Standard Signs Manual

Post on 08-Feb-2022

8 views 0 download

Transcript of Standard Signs Manual

Standard Signs ManualNEW, CHANGED, OR DELETED 1/2017

PAVEMENT MESSAGES

i

PMA-1...................................PMA-2 (L or R) .....................PMA-3 (L or R) .....................PMA-4...................................PMA-5...................................PMA-6...................................PMA-7...................................

PMC-1 ..................................PMC-2 ..................................PMC-3 ..................................PMC-4 ..................................PMC-5 ..................................PMC-6 ..................................

PMS-1...................................PMS-2...................................PMS-3...................................PMS-4...................................PMS-5...................................PMS-6...................................PMS-7...................................PMS-8...................................

PMW-1 ..................................PMW-2 ..................................PMW-3 ..................................PMW-4 ..................................PMW-5 ..................................

PM-CMA ...............................

Straight Pavement Marking ArrowTurn Pavement Marking ArrowTurn, Straight Pavement Marking ArrowLeft, Right Turn Pavement Marking ArrowRight Left Turn, Straight Pavement Marking ArrowPavement Transition ArrowWrong Way Arrow

Standard Characters - A,B,C,D,E,FStandard Characters - G,H,I,J,K,LStandard Characters - M,N,O,P,Q,RStandard Characters - S,T,U,V,W,XStandard Characters - Y,Z,1,2,3,4Standard Characters - 5,6,7,8,9,0

Designated Bike Detector SystemDesignated Bike SymbolDesignated Shared Lane MarkingHOV Pavement MarkerDo Not Tailgate Pavement DotYield Pavement MarkingsRailroad Pavement MarkingAccessible Parking Symbol

Standard Words - YIELD, EXPRSStandard Words - STOP, LANEStandard Words - BIKE, XINGStandard Words - PED, ONLYStandard Words - SCHOOL, AHEAD

Pavement Marking Areas

APPROVED DATE OF REV.

1/1/03NOTES:

26.5 X 72 42 X 114

a 37 60

b 35 54

c 7.5 12

d 9.5 15

efghijkl

mnopqrstuvwxyz

SIZEDIMENSION

1. All dimensions are in inches.2. The 26.5 X 72 size shall be used for bike trails and bike lanes only. PMA-1

Straight Pavement Marking Arrow

APPROVED DATE OF REV.

1/1/03

NOTES:

45 X 60 72 X 96

a 19 31

b 26 42

c 14 23d 4 7e 23 37f 3.5 6g 24 39h 17 27i 7.5 12j 25.5 41kl

mnopqrstuvwxyz

SIZEDIMENSION

1. All dimensions are in inches.2. 45 X 60 size shall be used for bike trails and bike lanes only.3. Arrow to be designated left (L) or right (R).

PMA-2(L or R)1/1/06

Turn Pavement Marking Arrow

APPROVED DATE OF REV.

1/1/03

NOTES:

54.5 X 95 87 X 152

a 19 31

b 26 42

c 14 23d 4 7e 37 60f 58 92g 7.5 12h 18 29i 17 27j 24 39k 3.5 6l 9.5 15

m 18 27n 15.5 25opqrstuvwxyz

SIZEDIMENSION

1. All dimensions are in inches.2. The 54.5 X 95 size shall be used for bike trails and bike lanes only.3. Arrow to be designated left (L) or right (R).

PMA-3(L or R)1/1/06

Turn, Straight Pavement Marking Arrow

APPROVED DATE OF REV.

1/1/03

NOTES:

82.5 X 60 132 X 96

a 19 31

b 26 42

c 14 23d 4 7e 23 37f 3.5 6g 24 39h 17 27i 7.5 12j 25.5 41kl

mnopqrstuvwxyz

SIZEDIMENSION

1. All dimensions are in inches.2. 82.5 X 60 size shall be used for bike trails and bike lanes only.

PMA-41/1/06

Left, Right Turn Pavement Marking Arrow

APPROVED DATE OF REV.

