Sindh – the land of endless Sindh – the land of endless opportunitiesopportunities
Presented by
Mohammad Younus DaghaSecretary Investment
World Bank Ranking – Ease of Doing Business 2011
Pakistan has gained top ranking amongst its South Asian competitors, according to World Bank’s report on Ease of Doing Business 2011 and 2nd best in the region in terms of trading across borders, in getting credit and in protecting investors.
Country RankPakistan 83Maldives 85Sri Lanka 102
Bangladesh 107Nepal 116India 134
Afghanistan 167
CENTRAL ASIA
MIDDLE EAST
Sindh’s Competitive Edge
Financial Capital of Pakistan – Karachi Karachi Stock Exchange – Thriving
Stock Exchange Nucleus of Headquarters of major
Banks, Financial Institutions & Business houses
Coastline – 352 KMs Two Major Ports Huge potential for Aquaculture
Sindh’s Competitive Edge
The Regional Power House of the Future – SINDH Thar Coal – 100,000 MW for 300
Years Wind Corridor – 50,000 MW
potential Oil – 56% of country’s production Gas – 70% of country’s production
Large Agricultural base Trained, Educated & Affordable
workforce
Priority Sectors – Priority Sectors – Energy & EducationEnergy & Education
Projected Energy Demand
Wind Resource in SindhWind Resource in Sindh
Pakistan has a 1,046 Km Pakistan has a 1,046 Km coastline out of which 352 coastline out of which 352 Kms are in SindhKms are in Sindh
Average wind speed more Average wind speed more than 7 m/s above 60 m in than 7 m/s above 60 m in Gharo Wind Corridor in Gharo Wind Corridor in SindhSindh
Estimated wind potential of Estimated wind potential of more than 50,000 MWmore than 50,000 MW
Wind Wind
Corridor
Corridor
Sindh’s Wind Corridor
WIND MEASURING SITES IN SINDH
Renewable Energy Policy 2006
Land being provided at attractive ratesLand being provided at attractive rates Wind Risk – risk associated with variability of wind speedWind Risk – risk associated with variability of wind speed Guaranteed Market (Mandatory Purchase of Electricity)Guaranteed Market (Mandatory Purchase of Electricity) Cost plus tariff – All variable costs covered in Tariff Cost plus tariff – All variable costs covered in Tariff 17% Return on Equity (ROE) guaranteed by the Government17% Return on Equity (ROE) guaranteed by the Government Tariff determined by NEPRA : 13 USTariff determined by NEPRA : 13 US cents per KwHcents per KwH Tax free income for 30 yearsTax free income for 30 years Tax free importTax free import Net MeteringNet Metering WheelingWheeling Several other fiscal and financial incentivesSeveral other fiscal and financial incentives
Renewable Energy Policy 2006
토지원가를재생에너지에대한임대프로젝트Cost of Land lease for Renewable Energy Projects
30 년임대기간30 Years Lease Period
RS 돈을임대했습니다 . 35000/ 30 년동안 1에이커당Lease Money Rs. 35000/acre for 30 Years
임대지급방식으로
Payment of Lease in the Following manner:
즉 1r. 1 인당 500 에이커주소런던시 W1/ 1 년에 10 년만에처음 .Rs. 500/-per acre/year for first 10 years period. RS입니다 . 1 인당 1000 에이커주소런던시 W1/ 1 년임기 2 년동안10.Rs. 1000/-per acre/year for second term of 10 years period. RS입니다 . 1 인당 2000 에이커주소런던시 W1/ 1 년임기는 3 년동
안 10.Rs. 2000/-per acre/year for Third term of 10 years period.
