CONSTRUCTION BULLETIN
Sample Project of The onth
8/16/2019 Sample Project of the Month 01
2/46
About The Publication
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com
BCI Asia Construction Bulletin i
The BCI Asia Construction Bulletin - INDONESIA R071207 is published by:
BCI Asia Construction Information Pte Ltd371 Beach Road, KeyPoint #02-25, Singapore 199597
65 6538 6836 f 65 6538 6896 Email singapore@bciasia.com Website www.bciasia.com
Other offices:
JakartaSurabayaBangkokHanoiHo Chi Minh CityHong KongKuala LumpurManilaSydney
6221 5790 2930 6231 8293056844 537 8548
662 651 8600
848 997 4220 852 2538 0011603 7661 1380632 884 1122612 9432 4100
f 6221 5790 2933/34 f 6231 8293057 f 844 537 8549 f 662 651 8606
f 848 997 4150 f 852 2875 0511 f 603 7661 1381 f 632 884 1121 f 612 9432 4111
E-mail: jakarta@bciasia.comE-mail: surabaya@bciasia.comE-mail: bangkok@bciasia.comE-mail: vietnam@bciasia.comE-mail: vietnam@bciasia.comE-mail: hk@bciasia.comE-mail: kl@bciasia.comE-mail: manila@bciasia.comE-mail: sydney@bciaustralia.com
THE PUBLICATION
BCI Asia Construction Bulletin reports on building and construction projects in Southeast Asia, Hong Kong, and Macau.Projects are researched locally by highly qualified in-house research staff. Projects are monitored from their inception throughvarious phases of planning, design, tender and contract award through to early construction.
PROJECT CATEGORIES
Projects are classified into 19 categories for easier reference. Categories are defined as follows:
Car Parks Major car parks, approximately 50 bays or more. Community Child care centres, kindergartens, churches, mosques, temples, funeral parlours and cemeteries, libraries,
community halls, meeting rooms, fire stations. Education Universities, colleges, schools, research centres and any buildings that have an educational
function. Exhibition Conference centres and exhibition halls. Health Hospitals, medical centres, surgeries (doctor/dental), pathology centres. Hotel Hotels, serviced apartments, motels, hostels and other forms of tourist accommodation. Industrial Factories, plants, workshops, warehouses and any other manufacturing and processing
facilities.
Infrastructure Roads, bridges, civil works, waterways, marinas, piers pipelines, subdivisions and tunnels. Landscaping Significant landscaping component. Legal Law courts, police stations and prisons. Mining Mines (e.g. coal, gold, tin, copper) excluding oil and gas. Office Commercial and public offices. Oil and Gas Oil and gas exploration and production. Recreation Sporting stadiums, sporting fields with clubrooms, swimming pools, tennis courts, cinemas,
theme parks, tourist attractions, clubs, pubs, museums, art galleries and gardens. Residential Apartments, townhomes, retirement homes, residential estates and houses. Retail Shopping centres, supermarkets, shops, restaurants and cafes. Township Urban development. Transport Control towers, freight/passenger terminal buildings and bus/rail interchanges. Utilities Water and sewerage plants, pipelines, telecommunications and power plants.
PROJECT STAGES
Projects are listed in order of their stage of development. Stages are defined as follows:
Competition Architectural, interior and other construction-related design competitions Concept Concept or schematic design is underway Design Project plans are being drafted for planning approval Documentation Specification and working drawings are being drafted Tender Bids are being called for Main Contractor Post Tender Tender has closed Construction Main Contractor has commenced work on site. Main Contract Awarded or Subcontract(s) Tender
Or Subcontract(s) Awarded
Copyright © 2013 BCI Asia Construction Information Pte Ltd. No part of this publication may be reproduced, stored in a retrievalsystem, or transmitted in any form, or by any means, electronic, mechanical, photocopying, recording, or otherwise, without the prior
written permission of the publisher. All rights reserved. Printed in Singapore by BCI Asia Construction Information Pte Ltd. MICA (P) No.045/04/2009. Disclaimer: Every effort is made to ensure that information in this publication is accurate. However, noresponsibility will be taken for any errors which may inadvertently occur.
8/16/2019 Sample Project of the Month 01
3/46
About The Publication
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com
BCI Asia Construction Bulletin ii
HOW TO READ A BCI ASIA CONTRUCTION BULLETIN
A typical page from BCI Asia Construction Bulletin. Illustrating the features and benefits. The simple concise lay out is easyto read and user friendly.
THE BCI ASIA QUALITY PROMISE
Every project presented in BCI Asia Construction Bulletin
has been research and personally or orally confirmed by a member of the BCI Asia research staff
features at least one key decision maker with full contact details
certain jobs or contracts that are yet to be assigned
No project is included in BCI Asia Construction Bulletin unless it meets these minimum requirements.
1. The type of project bymajor category, e.g. hostel,industrial , retail, office allowsthe user to identify the projectsmost relevant to him. 2. The stage of the project gives up-to-dateinformation on how far the
project has advanced.
6. The constructiontimetable – allows the userto stage his sales priorities
8. The key contacts – participants in the decisionmaking process. With thislist of verified names,
addresses and telephonenumbers, the user can savecountless hours ofsearching and can gostraight to making contactto win new business
3. The project code- is aunique code for each project
allowing the user to track the progress of a project, to add
new information overtime andto assign the project
to a specific salesrepresentative.
5. Details of the project- provided in English and
Indonesian – containup-to-date and accurate
information on the
project – thoroughlyresearched and updated
whenever there isa significant changed
in the deve lopment
7. The Developer – often themost critical decision maker
when it comes to aconstruction
contact.
9. The next tender to beawarded, typically the main
contractor, who is invited to bid. At the later stage, the
appointed contractor isannounced as a key contact
for interested sub-contractors.
4. The project nameand address – allowsquick and reliable
reference at a glance
8/16/2019 Sample Project of the Month 01
4/46
Sample Project of The Month
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com
BCI Asia Construction Bulletin 1
PROJECT CATEGORY
Education and Research/ Industrial
PROJECT STAGE PROJECT CODE
Competition 144374002
BALAI PENDIDIKAN DAN PELATIHAN ILMU
PELAYARAN (BP2IP) SUMATERA BARAT (PHASE 5) Desa Nagari Tapakis, Kecamatan Ulakan, Padang
Pariaman, West Sumatera
● 2 x 3 storey training centre buildings (approx. 12,000sq m)
● 30 classrooms
● Workshops● Practical rooms
Building elements include:● Flooring : ceramic tile● Structural : reinforced concrete● Ceiling : gypsum board● Walling : light brick walls
● Roofing : concrete roof tile● Roof truss : steel frame● Aluminium framed doors & windows / solid wood
doors
Estimated cost: Rp50.46 bn (US$3.65 mn).
Construction is expected to start in June 2016. Construction isexpected to end in late December 2016.
Pembangunan 2 gedung balai pelatihan dan pendidikan 3lantai dengan luas bangunan sekitar 12.000 meter persegi.
Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkanmulai Juni 2016 dan selesai Desember 2016.
Government Implementing Agency KementerianPerhubungan - Badan Pengembangan Sumber Daya Manusia(BPSDM) Perhubungan Contact Mr Wahyu Satrio Utomo, SH, M.Si (Head Officer)
62 21 386 5064 f 62 21 384 7480Email: humas@bpsdm.dephub.go.id Website: www.bpsdm.dephub.go.id Jalan Medan Merdeka Timur No. 5, Jakarta Pusat, 10110,
Jakarta, Indonesia
Contact Mr Drs Ridwan Setiawan M.Si, M.Mar.E (KepalaPusat Pengembangan Sumber Daya Manusia PerhubunganLaut)
62 21 386 5064 f 62 21 384 7480Email: humas@bpsdm.dephub.go.id Website: www.bpsdm.dephub.go.id
Jalan Medan Merdeka Timur No. 5, Jakarta Pusat, 10110,Jakarta, Indonesia
Interior Designer To be appointed Remarks: The tenderers are listed in alphabetical order.
Bidders include:
BALAI PENDIDIKAN DAN PELATIHAN ILMU
PELAYARAN (BP2IP) SUMATERA BARAT (PHASE 5)
(continued...)
Adhika Karsa Pratama PT Contact Mr Ir. R. Hananto (Director)
62 21 314 7774 f 62 21 314 1923Email: services@adhikakarsapratama.co.id Website: adhikakarsapratama.co.id
Jalan Cimandiri No. 6, Flat 1, Lantai 3, Cikini, JakartaPusat, 10330, Jakarta, Indonesia
Asri Desindo Intiwidya PT Contact Mr Wahyu Kristianto (Director - Project Architect)
62 21 765 2061 / 7652064
f 62 21 765 2065
Email: adi0909@pt-adi.co.id Website: www.pt-adi.co.id
Jalan Ciputat Raya No. 12A, Pondok Pinang, KebayoranLama, Jakarta Selatan, 12310, Jakarta, Indonesia
Desigram Reka Matra PT Contact Mr Hardi (Project Coordinator)
62 21 8370 6703 f 62 21 8370 6703Email: desigram_rm@yahoo.com
Gedung Gajah Lantai 3A, Jalan Dr Sahardjo, JakartaSelatan, 12840, Jakarta, Indonesia
Mitra Fitrah Alam PT Contact Mr Muhamamd Djabir Hasan (Director)
62 21 8591 7656 f Not available Rukan Business Park Kirana Cawang Blok 33 Lantai 3,Jalan Mayjen D.I. Panjaitan Kavling 48, Jakarta Timur, 13340,Jakarta, Indonesia
Yodya Karya (Persero) PT Contact Mr Colbert Thomas Pangaribuan (PresidentDirector)
62 21 8590 5107 / 8193951
f 62 21 8591 2134
Email: yodyajakarta@yahoo.com Website: www.yoka.co.id
Gedung STT Sapta Taruna 6th Floor, Jalan D.I. PanjaitanKavling 12, Cawang, Jakarta Timur, 13340, Jakarta, Indonesia
Construction Manager To be appointed Remarks: The tenderers are listed in alphabetical order.
Bidders include:
8/16/2019 Sample Project of the Month 01
5/46
8/16/2019 Sample Project of the Month 01
6/46
Sample Project of The Month
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com
BCI Asia Construction Bulletin 3
JATIDIRI SPORTS CENTRE - SEKOLAH KHUSUS
OLAHRAGA (continued...)
Architect To be appointed Remarks: Qualification : Non small scale business.Qualification method : Pre-qualification. The aanwijzing(tender explanation) is scheduled on 28 December 2015.
Tender opens on 23 December, 2015 and closes on 29December, 2015.
Tender Office Dinas Pemuda dan Olahraga Propinsi JawaTengah Contact Mr Agus Prasutio, SH (Member of Tender
Committee - Pejabat Pelaksana Teknik Kegiatan (PPTK)) 62 24 841 9956 f 62 24 841 9959
Website: dinpora.jawatengah.go.id
Jalan Ki Mangunsarkoro No.12, Semarang, 50241, CentralJava, Indonesia
Contractor To be appointed
PROJECT CATEGORY
Education and Research/ Office
PROJECT STAGE PROJECT CODE
Competition 145279002
LABORATORIUM PENGUJIAN PENCEGAHAN DAN
PEMBERANTASAN PENYAKIT (P2P) Dusun Karanganyar, Desa Wonosari, Kecamatan Tutur,
Nongkojajar, Kabupaten Pasuruan, East Java
● 3 storey laboratory building (approx. 5,000 sq m)● Equipment storage● Observation room
Estimated cost: undisclosed.
