Standohyd Basecoat Guide.

1. Prepare the surface in the usual manner.

Preparation

· a light coat.· a covering coat.

2. Clean with Standohyd cleaner.

Mixing

Application

Overcoating

· Apply a final coat to control the effect.· Dry with a air blower system.

1. Mix the required amount of colour. 2. Add 5-10-15% StandohydDemineralized water.

1. With a one visit application spray a

If needed

1. Mix the clear according tothe (TDS).

2. Apply the clear according tothe (TDS).