ODOT’s GoalODOT’s Goal
Develop a streamlined stormwater Develop a streamlined stormwater runoff treatment program to: runoff treatment program to:
Meet all regulatory needs;Meet all regulatory needs; Provide ODOT with certainty Provide ODOT with certainty
regarding scope, schedule, and regarding scope, schedule, and budget budget
Result in an overall environmental Result in an overall environmental benefit and promote species benefit and promote species recovery.recovery.
Components of the Stormwater Components of the Stormwater Initiative Work PlanInitiative Work Plan
I.I. Streamline the DEQ Stormwater Streamline the DEQ Stormwater Management Plan Approval Management Plan Approval ProcessProcess
II.II. Develop Strategy/Process for Develop Strategy/Process for ODOT Projects with T&E Species ODOT Projects with T&E Species and Stormwater Effectsand Stormwater Effects
III.III. Develop a Watershed Approach to Develop a Watershed Approach to Mitigate for Unavoidable Mitigate for Unavoidable Stormwater EffectsStormwater Effects
I. Streamline the DEQ Stormwater I. Streamline the DEQ Stormwater Management Plan Approval ProcessManagement Plan Approval Process
Problem StatementProblem Statement
All applications for SWMPs reviewed in All applications for SWMPs reviewed in detail by DEQ, which results indetail by DEQ, which results in
Multiple requests for more Multiple requests for more information, design changesinformation, design changes
Constant danger of schedule slippingConstant danger of schedule slipping Heavy load on DEQ/ODOT liaisonHeavy load on DEQ/ODOT liaison
I. Streamline the DEQ Stormwater I. Streamline the DEQ Stormwater Management Plan Approval ProcessManagement Plan Approval Process
Determine Objectives/
Goal(s)
Water Resources
Impact Assessment
Water Quality Management
Design
Internal ODOT Quality
Control - QC Checklist
Optimize Treatment Option
Selection
ODOT Submits to DEQ- Submittal Application Form- Project Description- Objectives and Goals- Stormwater Treatment Measures- Project Plan Sheets
DEQ Reviews SWMP Submittal
Package
DEQ Approves
SWMP
Where We are Now:Where We are Now:DEQDEQ
Interagency Agreement with DEQ Interagency Agreement with DEQ and ODOT signedand ODOT signed
DEQ and ODOT developing training DEQ and ODOT developing training for Region and DEQ stafffor Region and DEQ staff
Training to be held in late Training to be held in late spring/early summer 2007spring/early summer 2007
II. Develop Strategy/Process for ODOT II. Develop Strategy/Process for ODOT Projects with Stormwater EffectsProjects with Stormwater Effects
Problem StatementProblem StatementStormwater had become a major Stormwater had become a major
impediment to efficient ESA process due impediment to efficient ESA process due to:to:
Lack of congruence in water quality Lack of congruence in water quality requirements between DEQ and NMFSrequirements between DEQ and NMFS
Changing thresholds for effects Changing thresholds for effects determinations in ESA Section 7 determinations in ESA Section 7 consultations consultations
Lack of early coordination to identify Lack of early coordination to identify emerging issues (i.e., new pollutants of emerging issues (i.e., new pollutants of concern)concern)
II. Develop Strategy/Process for ODOT II. Develop Strategy/Process for ODOT Projects with Stormwater EffectsProjects with Stormwater Effects
Proposed Strategy/ProcessProposed Strategy/Process Compile and synthesize literature on Compile and synthesize literature on
BMPs for stormwater treatmentBMPs for stormwater treatment Define water quality design stormDefine water quality design storm Develop water quantity guidanceDevelop water quantity guidance
II. Develop Strategy/Process for ODOT II. Develop Strategy/Process for ODOT Projects with Stormwater EffectsProjects with Stormwater Effects
Proposed Strategy/Process (cont.)Proposed Strategy/Process (cont.) Develop a BMP Selection Matrix and Develop a BMP Selection Matrix and
User’s GuideUser’s Guide Formalize a process toFormalize a process to
– Incorporate minimization of stormwater Incorporate minimization of stormwater impacts into project design (Low Impact impacts into project design (Low Impact Development techniques)Development techniques)
– Select most appropriate treatment BMPs Select most appropriate treatment BMPs for each project for each project