Construction is expected to start in early May 2016.
Construction is expected to end in late September 2016.
Bangunan laboratorium 3 lantai dengan luas bangunan
sekitar 5.000 meter persegi. Perkiraan biaya: tidakdinyatakan . Konstruksi diharapkan mulai Mei 2016 dan selesai September 2016.
Government Implementing Agency Balai Besar TeknikKesehatan Lingkungan dan Pengendalian Penyakit Surabaya Contact Mr Zainal Ilyas Nampira, SKM.,M. Kes. (HeadOfficer)
62 31 354 0189 / 3540191
f 62 31 352 8847
Email: info@btklsby.go.id Website: www.btklsby.go.id
Jalan Sidoluhur No. 12 (Indrapura), Surabaya, 60175, EastJava, Indonesia
Contact Mr Wahyu Hari Himawan (Kasubag Bina Program) 62 31 354 0189 / 3540191
f 62 31 352 8847
Email: info@btklsby.go.id Website: www.btklsby.go.id Jalan Sidoluhur No. 12 (Indrapura), Surabaya, 60175, EastJava, Indonesia
Supervisory Consultant To be appointed
Architect To be appointed Remarks: Qualification : Small scale business. Qualificationmethod : Pre-qualification. The aanwijzing (tenderexplanation) is scheduled on 29 December 2015.
Tender opens on 28 December, 2015 and closes on 04 January,2016.
Tender Office Balai Besar Teknik Kesehatan Lingkungandan Pengendalian Penyakit Surabaya Contact Mr Ronny Koesnariyanto, ST, M.Kes. (Head ofTender Comittee)
62 31 354 0189 / 354
0191
f 62 31 352 8847
Email: info@btklsby.go.id Website: www.btklsby.go.id Jalan Sidoluhur No. 12 (Indrapura), Surabaya, 60175, EastJava, Indonesia
8/16/2019 Sample Project of the Month 01
7/46
Sample Project of The Month
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com
BCI Asia Construction Bulletin 4
LABORATORIUM PENGUJIAN PENCEGAHAN DAN
PEMBERANTASAN PENYAKIT (P2P) (continued...)
Contractor To be appointed
PROJECT CATEGORY
Residential/ Retail/ Recreation
PROJECT STAGE PROJECT CODE
Concept 144893002
BANDUNG CENTRAL PARK
Site yet to be determined, Bandung, West Java
● 2 x 27 storey apartment buildings (approx. 50,000 sqm)
● Ground floor retail shops & restaurants● Children playground● Apartment lobby & reception lounge
Estimated cost: undisclosed.
Construction is expected to start in early June 2017.
Construction is expected to end in late December 2019.
Apartemen 27 lantai dengan luas bangunan sekitar 50.000
meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksidiharapkan mulai Juni 2017 dan selesai Desember 2019.
Developer Jabar Bumi Konstruksi PT Contact Mr Ir Wibowo (Director)
62 22 250 1426 f 62 22 250 1426Email: mail@jabarbumikonstruksi.co.id Website: jabarbumikonstruksi.co.id
Jalan Sidomulya No. 39, Bandung, 40123, West Java,Indonesia
Contact Mr Hidayat Karim (Project Manager) 62 22 250 1426 f 62 22 250 1426
Email: mail@jabarbumikonstruksi.co.id Website: jabarbumikonstruksi.co.id Jalan Sidomulya No. 39, Bandung, 40123, West Java,Indonesia
Conceptual Designer Jabar Bumi Konstruksi PT Contact Mr Ir Matheus (Operational Director)
62 22 250 1426 f 62 22 250 1426Email: mail@jabarbumikonstruksi.co.id Website: jabarbumikonstruksi.co.id
Jalan Sidomulya No. 39, Bandung, 40123, West Java,
Indonesia
Architect To be appointed
Structural Engineer To be appointed
Mechanical & Electrical Engineer To be appointed
Contractor To be appointed
8/16/2019 Sample Project of the Month 01
8/46
Sample Project of The Month
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com
BCI Asia Construction Bulletin 5
PROJECT CATEGORY
Residential/ Hotel/ Car Park/ Retail/ Recreation
PROJECT STAGE PROJECT CODE
Concept 145339002
CONDOTEL AT JALAN KOMBES POL M. DURYAT
Jalan Kombes Pol M. Duryat, Surabaya, East Java
● 20 storey apartment & hotel building (approx. 18,210sq m)
● 6 multi storey car park (approx. 4,200 sq m)● Up to 350 apartment units & hotel rooms● Lobby & reception lounge
● Ground floor retail shops & restaurants● Swimming pool
● Gymnasium, fitness centre
Building elements include:● Flooring : ceramic tile / homogeneous tile● Structural : reinforced concrete● Ceiling : gypsum board / acoustical ceiling
● Walling : precast concrete panel● Facade : glass wall cladding / decorative cladding● Aluminium framed doors & windows / solid wood
doors● Roofing : concrete slab roof● Lifts● Duct connected air conditioning / split type air
conditioning● Fire protection system
● Security system● Sanitary ware / plumbing● Building automation system
Estimated cost: Rp133.30 bn (US$9.65 mn).
Construction is expected to start in early March 2017.Construction is expected to end in early December 2017.
Kondotel 20 lantai dan 6 lantai gedung parkir dengan totalluas bangunan sekitar 22.410 meter persegi. Perkiraan
biaya: tidak dinyatakan. Waktu konstruksi belum ditentukan
Hotel Operator To be appointed
Architect Piter Gan Architect PT - Jakarta Contact Mr Piter Gan (Director)
62 21 765 1781 f 62 21 765 2875Email: pg@pitergan.com Website: www.pitergan.com/
Jalan Pangeran Antasari No. 10B, Cipete Selatan, JakartaSelatan, 12150, Jakarta, Indonesia
Contact Mr Raymond Wibisono (Architect) 62 21 765 1781 f 62 21 765 2875
Email: jkt@pitergan.com Website: www.pitergan.com/ Jalan Pangeran Antasari No. 10B, Cipete Selatan, Jakarta
Selatan, 12150, Jakarta, Indonesia
Structural Engineer To be appointed
CONDOTEL AT JALAN KOMBES POL M. DURYAT
(continued...)
Mechanical & Electrical Engineer To be appointed
Quantity Surveyor To be appointed
Contractor To be appointed
8/16/2019 Sample Project of the Month 01
9/46
8/16/2019 Sample Project of the Month 01
10/46
Sample Project of The Month
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com
BCI Asia Construction Bulletin 7
PROJECT CATEGORY
Hotel/ Retail/ Recreation
PROJECT STAGE PROJECT CODE
Concept 145461002
HARPER HOTEL SOLO (4 STARS)
Site yet to be determined, Surakarta, Central Java
● 10 storey hotel building (approx. 6,600 sq m)
● up to 150 hotel rooms● Hotel lobby & reception area● Dining & restaurant● Swimming pool
● Single basement level car park
Estimated cost: undisclosed.
Construction is expected to start in late June 2016. Acompletion date is to be determined.
Bangunan hotel 10 lantai dan satu level basement, denganluas bangunan sekitar 6.600 meter persegi. Perkiraan biaya:tidak dinyatakan. Konstruksi diharapkan mulai Juni 2016.Waktu penyelesaian belum ditentukan.
Hotel Operator Archipelago International (formerly AstonInternational Indonesia) Contact Ms Nurulita Amalia (Corporate Director ofPurchasing)
62 21 831 8800 f 62 21 831 7180Website: www.archipelagointernational.com Wisma Staco, 3rd Floor Suite 100, Jalan CasablancaKavling 18, Jakarta Selatan, 12870, Jakarta, Indonesia
Contact Mr William Cornellius (Head of Project Department- Design Coordinator)
62 21 831 8800 f 62 21 831 7180Email: willyam.k@archipelagointernational.com Website: www.archipelagointernational.com
Wisma Staco, 3rd Floor Suite 100, Jalan CasablancaKavling 18, Jakarta Selatan, 12870, Jakarta, Indonesia
Architect To be appointed
Structural Engineer To be appointed
Mechanical & Electrical Engineer To be appointed
Contractor To be appointed
PROJECT CATEGORY
Hotel/ Retail/ Recreation/ Car Park
PROJECT STAGE PROJECT CODE
Concept 144916002
HOTEL AT JALAN PEMUDA - SURABAYA
Jalan Pemuda No. 17, Surabaya, East Java
● 19 storey hotel (approx 26,500 sq m)
● Up to 180 hotel rooms● Hotel lobby & reception lounge● Dining & restaurant● Banquet & function room
● Swimming pool● At grade car park
Building elements include:● Flooring : ceramic tile / homogeneous tile● Structural : reinforced concrete● Ceiling : gypsum board / acoustical ceiling● Walling : light brick walls
● Facade : glass wall cladding / aluminium compositecladding
● Roofing : concrete slab roof● Aluminium framed doors & windows / fabricated
wood doors● Piling : bored pile / precast pile / tube pile● Lifts
● Duct connected air conditioning● Fire protection system
● Security system● Sanitary ware● Building automation system
Estimated cost: undisclosed.
Construction is expected to start in early September 2016.Construction is expected to end in early September 2017.
Bangunan hotel 19 lantai dengan luas bangunan sekitar26.500 meter persegi. Perkiraan biaya: tidak dinyatakan.
Konstruksi diharapkan mulai September 2016 dan selesaiSeptember 2017.
Hotel Operator To be appointed
Architect Piter Gan Architect PT - Jakarta Contact Mr Piter Gan (Director)
62 21 765 1781 f 62 21 765 2875Email: pg@pitergan.com Website: www.pitergan.com/ Jalan Pangeran Antasari No. 10B, Cipete Selatan, JakartaSelatan, 12150, Jakarta, Indonesia
Contact Mr Raymond Wibisono (Architect) 62 21 765 1781 f 62 21 765 2875
Email: jkt@pitergan.com Website: www.pitergan.com/
Jalan Pangeran Antasari No. 10B, Cipete Selatan, JakartaSelatan, 12150, Jakarta, Indonesia
Structural Engineer To be appointed
8/16/2019 Sample Project of the Month 01
11/46
Sample Project of The Month
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com
BCI Asia Construction Bulletin 8
HOTEL AT JALAN PEMUDA - SURABAYA (continued...)
Mechanical & Electrical Engineer To be appointed
Quantity Surveyor To be appointed
Contractor To be appointed
PROJECT CATEGORY
Education and Research
PROJECT STAGE PROJECT CODE
Concept 142564002
INSTITUT AGAMA ISLAM NEGERI (IAIN)
TULUNGAGUNG - FAKULTAS SYARIAH DAN ILMU
HUKUM (FASIH)
Jalan Mayor Sujadi Timur No. 46, Tulungagung, East
Java
● 4 storey campus building (approx 4,500 sq m)● Classrooms
● Lecturer rooms● Administration room
Building elements include:● Flooring : ceramic tile● Structural : reinforced concrete● Ceiling : gypsum board● Walling : light brick walls
● Roofing : concrete roof tile● Roof truss : steel frame● Aluminium framed doors & windows / fabricated
wood doors● Sanitary ware / plumbing
Estimated cost: undisclosed.
