SCHH Computer Club

Post on 30-Dec-2015

62 views 10 download

Tags:

description

SCHH Computer Club. Treasurer’s Report February 8, 2007. Feb 1, 2007 Opening Balances. Liberty Bank Checking$10,150.76 Treasury Bills$80,000.00 Petty Cash $ 36.21 TOTAL FUNDS – 01/01/06 $90,186.97. January 2007 Income. Membership Dues$5,820.00 - PowerPoint PPT Presentation

Transcript of SCHH Computer Club

SCHH Computer Club

Treasurer’s Report

February 8, 2007

Feb 1, 2007 Opening Balances

Liberty Bank Checking$10,150.76

Treasury Bills$80,000.00

Petty Cash $ 36.21

TOTAL FUNDS – 01/01/06 $90,186.97

January 2007 Income

Membership Dues $5,820.00 Education Classes $1,260.00 Printing Fees $ .00 Interest Income

– Treasury Bills $ 313.88– Liberty Bank $ 6.16

TOTAL INCOME $7,400.04

January 2007 Expenses

Administration $ 82.44 Hardware $ 368.27 Printer Supplies $ 51.34 Software $ 194.10 Subscriptions $ 48.00

TOTAL $ 744.15

January 2007 Treasury Bill Activity Opening Balance $ 80,000 February2006 Additions $ 5,000 End of February Balance $ 85,000

January 31, 2007 Balances

Liberty Bank Checking $ 16,806.56

Treasury Bills $ 80,000.00

Petty Cash $ 36.21

TOTAL FUNDS – 1/31/07 $ 96,842.86

SCHH Computer Club

2007 Budget

2007 Opening Balances

Liberty Bank Checking$10,150.76

Treasury Bills$80,000.00

Petty Cash $ 36.21

TOTAL FUNDS – 01/01/06 $90,186.97

2007 Planned Income

Membership Dues $22,000 Education Classes $ 5,500 Printing Fees $ 600 Interest Income

– Treasury Bills $ 3,800– Liberty Bank Checking $ 50

TOTAL INCOME $31,950

2007 Planned Expenses [1 – 2]

Administration $ 445 Education $ 1,350 Hardware $ 9,580 Membership $ 315 Printing $ 1,025 Printer Supplies $ 1,065 Program $ 2,090

2007 Planned Expenses [2 - 2]

Software $ 5,091 Computer Room Cleaning $ 1,550 Special Events $ 4,950 Subscriptions $ 760

TOTAL EXPENSES $28,221

TOTAL GAIN $ 3,729

2007 Year-End Balances

Liberty Bank Checking $ 9,890.36

Treasury Bills $ 85,000.00

Petty Cash $ .00

TOTAL FUNDS – 12/31/07 $ 94,890.36

Key Issues for 2007

Budget for New Computer Club Room [Est. Late 1st Quarter 2008 Install]

Develop Budget for Reserve Requirements Review Annual Dues Rate Again

SCHH Computer Club

Proposed Budget

New Computer Room

Supplied By Del Webb/Pulte

A Large Room [46ft X 26ft]– Walls

– Ceiling with Connections for Mounted Projector

– Two Lockable Closets [6ft X 6ft]

– Lighting w/Dimmers

– Electrical Outlets

A Folding Partition to Allow Separate Classroom A Raised Floor [Allows Wiring to be Hidden]

Computer Club Requests

DSL & Cable TV outlets Phone Outlet at Monitor Desk Heavy Duty Air Conditioning – Power Usage Dimmable Lighting Opaque Back on Showcase [Limit Light] Install Ceiling Mounted Projector & Projection Screen Raised Flooring Folding Wall to Establish Two Rooms, when Needed

PC, Mac, or Space for Laptop

Laser Printer

Scanner & Photo Printer

Printing Supplies Underneath

Pho

ne

Mon

itor

Sho

wca

se

Scr

een

Sto

rage

Cab

(D

esk

Hei

ght)

Storage Room

Storage Room

30” 30” 30”5’5’5’ 6’

45’ 6” ID28’ 6” ID16’ 8” ID

4’ 8”

7’

3’ 8”5’ 6”

5’ 4” 29’

4” I

D

Inst

ruct

or

Folded Wall

Folding Wall

3 ½” OD Cable Chase in wall (for future needs)

110 VAC 20 A (most under raised floor)

Clock outlet and hanger above door

Clo

ck o

utle

t and

ha

nger

on

wal

l

In ceiling for projector

What Do We Need to Buy?

New Workstation Furniture [Tables & Chairs] New Cabinets for Printers/Scanners New Computers [Est. 20 PCs and 3 MACs] New & Upgraded Software New Printers / Scanners Cabling, Routers, UPS, and Surge Protectors Mountable Projection Screen

What Will Furniture Cost?

Workstations– Two Station Tables [18 @ $438] $ 7,884– Work Station Chairs [32 @ $173] $ 5,536

Storage Cabinets [3 @ $800] $ 2,400

FURNITURE TOTALS$15,820

What Will Computers Cost?

Computers

– PCs [Primarily Desktops]

– 20 @ $2,000 $ 40,000

– MACs

– 3 @ $2,500 $ 7,500

TOTAL COMPUTERS$ 47,500

What Will Software Cost?

Software

– Office Suite

– 23 @ $147 $ 3,381

– Other Software

– New & Upgrades $ 2,500

TOTAL SOFTWARE $ 5,881

What Will Electric & Network Cost? Electrical

– Surge Protectors [16 @ $269] $ 4,304– UPS [24 @ $98] $ 2,352

TOTAL ELECTRICAL $ 6,656

Networking– Routers [2 @ $295] $ 590– Cabling [ 36 @ $10] $ 360

TOTAL NETWORK $ 950

What Will Miscellaneous Cost?

Miscellaneous– Projection Screen $ 1.239

TOTAL MISCELLANEOUS $ 1,239

Cost Summary

Furniture $ 15,820 Computers $ 47,500 Software $ 5,881 Electrical $ 6,656 Networking $ 950 Miscellaneous $ 1,239 Tax & Shipping $ 2,500

GRAND TOTAL $ 80,546

Annual Estimated Reservesfor Replacement and Upgrade

Reserve Budget

Normal Replacement Cycle for Computers is 3 – 4 Years

CAM also notes that the Basic Insurance Policy for stolen or destroyed assets has a very high deductible. [ie Don’t Plan on It]

SCHHCC needs to plan for this contingency by Developing a Reserve Fund that will meet these replacement and upgrade needs.

Reserve Budget [2 – 2]

Computers [Replace 6 per year]– Per Unit Cost $2000 $ 12,000.00

Software Periodic Upgrades [O/S & Office]– Every 5 Years at $150 per $ 4,500.00

Annual Reserve Requirement $ 8,000.00

Reserve Budget [Time Phased] 2007 $0,000 $00,000 $10,000 2008 $8,000 $00,000 $18,000 2009 $8,000 $00,000 $26,000 2010 $8,000 $12,000 $22,000 2011 $8,000 $16,500 $13,500 2012 $8,000 $12,000 $ 9,500Start 2008 with an Estimated $10,000.Start Budgeting in 2008.Review Reserve Amount in 2011

Any Questions or Comments?