Department : Office of the Executive Engineer (PHE) Nalbari Division

Year of Establishment : 1983

Location of office : Mazdia Mugkuchi, Nalbari

Staff Details

SL. NO

NAME OF EMPLOYEES DESIGNATION

DATE OF

JOININGMOBILE NO EMAIL ID

1 Ashok Kr. Sarma

Executive Engineer

07-17-85 9435081836 tikolo1234@redifmail.com

2 Manas Pratim Borgohain

Asstt. Executive Engineer

06-23-90 9435115774 manasb.borgohain752@gmail.com

3 Tirtha Nath Sarma

Asstt. Executive Engineer

06/25/90 9435017294 tnsarmah2013gmail.com

4 Animesh Das Asstt. Engineer 12-31-12 9854032887 animeshdster@gmail.com 5 Samiran Das Asstt. Engineer 02-27-12 9864775128 Samiran.das06@gmail.com 6 Badruz

Zaman Asstt. Engineer 02-23-12 7399568298 zamancivil@yahoo.in

7 Narendra Nath Kalita

Asstt. Engineer 0.30.84 9859224363

8 Naurin Kausar

Asstt. Engineer 0.12.08 9854667512 Naurin.kausar1@gmail.com

9 Dilip Bhuyan Junior Engineer

9957870993

10 Bishnu Bania Junior Engineer

0.29.93 8473044360

11 Md. Anowar Hussain

Sr. Gr. J.E. 06-24-1987

9613138581

12 Hemchandra Kalita

Sr. Gr. J.E. 0.18.87 9678509799

13 Akshay Kr Bhatta

Junior Engineer

0.12.87 9864758786

14 Harekrishana Kakati

Junior Engineer

11-21-1988

9401265476

15 Pranab Barman

Junior Engineer

0.17.96 9435513827

16 Pinku Pathak Junior Engineer

04-02-2013

9613075918 sameersaloi@gmail.com

17 Rina Tahbildar

Junior Engineer

9864147597

Schematic Detail ( Details of schemes that are being implemented by Nalbari (PHE) Division in Financial year 2015-16)

Name of Programme :- Swachh Bharat Abhiyan (SBM)(G)

Name of scheme / Component Unit Target Achievement Remarks

IHHL Under SBM(G) Nos. 20842 15234

20842 Nos. of IHHL target has been fixed on April 2015 to March 2016 under SBM(G)

Name of Programme :- National Rural Drinking Water Programme(NRDWP)

PIPED WATER SUPPLY SCHEME(PWSS)

Sl. No. Deptt./Organization Programme

Project No. Scheme

[Targeted] in Nos No. Scheme

[Completed] in Nos

Remarks

1 NRDWP (QUANTITY) PWSS=14 PWSS=1

2 PHED NRDWP

(QUALITY) PWSS=8 PWSS=3

Works are in On-going

stage

Targeted Habitation:

Targeted= 114 Habs( Quality =69 habs & Quantity= 45habs)

Achieved = 15 Habs ( Quality =9 habs & Quantity= 6habs)

Name of Programme :- National Rural Drinking Water Programme(NRDWP)

SPOT SOURCE

Targeted= Nil

Achieved= Nil

Status of Targeted Schemes for the year 2015-16

Physical Progress Sl No.

Name of Scheme DTW/DUGWELL

UGR T.P. DISTRIBUTION SYSTEM

PUMP HOUSE

POWER CONNECTION

Whether Users’

committee formed

REMARKS

1

ALOKPUR PWSS

100%

100%

95%

90%

50%

0%

Not

formed

Fund demand for the power connection has been

submitted to CE office.

2

PURANBARI PWSS

100%

100%

100%

100%

100%

0%

Not

formed

Fund demand for power

connection has been

submitted to the CE office.

3 UTTARBALI PWSS

100% 100% 100

% 100% 100% 100% Formed

Boundary wall construction

and pump set yet to be installed.

4

GOBRADAL ZONE-II PWSS

100%

100%

100%

100%

100%

100%

Not

formed

pump set yet to be

installed.

5 ARANGAMOW PWSS

100% 100%

100%

30% 100% 0% Not formed

Fund demand for power

connection has been

submitted to the CE office.

6 BARGHOPA

100% 95% 80% 0% 0% 0% Not

formed Works are going on.

7 AKNA PWSS 100%

100% 80% 0% 0% 0% Not formed

Works are going on.

8 BHITHAMAHAL PWSS

100% 0% 0% 0% 0% 0% Not

formed

Deep tube well

completed.

9 POICHARA

PWSS

100% 100% 100

% 0% 0% 0% Not formed

Works are going on.

10 BAMUNBORI

PWSS

100% 0% 0% 0% 0% 0% Not

formed

Deep tube well

completed.

11

CILLING PWSS

100%

100%

80%

10%

80%

0%

Not formed

Works are going on.

12

BARNAGAR BANEKUCHI

PWSS

100% 100%

100%

0% 100% 0%

Not formed

Works are going on.

13 BISTUPUR 100 0% 0% 0% 0% 0% Not Deep tube

PWSS

% formed well completed.

14 BARKURIHA

PWSS

100% 0% 0% 0% 0% 0% Not

formed

Deep tube well

completed.-

15

BADRABONGAL

PWSS

0%

0%

0% 0% 0% 0% Not

formed Land finalized

16 SONKURIHA

KATHALGHAR PWSS

0% 0% 0% 0% 0% 0% Not formed Land finalized

17

CHAMARKUCHI PWSS

0% 0% 0% 0% 0% 0% Not

formed Land finalized

18

BAKUAJARI PWSS

0% 0% 0% 0% 0% 0% Not formed

Land finalized

19 HAHDOLI PWSS 100

% 100% 100

% 100% 100% 100% Formed Functioning

20 BHELAMARI PWSS

100%

100% 100%

100% 100% 100% Formed Functioning

21 JABJABKUCHI PWSS

100% 100% 100

% 100% 100% 100% Formed Functioning

22 TARMATHA PWSS

100%

100% 100%

100% 100% 100% Formed Functioning

Photo Gallery

Arikuchi PWSS Nakheti PWSS Khudra Dingdingi PWSS INDIVIDUAL HOUSEHOLD LATRINE (IHHL)