Dhaka WASA

Low Income Community Program: Challenges & Achievements

Supply of Water

Disposal of Sewerage

Storm Water Drainage

Dhaka WASA, an autonomous body, started its journey with the mandate to

effect

Unplanned City Development & Informal

Settlement

Switching to Surface Water from UnderGround Water

Large Investment Funding

Demography of Dhaka City

Pollution of Surrounding Rivers

Area : Dhaka & N’ngonj City With PeripheralsCurrently Served : Dhaka & Narayangonj CityPopulation : 12.5 Million

Water Supply Description

Total Coverage (Population) About 100 %

Demand Quantity 2,250 MLDProduction Capacity 2,420 MLD

Deep Tube Well 672 Nos.

Surface Water Treat. Plant 04 Nos.Length of Water Line 3,036 Km

Registered Consumer 320,773 Nos.

Public Standpipes 1,643 Nos.

VII

II

III

IVV

N. Gonj

X

IX

VIII

VI

I

Prior Dec 2012 Dec 2012 onwards

0

10

20

30

40

50

60

70

80

90

100

8778

1322

Surface WaterGround Water

Presently : From Surface Water

Sources 22% From Ground Water

Sources 78%

Name of Project Water Prodn (MLD)

Investment (M. US$)

Saidabad Phase III 450 500

Padma-Jashsaldia 450 450

Gandharbpur 500 700

Total 1,400 1,650

Transparency, Accountability & Chain of command

Mind Setup Change

Institutional Reform for Capacity Building

Cost Effective Management

Customer Service Excellence

Sustainability of Utility Organization

Large Investment

Access of Water to the Poor People

Shifting UG Water To Surface Water

To Make Dhaka WASA Profitable

Traditional Mind Setup

Bureaucracy

Lack of Transparency

Trade Union

Vested Interest

Increase of Water Production

Achievements

Reduction of NRW

Call Center “WASA Link-16162”

Improvement of Operating Ratio

Real Time, On-Line Billing SystemImprovement of Billing &

CollectionCBA – Mgt. Improved Relationship

Paperless e-Bill payment

Optimization of workforce

Networking Home & Abroad

Improvement of Chain of Command

Water & Sanitation Facility in LIC

GIS Based Management Info. System

..............Achievements

Sensitization of City Dwellers

Total Population : 3 Million

Existing Ppn Coverage : 1.7 Million

Informal/no connection : 1.3 Million

Informal Connection43%

Existing Connection40%

Formal connection (yr

2012)

17%

Status of Water Connection in LIC

Two types of Initiative of DWASA for LIC Sector :

DWASA own model since 2005

o Different NGO’s are working as a co-partner of DWASA (more than 90 scheme)

DWASA tries to adopt more innovative model Under DWSSP financed by the WB since 2007

o DWASA along with WB experts is still trying to Adopt such innovative model

Two types of Initiative of DWASA for LIC Sector :

DWASA own model since 2005

o Different NGO’s are working as a co-partner of DWASA (more than 90 scheme)

DWASA tries to adopt more innovative model Under DWSSP financed by the WB since 2007

o DWASA along with WB experts is still trying to Adopt such innovative model

Water connection through NGO/CBO

Internal O&M functions by CBO

Water main line connection & O&M functions by DWASA

Monitoring the activities of CBOs

Opening Water Point for Informal Settlement

Opening DTW for Informal

Settlements

Water is Human Right - Declaration of UN 2010

Some Initiatives of DWASA

Toilet for Disable

Toilet facility in Informal

Settlements

Full Computerized Billing System

Easy & Authenticate Bill Payment Sys.

Monthly Billing In Time

Bills Sent Out – More Than 99%

Revenue Collection – More Than 95%

Water Supply 24 x 7

Improved Quality Testing Procedure

Operating Ratio 0.66

Full Computerized Billing System

Easy & Authenticate Bill Payment Sys.

Monthly Billing In Time

Bills Sent Out – More Than 99%

Revenue Collection – More Than 95%

Water Supply 24 x 7

Improved Quality Testing Procedure

Operating Ratio 0.66

SL Subject Area Performance of 2008

Benchmark Standard

Achievements Dhaka WASA (Fin. Year)

2010-‘11 2011-‘12 2012-‘13

1 NRW 40.38 25.00 33.07 29.57 26.66

2 Bills Sent Out 93.00 99.50 97.56 98.86 99.00

3 Revenue Collection 64.50 95.00 94.96 93.36 95.00

4 Debt Age / Receivable 14.58 3.00 7.54 5.78 5.46

5 Manpower 16.20 12.00 9.11 8.86 9.16

6 Operating Ratio 0.90 0.65 0.78 0.66 0.66