FY2015-2020 Six-Year Improvement Program RICHMOND DISTRICT
FY2019 FY2020FY2018FY2017FY2016FY2015Fund Source Name
Funding Allocation Summary (000's)
RICHMOND DISTRICT
System Totals
Interstate
CTB Formula
$12,439$15,131$11,807$8,064$7,958$0Bridge - State $55,399
0 0 0 1,750 0 0High Priority - State 1,750
0 0 37,350 5,079 2,258 1,464Paving - Federal 46,151
0 0 9,338 1,270 565 366Paving - Soft Match 11,538
0 0 0 15,561 12,162 2,198Paving - State 29,921
NHPP
0 0 0 0 0 6,400BOA - NHPP Federal 6,400
0 0 0 0 0 1,600BOA - NHPP Soft Match 1,600
0 0 1,175 570 2,876 2,442Bridge - Federal 7,064
0 0 294 143 719 611Bridge - Soft Match 1,766
0 0 3,794 13,319 0 3,550Statewide - Federal 20,663
0 0 422 1,480 0 887Statewide - Soft Match 2,789
RSTP (STP Regional)
0 1,600 1,000 0 1,280 1,240MPO - Federal 5,120
0 400 250 0 320 310MPO - State Match 1,280
STP
0 0 8,121 0 0 0Statewide - Federal 8,121
0 0 2,030 0 0 0Statewide - Soft Match 2,030
$12,439$17,131$75,581$47,235$28,138$21,068Total $201,592
Primary
CMAQ
$3,440$4,094$2,624$1,343$890$417MPO - Federal $12,810
860 1,024 656 336 223 104MPO - State Match 3,202
CTB Formula
3,308 487 4,531 1,759 5,012 0Bridge - State 15,097
0 0 51 0 0 0High Priority - State 51
0 0 0 0 120 60ITS - State 180
0 0 0 2,634 618 1,256Paving - Federal 4,508
0 0 0 659 154 314Paving - Soft Match 1,127
0 0 0 4,656 14,871 0Paving - State 19,528
Highway Safety Improvements
0 0 0 2,025 2,025 5,427Federal 9,477
0 0 0 225 225 603Soft Match 1,053
NHPP
3,221 1,376 0 0 414 957Bridge - Federal 5,967
805 344 0 0 104 239Bridge - Soft Match 1,492
0 0 0 0 0 674Statewide - Federal 674
0 0 0 0 0 169Statewide - Soft Match 169
RSTP (STP Regional)
2,012 5,520 8,800 7,052 4,475 5,351MPO - Federal 33,210
503 1,380 2,200 1,763 1,119 1,338MPO - State Match 8,302
STP
5,569 3,332 2,988 1,932 3,282 682Bridge - Federal 17,786
1,392 833 747 483 821 171Bridge - Soft Match 4,446
0 0 252 8 1,814 755Statewide - Federal 2,829
0 0 63 2 454 189Statewide - Soft Match 707
$21,109$18,390$22,913$24,877$36,619$18,706Total $142,615
11/12/2014 701
FY15 REVISED FINAL
FY2015-2020 Six-Year Improvement Program RICHMOND DISTRICT
FY2019 FY2020FY2018FY2017FY2016FY2015Fund Source Name
Funding Allocation Summary (000's)
RICHMOND DISTRICT - cont.