Other Renewable Energy Areas
Bio-mass has a huge potential (over 2000 MW) Sugar and Rice industry have potential of generating at least
1000 MW of power, using their by-products Bagass and Rice husk
Karachi Cattle Colony One of its kind in the world with 400,000 cattle Potential of 25-35 MW electricity generation
Waste to Energy Karachi has an estimated potential of more than 500 MW in
Waste to Energy
Education CityEducation City
LocationLocation
Education City – Education City – investing in Human Resourceinvesting in Human Resource
Approximately 9,000 acres of land has been notified as Education City
Core elements of EC are educational and health institutions that will provide solutions to Pakistan’s challenge of higher education
Educational institutions will create the opportunity for private R&D businesses as a component of EC
Education City Master Plan (ECMP) will be complete by July 2011
Sectors for Future GrowthSectors for Future Growth
Agro-Processing and Cold Chain
Sindh grows a variety of field and horticultural crops with wheat, cotton, rice and sugarcane contributing to 70% of the total cropped area
Sindh’s Horticulture contributes to more than 73% banana, 34% mangoes, 53% dates, 40% onion, 88% red chillies and 30% mango of entire country production
Sindh produces 36% of rice,27% of the sugarcane,25% of cotton and 15% of the wheat in the country
Marble City
Sindh has billions of tons of Granite and Marble reserves
SBI has planned to develop Marble City near Karachi on 300 acres
Common facilities for:Precision CuttingHigh Quality ProcessingTraining and Marketing
Karachi Mass Transit ProgramKarachi Mass Transit ProgramInvestment OpportunitiesInvestment Opportunities
Bus Rapid Transit System (BRTS)
Bus Rapid Transit (BRT) is a high quality metro like transit service that utilizes exclusive right-of-way
bus lanes.
BRTS
The main characteristics of BRT system include: Segregated Bus ways Rapid Boarding & Alighting Clean, Secure & comfortable Stations and terminals Efficient pre board fare collection. Effective licensing & regulatory regime for bus operators. Clear and prominent signage and real-time information displays. Transit prioritization at intersections Modal integration at stations and terminals Clean fuel bus technologies. Sophisticated marketing identity. Excellence in customer service
BRTS - Characteristics
JICA traffic demand forecast study of year 2008 evaluated 8 rapidmass transit alignments (3 BRT lines and 5 RRT Corridors).
BRTS and RRTS
BRT Line – 1 BRT Line 1 covers a distance of 25 km from Surjani Town to Cantonment Station. Along its main alignment an extension of this line (or through feeder bus or tramservices) which would connect City Station to Cantonment Station via highly travelled I. I. Chundrigar Road and Shaheen Complex.
BRTLine
Length(KM)
Proposed No. of
Stations
Estimated Cost
(USD m)1 25.0 23 146
BRTS Line 1
BRT Line – 2 BRT Line 2 covers a distance of 15.5 km from Safoora Goth to Numaish (near Mazar-e-Quaid). At Numaish this line would be connected with BRT Line 1 to
facilitate the extension services.
BRTLine
Length(KM)
Proposed No. of
Stations
Estimated Cost
(USD m)2 15.5 10 90.5
BRTS Line 2
BRT Line – 3 BRT Line 3 covers a distance of 4 km from Orangi Town to Board Office (North Nazimbad). At Board Office this lines would be connected with BRT Line 1 to facilitate the extension services.
BRTLine
Length(KM)
Proposed No. of
Stations
Estimated Cost
(USD m)3 4 4 23.0
BRTS Line 3
Summary of Bus Rapid Transit System (BRTS)
Summary
BRT Line Length (km)No. of
StationsCost
USD mBRT Line 1 25.0 23 146
BRT Line 2 15.5 10 90.5
BRT Line 3 4.0 4 23
TOTAL 44.5 37 259.5
Rapid Rail Transit System (RRTS) RRTS is one of the urban transit systems (medium / high capacity Metro) being successfully used worldwide. The system consists of high performance electric powered trains operating in exclusive right of way usually elevated or underground with medium to high passengers carrying capacity.
RRTS
RRT Corridor – I 15.2 km from Sohrab Goth to M. W. Tower Construction - partly
underground and partly elevated.
7 underground stations serving to central and commercial districts.
Average distance of 1 to 1.5 km.
Rest of the alignment is elevated with 8 stations
RRT Corridor I
RRT Corridor
Approx. Length(km)
Stations Approx. Cost(US$
million)Elevated Under
Ground Total Elevated Under Ground Total
I 8 7.2 15.2 8 7 15 675.0
RRT CorridorTotal No. of
Passengers ( in1000s per day)
Maximum Demand at a Section (1,000 / day)
Peak Hour / Peak Direction Traffic
(per / hour)1
I 1,225.3 363.7 36,400
Travel Demands along RRT Corridor – I
Details of construction parameters and demand forecasts for corridor I
RRT Corridor I
RRT Corridor – II The corridor-II is planned as elevated underground
double track line from Karachi Cantt Station to Qasba Colony
The length is 13.4 km with 9 elevated and6 underground stations
RRT Corridor II
Details of construction parameters and demand forecasts for corridor II
RRT Corridor
Approx. Length(km)
Stations Approx. Cost(US$
million)Elevated Under
Ground Total Elevated Under Ground Total
II 8.4 5 13.4 9 6 15 537.0Travel Demands along RRT Corridor – II
RRT CorridorTotal No. of
Passengers ( in1000s per day)
Maximum Demand at a Section (1,000 /
day)
Peak Hour / Peak Direction Traffic
(per / hour)
II 797.5 198.9 19,900
RRT Corridor II
RRT Corridor – III The priority corridor-IV is proposed as elevated
double track line from Karachi Cantt Station to Landhi.
