State Project No. 736-99-1509 F.A.P No. SPR-001(031) Roadway Base Map Development Statewide

Post on 02-Jan-2016

27 views 1 download

Tags:

description

State Project No. 736-99-1509 F.A.P No. SPR-001(031) Roadway Base Map Development Statewide March 4, 2008. Project Manager Leslie Mix (225) 379-1919 LeslieMix@dotd.la.gov. Project Description. - PowerPoint PPT Presentation

Transcript of State Project No. 736-99-1509 F.A.P No. SPR-001(031) Roadway Base Map Development Statewide

State Project No. 736-99-1509State Project No. 736-99-1509F.A.P No. SPR-001(031)F.A.P No. SPR-001(031)

Roadway Base Map DevelopmentRoadway Base Map DevelopmentStatewideStatewide

March 4, 2008March 4, 2008

State Project No. 736-99-1509State Project No. 736-99-1509F.A.P No. SPR-001(031)F.A.P No. SPR-001(031)

Roadway Base Map DevelopmentRoadway Base Map DevelopmentStatewideStatewide

March 4, 2008March 4, 2008

Project ManagerProject ManagerLeslie MixLeslie Mix

(225) 379-1919(225) 379-1919LeslieMix@dotd.la.govLeslieMix@dotd.la.gov

Project ManagerProject ManagerLeslie MixLeslie Mix

(225) 379-1919(225) 379-1919LeslieMix@dotd.la.govLeslieMix@dotd.la.gov

Project DescriptionProject Description

Create an accurate, geo-referenced, and Create an accurate, geo-referenced, and topologically correct public road feature class topologically correct public road feature class for state and non-state maintained.for state and non-state maintained.

Scope of ServicesScope of Services

Phase 1: Public road feature class Phase 1: Public road feature class creation and adjustmentcreation and adjustment

Phase 2: Assignment of LRS ID to Phase 2: Assignment of LRS ID to public road featurepublic road feature

Phase 3: TrainingPhase 3: Training

Phase 1 – Feature CreationPhase 1 – Feature Creation

Create public road polyline feature from Create public road polyline feature from current Topologically Integrated Geographic current Topologically Integrated Geographic Encoding and Referencing (TIGER) vector Encoding and Referencing (TIGER) vector data or other data approved by LADOTDdata or other data approved by LADOTD

This feature will represent the centerline of This feature will represent the centerline of undivided highways, both directions on undivided highways, both directions on divided highways, and ramps, wyes, divided highways, and ramps, wyes, frontage roads and other connectorsfrontage roads and other connectors

Create public road polyline feature from Create public road polyline feature from current Topologically Integrated Geographic current Topologically Integrated Geographic Encoding and Referencing (TIGER) vector Encoding and Referencing (TIGER) vector data or other data approved by LADOTDdata or other data approved by LADOTD

This feature will represent the centerline of This feature will represent the centerline of undivided highways, both directions on undivided highways, both directions on divided highways, and ramps, wyes, divided highways, and ramps, wyes, frontage roads and other connectorsfrontage roads and other connectors

Centerline MileageCenterline Mileage

State maintained centerline road mileage – State maintained centerline road mileage – 16,691 miles16,691 miles

Non-state maintained centerline road Non-state maintained centerline road mileage – 44,253 milesmileage – 44,253 miles

*Does not includes ramps, wyes, connectors, divided state and local roads, etc….

State maintained centerline road mileage – State maintained centerline road mileage – 16,691 miles16,691 miles

Non-state maintained centerline road Non-state maintained centerline road mileage – 44,253 milesmileage – 44,253 miles

*Does not includes ramps, wyes, connectors, divided state and local roads, etc….

Phase 2 – LRS IDPhase 2 – LRS ID

Text field will be added to the polyline Text field will be added to the polyline feature as a unique identifier.feature as a unique identifier.

This procedure will be shown later.This procedure will be shown later.

Phase 3 - TrainingPhase 3 - Training

Develop a two-day on-site workshop Develop a two-day on-site workshop to provide training for editing, updating to provide training for editing, updating and maintaining the data for the LA and maintaining the data for the LA DOTD staff.DOTD staff.

Scheduling and ReportingScheduling and Reporting

Delivery in lots per a negotiated Delivery in lots per a negotiated scheduleschedule

Paid based on negotiated schedulePaid based on negotiated schedule

DeliverablesDeliverables

Data to be delivered in ESRI ArcGIS version Data to be delivered in ESRI ArcGIS version 9.2 or latest File Geodatabase including 9.2 or latest File Geodatabase including FGDC compliant metadataFGDC compliant metadata

Data to conform to National Map Accuracy Data to conform to National Map Accuracy Standards based on Publication FGDC-Standards based on Publication FGDC-STD-007.3-1998STD-007.3-1998

Data to be made available throughout Data to be made available throughout project via a secure portal and a project via a secure portal and a DVD for each lotDVD for each lot

Data to be delivered in ESRI ArcGIS version Data to be delivered in ESRI ArcGIS version 9.2 or latest File Geodatabase including 9.2 or latest File Geodatabase including FGDC compliant metadataFGDC compliant metadata

Data to conform to National Map Accuracy Data to conform to National Map Accuracy Standards based on Publication FGDC-Standards based on Publication FGDC-STD-007.3-1998STD-007.3-1998

Data to be made available throughout Data to be made available throughout project via a secure portal and a project via a secure portal and a DVD for each lotDVD for each lot

Deliverables – cont’d.Deliverables – cont’d.

After first delivery, LADOTD and After first delivery, LADOTD and consultant will meet to discuss the consultant will meet to discuss the tools, data models and processing tools, data models and processing methodology.methodology.

Quality RequirementsQuality Requirements

Quality control plan must be submitted Quality control plan must be submitted for LA DOTD approval before work for LA DOTD approval before work begins.begins.

Possible Additional ServicesPossible Additional Services

Update / Improve address range Update / Improve address range informationinformation

Create a routing networkCreate a routing network

General InformationGeneral Information

LADOTD will entertain proposals for the use of LADOTD will entertain proposals for the use of alternative source data provided all project goals, alternative source data provided all project goals, objectives, and deliverables can be metobjectives, and deliverables can be met

LADOTD will not entertain any proprietary LADOTD will not entertain any proprietary considerations regarding such alternate source considerations regarding such alternate source datadata

LRS content and any other information generated LRS content and any other information generated by this project will be owned by LADOTDby this project will be owned by LADOTD

LADOTD will entertain proposals for the use of LADOTD will entertain proposals for the use of alternative source data provided all project goals, alternative source data provided all project goals, objectives, and deliverables can be metobjectives, and deliverables can be met

LADOTD will not entertain any proprietary LADOTD will not entertain any proprietary considerations regarding such alternate source considerations regarding such alternate source datadata

LRS content and any other information generated LRS content and any other information generated by this project will be owned by LADOTDby this project will be owned by LADOTD

General Information – cont’d.General Information – cont’d.

The intent is to allow LADOTD to The intent is to allow LADOTD to freely distribute the deliverables of this freely distribute the deliverables of this project in accordance with Louisiana project in accordance with Louisiana Revised Statue Title 44:1 Revised Statue Title 44:1 et seqet seq..

LRS IDLRS ID

PresentationPresentation