Soccer Stadium & Practice Field Neighborhood Meeting

Post on 29-Dec-2021

1 views 0 download

Transcript of Soccer Stadium & Practice Field Neighborhood Meeting

1

Soccer Stadium & Practice FieldNeighborhood Meeting

July 28, 2020

Existing Conditions

Point of Access

2,113 seats

Pedestrian

Service

EAST WEST CONNECTOR

GARAGE

PRACTICEFIELD

TIGER

FINNEY CAMPBELLFIELDS

SOCCERSTADIUMParking

FINNEY CAMPBELL

FIELDS

SOCCERSTADIUM

PRACTICE FIELD

BIRDS EYE VIEW FROM NORTH WEST

STADIUM BIRDS EYE VIEW FROM THE SOUTH EAST

+ 120+ 130

RESTROOMS

RESTROOMS

TICKETS

STORAGE& MECH

West Pavilion

Concourse Level

~ 130

+ 130

West Pavilion

Concourse Level Locker LevelPress Box Level

FILMING

PRESS BOX

FILMING

RESTROOMS

RESTROOMS

TICKETS

STORAGE& MECH

VISITOR’SROOM

TEAMROOM

TEAMROOM

+ 120+ 120+ 142

TEAM BENCH

TEAM BENCH

+ 118

MAIN WEST ELEVATIONSASAKI ARCHITECTURE & JCFO LANDSCAPE

REGIONALSTORM WATER SYSTEM

GEOTHERMAL WELLS

FIELD SECTION DIAGRAM

West Pavilion

WALK TOWARDS STADIUM FROM THE SOUTH SASAKI ARCHITECTURE & JCFO LANDSCAPE

West

PEDESTRIAN APPROACH TO WEST ENTRY FROM SOUTHSASAKI ARCHITECTURE & JCFO LANDSCAPE

West

PEDESTRIAN APPROACH TO WEST ENTRY FROM NORTHSASAKI ARCHITECTURE & JCFO LANDSCAPE

West

PEDESTRIAN APPROACH TO WEST ENTRY FROM NORTHSASAKI ARCHITECTURE & JCFO LANDSCAPE

West

PEDESTRIAN PATH FACING SOUTHSASAKI ARCHITECTURE & JCFO LANDSCAPE

West

SIDEWALK SOUTH OF STADIUMSASAKI ARCHITECTURE & JCFO LANDSCAPE

South

PRACTICE FIELDSASAKI ARCHITECTURE & JCFO LANDSCAPE

Practice Field

East Pavilion

Concourse Level

+ 130

RESTROOMS

RESTROOMS

CONCESSIONS

+ 123

East Pavilion

East Pavilion

Circulation

2,113 seats

Pedestrian/Bike pathsVehicular

GARAGE

PRACTICEFIELD

TIGER

FINNEY CAMPBELLFIELDS

SOCCERSTADIUM

EAST WEST CONNECTOR

Service

CirculationBus Route

GARAGE

PRACTICEFIELD

TIGER

FINNEY CAMPBELLFIELDS

SOCCERSTADIUM

Transit Hub

EAST WEST CONNECTOR

Schedule / Attendance

P

2,113 seats

EAST WEST CONNECTOR

GARAGEPRACTICE

FIELD

TIGER

SOCCERSTADIUM

FINNEY CAMPBELLFIELDS

Season• Sept -mid Nov: 20 games• Tues-Wed -Thu-Sat-Sun • Starting Time: 1 through 7pm typical• 3 spring games (weekends @ noon)

Attendance:• Average game <400 • Post Season game: up to full capacity

Cars• Average game <300 cars• Post Season game: up to 800 cars

Sports Lighting

EAST WEST CONNECTOR

GARAGEPRACTICE

FIELD

TIGER

SOCCERSTADIUM

FINNEY CAMPBELLFIELDS

Sports Lighting

Designed to meet the International Dark Skies Association criteria for protection of the night sky

Sports LightingAverage foot candles

1-20 fc

20-30 fc

75-90 fc

0.0-1 fc

STADIUM BIRDS EYE VIEW FROM THE SOUTH EAST

East Campus Construction Update

• Ge o-e xchange bore d rilling

– Surface d rilling continue s ad jace nt to Finne y Cam pbe ll Fie ld and along Fitzrandolph Road

– Be low surface d rilling will be g in in m id -August, 2020 in the are a of the p ropose d garage and the p ropose d socce r stad ium

– Surface d rilling on the e ast s ide of Fitzrand olph within the are a on the “e ast” sid e of the road ne ar the UNOW Childcare Ce nte r it locate d ) won’t be g in until la te r this ye ar, date TBD.

Construction Update - July 28, 2020

Blasting in Parking Lot 21 to excavate for geo -e xchange d rilling• Blasting will be lim ite d to the are a m arke d in dark b lue .• Prior to e ach b last the re will be a se rie s of aud ib le horn

warnings; thre e horn warnings five m inute s p rior to the b last, two warnings one m inute p rior to the b last, and one “a ll c le ar” horn warning afte r the b last.

• Traffic on Faculty Road from the Lot 21 e ntrance to Broadm e ad and on Fitzrand olph from Faculty Road to the UNOW Childcare Ce nte r acce ss road will be pause d in advance of the b last.

• Se ism ographs will be p lace d approxim ate ly 500 fe e t from the b last s ite and a t a p riva te re side nce on Faculty Road ne ar Harrison Stre e t. Me asure m e nts are re corde d afte r e ach b last.

• Blasting e xpe cte d to continue for approxim ate ly e ight we e ks, conclud ing by the e nd of Se p te m be r 2020

Construction Update - July 28, 2020

• Te st b last sche dule d for July 28 a t 1:30 pm was postpone d .

– RESCHEDULED TO FRIDAY JULY 31 AT 11:00 AM• Inform ation about the p lan/ sche dule to p roce e d base d

on te st b last re sults will be share d with ne ighbors

Construction Update - July 28, 2020

• Ne ighbors who live p roxim ate to the are a whe re b las ting is taking p lace m ay contac t p roje c t m anage r Ste ve Hancock (sh8@prince ton.e du) to re que st a s ite inspe ction a t the ir p rope rty

• We do not e xpe ct the re to be any dam age as a re sult of the b las ting work, but if the re we re to be dam age tha t re sults from the b las ting , the Unive rs ity would be re sponsib le for p rovid ing a re m e dy

Construction Update - July 28, 2020

• Fitzrandolph Obse rvatory

– Site work unde rway to p re pare for re m oval of the obse rvatory– Obse rvatory e xpe cte d to be re m ove d during firs t thre e we e ks of

Se p te m be r• Stone s from the obse rvatory to be re m ove d and s tore d for future

cam pus use– Re m oval of the Obse rvatory doe s not involve any b las ting .

Construction Update - July 28, 2020

STADIUM BIRDS EYE VIEW FROM THE SOUTH EAST