The length of this corridor is about 20.5 km with 17 Stations (All elevated)
RRT Corridor III
Details of construction parameters and demand forecasts for corridor III
RRT Corridor
Approx. Length(km)
Stations Approx. Cost(US$
million)Elevated Under
Ground Total Elevated Under Ground Total
III 20.5 0 20.5 17 - 17 492.0
RRT Corridor
Total No. of Passengers ( in1000s per day)
Maximum Demand at a Section (1,000 / day)
Peak Hour / Peak Direction Traffic
(per / hour)
III 205.3 81.7 8,200
Travel Demands along RRT Corridor – III
RRT Corridor III
RRT Corridor –IV The priority corridor IV is proposed as elevated double track line
from Nagan Chowrangi to Korangi via Rashid Minhas Road and over Shah Faisal Colony
The length is approx. 14.5km with 12 stations.
RRT Corridor IV
Details of construction parameters and demand forecasts for Corridor IV
RRT Corridor
Approx. Length(km)
Stations Approx. Cost(US$
million)Elevated Under
Ground Total Elevated Under Ground Total
IV 14.5 0 14.5 12 - 12 348.0
RRT CorridorTotal No. of
Passengers ( in1000s per day)
Maximum Demand at a Section (1,000 / day)
Peak Hour / Peak Direction Traffic
(per / hour)
IV 442.1 112.7 11,300
RRT Corridor IV
• RRT Corridor – V The priority corridor-V is planned as elevated double track
line from Tower to Baldia Colony.
The length of corridor – V is about 9.8 km with 9 Stations.
RRT Corridor V
RRT Corridor
Approx. Length(km)
Stations Approx. Cost(US$
million)Elevated Under Ground Total Elevated Under
Ground Total
V 9.8 0 9.8 9 - 9 235.0
RRT CorridorTotal No. of
Passengers ( in1000s per day)
Maximum Demand at a Section (1,000 / day)
Peak Hour / Peak Direction Traffic
(per / hour)
V 343.0 128.6 12,900
Details of construction parameters and demand forecasts for this corridor V
RRT Corridor V
Summary of (RRTS) Strategic Network
RRT Corridor
Approx. Length (km) Stations Approx. Cost(US$
million)
Elevated
Under Ground Total Elevate
dUnder
Ground Total
Corridor I 8 7.2 15.2 8 7 15 675.0Corridor II 8.4 5 13.4 9 6 15 537.0Corridor
III 20.5 0 20.5 17 - 17 492.0
Corridor IV 14.5 0 14.5 12 - 12 348.0
Corridor V 9.8 0 9.8 9 - 9 235.0
TOTAL 61.2 12.2 73.4 55 13 68 2287.0
KMTS Line / Corridor
Length(km)
Estimated Cost (US$ millions)
BRT Line 1 25.0 146.0BRT Line 2 15.5 90.5BRT Line 3 4.0 23.0RRT Corridor I 15.2 674.5RRT Corridor II 13.4 537.0RRT Corridor III 20.5 492.0RRT Corridor IV 14.5 348.0RRT Corridor V 9.8 235.0
TOTAL 117.9 2546.0
Summary of Estimated Capital Cost
Shaheed Benazir Bhutto CNG Bus Project(PPP Based Environment Friendly Public Transport
System for Karachi - Sponsored By GOP)
In Collaboration with:In Collaboration with:
Karachi Mass Transit Cell, City District Government, Karachi
Rs. 5 Billion subsidy approved ( 2.5 billion for Karachi)
4,000 CNG buses in five years for Karachi Immediate phase, 500 – 1000 buses for Karachi Private sector bus investors: min fleet of 25 new buses
Debt to Equity ratio = 80:20 ; Repayment : 5 years
GOP Subsidy: Rs.677,181 over 5 years towards the cost of one bus; Rs.300,000/- as upfront grant and Rs.377,181/- as interest subsidy payable in 5 years
New dedicated CNG Buses (CBU) shall be exempted from 15% import duty.
