STUDENT RISK ASSESSMENT
Date30/9/2015
Location: Media StudiesPhotography Studio
Task being assessed: Students filming/taking photos in collegeAnonymous InterviewGeneral Risk assessment
Student Name:Maisie Timmins
HAZARDS DEGREE OF RISK CONTROL MEASURES ACTION PLANHazard
Regardless of control measuresPersons at
risk*1
Worst outco
me*2
Probability
*3
Risk Rating
A-E
Existing control measures taken against the risk
What further control measures are required when
and by whom
Tripping over wires Sf, st, cl, v, d(whoever is in the room)
Min Ps
D Make sure no wires are exposed When we enter the room the documentary makers should clear the floor around where we will be filming
Electric shock Sf, st, cl, v, d(whoever is in the room)
F R B Don’t have water around the electronic equipment
If anyone needs a drink during filming go away from the equipment
Tripping over bags Sf, st, cl, v, d(whoever is in the room)
Min Ps D Put bags safely away When we enter the room make sure all of our bags are safely out of the way
*1Sf = staffSt = studentsCr = contractorsCl = cleanersV = visitors
D = people with disabilitiesX = young/inexperiencedL = lone workersW = women of child-bearing age
*2 This is without control measuresF = fatalMaj = major injury or permanent disabilityMin = minor injuryNR = non-reportable