System Totals
CMAQ
$0$560$2,160$1,874$2,341$958MPO - Federal $7,892
0 140 540 468 585 240MPO - State Match 1,973
CTB Formula
4,291 5,532 1,885 2,962 0 0Bridge - State 14,670
0 95 0 0 0 0High Priority - State 95
1,089 1,133 1,051 1,039 638 117Unpaved - State 5,067
Highway Safety Improvements
0 0 1,080 135 2,070 135Federal 3,420
0 0 120 15 230 15Soft Match 380
Local Project Contributions
0 0 0 0 0 10,035Local 10,035
Residue Parcel Revenue
0 0 0 0 0 59State 59
Revenue Sharing Funds
0 0 0 0 0 9,110Local Match 9,110
0 0 0 0 0 9,110State Match 9,110
RSTP (STP Regional)
4,244 1,577 1,833 2,597 4,303 2,817MPO - Federal 17,372
1,061 394 458 649 1,076 704MPO - State Match 4,343
STP
5,041 3,248 4,586 5,461 3,367 2,980Bridge - Federal 24,682
1,260 812 1,146 1,365 842 745Bridge - Soft Match 6,171
2,309 2,264 2,234 1,953 2,074 1,558BROS - Federal 12,393
577 566 559 488 519 390BROS - Soft Match 3,098
Telecommunications
1,877 1,877 1,877 1,877 1,877 1,877State 11,261
$21,750$18,199$19,529$20,883$19,921$40,850Total $141,132
Urban
CMAQ
$2,763$2,151$1,800$3,480$3,461$2,681MPO - Federal $16,336
691 538 450 870 865 670MPO - State Match 4,084
CTB Formula
0 0 0 0 2,000 0High Priority - State 2,000
Revenue Sharing Funds
0 0 0 0 0 13,023Local Match 13,023
0 0 0 0 0 13,023State Match 13,023
RSTP (STP Regional)
3,412 4,452 1,548 2,140 2,938 1,567MPO - Federal 16,056
853 1,113 387 535 734 392MPO - State Match 4,014
STP
0 0 0 0 0 129Bridge - Federal 129
0 0 0 0 0 32Bridge - Soft Match 32
$7,718$8,254$4,185$7,025$9,999$31,516Total $68,697
Enhancement
Revenue Sharing Funds
$0$0$0$0$0$180Local Match $180
0 0 0 0 0 180State Match 180
Secondary
702 11/12/2014
FY15 REVISED FINAL
FY2015-2020 Six-Year Improvement Program RICHMOND DISTRICT
FY2019 FY2020FY2018FY2017FY2016FY2015Fund Source Name
Funding Allocation Summary (000's)
RICHMOND DISTRICT - cont.
System Totals
TAP
1,121 1,121 1,121 1,121 1,121 1,123MPO - Federal 6,727
0 0 0 0 0 1,000Statewide - Federal 1,000
$1,121$1,121$1,121$1,121$1,121$2,483Total $8,086
Transit
CMAQ
$28$28$28$428$428$742MPO - Federal $1,682
7 7 7 107 107 185MPO - State Match 420
$35$35$35$535$535$927Total $2,102
Other
CMAQ
$1,360$757$979$466$470$2,561MPO - Federal $6,593
340 189 245 116 118 640MPO - State Match 1,648
CTB Formula
0 0 0 0 375 150ITS - State 525
Highway Safety Improvements
4,453 3,116 2,489 5,267 3,713 1,656Federal 20,694
495 346 277 585 413 184Soft Match 2,299
Prescoping Funds
1,130 1,105 1,082 1,058 1,818 919State 7,113
RSTP (STP Regional)
4,532 1,050 1,018 2,410 1,203 488MPO - Federal 10,701
1,133 263 255 603 301 122MPO - State Match 2,675
$13,443$6,827$6,343$10,506$8,411$6,720Total $52,249
Grand Total $77,615$69,956$129,705$112,182$104,743$122,270 $616,472
11/12/2014 703
This Page Is Intentionally Left Blank
