright © 2017 APR Energy. All Rights Reserved. APR Energy, its logo, and “Powering Your Progress” are trademarks of APR Energy.2

Of the 10 countries with the most sunshine, seven are in Africa …

Copyright © 2017 APR Energy. All Rights Reserved. APR Energy, its logo, and “Powering Your Progress” are trademarks of APR Energy.3

… making solar power a sustainable and sensible solution for rural electrification.

Copyright © 2017 APR Energy. All Rights Reserved. APR Energy, its logo, and “Powering Your Progress” are trademarks of APR Energy.4

With Africa’s vast river network, continued development of hydropower …

Copyright © 2017 APR Energy. All Rights Reserved. APR Energy, its logo, and “Powering Your Progress” are trademarks of APR Energy.5

… will provide a lasting stream of sustainable power generation.

Copyright © 2017 APR Energy. All Rights Reserved. APR Energy, its logo, and “Powering Your Progress” are trademarks of APR Energy.6

Despite the benefits of renewables,

sustainable power is not necessarily

reliable power.

Copyright © 2017 APR Energy. All Rights Reserved. APR Energy, its logo, and “Powering Your Progress” are trademarks of APR Energy.7

Sustainable power needs

a reliable partner:

mobile fast-track power.

Copyright © 2017 APR Energy. All Rights Reserved. APR Energy, its logo, and “Powering Your Progress” are trademarks of APR Energy.

Cost-Effective Power – Fast

8

Solar hybrids combine benefits of renewables and security of back-up gensets.

Copyright © 2017 APR Energy. All Rights Reserved. APR Energy, its logo, and “Powering Your Progress” are trademarks of APR Energy.9

Gensets and turbines can inject large blocks of power to stabilize hydroelectric grids.

Copyright © 2017 APR Energy. All Rights Reserved. APR Energy, its logo, and “Powering Your Progress” are trademarks of APR Energy.10

Best of all, this cost-effective solution can be available in as fast as 60-90 days.

Copyright © 2017 APR Energy. All Rights Reserved. APR Energy, its logo, and “Powering Your Progress” are trademarks of APR Energy.11

But even with mobile fast-track power

to support

intermittent renewables …

Copyright © 2017 APR Energy. All Rights Reserved. APR Energy, its logo, and “Powering Your Progress” are trademarks of APR Energy.12

… Africa needs a balanced approach to power generation for sustainable growth.

Copyright © 2017 APR Energy. All Rights Reserved. APR Energy, its logo, and “Powering Your Progress” are trademarks of APR Energy.13

Introducing:Bridge to Permanent Power

Copyright © 2017 APR Energy. All Rights Reserved. APR Energy, its logo, and “Powering Your Progress” are trademarks of APR Energy.14

Mobile power is fast and cost-effective

but it’s also

Temporary.

Copyright © 2017 APR Energy. All Rights Reserved. APR Energy, its logo, and “Powering Your Progress” are trademarks of APR Energy.15

Now there’s a cost-effective power solution that’s

Fast and Permanent.

Copyright © 2017 APR Energy. All Rights Reserved. APR Energy, its logo, and “Powering Your Progress” are trademarks of APR Energy.

Bridge to Permanent Power

16

Project DeveloperAPR Energy

Equipment Supplier

GE Fast Power

Project EPCAPR Energy / GE

Customers no longer need to wait for years for installed power

Temporary Bridging Power in as fast as 60-90 days

Permanent Combined Cyclein 1-3 years

Copyright © 2017 APR Energy. All Rights Reserved. APR Energy, its logo, and “Powering Your Progress” are trademarks of APR Energy.

• Implementation:o Bridging Power: 2-3 months installation followed by 1-3 years of operationo Permanent Power: 1-3 years construction followed by 10-20 year PPA

• Pricingo Tiered – Customer pays same price for generation throughout the PPA

and gains substantial fuel savings when permanent plant goes commercialo Levelized – Customer pays the same cost per kWh (generation and fuel)

throughout the PPA regardless of technology

How Bridge to Permanent Works

17

A seamless solution at a tiered or levelized cost for power

Year10

Year5

Year15

5.00

5.50

6.00

6.50

7.00

7.50

FirstPower

Year20

Cen

ts p

er k

Wh

Example of Bridge to Permanent Price Options: 100MW w/ pipeline gas

Copyright © 2017 APR Energy. All Rights Reserved. APR Energy, its logo, and “Powering Your Progress” are trademarks of APR Energy.18

Bridge to Permanent Powerwith LNG and LPG:

Advantages Lower-cost fuels compared with diesel and HFO Increasing fuel availability in Africa Lower emissions vs. coal, diesel and HFO

Copyright © 2017 APR Energy. All Rights Reserved. APR Energy, its logo, and “Powering Your Progress” are trademarks of APR Energy.

• Provides electricity now with a parallel path to a highly efficient and cost-effective permanent power solution

• Ideal balance between speed and price

• No up-front payment by customer

• Flexibility of turbines to accommodate a range of fuels

Advantages of Bridge to Permanent

19

The power to grow Africa’s economy – now and for years to come

Copyright © 2017 APR Energy. All Rights Reserved. APR Energy, its logo, and “Powering Your Progress” are trademarks of APR Energy.20

why wait?

With a cost-effective solution that offers fast and permanent power,

Copyright © 2017 APR Energy. All Rights Reserved. APR Energy, its logo, and “Powering Your Progress” are trademarks of APR Energy.21

Questions?

Copyright © 2017 APR Energy. All Rights Reserved. APR Energy, its logo, and “Powering Your Progress” are trademarks of APR Energy.22