Sandy Forks Road Improvements Corridor Public Meeting ... · Sandy Forks. RD 2013. Plantings ....

Post on 02-Oct-2020

0 views 0 download

Transcript of Sandy Forks Road Improvements Corridor Public Meeting ... · Sandy Forks. RD 2013. Plantings ....

December 5, 2013

Sandy Forks Road Improvements From Six Forks Road to Falls of Neuse Road

Corridor Public Meeting

Sandy Forks RD 2013

Prepared by RK&K

Sandy Forks RD2013

Sandy Forks Rd. Improvements

Project Location Sandy Forks RD2013

Sandy Forks RD2013

• Poor Pavement Condition • Alligator Cracking and Pot Holes • No Pedestrian Facilities • Lack of turn lanes • Inadequate Drainage • Not Aesthetically Pleasing

Project Background Sandy Forks RD2013

Sandy Forks RD2013

(

Typical Section – 3 Lane Undivided Sandy Forks RD2013

3- 11’ Lanes, 6’ Sidewalks, 5’ Bike Lanes, 76’ ROW

Sandy Forks RD2013Sandy Forks RD2013 Typical Section – 2 Lane Divided

2 - 11’ Lanes, 16.5’ Median, 6’ Sidewalks 5’ Bike Lanes, 81.5’ ROW

Sandy Forks RD2013 Bioretention

Landscape features adapted to provide storm water management • During storms water ponds on the surface (< 1’ deep) • Water infiltrates into mulch\soil system over 1-2 days • 3 locations on the project (1 median, 2 roadside)

Sandy Forks RD2013 Plantings

Planting Objectives • Low maintenance, native • Human scale • Seasonal interest • Way finding • CPTED principles

Conceptual Plantings • Canopy Trees: Willow Oak, Scarlet Oak, Nuttall Oak, Water Oak,

Black Gum, Bald Cypress • Understory Trees: Eastern redbud, Dogwood, Serviceberry • Shrubs: Dwarf yaupon, Inkberry, Winterberry, Carissa, Viburnum,

Witchazel, Camellia • Grasses/perennials: Fountain grass, Black-eyed susan,

Coneflower, Aster

Sandy Forks RD2013 Public Meetings

• First Public Meeting on December

5, 2013 at Green Road Park and Community Center.

• Second Public Meeting anticipated for Spring 2014

• City Council Public Hearing in Summer 2014.

Sandy Forks RD2013 Funding & Schedule

Estimated Project Cost: • $9.9 Million Including Construction and Right of Way

Project Schedule:

• Complete Right of Way Acquisition – Winter 2015 • Advertise Construction Contract – Winter 2015 • Award Construction Contract – Spring 2015 • Complete Construction – Fall 2016

Sandy Forks RD2013

10

Project Overview

Sandy Forks RD2013

Sandy Forks RD2013 Sandy Forks RD

2013

Sandy Forks RD2013 Sandy Forks RD

2013

Sandy Forks RD2013 Sandy Forks RD

2013

Sandy Forks RD2013 Sandy Forks RD

2013

Sandy Forks RD2013 Sandy Forks RD

2013

Sandy Forks RD2013 Sandy Forks RD

2013

Sandy Forks RD2013 Sandy Forks RD

2013

Sandy Forks RD2013

18

Questions

Sandy Forks RD2013