704 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Interstate
MPO Area
RichmondInterstate
PROGRAM/SYSTEM
I-64 - WIDEN FROM 4 TO 6 LANES AND
IMPROVE RTE 623 INTERCHNG
PROJECT
UPC NO.:
ROUTE:
70542
FO0064
Federal Requirement for Access Approval on Route 288 Intchg.REPORT NOTE:
Underway
SCHEDULE
1,413
ESTIMATED COST (000's)
JURISDICTION:
I-64STREET NAME:
PERichmond District-wide
Underway 35,816CNFROM: 0.99 MI W RTE 623 (WB - RTE 622, EB - RTE
623) TO: 0.38 MI W RTE 295 IN SHORT PUMP
(POUNCEY TRACT RD) (4.5200 MI)
DESCRIPTION: RW
8578,8579,8580,8581,8635,8639,9778,9779,9780,9781,26461,26462,2667159,61,73,74,81,86,95,96,96,97,100PROJECT LENGTH: 4.5200 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Reconstruction w/ Added Capacity TO 37,229
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 4,305Bond Proceeds: CPR Bonds
1,407 0 0 0 0 0 0CTB Formula: Bridge - State
0 0 0 0 0 0 860CTB Formula: High Priority - Federal
0 0 0 0 0 0 215CTB Formula: High Priority - Soft Match
0 0 0 0 1,750 0 0CTB Formula: High Priority - State
0 0 0 0 0 0 6,718Interstate: Federal
0 0 0 0 0 0 1,222Interstate: State Match
0 0 0 0 0 6,400 0NHPP: BOA - NHPP Federal
0 0 0 0 0 1,600 0NHPP: BOA - NHPP Soft Match
0 0 0 0 0 928 8,907NHPP: Statewide - Federal
0 0 0 0 0 232 2,227NHPP: Statewide - Soft Match
0 0 0 0 0 0 457Soft Match: Federal
0 0 0 0 1,750 1,407 9,160 24,912Total
MPO Area
RichmondInterstate
PROGRAM/SYSTEM
RTE 64 - REPLACE BRIDGES OVER RTE 156
PROJECT
UPC NO.:
ROUTE:
97565
FO0064
Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
2,000
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHenrico County
FY2017 15,386CNFROM: APPROACHES & BRIDGE OVER RTE 156 TO:
(2.60 MI W RTE 295)
DESCRIPTION: RW
30233 -1PROJECT LENGTH: _ STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 17,386
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
1,250 0 10,131 3,005 3,000 0 0CTB Formula: Bridge - State 0
MPO Area
NonMPOInterstate
PROGRAM/SYSTEM
I-64 WB RESTORE EXIST. PAVE
PROJECT
UPC NO.:
ROUTE:
104496
FO0064
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEGoochland County
Underway 2,765CNFROM: GOOCHLAND/LOUISA COUNTY LINE TO: 0.41
MI. W. RTE. 606 (WALTON RD.) (3.3500 MI)
DESCRIPTION: RW
PROJECT LENGTH: 3.3500 MISCOPE OF WORK: Resurfacing TO 2,765
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
2,765 0 0 0 0 0 0CTB Formula: Paving - State 0
11/12/2014 705
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Interstate
MPO Area
NonMPOInterstate
PROGRAM/SYSTEM
I-64 EB REHAB EXISTING PAVEMENT
PROJECT
UPC NO.:
ROUTE:
104498
FO0064
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEGoochland County
Underway 1,760CNFROM: 0.36 MI. E. RTE. 522 (CROSS COUNTRY RD.)
TO: 2.51 MI. E. RTE. 522 (CROSS COUNTRY RD.)
