RV 2014: Can We Get There from Here? First and Last Miles by Dan Gallagher

Post on 05-Dec-2014

95 views 3 download

Tags:

description

Can We Get There from Here? First and Last Miles AICP CM 1.5 Pasadena, Charlotte and Boulder have all gotten creative to connect their first and last miles. Learn how as we explore what's often the last piece of the transportation puzzle. See how bicycle and pedestrian improvements can provide access to busy corridors and enable everyone to start and complete their trips. First and last miles can take many forms: Investigate a range of solutions here. Moderator: Dylan Jones, Architect, Gensler, Los Angeles, California Carlos Hernandez, AICP, Principal, Fox Tuttle Transportation Group, Boulder, Colorado Dan Gallagher, AICP, Transportation Planning Manager, Charlotte Department of Transportation, Charlotte, North Carolina Whitney Pitkanen, Senior Project Manager, CALSTART, Pasadena, California Genevieve Hutchison, Senior Transportation Planner/Bicycle Program Coordinator, Denver, Colorado

Transcript of RV 2014: Can We Get There from Here? First and Last Miles by Dan Gallagher

The Last Mile – The Charlotte Story

Dan Gallagher, AICPCharlotte DOT – Planning Manager

Railvolution | September 22, 2014

• What we inherited• What we are doing• What’s next

The way we used to build streets…

The Last Mile – used to just happen

The way we built streets from 1950 - 2000…

Somehow – we forgot about the last mile

In many ways…our profession forgot about pedestrians

1. Identify what is not working and quit doing it!

2. Get it into your codes/policies!

3. Some big things…lots of little things

We needed to change - Get your ordinances/polices right!

It’s not just sidewalks and bikeways…

Steps toward improving the Last Mile

It’s about creating GREAT PLACES and GREAT STREETS

70 feet wide

Charlotte’s Movement to Complete Streets

Many tools – 1 tool is road diets

East Boulevard

16 feet wide

Charlotte has implemented 25+ road diets in last 8 years!

We Invested! - A lot in 10 years!

• $46OM LRT (2007)• $65M – streets,

sidewalks, bikeways

• $1.2B LRT (2017)• $110M – streets,

sidewalks, bikeways

$400M

Complete Streets

Emphasis on LRT Station Areas - our jewels!

Æb LYNX Blue Line Station

Light Rail Station 1 Mile Buffer

Infrastructure plans

Infrastructure for each station area…concurrent with LRT

Æb LYNX Blue Line Station

SCIP Projects

Light Rail Station 1 Mile Buffer

Before After

Better pedestrian environments through capital improvements

Made pathways to stations - inviting

Before After

Better pedestrian environments through private development

Rely on the Private Sector

Æb LYNX Blue Line Station

Bike Lanes

Signed Bike Route

Off Street Paths

SCIP Projects

Light Rail Station 1 Mile Buffer

Complement with a Bike Network

Implemented Charlotte Bcycle

Entirely privately funded!

Bike Lanes on Many Thoroughfares

YEAR_BUILT

Bike Lanes

Signed Bike Routes

Greenways and Off-Street Paths - Paved

Greenways and Off-Street Paths - Unpaved

Suggested Bike Routes

Bike Lanes In 2003

YEAR_BUILT

Bike Lanes

Signed Bike Routes

Greenways and Off-Street Paths - Paved

Greenways and Off-Street Paths - Unpaved

Suggested Bike Routes

Growing Our Bike Network

YEAR_BUILT

Bike Lanes

Signed Bike Routes

Greenways and Off-Street Paths - Paved

Greenways and Off-Street Paths - Unpaved

Suggested Bike Routes

YEAR_BUILT

Bike Lanes

Signed Bike Routes

Greenways and Off-Street Paths - Paved

Greenways and Off-Street Paths - Unpaved

Suggested Bike Routes

YEAR_BUILT

Bike Lanes

Signed Bike Routes

Greenways and Off-Street Paths - Paved

Greenways and Off-Street Paths - Unpaved

Suggested Bike Routes

Facility Type MilesBike lanes and paved shoulders (>3') 75Signed routes 55Greenways and off-street paths 44Total 174

Implemented a big bicycling toolbox!

Continually expanding our toolbox…

Bicycle Detection Bike Box

1212thth Street Cycletrack Street Cycletrack

Buffered Bike Lanes and Green Lanes

Remount Road

E. 4th Street

Little Sugar Creek Greenway = 4 miles

Learned from Minneapolis!Imagine 26 miles! - $35M

Improved Connections to Center City

Re-thinking our bridges

10th St pathway

South Blvd. pathway

Same model for LRT extension northward - Replicate your Successes!

Æb BLE Stations

BLE Alignment

Light Rail Station 1 Mile Buffer

• $1.2B LRT• $107M

Æb BLE Stations

BLE Alignment

Cross Charlotte Bike Trail

Existing

Proposed

Bike Lanes

Signed Bike Route

NECI Projects

Light Rail Station 1 Mile Buffer

• Sidewalk & Pedestrian Safety Program

– Fix gaps in pedestrian network by building missing sidewalks and key pedestrian crossings

– Bonds: $7.5 million/yr.

Over 200 miles of new sidewalk since 2002.

Build it right the first time – so much

cheaper!

Pedestrians are a priority!

The Last MileExciting times - Our work is just…starting

Dan Gallagher, AICPCharlotte DOT – Planning Manager