Construction is expected to start in late August 2016.
Construction is expected to end in late December 2016.
Gedung kampus 4 lantai terdiri dengan luas bangunan sekitar
4.500 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai Agustus 2016 dan selesai Desember 2016.
Developer Institut Agama Islam Negeri Tulungagung Contact Mr Saifudin Zuhri (Wakil Rektor BidangAdministrasi Umum, Keuangan & Perencanaan)
62 355 321 513 f 62 355 321 656Email: info@stain-tulungagung.ac.id Website: www.iain-tulungagung.ac.id Jalan Mayor Sujadi Timur No. 46, Plosokandang,
Tulungagung, 66221, East Java, Indonesia
Supervisory Consultant To be appointed
Architect Alco Art Studio Consultant PT Contact Mr Ir. Gunawan ,MT, IAI (Director - PrincipalArchitect)
62 31 847 0138 / 8410149
f 62 31 841 0149
Email: alco_sby@yahoo.com Jalan Sidosermo PDK VA Kavling 45, Surabaya, 60239,East Java, Indonesia
Contact Mr Ir. Mohamad Sjamsul Arifin (Team Leader)
62 31 847 0138 / 8414549
f 62 31 841 4549
Email: alco_sby@yahoo.com Jalan Sidosermo PDK VA Kavling 45, Surabaya, 60239,East Java, Indonesia
8/16/2019 Sample Project of the Month 01
12/46
Sample Project of The Month
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com
BCI Asia Construction Bulletin 9
INSTITUT AGAMA ISLAM NEGERI (IAIN)
TULUNGAGUNG - FAKULTAS SYARIAH DAN ILMU
HUKUM (FASIH) (continued...)
Construction Manager Etika Prana PT Contact Mr Chasan Hindaroh (Director - Project Coordinator)
62 31 594 2677 / 5941598
f 62 31 594 1598
Email: etika_9000@yahoo.com
Jalan Mojoklanggru Wetan IV - A No. 20 - 21, Surabaya,60285, East Java, Indonesia
Contact Mr Iqbal Ibnu Rosyid (Team Leader) 62 31 594 2677 / 594
1598
f 62 31 594 1598
Email: etika_9000@yahoo.com Jalan Mojoklanggru Wetan IV - A No. 20 - 21, Surabaya,60285, East Java, Indonesia
Contractor To be appointed
PROJECT CATEGORY
Utilities/ Infrastructure
PROJECT STAGE PROJECT CODE
Concept 121308002
JAWA 7 COAL POWER PLANT (2 X 1,000 MW) IPP -
BANTEN Desa Terate, Kecamatan Kramatwatu, Serang, Banten
● Coal fired steam power plant (capacity of 2 x 1,000MW)
● Turbine house● Boiler house with steel structure
● Chimney● Electrical system
● Jetty & trestle●
Oil tanks● Seal pit● Coal handling system● Cooling water system
Estimated cost: undisclosed.
Construction is expected to start in early June 2017.Construction is expected to end in early January 2019.
Pembangkit listrik tenaga uap batubara dengan kapasitas 2 x1.000 megawatt. Perkiraan biaya : tidak dinyatakan. Konstruksi diharapkan mulai Juni 2017 dan selesai Januari2019.
Concessionaire Pembangkitan Jawa Bali PT Contact Mr Mulyo Adji (Development & CommercialDirector)
62 31 828 3180 - 8283186
f 62 31 829 1280
Email: info@ptpjb.com Website: www.ptpjb.com
Jalan Ketintang Baru No 11, Surabaya, 60231, East Java,Indonesia
Regulator Perusahaan Listrik Negara (Persero) PT - UnitInduk Pembangunan VIII Contact Mr Pudjo Santoso (General Manager)
62 31 829 1377f
62 31 828 8959 / 8291538Email: uip8@pln-uip-ktjb.co.id Website: www.pln.co.id/uipkitthermaljb Jalan Ketintang Baru I No. 1-3, Surabaya, 60231, EastJava, Indonesia
Perusahaan Listrik Negara (Persero) PT Contact Mr Iwan Purwana (Head of Strategic ProcurementDivision)
62 21 726 1122 / 7261875
f 62 21 722 7025 / 7227060
Email: kontakkami@pln.co.id Website: www.pln.co.id
Jalan Trunojoyo Blok MI / 135, Main Building 15th floor,Kebayoran Baru, Jakarta Selatan, 12110, Jakarta, Indonesia
8/16/2019 Sample Project of the Month 01
13/46
Sample Project of The Month
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com
BCI Asia Construction Bulletin 10
JAWA 7 COAL POWER PLANT (2 X 1,000 MW) IPP -
BANTEN (continued...)
Contact Mr Hernadi Buhron (Head of IPP Division) 62 21 726 1122 / 7261875
f 62 21 722 7025 / 7227060
Email: kontakkami@pln.co.id Website: www.pln.co.id
Jalan Trunojoyo Blok MI / 135, Main Building 15th floor,Kebayoran Baru, Jakarta Selatan, 12110, Jakarta, Indonesia
Loan Agency To be appointed
Investor China Shenhua Energy Co.,Ltd Contact Mr Wang Shumin (Vice President)
86 10 5813 1088 f 86 10 5813 1804Email: ir@csec.com Website: www.csec.com No.22 Xibinhe Road Andingmen, Dongcheng District,Beijing, China
Environmental Impact Assessment To be appointed Remarks: The tenderers are listed in alphabetical order
Bidders include:
Adi Banuwa PT - Operational Office Contact Mrs Yuliana Andriani (Director)
62 31 841 2536 / 8412543
f 62 31 841 2517
Email: ptadibanuwa@yahoo.com Ruko Panji Makmur Blok C No. 11, Jalan Raya PanjangJiwo, Surabaya, 60400, East Java, Indonesia
Gelar Buana Semesta PT Contact Mr Ardi Efendi Saleh (Director)
Not available f Not availableEmail: gelarbuanasemesta@gmail.com Jalan Mentor No. 62, Sukaraja, Bandung, 40172, WestJava, Indonesia
Nusa Buana Cipta PT
Contact Mr Dwisatya H (Staff of Marketing Division) 62 21 830 3718 f 62 21 830 3718
Email: pemasaran@nusabuanacipta.com Jalan Tebet Utara IB No 3, Tebet, Jakarta Selatan, 12810,Jakarta, Indonesia
JAWA 7 COAL POWER PLANT (2 X 1,000 MW) IPP -
BANTEN (continued...)
Intimulya Multikencana PT Contact Mr Ir. H. Suhardi (Direktur Utama)
62 22 780 3787 f 62 22 783 4961Email: intimulyamultikencana@ymail.com
Komplek Ujung Berung Indah Blok 7 No. 7, Bandung,40613, West Java, Indonesia
Royal Haskoning DHV Contact Mr Wybe de Jager (Director)
62 21 750 4605 f 62 21 750 4610
Email: info@id.rhdhv.com Website: www.royalhaskoningdhv.com
Ventura Building 2nd floor, Jalan R.A. Kartini No. 26(Outer Ring Road) Cilandak, Jakarta Selatan, 12430, Jakarta,Indonesia
Surveyor Indonesia PT Contact Mr M. Arief Zainuddin (President Director)
62 21 526 5526 / 5263333 / 526 51591
f 62 21 526 5525
Email: pt.surveyor@asia.com Website: www.ptsi.co.id Graha Surveyor Indonesia, Jalan Jendral Gatot SubrotoKavling 56, Jakarta Selatan, 12950, Jakarta, Indonesia
Tender Office Perusahaan Listrik Negara (Persero) PT Contact Mr Kuswara Harjowijaya (Secretary of ProcurementCommittee)
62 21 722 7049 f 62 21 722 7025 / 7227060
Email: kontakkami@pln.co.id Website: www.pln.co.id
Jalan Trunojoyo Blok MI / 135, Main Building 15th floor,Kebayoran Baru, Jakarta Selatan, 12110, Jakarta, Indonesia
EPC Contractor To be appointed
8/16/2019 Sample Project of the Month 01
14/46
8/16/2019 Sample Project of the Month 01
15/46
Sample Project of The Month
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com
BCI Asia Construction Bulletin 12
KOTA BARU PARAHYANGAN (PHASE 2) -
MARANATHA UNIVERSITY (continued...)
Yayasan Maranatha Bandung Contact Mr Beng Sugiharto (Ketua Yayasan)
62 22 201 2186 / 2007916
f 62 22 200 7916
Email: info@maranatha.edu Website: www.maranatha.edu
Jalan Prof. drg. Surya Sumantri No. 65, Bandung, 40164,West Java, Indonesia
Belaputera Intiland PT Contact Mr Viki Auliya (Architect)
62 22 8681 3837 / 6803333 / 680 7888
f 62 22 680 7555
Email: viki.auliya@kotabaruparahyangan.com Website: www.kotabaruparahyangan.com
Jalan Panyawangan, Kavling 66B, No. 6, Bumi Indraprasta,Home and Living Centre, Kota Baru Parahyangan, BandungBarat, 40553, West Java, Indonesia
Yayasan Maranatha Bandung Contact Ms Cindy (Administrator / General Staff)
62 22 201 2186 / 2007916
f 62 22 200 7916
Email: info@maranatha.edu
Website: www.maranatha.edu Jalan Prof. drg. Surya Sumantri No. 65, Bandung, 40164,West Java, Indonesia
Master Planner Townland International PT Contact Mr Johannes Spies (Director)
62 21 2941 0621 f 62 21 2941 0622Email: tcljkt@townland.com Website: www.townland.com Granadi Building Lantai 7 Tipikal Utara, Jalan Rasuna SaidBlok X - 1, Kavling 8 - 9, Kuningan, Jakarta Selatan, 12950,Jakarta, Indonesia
Contact Ms Farida Devi Kurniati (Senior Urban Designer)
62 21 2941 0621 f 62 21 2941 0622Email: farida.devi@townland.com Website: www.townland.com Granadi Building Lantai 7 Tipikal Utara, Jalan Rasuna SaidBlok X - 1, Kavling 8 - 9, Kuningan, Jakarta Selatan, 12950,Jakarta, Indonesia
Architect Global Rancang Selaras PT Contact Mr Adi Utomo Hatmoko (Principal Architect)
62 274 880 637 f 62 274 887 778Email: adm_globalrancangselaras@yahoo.com Website: www.globalrancangselaras.com Jalan Apel No. 111, Nglaban, Ngaglik, Sleman, 55281, DIYogyakarta, Indonesia
KOTA BARU PARAHYANGAN (PHASE 2) -
MARANATHA UNIVERSITY (continued...)
