Simulation of Georgia Mountain Wind Project, Vermont (2.5 miles) Simulation by Saratoga Associates...

Post on 17-Dec-2015

225 views 0 download

Tags:

Transcript of Simulation of Georgia Mountain Wind Project, Vermont (2.5 miles) Simulation by Saratoga Associates...

Simulation of Georgia Mountain Wind Project, Vermont (2.5 miles)

Simulation by Saratoga Associates and Northeast Wind

Wind Energy: Toward Building Consensus

THE VISUAL IMPACTS PROBLEM

Jean Vissering Landscape Architecture

Gas Station along Scenic Section of Interstate 89, Vermont

Simulation of 5-turbine Georgia Mountain Wind Project, Vermont (portion) (.7 miles)

Simulation by Saratoga Associates

Simulation of Granite Reliable Wind Project, New Hampshire (2.6 miles)Simulation by Northeast Wind

Vermont Yankee Nuclear Power

Station ►

West Virginia Coal Plant

Fenner Wind Project, New York

Photograph by John Zimmerman, Northeast Wind

Scale (Size)• Height

• Horizontal Scale (# turbines)

San Gorgonio Wind Facility, California

Photo by David Polanski

Simulation of 15-tTurbineDeerfield Wind Project, Vermont (6.1 miles)

Simulation by Northeast Wind

Panorama View of 15-turbine Deerfield Wind Project Site, Vermont, (6.1 Miles Away)

Haystack Mountain

Factors reducing visual impacts:

• Distance Away

• Cultural vs. Natural Context

• Occupies Limited portion of the View

• Project would appear lower in elevation and away from major focal point.