RRC-04 Results - terjin.com Geneva Conference ... RRC-04 Results 3 Planning Area present at RRC-04...

Post on 18-Apr-2018

230 views 5 download

Transcript of RRC-04 Results - terjin.com Geneva Conference ... RRC-04 Results 3 Planning Area present at RRC-04...

RRC-04 Results

Klaus Huber, LS telcom AG

2 2004 by LS telcom AG LS Summit 2004: RRC-04 Results

History and Planning Area

� 1961: Stockholm Conference (ST61), European Broadcasting Area

� 1989: Geneva Conference (GE89), African Broadcasting Area+

� 1995: Wiesbaden Agreement (WI95), CEPT, on T-DAB

� 1997: Chester Agreement (CH97), CEPT, on DVB-T

� 2001: Resolution 1185 (ITU Council), consolidated 2003

� 2002: PPT Marrakesh, proposed extended planning area

� 2004, May 10th to 28th: 1st session of RegionalRadiocommunication Conference (RRC-04), Geneva

� 174 - 230 MHz and 470 - 862 MHz,

� 95 countries present

3 2004 by LS telcom AG LS Summit 2004: RRC-04 Results

Planning Area

present at RRC-04

still in planning area

Screencopy from

CHIRplus_SAT,

IDWM country vectors © ITU

4 2004 by LS telcom AG LS Summit 2004: RRC-04 Results

Resolutions

� Resolution 1

� Report to the second session: data formats, intersessional planning exercises

� Resolution [COM4/1]

� Protection of DTB from BSS networks on UHF (620-790 MHz)

� Resolution [COM4/2]

� ITU-R shall provide PR for other services not given in BT.1368-4

� Resolution [COM4/3]� Development of protection criteria for aeronautical radionavigation

(in 19 planning area countries: 645-862 MHz co-primary)

� Resolution [COM4/4]� Studies of radiowave propagation (vertical refractivity)

5 2004 by LS telcom AG LS Summit 2004: RRC-04 Results

Resolutions (continued)

� Resolution [COM4/5]

� ITU-R shall complete Rec. BT.1368-4 and BS.1660 PR tables

� Resolution [COM4/6]

� ITU-R shall develop protection criteria for land mobile service against T-DAB on VHF.

� Resolution [COM4/7]

� ITU-R shall conduct studies on coordination distances

� Resolution [COM5/1]� Establishment of Intersessional Planning Group (IPG)

� and planning exercise team, Annex 2: Time table

� Resolution [COM5/2]

� Date, venue and agenda of the second session of the RRC

6 2004 by LS telcom AG LS Summit 2004: RRC-04 Results

Resolutions (continued)

� Resolution GT-PLEN/1 and GT/PLEN/2

� Short harmonization conferences on ST61 / GE89

� Resolution GT-PLEN/3

� Interim procedure to coordinate other services

� Resolution [PLEN/1]

� Establishing Regulatory/Procedural Group (RPG)

7 2004 by LS telcom AG LS Summit 2004: RRC-04 Results

The Report

Annex to Resolution 1:

� Report of the first session to the second session

� 7 chapters, 315 pages

� To be forwarded to the second session by ProfessorKrivocheev

8 2004 by LS telcom AG LS Summit 2004: RRC-04 Results

Chapter 1

Chapter 1: Definitions� Low Power Station (< 50 W band III, < 250 W Band IV/V)

� Existing and planned broadcast assignments and allotments� ST61 / GE89 + outside, deadline 31 October 2005

� MIFR 31 December 1989

� Other services: 10 May 2004 or coordinated by 31 October 2005

� Annex 1.2 to chapter 1: Identification of potentially affected administrations

(ST61 / GE89 distances can be used against analogue broadcasting)

9 2004 by LS telcom AG LS Summit 2004: RRC-04 Results

Chapter 2

Chapter 2: Propagation (113 pages)

� Recommendation ITU-R P.1546-1

� Propagation Zones� Zone 1: Rec. P.1546-1 Land, also used to derive for Zone 2,

Zone 3 and Zone D (former C1 in GE89)

� Zone 4: Rec. P.1546-1 Warm sea, also used to derive forZone A, Zone B, Zone C

� Zone 5: Rec. P.1546-1 Cold sea

� Tabulated values for all Zones (and more) exist

� TCA correction now just until 0 dB

� Improvement for mixed path

10 2004 by LS telcom AG LS Summit 2004: RRC-04 Results

Chapter 3

Chapter 3: Technical basis and characteristics� Reception modes

� fixed roof-level

� portable outdoor

� portable indoor

� mobile

11 2004 by LS telcom AG LS Summit 2004: RRC-04 Results

Chapter 3 (continued)

� Reference Planning Configurations (RPCs)

with different C/N and (Emed)ref

� RPC1 DVB-T, fixed roof-level

� RPC2 DVB-T, portable / mobile

� RPC3 DVB-T, portable indoor

� RPC4 T-DAB, mobile 99%

� RPC5 T-DAB, portable indoor 95%

12 2004 by LS telcom AG LS Summit 2004: RRC-04 Results

Chapter 3 (continued)

� Reference Networks (RNs)

� RN1, large service area SFN

� RN2, small service area SFN

� RN3, small service area SFN for urban environment

� RN4, semi-closed small service area SFN

� RN for RPC4 and RPC5 (T-DAB), 60 km TX-distance

D

d

� Hierarchical modulation now with C/N list

13 2004 by LS telcom AG LS Summit 2004: RRC-04 Results

Chapter 5

Chapter 5: Planning principles and methods� Wanted signal summation: k-LNM

� Unwanted signal summation: power sum method

� Combined location correction factor

� The channel potential method

(using interference contours of

analogue assignments to

construct digital allotments)

14 2004 by LS telcom AG LS Summit 2004: RRC-04 Results

Chapter 6

Chapter 6: Data formats

� New Requirements: tag-oriented (as TerRaSys) or fixed format (as CH97) not yet decided. Deadline: 30 June 2004� Tag-oriented: ITU preferred, modern

� Fixed format: EBU preferred, easier to check manually

� Analogue: "T02", other services: T11, T12, T13, T14

� Optional fields present

15

2004by LS

telcom A

GLS

Sum

mit2004: R

RC

-04R

esults

in force:

notearlier than12

months

afterend

of2nd

session

validation, correction,publication

pevalidation, correction,publication

Tim

e Tab

le

56

78

910

1112

12

34

56

78

910

1112

12

34

56

78

910

20042005

2006

RR

C-04,

three weeks

RR

C-06,

five weeks

electronic input format

data capture software

implementation & verification

publication resultsof planning exercise

reference date,last submission of input data for RRC-06

followed by

GE

89 / ST

61harm

onisationconferences

provide BR with planning softw.

submission of initial input data

production of draft plan

draft plan publication

16 2004 by LS telcom AG LS Summit 2004: RRC-04 Results

Chapter 7

Chapter 7: Regulatory / procedural aspects� RPG: Regulatory/Procedural Group

� Working Party of RPG

� IPG: Intersessional Planning Group

� Steering Group (1 chairman, 4 vice-chairmen)

� Planning Exercise Team

(EBU 2, CEPT 2, ATU 2, RCC 2, ARB 2, IRN 1)

Head of PET nominated by director of BR

17 2004 by LS telcom AG LS Summit 2004: RRC-04 Results

Apparatus (inter-sessional)

PET

CEPTEBU ARBATU RCC IRNBR

IPG

SG/IPG

RPG + WP/RPG