Service Review and Plans
Carmine CioffiDatabase Administrator and Developer
3D Workshop, Barcelona (ES),
20-21 April 2009
Guess Where?
2
Guess Where?
3
BARCELLONA POZZO DI GOTTOMessina
Outline
• Systems Overview• Oracle configurations• Hardware Specifications• Issues• Future plans
4
Systems Overview
• ATLAS: 3 nodes RAC (OGMA)– third node added last week !!!
• LHCb: 2 nodes RAC (LUGH)• ATLAS LFC: single instance• FTS: single instance• TAG: single instance
5
Oracle configuration
• OGMA and LUGH:– Oracle 10.2.0.4– Jan 09 CPU– Processes = 800– Sessions = 885– open_cursors = 300– _buffered_publisher_flow_control_threshold = 30000– _db_block_numa = 1– _enable_NUMA_optimization = FALSE– _job_queue_interval = 1– streams_pool_size = 608MB
• ATLAS LFC: – Oracle 10.2.0.3– July 08 CPU– Processes = 150– Sessions = 170
6
Oracle configuration
• FTS:– Oracle 10.2.0.3– Jan 09 CPU– Processes = 350– Sessions = 390
• TAG:– Oracle 10.2.0.4– July 08 CPU– Processes = 150– Sessions = 170
• All systems are supported 24/7
7
Hardware Specification
• OGMA and LUGH:– 32bit– Red Hat Enterprise Linux AS release 4 (Nahant Update 7)– RAM: 4GB– Single Dual core AMD Opteron 2.4GHz– Third node:
• Two dual core AMD Opteron 2.4GH• RAM 8GB even though it uses only 4.
• LFC:– 32 bit– Red Hat Enterprise Linux AS release 4 (Nahant Update 7)– RAM: 4GB– Dual core Intel(R) Xeon(TM) CPU 2.80GHz
8
Hardware Specification
• FTS:– 32 bit– Red Hat Enterprise Linux AS release 4 (Nahant Update 7)– RAM: 4GB– Dual core Intel(R) Xeon(TM) CPU 2.80GHz
• TAG:– 32bit– Red Hat Enterprise Linux AS release 4 (Nahant Update 7)– RAM: 4GB– CPU: Dual quad core Intel(R) Xeon(TM) CPU 2.80GHz
9
Issues
• Little memory especially for LFC and FTS
• OGMA and LUGH run on old machines and are out of warranty
• No hardware redundancy: single path, single switch and single disk array
• Lost one of the TAG disk array. At the moment the database is broken
• Mix hardware (OGMA)10
Future plans
• Move to new hardware• Install Oracle 64 bit• Add more RAM• Add hardware resilience• Migrate FTS and LFC to 3 nodes RAC (6th May
09):– RAC already installed– 64 bit system– 8GB RAM– Two Dual Core AMD Opteron(tm) 2.4Gh
• Looking into offsite availability 11
Estimated dates for migration
• 3D ATLAS ~mid June• 3D LHCb ~end August• TAG ~beginning of September
12