Contact Mr Mario Andreti (Project Architect & ConstructionManager)
62 274 880 637 f 62 274 887 778Email: adm_globalrancangselaras@yahoo.com Website: www.globalrancangselaras.com Jalan Apel No. 111, Nglaban, Ngaglik, Sleman, 55281, DIYogyakarta, Indonesia
Contact Mrs Dian (Staff Officer)
62 274 880 637 f 62 274 887 778Email: adm_globalrancangselaras@yahoo.com Website: www.globalrancangselaras.com Jalan Apel No. 111, Nglaban, Ngaglik, Sleman, 55281, DIYogyakarta, Indonesia
Structural Engineer To be appointed
Mechanical & Electrical Engineer To be appointed
Quantity Surveyor To be appointed
Piling Contractor To be appointed
Contractor To be appointed
8/16/2019 Sample Project of the Month 01
16/46
Sample Project of The Month
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com
BCI Asia Construction Bulletin 13
PROJECT CATEGORY
Infrastructure
PROJECT STAGE PROJECT CODE
Concept 145544002
PATIHAN MADIUN BRIDGE DEVELOPMENT
Desa Patihan, Kecamatan Manguharjo, Madiun, East
Java
● Bridge construct (35 m length x 10 m width)● Reinforced concrete bridge● Bridge abutment● Girder bridge
● Bridge approach slab● Bridge safety barriers
Estimated cost: undisclosed.
Work is expected to start in early July 2016. Work is expectedto end in late December 2016.
Pembangunan jembatan struktur beton bertulang dengantotal panjang sekitar 35 meter dan lebar 10 meter. Perkiraanbiaya: tidak dinyatakan. Pekerjaan diharapkan mulai Juli2016 dan selesai Desember 2016.
Government Implementing Agency Dinas Pekerjaan UmumKota Madiun Contact Mr Ir. Danardono (Head Officer)
62 351 471 151 f 62 351 496 541Website: www.portal.madiunkota.go.id Jalan D.I Panjaitan No. 17, Madiun, 63121, East Java,Indonesia
Contact Mr Thariq Megah (Kepala Seksi Pemeliharaan Jalandan Jembatan)
62 351 471 151 f 62 351 496 541Website: www.portal.madiunkota.go.id
Jalan D.I Panjaitan No. 17, Madiun, 63121, East Java,Indonesia
Supervisory Consultant To be appointed
Civil Engineer To be appointed
Bridge Contractor To be appointed
PROJECT CATEGORY
Residential/ Health
PROJECT STAGE PROJECT CODE
Concept 141195002
RSUD WATES HOSPITAL - DORMITORY
Jalan Tentara Pelajar Km 1 No. 5 Wates, Kulon Progo,
DI Yogyakarta
● 3 storey dormitory building (approx. 3,000 sq m)● Up to 20 dormitory rooms● Multipurpose room
Estimated cost: undisclosed.
Construction is expected to start in early September 2016.Construction is expected to end in early December 2016.
Bangunan asrama 3 lantai, dengan luas bangunan sekitar3.000 meter persegi. Perkiraan biaya: tidak dinyatakan.
Konstruksi diharapkan mulai September 2016 dan selesai Desember 2016.
Developer Rumah Sakit Umum Daerah (RSUD) Wates Contact Ms Lies Indriyati (Director - Kuasa PenggunaAnggaran)
62 274 773 169 f 62 274 773 092Email: rsud@kulonprogokab.go.id Website: www.rsud.kulonprogokab.go.id Jalan Tentara Pelajar Km. 1 No. 5 Wates, Kulonprogo,55611, DI Yogyakarta, Indonesia
Contact Mr drg.Agung Sugiarto, M.Kes (Project Coordinator- Kabag administrasi dan Umum)
62 274 773 169 f 62 274 773 092Email: rsud@kulonprogokab.go.id Website: www.rsud.kulonprogokab.go.id Jalan Tentara Pelajar Km. 1 No. 5 Wates, Kulonprogo,55611, DI Yogyakarta, Indonesia
Supervisory Consultant To be appointed
Master Planner Pola Data Consultant PT Contact Mr Nufrizal F Hanafi (Director - Project Manager)
62 274 433 3680 / 7478764 / 719 4529
f 62 274 433 3680
Email: pola_data@yahoo.com Jalan Ponpes Sunan Ampel No. 02 Banjeng, Maguwoharjo,Depok, Sleman, 55283, DI Yogyakarta, Indonesia
Contact Mr Eko Sulistiatmojo (Architect) 62 274 433 3680 / 7478764 / 719 4529
f 62 274 433 3680
Email: pola_data@yahoo.com Jalan Ponpes Sunan Ampel No. 02 Banjeng, Maguwoharjo,Depok, Sleman, 55283, DI Yogyakarta, Indonesia
Architect To be appointed
Structural Engineer To be appointed
Contractor To be appointed
8/16/2019 Sample Project of the Month 01
17/46
Sample Project of The Month
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com
BCI Asia Construction Bulletin 14
PROJECT CATEGORY
Industrial
PROJECT STAGE PROJECT CODE
Concept 144316002
SAMPOERNA AGRO CPO FACTORY -
KALIMANTAN BARAT Site yet to be determined, West Kalimantan
● Crude palm oil plant (capacity of 30 tph)● Mechanical work● Conveyor lines● Workshop
Estimated cost: undisclosed.
Construction timetable is to be determined.
Pabrik pengolahan kelapa sawit dengan kapasitas produksi30 ton buah tandan segar per jam. Perkiraan biaya: tidak
dinyatakan. Waktu konstruksi belum ditentukan.
Developer Sampoerna Agro, Tbk PT Contact Mr Michael Kesuma (Head of Investor Relation)
62 21 577 1711 / 5770886
f 62 21 577 1712 / 5770015
Website: www.sampoernaagro.com Sampoerna Strategic Square, North Tower 28 Floor, JalanJendral Sudirman Kavling 45 - 46, Jakarta Selatan, 12930,Jakarta, Indonesia
Contact Mr Elman Salim (Project Head of EngineeringDepartment)
62 21 577 1711 / 5770886
f 62 21 577 1712 / 5770015
Email: elman.salim@sampoernaagro.com Website: www.sampoernaagro.com Sampoerna Strategic Square, North Tower 28 Floor, JalanJendral Sudirman Kavling 45 - 46, Jakarta Selatan, 12930,Jakarta, Indonesia
Contact Mr Oke (Staff of Engineering Division) 62 21 577 1711 / 5770886
f 62 21 577 1712 / 5770015
Website: www.sampoernaagro.com
Sampoerna Strategic Square, North Tower 28 Floor, JalanJendral Sudirman Kavling 45 - 46, Jakarta Selatan, 12930,Jakarta, Indonesia
EPC Contractor To be appointed
PROJECT CATEGORY
Industrial
PROJECT STAGE PROJECT CODE
Concept 144541002
SIDO MUNCUL FOOD NUTRITION FACTORY -
SLEMAN Sleman, DI Yogyakarta
● Single storey food nutrition factory (approx 25,000 sqm)
● Mechanical work● Production lines
● Quality control room
Estimated cost: undisclosed.
Construction is expected to start in early January 2017.Construction is expected to end in late December 2017.
Bangunan pabrik nutrisi makanan satu lantai, dengan luasbangunan sekitar 25.000 meter persegi. Perkiraan biaya:tidak dinyatakan. Konstruksi diharapkan mulai Januari 2017dan selesai Desember 2017.
Developer Sido Muncul Tbk PT - Semarang Factory Office Contact Mr Irwan Hidayat (President Director)
62 298 523 515 f 62 298 523 509Email: simuncul@indosat.net.id Website: www.sidomuncul.com
Jalan Soekarno Hatta Km. 28, Kelurahan Klepu,Kecamatan Bergas, Semarang, 50552, Central Java, Indonesia
Contact Mr Stefanus Agus Triharyanto (Head of BuildingDivision)
62 298 523 515 f 62 298 523 509Email: simuncul@indosat.net.id Website: www.sidomuncul.com
Jalan Soekarno Hatta Km. 28, Kelurahan Klepu,Kecamatan Bergas, Semarang, 50552, Central Java, Indonesia
Architect To be appointed
Structural Engineer To be appointed
Mechanical & Electrical Engineer To be appointed
Piling Contractor To be appointed
Contractor To be appointed
8/16/2019 Sample Project of the Month 01
18/46
Sample Project of The Month
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com
BCI Asia Construction Bulletin 15
PROJECT CATEGORY
Hotel/ Recreation/ Retail
PROJECT STAGE PROJECT CODE
Concept 103509002
THE RITZ CARLTON RESORTS AND SPA (5 STARS)
- TANAH LOT Jalan Tanah Lot, Tabanan, Bali
● 4 storey hotel building (approx 20,000 sq m)● Up to 200 hotel rooms● Hotel lobby & reception area● Dining & restaurant
● Swimming pool
Project deferred indefinitely
Building elements include:● Flooring : ceramic tile / homogeneous tile● Structural : reinforced concrete● Ceiling : gypsum board
● Walling : light brick walls● Roofing : concrete roof tile● Roof truss : lightweight steel● Aluminium framed doors & windows / solid wood
doors● Lifts● Split type air conditioning / duct connected air
conditioning● Sanitary ware / plumbing
● Fire protection system● Security system● Building automation system
Estimated cost: undisclosed.
Construction timetable is to be determined.
Pembangunan hotel 4 lantai terdiri dari 200 kamar hotel,
dengan luas bangunan sekitar 20.000 meter persegi. Perkiraan biaya: tidak dinyatakan. Waktu konstruksi belum
ditentukan.
Developer Ciputra Property Tbk PT
Contact Mr Artha Dinata Zakar (Director) 62 21 2988 8898 /5292 0982 / 2988 5858
f 62 21 2988 8899
Email: investor@ciputra.com Website: www.ciputraproperty.com Jalan Prof Dr Satrio Kavling 3 - 5, Jakarta Selatan, 12940,Jakarta, Indonesia
Contact Mr Antonius Andes (Staff of Project Division) 62 21 2988 8898 /5292 0982 / 2988 5858
f 62 21 2988 8899
Email: investor@ciputra.com Website: www.ciputraproperty.com Jalan Prof Dr Satrio Kavling 3 - 5, Jakarta Selatan, 12940,
Jakarta, Indonesia
THE RITZ CARLTON RESORTS AND SPA (5 STARS)
- TANAH LOT (continued...)
Hotel Operator The Ritz-Carlton Hotel Company L.L.C. Contact Mrs Ainslie Cheung (Regional Director)
852 2192 6207 f 852 2192 6073Email: rc.hkgkw.leads@ritzcarlton.com Website: www.ritzcarlton.com Suite 701, 7/F, 1063 King's Road, Hong Kong, HongKong, Hong Kong SAR
Architect Ground Kents Architect (GKA) Indonesia PT Contact Mr Marthin Grounds (Principal)
62 361 703 517 / 703518
f 62 361 703 652
Email: info@gkabali.com Website: www.gkabali.com Kawasan Bukit Permai, Mimpi Resort, Jimbaran, Badung,80361, Bali, Indonesia
Interior Designer Jaya Ibrahim, Jaya & Associates Contact Mrs Xaviera (Interior Designer)
65 6645 3575 f 65 6645 3599Email: info@jayainternational.com Website: www.jayainternational.com 115 Amoy Street #02-03, Singapore,Singapore 069935
Structural Engineer To be appointed
Mechanical & Electrical Engineer To be appointed
Quantity Surveyor To be appointed
Contractor To be appointed
8/16/2019 Sample Project of the Month 01
19/46
Sample Project of The Month
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com
BCI Asia Construction Bulletin 16
PROJECT CATEGORY
Hotel/ Recreation/ Retail
PROJECT STAGE PROJECT CODE
Concept 145484002
VEGA HOTEL YOGYAKARTA
Site yet to be determined, Yogyakarta, DI Yogyakarta
● 4 storey hotel building (approx. 4,000 sq m)
● Up to 90 hotel rooms● Restaurant● Lobby & reception lounge● Swimming pool
Estimated cost: undisclosed.