Project Highlights
Minimum Standard CNG Bus Specifications of 70 & 100 passengers carrying capacity notified by GOP
Concession Agreement finalized in consultation with all Commercial Banks / State Bank of Pakistan and other stake holders
Bus logo and color scheme with space provision for commercial advertisement has been finalized.
Ministry of Petroleum and SSGC have shown their willingness to reserve about 30 MMCFD on SSGCL system for CNG bus project in Karachi
Enabling Environment
Several Private Sector CNG Filling Stations have shown interest in supplying CNG to the project buses and also invest in high pressure CNG fuelling station. HDIP is also setting one station in public sector
Ex- KTC Bus terminals / depot sites shall be used for smooth operation of buses
Road Infrastructure improvements including Signal Free Corridors have been developed by CDGK to ensure efficient operation of CNG buses on sustainable basis.
A confirmatory Green Route Study (40 Routes) conducted with the financial support of IPDF for the facilitation of potential Operators / Investors
40 CNG Green Routes identified and notified for the Project.
Enabling Environment
Location: ST-35 and ST-39, Sector 11-I,Near UP Moor r #: V1
Sr #: D2Location: Plot # ST-5/1 Sector # 7-A
Sr #: D1Location: Plot # ST-1/1 Sector # 5-D
Sr #: U1Location: ST-1 Sector # 5,H Near Surjani Chowk North Karachi
Sr #: F2Location: Plot #ST-6,Block # 19
Sr #: F1Location: Plot #ST-1,Block # 12
Sr #:O1Location: ST-1,Block 6M Scheme - 36 Gulistan-e-Juahar near Mausmiat Chowk, Karachi
Sr #: N1Location: S.No 155 DehSafooran, Near Malir Halt Station , Karachi
Sr #: S1Location: S.No 448 Deh Mehran Model Colony Karachi
Sr #: G1Location: Plot # ST-2 Sector # 20-D
Sr #: C1Location Plot # ST-3 Sector # 10
Sr #: R1Location: St-39, B-35-E, Main Korangi Road , Karachi
Sr #: T1Location: H-22, Kda Scheme-3 Landhi Township,Near Dawood Chorangi Karachi
Sr #: B1Location: Plot # ST-2/2 Sector # 49 (Near Coast Guard)
Sr #: M2Location: Phase VIII
Sr #: A1Location: Plot# St-7, Block#1
Sr #: Q1Location: Kda Scheme no.2 near AbdullahGirls College Nazimabad Karachi
Sr #: P1Location: D-1 Site Manghopir Road , Near Habib Bank
Sr #: L5Location: Plot near Gulshan-e-Ghazi
Sr #: L1Location: Plot near new Bakra Piri
Sr #: L6Location: Plot at Nai Abadi Baldia (Dawood Goth)
Sr #: K3Location: Plot near last stop of Bus Route # 1-D
Sr #: K2Location: Plot near graveyard school Sector 11-1/2
Sr #: K1Location: Plot adjacent to orangi extention police station deh halkani
Sr #: K5Location: Plot at Gulshan Behar
Sr #: M1Location: Phase VII (Extension)
Sr #: J1Location: Plot# ST-1,Block # 64 HawksBay
Sr #:J2Location: Plot #ST-1,Block # 69 HawksBay
Sr #: B2Location: Plot # ST-17 Sector # 6-H (Near Chamra Chorangi)
Sr #: H1Location: Block #5 along main road near Chakora Nullah
Sr #: L2Location: Plot at Kokan Colony
Sr #: L3Location: Plot # ST-60 Sector 8
44
LegendLegend: KTC Bus Terminals (9) CDGK Bus Terminals (23)
Location Map of Existing Bus Stops & Termini (CDGK & KTC)
SBI’s Promotional ActivitiesSBI’s Promotional Activities
LDF 2011Livestock Dairy Fisheries & Poultry Exhibition/Seminar
LDF 2011Livestock Dairy Fisheries & Poultry Exhibition/Seminar
LDF 2011Livestock Dairy Fisheries & Poultry Exhibition/Seminar
Thank youThank you