Steffen Döbert, CTF3 meeting, 14.05.2008
Status of TBL
The CTF3 Test Beam Line (TBL)
42.5 m
8 m 2m
D FFD
DF
F
D F DDUMPD F D
F
FD
ITB
1.85m
CALIFES Probe beam injectorLIL-ACSLIL-ACSLIL-ACSD F D
D F D
DFDUMP
0.75
1.4m
1
DUMP
22.4 mTBL
2.5m
Transport path
DUMP
DUMP 22 m
2.0m
DF DF DF DF DF DF DF DF
3.0m3.0m6 m
D F DF DF D
16.5 mTBTS16 m
TL2’
TL2 and TBL in CLEX 2008
TL2’ to TBTS
TBL Prototype Module
CM
.BH
L 01
00
CCS.DUM 0995
CCS.VPI 0990
CCS.MTV 0980
CC
.VVS
090
0C
C.Q
FL 0
910
CC
.QD
L 09
20
CC
.BPR
091
5
CC
.BPM
093
0
CC
.WC
M 0
960
CC
.MTV
097
0C
C.V
PI 0
950
CC
.DH
D/D
VD 0
940
CB
.DH
D/D
VD 0
140
CB
.DH
D/D
VD 0
130
CB
.VVS
010
0
CB
.QFM
011
0
CB
.QD
M 0
120
CB
.BPM
015
0
CB
.PET
022
0
CB
.BPS
021
0
CB
.QD
R 0
200
CB.MOV 0205
CB
.VPI
021
5
CB
.VPI
013
5
CB
.BPM
025
0
Module integration
Status of the prototype components
PETS (CIEMAT): rf design finished, PETS prototype bar successfully manufactured Full PETS manufacturing and tank design progressing
BPM’s (Valencia and Barcelona): one analog unit finished and tested at CERN, 2 BPM prototypes assembled and ‘cold’ tested at CERN Funds for series production allocated
Quads (CERN): Design by Th. Zickler finished, prototype in June, series ordered with BINP
Quad-Movers (CIEMAT): prototype fully tested at CERN series production under preparation
High power rf (CERN): directional couplers, loads and waveguide components ordered
Low Level rf (CERN): being manufactured TL2’ diagnostics (CERN): Currently installed
InstallationIn progress, girders and quads mounted in
CLEXCurrently planned to be finished in June 2008,
(looks like PETS tank might be slightly delayed)
Tentative TBL-Schedule
Basic plan is to install the full beam line, including Quads with movers, BPM’s, replacement pipes for PETS tanks and the end of line diagnostic section during the next shutdown 2008/2009 After that PETS tanks will be installed as they get fabricated and delivered to CERN until 2010