Construction timetable is to be determined.
Hotel 4 lantai dengan luas bangunan sekitar 4.000 meter persegi. Perkiraan biaya: tidak dinyatakan. Waktu konstruksi
belum ditentukan.
Hotel Operator Parador Hotels and Resorts Contact Mr Ricky Theodores (Chief Operating Officer)
62 21 292 15999 / 29171111
f 62 21 292 16999
Email: info@parador-hotels.com Website: www.parador-hotels.com
Atria Residences Building, Lobby Level, CBD GadingSerpong Lot #5,Jalan Boulevard Gading Serpong, KabupatenTangerang, 15810, Banten, Indonesia
Contact Ms Pramita Sari Setiawan (Corporate MarketingCommunication Manager)
62 21 292 15999 / 29171111
f 62 21 292 16999
Email: info@parador-hotels.com Website: www.parador-hotels.com
Atria Residences Building, Lobby Level, CBD GadingSerpong Lot #5,Jalan Boulevard Gading Serpong, KabupatenTangerang, 15810, Banten, Indonesia
Architect To be appointed
Structural Engineer To be appointed
Mechanical & Electrical Engineer To be appointed
Contractor To be appointed
PROJECT CATEGORY
Residential
PROJECT STAGE PROJECT CODE
Design 138879002
CITI ALIT VILLA RESIDENCE - RESIDENTIAL
Jalan Raya Goa Gong, Mangupura, Badung, Bali
● 200 x 2 storey residential houses (approx. 120 sq meach)
● Units to have 4 bedrooms● Internal road network● Gated entrance
Building elements include:
● Flooring : homogeneous tile●
Structural : reinforced concrete● Ceiling : gypsum board● Walling : light brick walls● Roofing : concrete roof tile / concrete slab roof● Roof truss : lightweight steel
● Timber framed doors & windows / solid wood doors
Estimated cost: undisclosed.
Construction is expected to start in early March 2017.Construction is expected to end in late March 2018.
Kawasan perumahan meliputi 200 unit rumah 2 lantai,masing-masing dengan tipe luas bangunan sekitar 120 meter
persegi. Perkiraan biaya : tidak dinyatakan. Konstruksidiharapkan mulai Maret 2017 dan selesai Maret 2018.
Developer Citi Alits Cipta PT Contact Mr Samuel (Staff of Project Division)
62 361 474 3060 / 4743062
f Not available
Email: info@citialitswisata.com Website: www.citialitswisata.com
Jalan Letda Tantular No. 90, Renon, Denpasar, 80226, Bali,Indonesia
Master Planner Johanes Architects Contact Mr Dipl. Ing. Johanes A Kurnia (Director)
62 21 5890 3517 /9826 5429f
62 21 5890 3517 / 5872482Email: office@johanesarchitects.com Website: www.johanesarchitects.com Jalan Rubi Garden I/16 (Permata Mediterania), Pos pengumben, Srengseng, Kembangan, Jakarta Barat, 11630,Jakarta, Indonesia
Architect Johanes Architects Contact Mr Dipl. Ing. Johanes A Kurnia (Director)
62 21 5890 3517 /9826 5429
f 62 21 5890 3517 / 5872482
Email: office@johanesarchitects.com Website: www.johanesarchitects.com
Jalan Rubi Garden I/16 (Permata Mediterania), Pos pengumben, Srengseng, Kembangan, Jakarta Barat, 11630,Jakarta, Indonesia
8/16/2019 Sample Project of the Month 01
20/46
Sample Project of The Month
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com
BCI Asia Construction Bulletin 17
CITI ALIT VILLA RESIDENCE - RESIDENTIAL
(continued...)
Contact Mr Agung R (Senior Architect) 62 21 5890 3517 /9826 5429
f 62 21 5890 3517 / 5872482
Email: a6ung_r@yahoo.co.id Website: www.johanesarchitects.com
Jalan Rubi Garden I/16 (Permata Mediterania), Pos pengumben, Srengseng, Kembangan, Jakarta Barat, 11630,Jakarta, Indonesia
Structural Engineer To be appointed
Mechanical & Electrical Engineer To be appointed
Contractor To be appointed
PROJECT CATEGORY
Residential
PROJECT STAGE PROJECT CODE
Design 136313002
CITRALAND CITY LOSARI MAKASSAR - SUNSET
COVE CLUSTER Centre Point of Indonesia, Losari, Makassar, South
Sulawesi
● 139 x 2 storey residential houses (3 types of houses :120 sq m, 200 sq m & 240 sq m)
● Units to have 3 & 4 bedrooms
● Internal road network● Gated entrance
● Communal garden●
Perimeter fence walls
Please find more information atwww.citralandcitymakassar.com
Building elements include:● Flooring : ceramic tile / homogeneous tile● Structural : reinforced concrete● Ceiling : gypsum board● Walling : light brick walls● Roofing : concrete slab roof / metal sheet roofing● Roof truss : lightweight steel
● Aluminium framed doors & windows / fabricatedwood doors
● Sanitary ware / plumbing
Estimated cost: undisclosed.
Construction is expected to start in early June 2016.Construction is expected to end in late December 2017.
Kawasan perumahan meliputi 139 unit rumah 2 lantai,dengan 3 tipe luas bangunan sekitar 120, 200 dan 240 meter
persegi. Perkiraan biaya : tidak dinyatakan. Konstruksidiharapkan mulai Juni 2016 dan selesai Desember 2017.
Developer Ciputra Fajar Mitra PT (aka Ciputra Group) Contact Mr Tony Kustono (General Manager - Joint
Operation Ciputra Fajar Mitra PT - Yasmin Bumi Asri PT) 62 411 822 2288 / 8222299
f 62 411 822 2299
Jalan Tun Abdul Razak (Hertasning Baru), Gowa, 90232,South Sulawesi, Indonesia
Contact Mr Abdul Hakim (Inhouse Architect - Staf ofPlanning Division)
62 411 822 2288 / 8222299
f 62 411 822 2299
Jalan Tun Abdul Razak (Hertasning Baru), Gowa, 90232,South Sulawesi, Indonesia
8/16/2019 Sample Project of the Month 01
21/46
Sample Project of The Month
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com
BCI Asia Construction Bulletin 18
CITRALAND CITY LOSARI MAKASSAR - SUNSET
COVE CLUSTER (continued...)
Yasmin Bumi Asri PT Contact Mr Adityawarman M Kouwagam (Director)
Not available f Not available Jalan Kakatua II, Makassar, 90133, South Sulawesi,Indonesia ( For enquiry, please contact by Mail.)
Citraland City Makassar Contact Mr Cipta Harun (Manager - Citraland City MakassarProject)
62 411 873 625 f 62 411 873 625
Email: citralandcitymakassar@ciputra.co.id Website: www.citralandcitymakassar.com Jalan Citraland Boulevard No. 6 , Centre Point ofIndonesia, Makassar, 90224, South Sulawesi, Indonesia
Land Development Consultant Witteveen + Bos ConsultingEngineers Contact Mr Sawarendro (Master Planner Engineer)
62 21 719 1282 f 62 21 719 1283Email: info@witbo.co.id Website: www.witteveenbos.com Park View Plaza 6th Floor JalanTaman Kemang No. 27,Jakarta Selatan, 12730, Jakarta, Indonesia
Architect DP Architects Pte Ltd Contact Mr Wu Tzu Chiang (Project Director - PrincipalArchitect)
65 6338 3988 f 65 6337 9989Email: dparchitects@dpa.com.sg Website: www.dpa.com.sg 6 Raffles Boulevard #04-100 Marina Square,Singapore 039594
Quantity Surveyor To be appointed
Earthworks Contractor Pembangunan Perumahan (Persero)Tbk PT - Kantor Cabang VIII - Makassar Contact Mr Fatchul Birri (Branch Manager)
62 411 887 879 / 868701
f 62 411 868 692
Email: ptppcabang8@yahoo.com Website: www.pt-pp.com Jalan Letjen Hertasning Blok II No. 1, Makassar, 90222,South Sulawesi, Indonesia
Contact Mr Muliadi (Staff of Procurement Division) 62 411 887 879 / 868701
f 62 411 868 692
Email: muliadi_setiawan@yahoo.com Website: www.pt-pp.com Jalan Letjen Hertasning Blok II No. 1, Makassar, 90222,
South Sulawesi, Indonesia
Contractor To be appointed
PROJECT CATEGORY
Hotel/ Recreation/ Retail
PROJECT STAGE PROJECT CODE
Design 135317002
LOMBOK EPICENTRUM - HOTEL (4 STARS)
Jalan Sriwijaya, Mataram, West Nusa Tenggara
● 16 storey hotel (approx 15,000 sq m)
● 400 hotel rooms● Hotel lobby & reception lounge● Dining & restaurant● Swimming pool
Project deferred indefinitely
Building elements include:● Flooring : homogeneous tile / wood flooring● Structural : reinforced concrete● Ceiling : gypsum board● Walling : light brick walls
● Roofing : concrete slab roof● Aluminium framed doors & windows / fabricated
wood doors● Piling : bored pile / precast pile● Lifts● Duct connected air conditioning● Fire protection system / security system
● Sanitary ware / plumbing● Building automation system
Estimated cost: undisclosed.
Construction timetable is to be determined.
Bangunan hotel 16 lantai, dengan luas bangunan sekitar15.000 meter persegi. Perkiraan biaya: tidak dinyatakan.Waktu konstruksi tidak ditentukan.
Developer Sriwijaya Propindo Utama PT Contact Mr Adi Putra (Project Coordinator)
62 370 631 777 / 631888
f 62 370 648 129
Email: cs@lombokepicentrum.com
Jalan Sriwijaya, Mataram, 83121, West Nusa Tenggara,Indonesia
Hotel Operator To be appointed
Investor Varindo Lombok Inti PT Contact Mr Gede Agus Surya Primayadi (Managing Director)
62 370 635 421 / 626620 / 661 1111
f 62 370 622 5333
Email: planning@varindolombokinti.com Jalan Langko No 36A, Mataram, 83114, West NusaTenggara, Indonesia
Contact Mrs Fauza (Architect / Technical Manager)
62 370 635 421 / 626620 / 661 1111
f 62 370 622 5333
Email: planning@varindolombokinti.com Jalan Langko No 36A, Mataram, 83114, West NusaTenggara, Indonesia
8/16/2019 Sample Project of the Month 01
22/46
Sample Project of The Month
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com
BCI Asia Construction Bulletin 19
LOMBOK EPICENTRUM - HOTEL (4 STARS)
(continued...)