(2.1500 MI)
DESCRIPTION: RW
PROJECT LENGTH: 2.1500 MISCOPE OF WORK: Resurfacing TO 1,760
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 422 0CTB Formula: Paving - Federal
0 0 0 0 0 106 0CTB Formula: Paving - Soft Match
1,232 0 0 0 0 0 0CTB Formula: Paving - State
0 0 0 0 0 1,232 528 0Total
MPO Area
RichmondInterstate
PROGRAM/SYSTEM
I-64 EB REHAB EXISTING PAVEMENT
PROJECT
UPC NO.:
ROUTE:
104499
FO0064
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PENew Kent County
Underway 17,319CNFROM: 0.13 mi. E. Airport Rd. TO: James City CL
(15.6900 MI)
DESCRIPTION: RW
PROJECT LENGTH: 15.6900 MISCOPE OF WORK: Resurfacing TO 17,319
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 2,400 242 0CTB Formula: Paving - Federal
0 0 0 0 600 60 0CTB Formula: Paving - Soft Match
8,165 0 0 0 5,851 0 0CTB Formula: Paving - State
0 0 0 0 8,851 8,165 302 0Total
MPO Area
RichmondInterstate
PROGRAM/SYSTEM
RTE 64 - REPLACE BRIDGES OVER RTE 33
(NINE MILE RD)
PROJECT
UPC NO.:
ROUTE:
105141
FO0064
Revised schedule required.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
I-64STREET NAME:
PEHenrico County
FY2014 9,535CNFROM: APPROACHES & BRIDGES OVER RTE 33 TO:
(0.80 MI E RTE 156) (0.8300 MI)
DESCRIPTION: RW
30208,30209 -1PROJECT LENGTH: 0.8300 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 9,535
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
282 0 0 0 0 0 0CTB Formula: Bridge - State
2,876 0 0 1,175 570 2,442 179NHPP: Bridge - Federal
719 0 0 294 143 611 45NHPP: Bridge - Soft Match
0 0 0 0 0 0 160STP: Bridge - Federal
0 0 0 0 0 0 40STP: Bridge - Soft Match
0 0 0 1,469 713 3,877 3,053 424Total
706 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Interstate
MPO Area
NonMPOInterstate
PROGRAM/SYSTEM
I-85 RESTORE EXIST. PAVE NB/SB
PROJECT
UPC NO.:
ROUTE:
104465
FO0085
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PERichmond District-wide
Underway 22,265CN
FROM: MM 6.70 TO: MM 37.56 (30.8600 MI)DESCRIPTION: RW
PROJECT LENGTH: 30.8600 MISCOPE OF WORK: Restoration and Rehabilitation TO 22,265
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
800 0 0 5,137 1,098 0 301CTB Formula: Paving - Federal
200 0 0 1,284 275 0 33CTB Formula: Paving - Soft Match
0 0 0 0 5,126 45 0CTB Formula: Paving - State
0 0 0 1,459 5,710 0 0NHPP: Statewide - Federal
0 0 0 162 634 0 0NHPP: Statewide - Soft Match
0 0 0 8,043 12,843 1,000 45 334Total
MPO Area
Tri-CitiesInterstate
PROGRAM/SYSTEM
I-85 RESTORE EXIST. PAVE NB/SB
PROJECT
UPC NO.:
ROUTE:
104466
FO0085
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEDinwiddie County
Underway 44,197CN
FROM: MM 40.32 TO: MM 61.44 (21.1200 MI)DESCRIPTION: RW
PROJECT LENGTH: 21.1200 MISCOPE OF WORK: Restoration and Rehabilitation TO 44,197
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
658 0 0 23,733 0 800 268CTB Formula: Paving - Federal
165 0 0 5,933 0 200 30CTB Formula: Paving - Soft Match
0 0 0 1,834 1,435 0 0NHPP: Statewide - Federal
0 0 0 204 159 0 0NHPP: Statewide - Soft Match
0 0 0 7,023 0 0 0STP: Statewide - Federal
0 0 0 1,756 0 0 0STP: Statewide - Soft Match
0 0 0 40,482 1,595 823 1,000 297Total
MPO Area
RichmondInterstate
PROGRAM/SYSTEM
RTE 95 - BRIDGE REHABILITATION
PROJECT
UPC NO.:
ROUTE:
18944
FO0095
Complete
SCHEDULE
6,841
ESTIMATED COST (000's)
JURISDICTION:
Interstate 95STREET NAME:
PERichmond District-wide
Underway 92,400CN
UnderwayFROM: 0.20 miles south of Lombardy Intersection TO:
0.02 miles north of Upham Brook (5.3200 MI)
DESCRIPTION: 387RW
9836,9837,21443,21445,21447,21449,21451,21453,21455,21457,2149861,64,66,74,75,77,81,85PROJECT LENGTH: 5.3200 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Rehab w/o Added Capacity TO 99,628
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 7,317Bonus OA: Federal
0 0 0 0 0 0 813Bonus OA: State Match
0 0 0 0 0 0 76,854Interstate: Federal
0 0 0 0 0 0 13,950Interstate: State Match
0 0 0 0 0 0 583NHPP: Statewide - Federal
0 0 0 0 0 0 111NHPP: Statewide - Soft Match
0 0 0 0 0 0 0 99,628Total
11/12/2014 707
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Interstate
MPO Area
RichmondInterstate
PROGRAM/SYSTEM
RTE 95 - INTERCHANGE MODIFICATION
PROJECT
UPC NO.:
ROUTE:
58920
FO0095
MPO Project PE & RW only. See ARRA UPC 94855 for CN phase.REPORT NOTE:
Complete
SCHEDULE
661
ESTIMATED COST (000's)
JURISDICTION:
Lewistown Rd.STREET NAME:
PEHanover County
CN
UnderwayFROM: 0.064 Mi. W. Int. Rte. 743 TO: 0.367 Mi. E. Int.
