Super Double-Offset Wall - construction details

Post on 24-Jul-2015

4.208 views 1 download

Tags:

Transcript of Super Double-Offset Wall - construction details

24”OC24

”OC

R-13 FG batt

R-11 FG batt

1-1/2” Thermaxtape

The

rmax wall assembly stoptop plate stop (overlap)

5/8” drywall

EXT WALL PLAN VIEWSOLAR RANCH © 2009 FINISH WERKS LLC (Rev 10.09.09)

wal

l ass

embl

y st

opto

p pl

ate

stop

REVISION #1 10.09.09:

Exterior and interior 2x4 studs STAGGERED (offset = 12”) for better thermal break

REVISION #2 10.09.09:

•Use 2x3 studs at:corners (drywall)

1-1/2” Handi (closed cell) foam to wrap interior studs

24”OC

2x3

Studs

for d

rywall

12”

<<

1-1

/2”

Han

di f

oam

to

wra

p al

l pen

etra

tions

1/2” rigid foam board (cover full depth of rough opening, 4 sides)

2x4 exterior frame

2x3 interior frame

Pine window stool

Drywall casing in lieu of jams (sides/top)

Window (or Door)

EXT WALL PLAN VIEW (window/door opening)

REVISION #2 10.09.09:

•Use 2x3 studs at:corners (drywall)

•2x3 (interior wall) king/jack studs of window and door openings (if structurally suitable)

•2x3 framing at all rough openings to reduce thermal bridging

SOLAR RANCH © 2009 FINISH WERKS LLC (Rev 10.09.09)

2x3

Studs

for d

rywall

2x3

roug

h

open

EXT WALL ROUGH OPENING DETAIL

1-1/

2” H

andi

foam

(c

lose

d ce

ll)

Jack/crippleKing

Jack

Double 2x4 Sill

2x Header

1-1/

2” T

herm

ax

5/8”

dry

wa

ll

2x42x3

1/2” rigid foam board to cover full depth of rough opening, from outside of Thermax to back of

gypsum, on 4 sides)

AND 1/2” rigid foam sandwiched in the header

REVISION #2 10.09.09:

•2x3 (interior wall) king/jack studs of window and door openings (if structurally suitable)

•2x3 framing at all rough openings to reduce thermal bridging

SOLAR RANCH © 2009 FINISH WERKS LLC (Rev 10.09.09)

ENVELOPE SECTION

ENVELOPE SECTION (top half)

ENVELOPE SECTION (bottom half)