Master Planner ¿¿McKingley Team Architects Contact Mr Sahlan Mckingley (Director - PrincipalArchitect)
612 9299 9779 f 612 9299 9779Email: team@mt-architect.com Website: www.mt-architect.com
72 Erskine St, Sydney, New South Wales NSW 2000,Australia
Architect ¿¿McKingley Team Architects Contact Mr Sahlan Mckingley (Director - Principal
Architect) 612 9299 9779 f 612 9299 9779
Email: team@mt-architect.com Website: www.mt-architect.com
72 Erskine St, Sydney, New South Wales NSW 2000,Australia
Contact Mrs Cory Elisabeth (Architect - Project Division) 612 9299 9779 f 612 9299 9779
Email: susan@h3architects.com.au Website: www.mt-architect.com 72 Erskine St, Sydney, New South Wales NSW 2000,Australia
Interior Designer To be appointed
Mechanical & Electrical Engineer To be appointed
Contractor To be appointed
PROJECT CATEGORY
Residential/ Recreation/ Retail/ Car Park
PROJECT STAGE PROJECT CODE
Design 129469002
SENTUL CITY - SENTUL GARDEN APARTMENT
(TOWER A) Jalan M.H. Thamrin, Komplek Sentul City, Bogor, West
Java
● 16 storey apartment tower (approx 25,100 sq m)● Up to 448 apartment units● Studio type apartments (approx. 23 sq m), single
bedroom units (approx. 27 sq m), & 2 bedroom units(approx. 48 sq m)
● 2 basement levels car park●
Apartment lobby & reception area● Ground floor retail shops & restaurants● Swimming pool● Rooftop garden● Gym & fitness centre
● Citywalk, café & convenience store
Building elements include:● Flooring : ceramic tile / homogeneous tile / hardened
concrete floor● Structural : reinforced concrete● Ceiling : gypsum board
● Walling : precast concrete panel / gypsum board● Facade : glass wall cladding / decorative cladding
● Aluminium framed doors & windows / fabricateddoors
● 5 ifts● Split type air conditioning / duct connected air
conditioning● Pilling : bored pile
● Sanitary ware / plumbing● Fire protection system
● Security system● Building automation system
Estimated cost: Rp150.60 bn (US$10.90 mn).
Construction is expected to start in early August 2016.
Construction is expected to end in late August 2018.
Apartemen 16 lantai dan 2 level basement, dengan luas
bangunan sekitar 25.100 meter persegi. Perkiraan biaya:tidak dinyatakan. Konstruksi diharapkan mulai Agustus 2016dan selesai Agustus 2018.
Developer Sentul City Tbk PT Contact Mr Adi Dharmawan (Project Manager)
62 21 8792 6555 f 62 21 8792 6555Email: adi.dharmawan@sentulcity.co.id Website: www.sentulcity.co.id Jalan M H Thamrin Kav.8, Sentul City, Bogor, 16810,West Java, Indonesia
8/16/2019 Sample Project of the Month 01
23/46
Sample Project of The Month
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com
BCI Asia Construction Bulletin 20
SENTUL CITY - SENTUL GARDEN APARTMENT
(TOWER A) (continued...)
Contact Mr Petra Firman Pakpahan (Planning Division Staff) 62 21 8792 6555 /8796 1889
f 62 21 8796 0778 /8796 1777
Email: ptsc@sentulcity.co.id Website: www.sentulcity.co.id Gedung Graha Utama, Jalan M.H. Thamrin No. 1 Kavling8, Sentul City, Bogor, 16810, West Java, Indonesia
Architect Kind Indonesia Architects Contact Mr Adjie Negara (Principal Architect)
62 21 2995 9825 f 62 21 8771 0575
Email: info@kind.id Website: www.kind.id Citylofts Sudirman Suite 1516, Jalan K.H. Mas Mansyur No. 121, Jakarta Pusat, 10220, Jakarta, Indonesia
Contact Ms Siti Aisah Ghani (Team Leader / Architect) 62 21 8771 6431 f 62 21 8771 6431
Email: info@kind.id Website: www.kind.id Jalan Komjen Polisi M. Yasin, Cimanggis, Depok, 16452,West Java, Indonesia
Structural Engineer To be appointed
Mechanical & Electrical Engineer To be appointed
Piling Contractor To be appointed
Contractor To be appointed
PROJECT CATEGORY
Community/ Education and Research
PROJECT STAGE PROJECT CODE
Design 145235002
UNIVERSITAS SAMUDRA - AUDITORIUM
Gampong Meurandeh, Kecamatan Langsa Lama, Langsa,
Aceh
● 3 storey auditorium building (approx 9,000 sq m)● Lobby lounge● Auditorium balcony● Equipment room
Building elements include:
● Flooring : ceramic tile / homogeneous tile●
Structural : reinforced concrete● Ceiling : gypsum board● Walling : light brick walls● Roofing : concrete roof tile● Roof truss : steel frame
● Aluminium framed doors & windows / fabricatedwood doors
● Sanitary ware / plumbing
Estimated cost: undisclosed.
Construction is expected to start in early April 2016.Construction is expected to end in late November 2016.
Gedung auditorium 3 lantai dengan luas bangunan sekitar9.000 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai April 2016 dan selesai
November 2016.
Developer Universitas Samudra Contact Mr Drs. Bachtiar Akob, M.Pd (Rector)
62 641 426 534 f 62 641 426 535Email: info@unsam.ac.id Website: www.unsam.ac.id Gampong Meurandeh, Kecamatan Langsa Lama, Langsa,24416, Aceh, Indonesia
Contact Mr Tuti Israyani, SP (Kasubbag Perencanaan)
62 641 426 534 f 62 641 426 535Email: info@unsam.ac.id Website: www.unsam.ac.id
Gampong Meurandeh, Kecamatan Langsa Lama, Langsa,24416, Aceh, Indonesia
Supervisory Consultant To be appointed
Architect Inochi Konsultan PT Contact Mr Rickie Andre (Director)
62 651 29602 f Not availableEmail: inochi_cv@yahoo.com Jalan Teuku Panglima Nyak Makam No. 5, Gampong KotaBaru, Kecamatan Kuta Alam, Banda Aceh, 23125, Aceh,
Indonesia
8/16/2019 Sample Project of the Month 01
24/46
Sample Project of The Month
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com
BCI Asia Construction Bulletin 21
UNIVERSITAS SAMUDRA - AUDITORIUM (continued...)
Contact Ms Cut Sri Sukma (Project Coordinator) 62 651 29602 f Not available
Email: inochi_cv@yahoo.com
Jalan Teuku Panglima Nyak Makam No. 5, Gampong KotaBaru, Kecamatan Kuta Alam, Banda Aceh, 23125, Aceh,Indonesia
Contractor To be appointed
PROJECT CATEGORY
Hotel/ Retail/ Recreation/ Car Park
PROJECT STAGE PROJECT CODE
Design 144877002
YELLO HOTEL (3 STARS) - RUNGKUT SURABAYA
Jalan Raya Rungkut, Surabaya, East Java
● 13 storey hotel building (approx 9,000 sq m)
● Single basement level car park● Hotel lobby & reception area● Dining & restaurant● Banquet & function hall
● Swimming pool
Building elements include:●
Flooring : ceramic tile / homogeneous tile● Structural : reinforced concrete● Ceiling : gypsum board / acoustical ceiling● Walling : precast concrete panel / gypsum board / light
brick walls
● Facade : glass wall cladding / decorative cladding● Aluminium framed doors & windows / solid wood
doors● Lifts● Split type air conditioning / duct connected air
conditioning● Sanitary ware / plumbing
● Fire protection system / security system● Building automation system
Estimated cost: undisclosed.
Construction is expected to start in early October 2016.Construction is expected to end in late December 2017.
Pembangunan hotel 13 lantai dan satu level basement,dengan luas bangunan sekitar 9.000 meter persegi. Perkiraanbiaya: tidak dinyatakan. Konstruksi diharapkan mulai
Oktober 2016 dan selesai Desember 2017.
Hotel Operator Tauzia Hotel Management Contact Mr Armand Steinmeyer (Head of BusinessDevelopment)
62 21 526 5223 / 52960490 ext 104
f 62 21 526 5213
Email: development@tauzia.com Website: www.tauzia.com K-link Tower 25th Floor - Suite B, Jalan Jendral GatotSubroto Kavling 59A, Jakarta Selatan, 12950, Jakarta,Indonesia
Architect Urbane Indonesia PT Contact Mr Irvan P Darwis (Senior Architect)
62 22 253 1004 f 62 22 253 1024Email: contact@urbane.co.id Website: www.urbane.co.id Jalan Cigadung Raya Barat No. 5, RT 005 / RW 002,
Cipaheut Kelurahan Cigadung, Bandung, 40191, West Java,Indonesia
8/16/2019 Sample Project of the Month 01
25/46
Sample Project of The Month
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com
BCI Asia Construction Bulletin 22
YELLO HOTEL (3 STARS) - RUNGKUT SURABAYA
(continued...)
Contact Mr Angga Latief (Architect) 62 22 253 1004 f 62 22 253 1024
Email: contact@urbane.co.id Website: www.urbane.co.id Jalan Cigadung Raya Barat No. 5, RT 005 / RW 002,Cipaheut Kelurahan Cigadung, Bandung, 40191, West Java,Indonesia
Structural Engineer To be appointed
Mechanical & Electrical Engineer To be appointed
Quantity Surveyor To be appointed
Piling Contractor To be appointed
Contractor To be appointed
PROJECT CATEGORY
Residential/ Hotel/ Exhibition/ Recreation/ Retail
PROJECT STAGE PROJECT CODE
Documentation 116611002
AMARSVATI RESORT & CONDOTEL (5 STARS) -
AVANI TOWER Jalan Raya Malimbu, Lombok Utara, West Nusa
Tenggara
● 14 storey apartment & hotel building (approx 18,250sq m)
● 150 apartment units & hotel rooms
● Studio type units, 1 bedroom units (type of units:approx 45.43 sq m each)
● Cafe & restaurant●
Fitness centre & spa● Banquet & function room● Lobby & reception area● Swimming pool
Please find more information at www.amarsvati.com
Building elements include:● Flooring : marble tile / granite flooring / parquet /
carpet● Structural : reinforced concrete● Ceiling : gypsum board
● Walling : light brick walls / precast concrete panel● Roofing : concrete slab roof
● Aluminium framed windows / solid wood doors● Piling : bored pile● Lifts● Split type air conditioning / duct connected air
conditioning● Fire protection system
● Security system● Sanitary ware / plumbing
● Building automation system
Estimated cost: undisclosed.
Construction is expected to start in early May 2016.Construction is expected to end in late December 2017.
Kondotel 14 lantai dengan luas bangunan sekitar 18.250meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi
diharapkan mulai Mei 2016 dan selesai Desember 2017.
