Description
Architects: Gualano & Gualano Arquitectos –
MarceloGualano / Martín Gualano
Location: Rivera, Uruguay
Collaborators: Aida Aguirre, Carolina Algorta, IgnacioDe Souza, JoaquínMascheroni, Elena Pi, CarinaStrata,Andrés Varela
Built Area: 13,000 sqm
Project Year: 2008 – 2011
Photographs: Marcos Mendizabal, José Pampín
7/27/2019 Rivera Hotel - ِِِِArchitectural Case Study
http://slidepdf.com/reader/full/rivera-hotel-architectural-case-study 4/25
Location
Uruguay , Rivera City
NN
7/27/2019 Rivera Hotel - ِِِِArchitectural Case Study
http://slidepdf.com/reader/full/rivera-hotel-architectural-case-study 5/25
The Site :
The city of Rivera, 500km north of Montevideo, is locatedat the junction of the CuchillaNegra and the Cuchilla de
Santa Ana.It contributes with the Brazilian city of Santana do
Livramento while sharing a land border: only a streetand a square, Plaza Internacional, separate the two.
In this city, the social integration between two countriesthat share no territorial limits is the prevailing aspect, aspeople are able to cross freely from one city to the other.
7/27/2019 Rivera Hotel - ِِِِArchitectural Case Study
http://slidepdf.com/reader/full/rivera-hotel-architectural-case-study 6/25
The Site :
7/27/2019 Rivera Hotel - ِِِِArchitectural Case Study
http://slidepdf.com/reader/full/rivera-hotel-architectural-case-study 7/25
The project
The project of the new Rivera Hotel and Casino complexproposes a three-tiered intervention:
1 . To reactivate the old building of the casino
2 . To incorporate the Teatro Municipal (MunicipalTheater) to the new complex
3 . To build a new four-star Hotel in the site located
across Uruguay street.
The building complex attempts to configure a new polein the city of Rivera through an Entertainment Center, by
repurposing the old casino and Municipal Theater.
7/27/2019 Rivera Hotel - ِِِِArchitectural Case Study
http://slidepdf.com/reader/full/rivera-hotel-architectural-case-study 8/25
7/27/2019 Rivera Hotel - ِِِِArchitectural Case Study
http://slidepdf.com/reader/full/rivera-hotel-architectural-case-study 9/25
Basement Floor -2
Parking Area
storage
Vertical
circulation
Lost Spaces
7/27/2019 Rivera Hotel - ِِِِArchitectural Case Study
http://slidepdf.com/reader/full/rivera-hotel-architectural-case-study 10/25
Basement Floor -2
Guests Circulationpeople
vehicles
7/27/2019 Rivera Hotel - ِِِِArchitectural Case Study
http://slidepdf.com/reader/full/rivera-hotel-architectural-case-study 11/25
Basement Floor -1
Parking Area
Storage
Vertical
Circulation Entry
7/27/2019 Rivera Hotel - ِِِِArchitectural Case Study
http://slidepdf.com/reader/full/rivera-hotel-architectural-case-study 12/25
Basement Floor -1
Guests Circulationpeople
vehicles
7/27/2019 Rivera Hotel - ِِِِArchitectural Case Study
http://slidepdf.com/reader/full/rivera-hotel-architectural-case-study 13/25
InTake
Storage
s
Parkings
Functional Analysis:
Ground floor
Bubble diagram
7/27/2019 Rivera Hotel - ِِِِArchitectural Case Study
http://slidepdf.com/reader/full/rivera-hotel-architectural-case-study 14/25
Ground Floor
Theatre
Kitchen
W.C.s
Temp. StorageSecondaryEntrance
Main
Entrance
Lobby & Dinning
Reception
VerticalCirculation
7/27/2019 Rivera Hotel - ِِِِArchitectural Case Study
http://slidepdf.com/reader/full/rivera-hotel-architectural-case-study 15/25
Functional Analysis:
Ground floor
Bubble diagram
Storage
Kitchen
7/27/2019 Rivera Hotel - ِِِِArchitectural Case Study
http://slidepdf.com/reader/full/rivera-hotel-architectural-case-study 16/25
First Floor
Staff Waiting
VerticalCirculation
Staff W.C.s
This floor is a
semi-floor
built tho hold
the weight of
pool , has
Work Shop
Cafeteria
Staff
Changing
Theatre
Administration
7/27/2019 Rivera Hotel - ِِِِArchitectural Case Study
http://slidepdf.com/reader/full/rivera-hotel-architectural-case-study 17/25
Second Floor
Load Holding
VerticalCirculation
Work ShopLaundry
Temp. Storage
Security
Dry Clean Pool Equipment
7/27/2019 Rivera Hotel - ِِِِArchitectural Case Study
http://slidepdf.com/reader/full/rivera-hotel-architectural-case-study 18/25
Third Floor
Dinning
RestaurantPool
VerticalCirculation
Pool Seating Library And Reading Massage Area
W.C.sPool Showers And W.C
7/27/2019 Rivera Hotel - ِِِِArchitectural Case Study
http://slidepdf.com/reader/full/rivera-hotel-architectural-case-study 19/25
Fourth – Fifth - Sixth Floor
VerticalCirculation
ClientsRooms
7/27/2019 Rivera Hotel - ِِِِArchitectural Case Study
http://slidepdf.com/reader/full/rivera-hotel-architectural-case-study 20/25
Roof Plan
Ducts
Vertical
Circulation
7/27/2019 Rivera Hotel - ِِِِArchitectural Case Study
http://slidepdf.com/reader/full/rivera-hotel-architectural-case-study 21/25
7/27/2019 Rivera Hotel - ِِِِArchitectural Case Study
http://slidepdf.com/reader/full/rivera-hotel-architectural-case-study 22/25
North East Elevation
7/27/2019 Rivera Hotel - ِِِِArchitectural Case Study
http://slidepdf.com/reader/full/rivera-hotel-architectural-case-study 23/25
North West Elevation
7/27/2019 Rivera Hotel - ِِِِArchitectural Case Study
http://slidepdf.com/reader/full/rivera-hotel-architectural-case-study 24/25
Section
Double Volume Lobby
Three
Floors
For
Clients
Pool Floor
Two Floors UnderGround Parking
Concrete Under
The Pool To
Carry The Load