Rte. 743 (0.4310 MI)
DESCRIPTION: 1,081RW
PROJECT LENGTH: 0.4310 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 1,742
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 348Non-Formula: State Match
0 0 0 0 0 0 1,394RSTP (STP Regional): Federal
0 0 0 0 0 0 0 1,742Total
MPO Area
Tri-CitiesInterstate
PROGRAM/SYSTEM
RTE 95 - INTERCHANGE IMPROVEMENT/
ROUNDABOUT
PROJECT
UPC NO.:
ROUTE:
85623
FO0095
Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
1,404
ESTIMATED COST (000's)
JURISDICTION:
TEMPLE AVESTREET NAME:
PEColonial Heights
FY2014 14,395CN
FY2014FROM: 0.041 MI W HAMILTON AVE TO: 0.069 MI E
EXISTING I-95 RAMP (0.3690 MI)
DESCRIPTION: 4,250RW
PROJECT LENGTH: 0.3690 MISCOPE OF WORK: Safety TO 20,049
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 4,941Bond Proceeds: CPR Bonds
0 0 0 0 0 0 7,864Interstate: Federal
0 0 0 0 0 0 1,619Interstate: State Match
0 0 0 0 0 2,622 1,600NHPP: Statewide - Federal
0 0 0 0 0 656 400NHPP: Statewide - Soft Match
0 0 0 0 0 0 347Soft Match: Federal
0 0 0 0 0 0 3,278 16,771Total
708 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Interstate
MPO Area
RichmondInterstate
PROGRAM/SYSTEM
RTE 802 - REPLACE BRIDGE OVER 95, MOD
RAMPS & AIRPARK RD
PROJECT
UPC NO.:
ROUTE:
90347
FO0095
MPO project.REPORT NOTE:
Underway
SCHEDULE
2,074
ESTIMATED COST (000's)
JURISDICTION:
LEWISTOWN ROADSTREET NAME:
PEHanover County
FY2015 22,693CN
UnderwayFROM: 0.252 MILES WEST INT. I-95 TO: 0.431 MILES
EAST INT. I-95 (0.6830 MI)
DESCRIPTION: 5,341RW
29524 -1PROJECT LENGTH: 0.6830 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 30,108
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
3,331 0 0 8,602 3,000 0 0CTB Formula: Bridge - State
0 0 0 0 0 0 125Non-Formula: State Match
0 0 0 0 0 0 7,459RSTP (STP Regional): Federal
1,040 0 1,600 1,000 0 1,040 0RSTP (STP Regional): MPO - Federal
260 0 400 250 0 260 0RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 1,740RSTP (STP Regional): State Match
0 0 2,000 9,852 3,000 4,631 1,300 9,324Total
MPO Area
RichmondInterstate
PROGRAM/SYSTEM
ARRA - HANOVER 95 RAMP IMPROVEMENTS
FOR LEWISTOWN (743)
PROJECT
UPC NO.: 94855
FOARRA09
PE & RW on UPC 58920;REPORT NOTE:
FROM: 0.061 MI W INT RTE 743 TO: 0.367 MI E INT RTE
743 (0.4290 MI)
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 3,188American Recovery and Reinvestment Act:
Urbanized Area > 200K
MPO Area
Multiple MPOsInterstate
PROGRAM/SYSTEM
I-95 NB ONLY RESTORE EXIST. PAVE
PROJECT
UPC NO.:
ROUTE:
104489
FO0095
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEChesterfield County
Underway 4,313CNFROM: Rte. 620 (Woods Edge Rd.) TO: Rte. 10 (West
Hundred Rd.) (3.5700 MI)
DESCRIPTION: RW
PROJECT LENGTH: 3.5700 MISCOPE OF WORK: Resurfacing TO 4,313
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 781 0 1,426CTB Formula: Paving - Federal
0 0 0 0 195 0 158CTB Formula: Paving - Soft Match
0 0 0 0 0 1,753 0CTB Formula: Paving - State
0 0 0 0 976 0 1,753 1,584Total
11/12/2014 709
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Interstate
MPO Area
Tri-CitiesInterstate
PROGRAM/SYSTEM
I95/85 SB INTERCHANGE SAFETY
IMPROVEMENTS (PE ONLY)
