SKKU Lab - Meeting

Post on 02-Jan-2016

27 views 0 download

Tags:

description

SKKU Lab - Meeting. SKKU Lab-meeting, 18.June.2014 Dong- hyun Kim on behalf of the cern-904 team Department of physics, sungkyunkwan university, korea. 1. Status of RPC Study. RPC current study. Ramp. 1. Status of RPC Study. RPC current study. < Current graph >. - PowerPoint PPT Presentation

Transcript of SKKU Lab - Meeting

1

SKKULab - MeetingSKKU LAB-MEETING, 18.JUNE.2014

DONG-HYUN KIM ON BEHALF OF THE CERN-904 TEAM

DEPARTMENT OF PHYSICS, SUNGKYUNKWAN UNIVERSITY, KOREA

21. Status of RPC Study RPC current study

Ramp

31. Status of RPC Study RPC current study

< Current graph > < HV & Current graph >

41. Status of RPC Study HV effect study

- @ 1 kV HV, current is 0.3

51. Status of RPC Study RPC current study on EP1/EP2 –

cosmic(9500kV),standby(7000kV)

< EP1 average HV & Current graph > < EP2 average HV & Current graph >

61. Status of RPC Study Problematic channels current study

< EP1 R2 C03&C04 HV & Current graph >

< EP2 R2 C03&C04 HV & Current graph >

72. Status of Data analysis

MCFM generated jobs too much failed

240 jobs submitted and 220 jobs failed

Still study about How to set the MCFM option and method