1/1/03

NOTES:

82.5 X 95 132 X 152

a 19 31

b 26 42

c 14 23d 4 7e 37 60f 58 92g 7.5 12h 18 29i 17 27j 24 39k 3.5 6l 9.5 15

m 18 27n 15.5 25opqrstuvwxyz

SIZEDIMENSION

1. All dimensions are in inches.2. The 82.5 X 95 size shall be used for bike lanes and bike trails only. PMA-51/1/06

Right Left Turn, Straight Pavement Marking Arrow

APPROVED DATE OF REV.

1/1/03

5’ 6” X 19”

a 33

b 69

c 12d 216e 108f 60g 24hijkl

mnopqrstuvwxyz

SIZEDIMENSION

NOTES: 1. All dimensions are in inches unless otherwise indicated.2. Right lane arrow is shown. For left lane arrow, use mirror image. PMA-6

Pavement Transition Arrow

PLACEMENTON PAVEMENT

RIGHTARROW

20 Degrees

20 Degrees

APPROVED DATE OF REV.

Dimensions are in inches unless otherwise indicated.NOTE:

a 281

b 209

c 84d 120e 30f 8ghijkl

mnopqrstuvwxyz

SIZEDIMENSION

6/1/16 PMA-7

Wrong Way Arrow

APPROVED DATE OF REV.

Standard Characters - A,B,C,D,E,F

4’ 8’

a 7.7 15.4

b 48 96

c 2 4d 11.5 23e 17 34f 13.5 27ghijkl

mnopqrstuvwxyz

SIZEDIMENSION

12/1/15 PMC-1NOTE: Dimensions are in inches unless otherwise indicated.

APPROVED DATE OF REV.

4’ 8’

a 7.7 15.4

b 48 96

c 2 4d 23 46e 11.5 23f 5.8 11.5g 3.9 7.7h 9.6 19.2i 17.3 34.6jkl

mnopqrstuvwxyz

SIZEDIMENSION

12/1/15 PMC-2

Standard Characters - G,H,I,J,K,L

NOTE: Dimensions are in inches unless otherwise indicated.

APPROVED DATE OF REV.

4’ 8’

a 7.7 15.4

b 48 96

c 2 4d 17.3 34.6e 14.4 28.8f 13.5 26.9g 3.9 7.7h 15.4 30.8ijkl

mnopqrstuvwxyz

SIZEDIMENSION

12/1/15 PMC-3

Standard Characters - M,N,O,P,Q,R

NOTE: Dimensions are in inches unless otherwise indicated.

APPROVED DATE OF REV.

4’ 8’

a 7.7 15.4

b 48 96

c 2 4d 15.4 30.7e 13.5 26.9f 17.3 34.6ghijkl

mnopqrstuvwxyz

SIZEDIMENSION

12/1/15 PMC-4

Standard Characters - S,T,U,V,W,X

NOTE: Dimensions are in inches unless otherwise indicated.

APPROVED DATE OF REV.

4’ 8’

a 7.7 15.4

b 48 96

c 2 4d 3.9 7.7e 5.8 11.5f 19 38g 12.5 25h 1 2i 9.6 19.2jkl

mnopqrstuvwxyz

SIZEDIMENSION

12/1/15 PMC-5

Standard Characters - Y,Z,1,2,3,4

NOTE: Dimensions are in inches unless otherwise indicated.

APPROVED DATE OF REV.

4’ 8’

a 7.7 15.4

b 48 96

c 2 4d 3.9 7.7e 25 50f 13.4 26.9g 15.4 30.7h 9.6 19.2i 5.8 11.6jkl

mnopqrstuvwxyz

SIZEDIMENSION

12/1/15 PMC-6

Standard Characters - 5,6,7,8,9,0

NOTE: Dimensions are in inches unless otherwise indicated.

APPROVED DATE OF REV.

Dimensions are in inches unless otherwise indicated.NOTE:

Designated Bike Detector System

a 16.3

b 24

c 6d 5e 2f 1.7ghijkl

mnopqrstuvwxyz

SIZEDIMENSION

12/1/15 PMS-1

APPROVED DATE OF REV.

1/1/03

NOTE:

USE ON4’ WIDELANES

USE ON6’ WIDELANES

USE ON8’ WIDELANES

a 24 36 48

b 48 72 96

cdefghijkl

mnopqrstuvwxyz

SIZEDIMENSION

Dimensions are in inches unless otherwise indicated.

