Date Plan4th October ‘11 - Deadline for most pre-production
including magazine textual analysis (micro and macro), equipment list,
project proposal, flat plans, audience questionnaire & results, production
of copy, analysis of the institution that would publish my magazine
- Photo shoot for contents page – photograph the different models in the studio with using guitars and/or
drum kit.
7th October ‘11 - Photo shoot with Daniel for the front cover and double page
spread. Outdoors shoot with the use of props such as a guitar.
- Deadline for all pre-production including all of the above and
evidence of original images, design of masthead and fonts. Everything will be on my blog.
11th October ‘11 - Start of production – front cover, contents page and double page
spread.
21st October ‘11 - Deadline for all production work, everything must be on the blog.
28th October ‘11 - Deadline for evaluation, audio presentation, everything
completed and on the blog.