L0 FFL 154.70 m
L1R 158.48 m
BDEFG CG2
A
L2R 163.13 m
H
(S) 06
G
(S) 06
F
(S) 05
E
(S) 05
G36225.0 2550.0 6000.0 6000.0 6000.0 5600.0
MJ
MJ MJ MJ
MJ
G1
RWPRWP RWP RWP
L0 FFL 154.70 m
L1R 158.48 m
B D E F GCG2
A
L2R 163.13 m
H
(S) 06
G
(S) 06
F
(S) 05
E
(S) 05
G3
T1.1 T1.1 T1.1
T2 T2 T2 T1
5600.0 6000.0 6000.0 6000.0 2550.0 6225.0
MJ
MJ MJ
MJ
MJ
MJMJ
RWP RWP RWP RWP
G1
RWP
E03
E04
KMdimensions
Ramtech Consulting
Design Group 3 LLP
© The information contained in this drawing is thecopyright of the author annotated below, and must notbe used in whole or in part without the express writtenapproval.
DO NOT SCALE FROM THIS DRAWING
Project No
Scale
Date
Drawing No REV
Project
Title
Client
Cost Consultant
Services
Structural
31 Batchworth LaneNorthwood Middlesex HA6 3DUTel : 07967 125858
Tel : 0208 432 3241
Design & Build Contractor
Buchanan Hartley Architects
Architects & Interior Designers
34 Mortimer StreetLondon W1W 7RFTel : 0207 592 7247
Tel : 0207 592 7281
Vascroft Contractors LTD. 861 Coronation RoadRoyal Park, London NW10 7PTTel : 0208 963 3400
6
North & South Elevations
2002
BAPS TEMPLE &COMMUNITY CENTREMANCHESTER
BAPS Swaminarayan Sanstha (UK)
20/10/2016
1:100 @A1/ 1:200 A3
(E) 02
1 : 100
NORTH ELEVATION
1 : 100
SOUTH ELEVATION E04SOUTH ELEVATION
Rev DESCRIPTION DATE Issuedby
0 Tender Issue 09/01/2017 GEJ1 Revised Artwork 23/05/2017 SLJ2 For Information 11/12/2018 TSS3 Rooflights & Full Restraint Omitted 20/12/2018 TSS4 Contract Issue 13/02/2019 TSS5 Artwork Updated 26/09/2019 TSS6 RWP Setting out Dimensions added 18/10/2019 TSS