PROJECT
UPC NO.:
ROUTE:
104956
FO0095
MPO Project. Complete estimate and schedule required.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
I95STREET NAME:
PEPetersburg
CN
FROM: I85 TO: WAGNER ROAD (2.3500 MI)DESCRIPTION: RW
PROJECT LENGTH: 2.3500 MISCOPE OF WORK: Safety TO 0
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 160RSTP (STP Regional): MPO - Federal
0 0 0 0 0 0 40RSTP (STP Regional): MPO - State Match
-200 0 0 0 0 0 0 200Total
MPO Area
RichmondInterstate
PROGRAM/SYSTEM
RTE 95 - OVERLAP IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
105055
FO0095
HB2 ADJUSTMENT
Revised schedule required.REPORT NOTE:
FY2014
SCHEDULE
9,928
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PERichmond
FY2017 49,842CN
FY2016FROM: I95/64 TO: I95/I64DESCRIPTION: 2,230RW
PROJECT LENGTH: _SCOPE OF WORK: Reconstruction w/o Added Capacity TO 62,000
REQ'D AFTER
2020*FY2020* FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
80 0 0 0 0 0 0RSTP (STP Regional): MPO - Federal
20 0 0 0 0 0 0RSTP (STP Regional): MPO - State Match
61,900 0 0 0 0 100 0 0Total
MPO Area
RichmondInterstate
PROGRAM/SYSTEM
RTE 95 - INTERCHANGE ALTERNATIVES
ANALYSIS AT RTE 54
PROJECT
UPC NO.:
ROUTE:
106215
NFO0095
MPO Project.REPORT NOTE:
FY2015
SCHEDULE
450
ESTIMATED COST (000's)
JURISDICTION:
I-95STREET NAME:
PEAshland
CNFROM: AT RTE 54 INTERCHANGE TO: AT RTE 54
INTERCHANGE
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Other TO 450
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
160 0 0 0 0 200 0RSTP (STP Regional): MPO - Federal
40 0 0 0 0 50 0RSTP (STP Regional): MPO - State Match
0 0 0 0 0 200 250 0Total
710 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Interstate
MPO Area
RichmondInterstate
PROGRAM/SYSTEM
RTE 95 - INSTALL BARRIER SERVICE
PROJECT
UPC NO.:
ROUTE:
106536
NFO0095
NEW PROJECT
FY2015
SCHEDULE
40
ESTIMATED COST (000's)
JURISDICTION:
0095STREET NAME:
PEChesterfield County
FY2015 275CNFROM: 1.00 MI S RTE 613 (WILLIS RD) INTERCHANGE
TO: 1.23 MI S RTE 613 (WILLIS RD) INTERCHANGE
(0.2300 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.2300 MISCOPE OF WORK: Safety TO 315
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 216Highway Safety Improvements: Federal
0 0 0 0 0 0 24Highway Safety Improvements: State Match
74 0 0 0 0 0 0 241Total
MPO Area
RichmondInterstate
PROGRAM/SYSTEM
RTE 195 - BRIDGE REPLACEMENT OVER RTE
76, CSX, RAMP S
PROJECT
UPC NO.:
ROUTE:
93087
FO0195
Underway
SCHEDULE
3,751
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PERichmond
FY2017 17,639CNFROM: RTE 195 - BRIDGE REPLACEMENT OVER RTE
76, CSX, RAMP S TO: (0.7 MI W RTE 146) (0.8300 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.1000 MISCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 21,390
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
1,688 12,439 5,000 200 2,064 0 0CTB Formula: Bridge - State 0
MPO Area
RichmondInterstate
PROGRAM/SYSTEM
RTE 295 - UPGRADE/REPLACE SIGNS - PHASE
1
PROJECT
UPC NO.:
ROUTE:
102708
NFO0295
Complete
SCHEDULE
63
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PERichmond District-wide
Underway 1,262CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 1,326
