Stephen Milton

Undulator System Overview milton@aps.anl.gov

14 November, 2004

Undulator System Overview

Stephen Milton

Stephen Milton

Undulator System Overview milton@aps.anl.gov

14 November, 2004

Undulator Systems WBS 1.4

Stephen Milton

Undulator System Overview milton@aps.anl.gov

14 November, 2004

Undulator Hall Schematic Baseline Layout

Stephen Milton

Undulator System Overview milton@aps.anl.gov

14 November, 2004

LCLS Organization @ L2

Stephen Milton

Undulator System Overview milton@aps.anl.gov

14 November, 2004

Management: Organization

APS

J.M. Gibson

Assoc. Lab. Director

LCLS Undulator

S. Milton

Project Director

LCLS Project

J. Galayda

Project Director

Accel. Systems. Div.

R. Gerig

Division Director

Exp. Facilities Div.

E. Gluskin

Division Director

APS Operations Div.

W. Ruzicka

Division Director

D. Walters

Vacuum/Diagnostics

CAM

M. White

Magnet Systems

CAM

J. Stein

Controls

CAM

R.Ruland/MMF

J. Welch/Fixed Support

CAM

H.D. Nuhn

Undulator System

Physicist

Stephen Milton

Undulator System Overview milton@aps.anl.gov

14 November, 2004

Fully Characterized Prototype

Stephen Milton

Undulator System Overview milton@aps.anl.gov

14 November, 2004

Undulator: Prototype Status

Value Engineered Thoroughly

Most recentlyWingless poles

Aluminum magnet block/pole holder simplification

All measurement testedIncluding before and after transporting

Stephen Milton

Undulator System Overview milton@aps.anl.gov

14 November, 2004

3-D CAD Rendering of the Prototype

Stephen Milton

Undulator System Overview milton@aps.anl.gov

14 November, 2004

Acquisition/Delivery PlanUndulators

Prototyped and Thoroughly Tested

Long-Lead ProcurementsTi Strongback

Magnet Blocks

Magnets Poles

1st Article in industry before production run (FY05)

Assemble in industry

Deliver to SLAC MMF

Measure/tune at SLACHandover of responsibility to SLAC following successful tuning

Install

Stephen Milton

Undulator System Overview milton@aps.anl.gov

14 November, 2004

Undulator: Status of LLPs

Statement of WorkComplete for Ti stongback

Near complete for the poles and the magnet blocks

Federal Business Opportunities (FedBizOps)Requests for interest released

Will be used to qualify vendors

See other’s talks for many more details

Stephen Milton

Undulator System Overview milton@aps.anl.gov

14 November, 2004

Continuing Resolution

???For the purpose of this review don’t worry about it.