PMS-23/16/06

Designated Bike Symbol

APPROVED DATE OF REV.

Dimensions are in inches unless otherwise indicated.NOTE:

a 40

b 112

c 72d 6efghijkl

mnopqrstuvwxyz

SIZEDIMENSION

Designated Shared Lane Marking

12/1/15 PMS-3

APPROVED DATE OF REV.

1/1/03

NOTES:

6’DIAMOND

12’DIAMOND

a 15 30

b 72 144

c 3 6defghijkl

mnopqrstuvwxyz

SIZEDIMENSION

1. Dimensions are in inches unless otherwise indicated.2. 6’ size is for bike lanes and bike trails only PMS-4

HOV Pavement Marker

APPROVED DATE OF REV. All dimensions are in inches.NOTE:

36 X 60 54 X 90

a 15 22.5

b 54 81

c 36 54d 60 90efghijkl

mnopqrstuvwxyz

SIZEDIMENSION

PMS-51/1/08

Do Not Tailgate Pavement Dot

APPROVED DATE OF REV.

Yield Pavement Markings

18” 36”

a 18 36

b 12 24

c 6 6d 3-12 3-12e 72 72f 156 240g 30 36h 8 8ijkl

mnopqrstuvwxyz

SIZEDIMENSION

12/1/15 PMS-6

YIELD TRIANGLE

YIELD AHEAD

TRIANGLE

NOTE: Dimensions are in inches unless otherwise indicated.

APPROVED DATE OF REV.

Railroad Pavement Marking

8’

a 78

b 240

c 288d 72e 192f 24g 18h 36i 16

j FULL WIDTH OF LANE

kl

mnopqrstuvwxyz

SIZEDIMENSION

12/1/15NOTE: Dimensions are in inches unless otherwise indicated. PMS-7

APPROVED DATE OF REV. NOTE: Dimensions are in inches unless otherwise indicated.

Accessible Parking Symbol

STANDARD SPECIAL

a 24 36

b 28 41

c 3 4d 32.8 48.8e 32.8 58.8fghijkl

mnopqrstuvwxyz

SIZEDIMENSION

12/1/15 PMS-8

APPROVED DATE OF REV.

NOTE: Dimensions are in inches unless otherwise indicated.

4’ 8’

a 40.8 81.6

b 48 96

c 2 4d 46.5 93efghijkl

mnopqrstuvwxyz

SIZEDIMENSION

PMW-112/1/15

Standard Words - YIELD, EXPRS

APPROVED DATE OF REV.

Dimensions are in inches unless otherwise indicated.NOTE:

4’ 8’

a 36.8 73.6

b 48 96

c 2 4defghijkl

mnopqrstuvwxyz

SIZEDIMENSION

PMW-212/1/15

Standard Words - STOP, LANE

APPROVED DATE OF REV.

Dimensions are in inches unless otherwise indicated.NOTE:

4’ 8’

a 31.1 62.2

b 48 96

c 2 4defghijkl

mnopqrstuvwxyz

SIZEDIMENSION

PMW-312/1/15

Standard Words - BIKE, XING

APPROVED DATE OF REV.

NOTE: Dimensions are in inches unless otherwise indicated.

SIZEDIMENSION

PMW-4

4’ 8’

a 36.8 73.6

b 48 96

c 2 4d 27.1 54.2efghijkl

mnopqrstuvwxyz

12/1/15

Standard Words - PED, ONLY

APPROVED DATE OF REV.

Dimensions are in inches unless otherwise indicated.NOTE: PMW-5

SIZEDIMENSION

4’ 8’

a 56.2 112.4

b 48 96

c 2 4d 46.5 93efghijkl

mnopqrstuvwxyz

12/1/15

Standard Words - SCHOOL, AHEAD

APPROVED DATE OF REV.

1/19/17 PM-CMA

Pavement MarkingAreas

NOTE: All removal areas are computed as rectangles as required by Spec. 2102.

Installation and removal of horizontal bars for railroad crossing pavement message paid for as 24” solid line white.