II. Develop Strategy/Process for ODOT II. Develop Strategy/Process for ODOT Projects with Stormwater EffectsProjects with Stormwater Effects
Proposed Strategy/Process con’tProposed Strategy/Process con’t Develop ESA Effects Determination Develop ESA Effects Determination
GuidanceGuidance Develop template language for NLAA and Develop template language for NLAA and
LAA Determinations for Biological LAA Determinations for Biological AssessmentsAssessments
Link the determinations of effect with the Link the determinations of effect with the BMP Selection MatrixBMP Selection Matrix
Develop a performance measurement and Develop a performance measurement and reporting methodreporting method
II. Develop Strategy/Process for ODOT II. Develop Strategy/Process for ODOT Projects with Stormwater EffectsProjects with Stormwater Effects
Anticipated BenefitsAnticipated Benefits
Regulatory AgenciesRegulatory Agencies Meet regulatory requirementsMeet regulatory requirements Well-defined terms and conditions Well-defined terms and conditions
that allow for flexibility in applicationthat allow for flexibility in application Protect ESA-listed fishProtect ESA-listed fish Protect Oregon’s water quality and Protect Oregon’s water quality and
wetland resourceswetland resources
II. Develop Strategy/Process for ODOT II. Develop Strategy/Process for ODOT Projects with Stormwater EffectsProjects with Stormwater Effects
Anticipated BenefitsAnticipated BenefitsODOTODOT Certainty in project development and Certainty in project development and
constructionconstruction Reduction in project delaysReduction in project delays Support ODOT’s Sustainability goalsSupport ODOT’s Sustainability goals
II. Develop Strategy/Process for ODOT II. Develop Strategy/Process for ODOT Projects with Stormwater EffectsProjects with Stormwater Effects
Where are we now?Where are we now? BMP Summary Reports CompletedBMP Summary Reports Completed BMP Selection Matrix draft under BMP Selection Matrix draft under
reviewreview BMP Selection Matrix Users’ Guide BMP Selection Matrix Users’ Guide
under reviewunder review
II. Develop Strategy/Process for ODOT II. Develop Strategy/Process for ODOT Projects with Stormwater EffectsProjects with Stormwater Effects
Where are we now (cont.)Where are we now (cont.) Draft Water Quality Design Storm Draft Water Quality Design Storm
under reviewunder review Water Quantity Guidance under Water Quantity Guidance under
developmentdevelopment ESA Effects Determination Guidance ESA Effects Determination Guidance
for Water Quality under developmentfor Water Quality under development
III. Develop a watershed approach to III. Develop a watershed approach to mitigate for unavoidable stormwater effectsmitigate for unavoidable stormwater effects
Problem StatementProblem Statement Current approach to mitigate impacts of Current approach to mitigate impacts of
transportation projects on water resources transportation projects on water resources is project specific, on-site treatmentis project specific, on-site treatment
Energy is devoted to mitigation efforts that Energy is devoted to mitigation efforts that can result in little net benefit to the can result in little net benefit to the watershedwatershed
Projects that can’t meet Resource Agency Projects that can’t meet Resource Agency goals subject to squabbling and uncertain goals subject to squabbling and uncertain additional requirements additional requirements
III. Develop Watershed Approach to III. Develop Watershed Approach to Mitigate for Unavoidable Stormwater Mitigate for Unavoidable Stormwater
EffectsEffects
Proposed Strategy/Solution (In Proposed Strategy/Solution (In Development)Development)
Technical evaluation of needs and Technical evaluation of needs and opportunities for mitigationopportunities for mitigation
Political effort to achieve agreement Political effort to achieve agreement on goals, methods, and interagency on goals, methods, and interagency coordinationcoordination
III. Develop Watershed Approach to Mitigate III. Develop Watershed Approach to Mitigate for Unavoidable Stormwater Effectsfor Unavoidable Stormwater Effects
Work will commence when Task II is Work will commence when Task II is close to completionclose to completion
??ss