Developer North Pacific Development PT (aka PolluxProperties Indonesia) Contact Mr Nico Purnomo Po (Chief Executive Officer)
62 21 515 1036 f 62 21 515 1037Email: info@pollux.com.sg Website: www.pollux.co.id Sudirman Central Business District, Jalan Jendral SudirmanKavling 52-53, Indonesia Stock Exchange Building Tower II#28-01, Jakarta Selatan, 12190, Jakarta, Indonesia
8/16/2019 Sample Project of the Month 01
26/46
Sample Project of The Month
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com
BCI Asia Construction Bulletin 23
AMARSVATI RESORT & CONDOTEL (5 STARS) -
AVANI TOWER (continued...)
Contact Ms Andriana Neysa Sutanto (Project Manager /Architect)
62 21 515 1036 f 62 21 515 1037Email: neysa.sutanto@pollux.com.sg Website: www.pollux.co.id Sudirman Central Business District, Jalan Jendral SudirmanKavling 52-53, Indonesia Stock Exchange Building Tower II#28-01, Jakarta Selatan, 12190, Jakarta, Indonesia
Mega Citra Prima PT Contact Undisclosed
62 21 2992 8020 f 62 21 2992 0060Email: enquiry@amarsvati.com Jalan M. H. Thamrin Kavling 20 - 30, The Plaza Indonesia#45 - 1A, Jakarta Pusat, 10350, Jakarta, Indonesia
ConsultantRemarks: Furniture Consultant & Supplier
Mahakarya Warisan Nusantara PT (aka Arbor & Troy) Contact Mr Kemal (Staff of Project Division)
62 21 719 9070 f 62 21 721 0529Website: www.mahakarya-indonesia.com The Papilion Kemang, Jalan Kemang Raya No. 45 AA,Jakarta Selatan, 12730, Jakarta, Indonesia
Hotel Operator Ariva Hospitality Contact Mr Cameron Ong (Director)
65 6848 5029 f 65 6848 1083Email: enquiries@stayariva.com Website: www.stayariva.com
12 Tannery Road 02 - 05 HB Centre 1, Singapore,Singapore 347722
Contact Mr Stanley Ling (Chief Executive Officer) 65 6848 5029 f 65 6848 1083
Email: enquiries@stayariva.com Website: www.stayariva.com 12 Tannery Road 02 - 05 HB Centre 1, Singapore,Singapore 347722
Architect Arkonin PT Contact Mrs Sita Budi Saptawati (Architect)
62 21 736 4176 f 62 21 736 3829Email: sbsaptawati@arkonin-id.com Website: www.arkonin-id.com
Gedung Arkonin, Jalan Bintaro Taman Timur, Bintaro JayaSektor I, Jakarta Selatan, 12330, Jakarta, Indonesia
Contact Ms Nadya Karina (Architect) 62 21 736 4176 f 62 21 736 3829
Email: arkonin@indo.net.id
Website: www.arkonin-id.com
Gedung Arkonin, Jalan Bintaro Taman Timur, Bintaro JayaSektor I, Jakarta Selatan, 12330, Jakarta, Indonesia
AMARSVATI RESORT & CONDOTEL (5 STARS) -
AVANI TOWER (continued...)
Interior Designer Dreammetal Contact Mr Raymon Cheng (Principal Architect)
65 9878 8687 / 97640206
f Not available
Email: dreammetal.id@gmail.com Website: www.dreammetal.net 4B Boon Tiong Road #07 - 33, Singapore, Singapore165004
Structural Engineer Rekacipta Kinematika PT
Contact Mr Sugia Mulyana (Project Director) 62 21 8430 6407 f 62 21 8430 6407
Email: kine_cad@kinematika.com Website: www.kinematika.com Kawasan Niaga Citragrand, Blok R12 No. 3, JalanAlternatif Cibubur - Cileungsi Km. 4, Jatisampurna, Bekasi,17435, West Java, Indonesia
Contact Mr Leonardi Kawidjaja (Project Manager) 62 21 8430 6407 f 62 21 8430 6407
Email: kine_cad@kinematika.com Website: www.kinematika.com Kawasan Niaga Citragrand, Blok R12 No. 3, JalanAlternatif Cibubur - Cileungsi Km. 4, Jatisampurna, Bekasi,
17435, West Java, Indonesia
Mechanical & Electrical Engineer Metakom Pranata PT Contact Mr Agus Joko Triyanto (Project Coordinator)
62 21 582 3167 / 5826178
f 62 21 582 3168
Email: mpranata.mp@gmail.com Website: www.metakom-pranata.com Puri Kencana Blok K7 No. 2 E - F, Kembangan, JakartaBarat, 11610, Jakarta, Indonesia
Piling Contractor Satria Cipta Astakencana PT Contact Mr Rudy Setyawan (Director & Project Manager)
62 361 463 451 f 62 361 462 773Email: satria-bl@satria.famili.com
Jalan Sekar Jepun No 4 Gatot Subroto Timur, Denpasar,80237, Bali, Indonesia
Contractor To be appointed
8/16/2019 Sample Project of the Month 01
27/46
Sample Project of The Month
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com
BCI Asia Construction Bulletin 24
PROJECT CATEGORY
Residential/ Recreation/ Car Park
PROJECT STAGE PROJECT CODE
Documentation 131227002
BANDUNG NASUTION SUPERBLOCK -
APARTMENT TOWER A Jalan A H. Nasution, Bandung, West Java
● 27 storey apartment tower (approx. 30,000 sq m)● 900 apartment units● Studio type apartments, single bedroom units & 2
bedroom units
● Single basement level car park● Apartment lobby & reception lounge
● Ground floor retail shops & restaurants●
Swimming pool
Building elements include:● Flooring : ceramic tile / homogeneous tile● Structural : reinforced concrete
● Ceiling : gypsum board● Walling : precast concrete panels / light brick wall● Facade : glass wall cladding● Roofing : concrete roof tile / concrete slab roof● Aluminium framed doors & windows / fabricated
wood doors● Piling : mini pile / bored pile
● Lifts● Sanitary ware / plumbing
● Fire protection system● Security system● Building automation system
Estimated cost: Rp152.00 bn (US$11.26 mn).
Construction is expected to start in early December 2016.Construction is expected to end in late December 2018.
Apartemen 27 lantai dan satu level basement, dengan luasbangunan sekitar 30.000 meter persegi. Perkiraan biaya:
tidak dinyatakan. Konstruksi diharapkan mulai Desember2016 dan selesai Desember 2018.
Developer Robben Graha Mandiri PT Contact Mr Benny Yoshawirja (Director / ProjectCoordinator)
62 22 423 7518 / 4223237
f 62 22 423 9688
Email: psb.square@gmail.com Pecinan Lama No. 9, Bandung, 40111, West Java,Indonesia
Environmental Impact Assessment Teisar Cipta Sarana PT(aka Denisa Purnama CV) Contact Ms Yunita Pusparini (Ririn) (Project Division Staff)
62 22 540 5602 / 5433946 / 541 6631
f 62 22 540 5602
Email: teisar_cs@yahoo.com Jalan Manglid No. 25, Kopo Sayati, Bandung, 40226, WestJava, Indonesia
BANDUNG NASUTION SUPERBLOCK - APARTMENT
TOWER A (continued...)
Contact Mr Ahmad Dani (Director & Team Leader) 62 22 540 5602 / 5433946 / 541 6631
f 62 22 540 5602
Email: teisar_cs@yahoo.com Jalan Manglid No. 25, Kopo Sayati, Bandung, 40226, WestJava, Indonesia
Contact Mr Radi (Team Leader) 62 22 540 5602 / 543
3946 / 541 6631
f 62 22 540 5602
Email: teisar_cs@yahoo.com Jalan Manglid No. 25, Kopo Sayati, Bandung, 40226, WestJava, Indonesia
Architect Recta Optima PT Contact Mr Hansen Setiawan (Team Leader / Architect)
62 22 727 2052 f 62 22 727 2052Email: hansen@recta.co.id
Jalan Pratista Raya No. 49, Bandung, 40291, West Java,Indonesia
Contact Mr Rovi (Architect) 62 22 727 2052 f 62 22 727 2052
Email: home@recta.co.id
Jalan Pratista Raya No. 49, Bandung, 40291, West Java,Indonesia
Structural Engineer Recta Optima PT Contact Ms Paulina Jacintha (Structural Engineer)
62 22 727 2052 f 62 22 727 2052Email: paulina@recta.co.id Jalan Pratista Raya No. 49, Bandung, 40291, West Java,Indonesia
Mechanical & Electrical Engineer To be appointed
Piling Contractor To be appointed
Contractor To be appointed
8/16/2019 Sample Project of the Month 01
28/46
Sample Project of The Month
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com
BCI Asia Construction Bulletin 25
PROJECT CATEGORY
Health/ Education and Research/ Car Park
PROJECT STAGE PROJECT CODE
Documentation 140714002
HOSPITAL - JALAN RAYA SOLO - SRAGEN
Jalan Raya Solo - Sragen (eks PT Palur Raya), Jaten,
Karanganyar, Central Java
● 4 storey hospital (approx. 12,000 sq m)● Inpatient care unit● Emergency unit● Polyclinic unit
● Surgical unit● Medical laboratory
● Medical consulting rooms●
Patient medical record room● Patient recovery rooms● Obstetrics & gynaecology unit● Registration area & waiting room● Observation room
● Pharmacy room● Neonatal Intensive Care Unit (NICU)● Medical equipment storage room● At grade car park
Building elements include:● Flooring : ceramic tile / homogeneous tile
● Structural : reinforced concrete● Ceiling : gypsum board / acoustical ceiling
● Walling : light brick walls● Facade : glass wall cladding / aluminium composite
cladding● Roofing : concrete slab roof
● Aluminium framed doors & windows / fabricatedwood doors
● Lifts● Split type air conditioning / duct connected air
conditioning● Fire protection system● Security system
● Sanitary ware
● Building automation system
Estimated cost: undisclosed.
Construction is expected to start in early January 2017. Acompletion date is to be determined.
Bangunan rumah sakit 4 lantai dengan luas bangunan sekitar12.000 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai Januari 2017. Waktu
penyelesaian belum ditentukan.
HOSPITAL - JALAN RAYA SOLO - SRAGEN
(continued...)
