Post on 14-Mar-2020
Secretary MARK A. VILLARDepartment of Public Works and Highways
Presented by:
MARIA CATALINA E. CABRAL, PhDUndersecretary for Planning and PPP
The Life We Want
The Philippines is a prosperous middle class society where
no one is poor. People live long and healthy lives and are
smart and innovative. The country is a high-trust society
where families thrive in vibrant, culturally diverse, and
resilient communities.Source: www.neda.gov.ph
2017-2022 Philippine Development Plan Strategic Framework
“A sustained increase in
public infrastructure
spending to 5% of GDP
would add a total of 5-6%
to GDP after 15 years."
International Monetary Fund
Partners for Change
BOLDEST, MOST AMBITIOUSINFRASTRUCTURE PROGRAM IN HISTORY (% TO GDP)
Source: Philippine Institute for Development Studies
2017 National Expenditure Program
AVERAGE FOR PAST SIX (6) ADMINISTRATION IN 50 YEARS
DUTERTE YEAR 1(2017 Budget)
BOLDEST, MOST AMBITIOUS INFRASTRUCTURE PROGRAM IN HISTORY (in PHP)
Source: Philippine Institute for Development Studies
2017 National Expenditure Program
2017
2018
2019
2020
2021
2022
847 B
1.2T
1.3 T
1.5 T
1.7 T
1.9 T
8.4 T PHPin 6 years
SOURCE: www.build.org.ph
P90.7B
FY 2011
P543.7B
FY 2017
DPWH FY 2017 INFRASTRUCTURE PROGRAM(Amount in Billion)
P107.8 B Traffic Decongestion Program
P18.8 BConvergence and Rural Road Development
Program (TRIP, ROLL-IT)
P95.9 BIntegrated and Seamless Transport System
(Includes P31.1 B for Mindanao Logistics Infrastructure Network, MLIN)
P104.4 BLivable, Sustainable and Resilient
Communities
P115.3 BSchool Buildings & Farm to Market Road
Study of Master Plan on High Standard Highway Network Development in the
Republic of the Philippines
LUZON SPINE EXPRESSWAY NETWORK
Name of Projects Length (km)
Tarlac-Pangasinan-La Union Expressway,
TPLEX
(Section 3 -Urdaneta City-Rosario, La Union)
25.83
TPLEX Extension
(Rosario - San Fernando, La Union)
54.00
Central Luzon Link Expressway, CLLEx – Phase
I (Tarlac-Cabanatuan)
30.00
Central Luzon Link Expressway, CLLEx -
Phase II (Cabanatuan-San Jose)
35.70
Plaridel By-Pass Road, Phase II 9.96
North Luzon East Expressway, NLEE (Stage 1)
- La Mesa Parkways
18.00
North Luzon East Expressway , NLEE (Stage 2) 91.10
NLEX Harbor Link, Segment 10 5.58
NLEX Harbor Link, Segment 8.2 8.35
Metro Manila Skyway Stage 3 14.80
NLEX-SLEX Connector Road 8.00
NAIA Expressway (NAIAX) 14.85
C-5 South Link Expressway Project 7.74
Southeast Metro Manila Expressway, C6
(Phase I)
34.00
Cavite-Laguna Expressway (CALA-X) 44.20
SLEX TR4 (Sto. Tomas-Lucena) 56.87
Quezon-Bicol Expressway (QUEBEX) 180.00
Camarines Sur Expressway 16.00
Total: 654.98km
Bridges crossing Pasig River (6)
•North and South Habor Bridge
•Binondo-Intramuros Bridge
•2nd Ayala Bridge (Carlos Palanca-San Marcelino)
•Beata-F.Y. Manalo Bridge (Pandacan-Sta. Ana)
•F. Blumentritt-Antipolo Bridge
•Estrella-Pantaleon Bridge
Bridges crossing Marikina River (4)
•Kabayani-Katipunan Bridge
•Reposo-Guatemala Bridge
•J.P. Rizal-Yale Bridge
•G. Gabriel St.-Mercury Ave. Bridge
Bridges crossing Manggahan Floodway (2)
•East Bank-West Bank Bridge 1
•East Bank-West Bank Bridge 2
Project Cost: P18.98 B
PANAY-GUIMARAS –NEGROS LINK BRIDGE, 19.2 km
CEBU-NEGROS LINK BRIDGE, 7km
PANGUIL BAY BRIDGE, 3.5km
LUZON-SAMAR LINK BRIDGE, 25.4km
CEBU-BOHOL LINK BRIDGE, 27.5km
BOHOL-LEYTE LINK BRIDGE, 35km
LEYTE-SURIGAO LINK BRIDGE, 23km
For Feasibility Study
For implementation
Inter-Island Linkage Projects
13
Construct/improve logistics infrastructure
network in Northern Mindanao, Davao,
SOCSARGEN and CARAGA (Length-2,074 km)
Aims to enhance the agribusiness
competitiveness in Mindanao by developing an
intermodal logistics system that will address
the constraints caused by high cost of transport
and inadequate logistics infrastructure, among
others.
Project Cost: P80.41 B
Schedule: 2015-2018
Master Plan for Flood Management in Metro Manila and Surrounding Areas
Name of Project Php’B
Pasig-Marikina River Improvement and Dam Construction 198.44
Meycauayan River Improvement 14.04
Malabon-Tullahan River Improvement 21.64
South Parañaque-Las Piñas River Improvement 17.34
East Mangahan Floodway (Cainta & Taytay River Improvement)
25.90
West Laguna Lakeshore Land Raising 25.19
Land Raising for Small Cities around Laguna Lakeshore 7.16
Improvement of the Inflow Rivers to Laguna Lake 0.64
Manila Core Area Drainage Improvement 27.26
West Mangahan Area Drainage Improvement 5.52
Valenzuela-Obando-Meycauayan (VOM) Improvement 8.61
Total Estimated Requirement: P351.7 B