Developer Gapura Mas Asri PT Contact Mr Arya Wiryawan (Project Director)
62 271 821 363 / 821800 / 825 888
f 62 271 821 363 / 825405
Email: agungtex88@yahoo.com Jalan Raya Palur Km 9,1, Karanganyar, 57771, CentralJava, Indonesia
Contact Mr Yudi (Project Manager) 62 271 821 363 / 821
800 / 825 888
f 62 271 821 363 / 825
405Email: agungtex88@yahoo.com Jalan Raya Palur Km 9,1, Karanganyar, 57771, CentralJava, Indonesia
Architect Megatika International PT - Pos Pengumben Office Contact Mr Joe Louis Widodo (Design Director)
62 21 5365 1221 f 62 21 5365 0880Email: megatika@cbn.net.id Website: www.megatika.com Komplek Apartemen Permata Eksekutif, Gedung KantorLantai 3, Jalan Pos Pengumben, Jakarta Barat, 11550, Jakarta,Indonesia
Contact Mr Frendy Martin Sudewo (Architect) 62 21 5365 1221 f 62 21 5365 0880
Email: megatika@cbn.net.id Website: www.megatika.com Komplek Apartemen Permata Eksekutif, Gedung KantorLantai 3, Jalan Pos Pengumben, Jakarta Barat, 11550, Jakarta,Indonesia
Structural Engineer Cipta Sukses PT Contact Mr Anwar Susanto (Director / Project Coordinator)
62 21 5596 3655 f 62 21 5595 8211Email: anwars@cbn.net.id
Ruko Pelangi Blok H No. 11, Taman Palem Lestari,Cengkareng, Jakarta Barat, 11730, Jakarta, Indonesia
Mechanical & Electrical Engineer To be appointed
Quantity Surveyor To be appointed
Contractor To be appointed
8/16/2019 Sample Project of the Month 01
29/46
Sample Project of The Month
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com
BCI Asia Construction Bulletin 26
PROJECT CATEGORY
Hotel/ Car Park/ Retail
PROJECT STAGE PROJECT CODE
Documentation 140180002
HOTEL - JALAN SUMATERA GRESIK (3 STARS)
Jalan Sumatera, Kebomas, Gresik, East Java
● 11 storey hotel building (approx 7,800 sq m)
● Up to 140 hotel rooms● Hotel lobby & reception lounge● Dining & restaurant● At grade car park
Building elements include:
● Flooring : ceramic tile / homogeneous tile●
Structural : reinforced concrete● Ceiling : gypsum board / acoustical ceiling● Walling : light brick walls● Facade : glass wall cladding / aluminium composite
cladding
● Roofing : concrete slab roof● Aluminium framed doors & windows / fabricated
wood doors● Piling : bored pile / precast pile● Lifts● Split type air conditioning / duct connected air
conditioning
● Fire protection system● Security system
● Sanitary ware / plumbing● Building automation system
Estimated cost: undisclosed.
Construction is expected to start in early December 2016.Construction is expected to end in early November 2017.
Bangunan hotel 11 lantai dengan luas bangunan sekitar
7.800 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai Desember 2016 dan selesai
Desember 2017.
Developer Bumi Lingga Pertiwi PT
Contact Mr Ir. Rahmat Ridho MBA (Director) 62 31 393 0777 / 34930777
f 62 31 393 0666
Email: gkbmanajemen@gmail.com Website: www.blp-property.com Jalan Jawa No. 99, Gresik Kota Baru, Gresik, 61114, EastJava, Indonesia
Contact Mr Yanto (Project Manager) 62 31 393 0777 / 34930777
f 62 31 393 0666
Email: gkbmanajemen@gmail.com Website: www.blp-property.com Jalan Jawa No. 99, Gresik Kota Baru, Gresik, 61114, East
Java, Indonesia
Hotel Operator To be appointed
HOTEL - JALAN SUMATERA GRESIK (3 STARS)
(continued...)
Architect Megatika International PT - Pos Pengumben Office Contact Mr Joe Louis Widodo (Design Director)
62 21 5365 1221 f 62 21 5365 0880Email: megatika@cbn.net.id Website: www.megatika.com Komplek Apartemen Permata Eksekutif, Gedung KantorLantai 3, Jalan Pos Pengumben, Jakarta Barat, 11550, Jakarta,Indonesia
Contact Mr Hadijanto (Architect)
62 21 5365 1221 f 62 21 5365 0880Email: megatika@cbn.net.id Website: www.megatika.com Komplek Apartemen Permata Eksekutif, Gedung KantorLantai 3, Jalan Pos Pengumben, Jakarta Barat, 11550, Jakarta,Indonesia
Structural Engineer To be appointed
Mechanical & Electrical Engineer Tritunggal GlobalMahakarya PT Contact Mr Indra Pranaka (Project Director)
62 21 7888 1457 f 62 21 7888 1457Email: tgm.ipi@gmail.com
Jalan Raya Lenteng Agung No. 26 A, RT 05 / RW 08,Lenteng Agung, Jakarta Selatan, 12610, Jakarta, Indonesia
Quantity Surveyor To be appointed
Contractor To be appointed
8/16/2019 Sample Project of the Month 01
30/46
Sample Project of The Month
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com
BCI Asia Construction Bulletin 27
PROJECT CATEGORY
Residential/ Infrastructure/ Recreation
PROJECT STAGE PROJECT CODE
Documentation 137759002
PARAMOUNT HILLS MANADO - RESIDENCES
Malalayang, Manado, North Sulawesi
● 754 x 2 storey residential houses (4 types of houses :103 sq m, 110 sq m, 161 sq m & 182 sq m)
● Units to have 3 & 4 bedrooms● Internal road network● Gated entrance
● Communal garden● Perimeter fence walls
Please find more information at www.paramount-land.com/project/residential/335/paramount-hills-manado/
Building elements include:● Flooring : ceramic tile / homogeneous tile
● Structural : reinforced concrete● Ceiling : gypsum board● Walling : light brick walls● Roofing : concrete roof tile / concrete slab roof● Roof truss : lightweight steel● Aluminium framed doors & windows / fabricated
wood doors
● Sanitary ware / plumbing
Estimated cost: undisclosed.
Construction is expected to start in early July 2016.Construction is expected to end in early December 2018.
Kawasan perumahan meliputi 754 unit rumah 2 lantai,dengan 4 tipe luas bangunan sekitar 103, 110, 161 dan 182meter persegi. Perkiraan biaya : tidak dinyatakan. Konstruksidiharapkan mulai Juli 2016 dan selesai Desember 2018.
Developer Paramount Enterprise International PT Contact Mr Aryo Tri Ananto (Technical Director)
62 21 5420 0888 /5420 0999
f 62 21 547 4335
Website: www.paramount-land.com
Paramount Plaza, Jalan Boulevard Raya Gading SerpongKavling 1, Gading Serpong, Kabupaten Tangerang, 15810,Banten, Indonesia
Contact Ms Esther Yuanita (Corporate Secretary / CorporateCommunication)
62 21 5420 0888 /5420 0999
f 62 21 547 4335
Email: esthery@paramountenterprise.co.id Website: www.paramount-land.com Paramount Plaza, Jalan Boulevard Raya Gading SerpongKavling 1, Gading Serpong, Kabupaten Tangerang, 15810,Banten, Indonesia
PARAMOUNT HILLS MANADO - RESIDENCES
(continued...)
Paramount Hills Manado Contact Mr Nawawi (Associate Director)
62 813 1123 0188 f Not available
Jalan Wolter Monginsidi, Malalayang, Manado, 95115, North Sulawesi, Indonesia
Architect Paramount Enterprise International PT Contact Mr Pramudya Djati Asmoro (Architect)
62 21 5420 0888 /
5420 0999
f 62 21 547 4335
Website: www.paramount-land.com
Paramount Plaza, Jalan Boulevard Raya Gading SerpongKavling 1, Gading Serpong, Kabupaten Tangerang, 15810,Banten, Indonesia
Quantity Surveyor Paramount Enterprise International PT Contact Mr Sutikno (Staff of Purchasing Division)
62 21 5420 0888 /5420 0999
f 62 21 547 4335
Website: www.paramount-land.com
Paramount Plaza, Jalan Boulevard Raya Gading SerpongKavling 1, Gading Serpong, Kabupaten Tangerang, 15810,Banten, Indonesia
Contractor To be appointed
8/16/2019 Sample Project of the Month 01
31/46
Sample Project of The Month
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email: singapore@bciasia.com Website: www.bciasia.com
BCI Asia Construction Bulletin 28
PROJECT CATEGORY
Education and Research
PROJECT STAGE PROJECT CODE
Documentation 135128002
PELITA HARAPAN SCHOOL
Jalan Honggowongso, Surakarta, Central Java
● 5 storey school building (approx 2,300 sq m)
● 12 classrooms● Administration office● Library room● Practical room
● Teacher rooms
Building elements include:●
Flooring : ceramic tile / homogeneous tile● Structural : reinforced concrete● Ceiling : gypsum board● Walling : light brick walls● Facade : glass wall cladding / aluminium composite
cladding● Roofing : concrete slab roof● Aluminium framed doors & windows / fabricated
wood doors● Lifts● Split type air conditioning● Fire protection system
● Sanitary ware
Estimated cost: undisclosed.
Construction is expected to start in early December 2016.Construction is expected to end in early July 2017.
Gedung sekolah 5 lantai terdiri dari 12 kelas dengan luasbangunan sekitar 2.300 meter persegi. Perkiraan biaya: tidakdinyatakan. Konstruksi diharapkan mulai Desember 2016dan selesai Juli 2017.
Developer Lippo Karawaci Tbk PT Contact Mr Eko Wahyudi (Design Manager)
62 21 5579 0190 /5577 7808 / 5579 0191
f 62 21 5579 7109
Email: corsec@lippokarawaci.co.id Website: www.lippokarawaci.co.id 2112 Boulevard Gajah Mada #01- 01, Lippo Cyber Park,Lippo Karawaci Utara, Tangerang, 15811, Banten, Indonesia
Architect Lippo Karawaci Tbk PT Contact Mr Eko Wahyudi (Design Manager)
62 21 5579 0190 /5577 7808 / 5579 0191
f 62 21 5579 7109
Email: corsec@lippokarawaci.co.id Website: www.lippokarawaci.co.id 2112 Boulevard Gajah Mada #01- 01, Lippo Cyber Park,Lippo Karawaci Utara, Tangerang, 15811, Banten, Indonesia
PELITA HARAPAN SCHOOL (continued...)
Local Architect Prima Detailindo PT (aka Detail StudioEngineering Consultant) Contact Mr Erwin Cahyadi (Director / Project Coordinator)
62 21 5596 3206 f 62 21 5596 3206Email: primadetailindo2015@gmail.com Website: www.primadetailindo.com Ruko Taman Palem Lestari, Ruko Pelangi Blok J No. 9,Cengkareng Barat, Jakarta Barat, 11730, Jakarta, Indonesia
Foreign Architect DP Architects Pte Ltd Contact Mr Wu Tzu Chiang (Project Director - Principal
Architect) 65 6338 3988 f 65 6337 9989
Email: dparchitects@dpa.com.sg Website: www.dpa.com.sg 6 Raffles Boulevard #04-100 Marina Square,Singapore 039594
Structural Engineer Satu Rekayasa Optima PT Contact Mr Yoas Yuniananta (Team Leader / StructuralEngineer)
62 21 2903 4281 f 62 21 2903 4281Email: yoas_y@yahoo.com APL Tower Lantai 18 Suite P3 Central Park, Jakarta Barat,11470, Jakarta, Indonesia
Contact Mrs Jennifer Khoo (Civil Engineer) 62 21 2903 4281 f 62 21 2903 4281
Email: yoas_y@yahoo.com
APL Tower Lantai 18 Suite P3 Central Park, Jakarta Barat,11470, Jakarta, Indonesia
Mechanical & Electrical Engineer Meco Systech InternusaPT Contact Mr Bartholomeus Brajaguna Aritonang (ProjectEngineer)
62 21 726 0817 / 7260841
f 62 21 726 0249
Email: kimf@indosat.net.id
Jalan Kebayoran Lama No. 194 A, Blok B7-8, KebayoranLama,