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,575Open Container Funds: Statewide -249
11/12/2014 711
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Interstate
MPO Area
RichmondInterstate
PROGRAM/SYSTEM
RTE 295 - UPGRADE/REPLACE SIGNS - PHASE
2
PROJECT
UPC NO.:
ROUTE:
102954
NFO0295
Complete
SCHEDULE
207
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PERichmond District-wide
Underway 2,409CN
FROM: MP 27.5 TO: MP 41.0 (13.5000 MI)DESCRIPTION: RW
PROJECT LENGTH: 13.5000 MISCOPE OF WORK: Safety TO 2,615
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 3,150Open Container Funds: Statewide -535
MPO Area
RichmondInterstate
PROGRAM/SYSTEM
RTE 295 - UPGRADE/REPLACE SIGNS
PROJECT
UPC NO.:
ROUTE:
102955
NFO0295
Complete
SCHEDULE
127
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PERichmond District-wide
Underway 1,898CN
FROM: MP 41 TO: MP 53 (12.0000 MI)DESCRIPTION: RW
PROJECT LENGTH: 12.0000 MISCOPE OF WORK: Safety TO 2,025
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 3,275Open Container Funds: Statewide -1,250
MPO Area
Multiple MPOsInterstate
PROGRAM/SYSTEM
I-295 RESTORE EXIST. PAVE NB/SB
PROJECT
UPC NO.:
ROUTE:
104467
FO0295
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PERichmond District-wide
Underway 26,115CN
FROM: MM 20.82 TO: MM 8.46 (12.3600 MI)DESCRIPTION: RW
PROJECT LENGTH: 12.3600 MISCOPE OF WORK: Restoration and Rehabilitation TO 26,115
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
800 0 0 8,480 800 0 268CTB Formula: Paving - Federal
200 0 0 2,120 200 0 30CTB Formula: Paving - Soft Match
0 0 0 0 4,584 400 0CTB Formula: Paving - State
0 0 0 0 6,174 0 0NHPP: Statewide - Federal
0 0 0 0 686 0 0NHPP: Statewide - Soft Match
0 0 0 1,099 0 0 0STP: Statewide - Federal
0 0 0 275 0 0 0STP: Statewide - Soft Match
0 0 0 11,973 12,444 1,000 400 297Total
712 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Interstate
MPO Area
RichmondInterstate
PROGRAM/SYSTEM
RTE 618 (MEADOWVILLE RD) - ADD BRIDGE AT
RTE 295
PROJECT
UPC NO.:
ROUTE:
105057
FO0295
HB2 ADJUSTMENT
FY2018
SCHEDULE
1,000
ESTIMATED COST (000's)
JURISDICTION:
MEADOWVILLE ROADSTREET NAME:
PEChesterfield County
FY2020 12,500CN
OVER RTE 295DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Bridge, New Construction TO 13,500
REQ'D AFTER
2020*FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 0Accounts Receivable: Local 13,500
MPO Area
RichmondInterstate
PROGRAM/SYSTEM
POCAHONTAS PARKWAY - T895 - VDOT
OVERSIGHT
PROJECT
UPC NO.: 92609
NFOBudget Item
FROM: Route 895 TO: Pocahontas ParkwayDESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 150Accounts Receivable: Local
0 0 0 0 0 0 150Total
MPO Area
NonMPOInterstate
PROGRAM/SYSTEM
RICHMOND - COMMITTED INTERSTATE
PAVING FUNDS - BALANCE ENTRY
PROJECT
UPC NO.: T13515
NFOBalance Entry
FROM: various TO: variousDESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 500 0 0 0NHPP: Statewide - Federal
0 0 0 56 0 0 0NHPP: Statewide - Soft Match
0 0 556 0 0 0 0Total
11/12/2014 713
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
IMPROVE TRAFFIC OPERATIONS
PROJECT
UPC NO.:
ROUTE:
58911
NFO
MPO Project - Revised schedule required.REPORT NOTE:
FY2020
SCHEDULE
2,100
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHenrico County
CNFROM: THRU SIGNALIZATION, TURN LANES AND ITS
ADVANCES TO: AT VARIOUS LOCATIONS
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 2,100
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 876CMAQ: Federal
0 0 0 0 0 0 206CMAQ: State Match
1,019 0 0 0 0 0 0 1,081Total
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
ARRA BRIDGE DESIGN-BUILD CONTRACT
PROJECT
UPC NO.: 92701
NFOARRA09
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 4,884American Recovery and Reinvestment Act:
Flexible
0 0 0 0 0 0 187(X) Maintenance Funds: Statewide
0 0 0 0 0 0 5,071Total
MPO Area
Tri-CitiesPrimary
PROGRAM/SYSTEM
ARRA HOPEWELL/PRINCE GEORGE 36
CORRIDOR IMPROVEMENTS
PROJECT
UPC NO.: 93209
NFOARRA09
FROM: 0.260 MI W RT144 TO: JEFFERSON PARK RD.
(RTE 630) (0.9420 MI)
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 9,877American Recovery and Reinvestment Act:
Flexible
0 0 0 0 0 0 60Primary Formula: State
0 0 0 0 0 0 9,937Total
714 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
2014 PLANT MIX SCHEDULE ASHLAND NORTH
RESIDENCY (PRIMARY)
PROJECT
UPC NO.:
ROUTE:
104476
NFO
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHanover County
Underway 5,231CN
FROM: VARIOUS TO: VARIOUSDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Resurfacing TO 5,231
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 986 0 0CTB Formula: Paving - Federal
0 0 0 0 247 0 0CTB Formula: Paving - Soft Match
2,877 0 0 0 1,121 0 0CTB Formula: Paving - State
0 0 0 0 0 0 0(X) Maintenance Funds: Statewide
0 0 0 0 2,354 2,877 0 0Total
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
2014 PLANT MIX SCHEDULE CHESTERFIELD
RESIDENCY (PRIMARY)
PROJECT
UPC NO.:
ROUTE:
104482
NFO
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEChesterfield County
Underway 5,128CN
FROM: VARIOUS TO: VARIOUSDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Resurfacing TO 5,128
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
618 0 0 0 368 369 0CTB Formula: Paving - Federal
154 0 0 0 92 92 0CTB Formula: Paving - Soft Match
3,435 0 0 0 0 0 0CTB Formula: Paving - State
0 0 0 0 0 0 0(X) Maintenance Funds: Statewide
0 0 0 0 460 4,207 461 0Total
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
ADA COMPLIANCE
PROJECT
UPC NO.:
ROUTE:
106351
NFO
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PERichmond District-wide
FY2015 500CN
FROM: various TO: variousDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 500
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 572Bond Proceeds: CPR Bonds -72
11/12/2014 715
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 1 - BR REPLACEMENT & MOD LTL @
DSCR
PROJECT
UPC NO.:
ROUTE:
15988
NFO0001
Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
2,731
ESTIMATED COST (000's)
JURISDICTION:
JEFFERSON DAVIS HIGHWAYSTREET NAME:
PEChesterfield County
FY2014 15,833CN
UnderwayFROM: Intersection w/ Rte. 145 (Chester Road) TO: 0.351
Miles North of Rte. 145 (Chester Road) (0.3510 MI)
DESCRIPTION: 1,823RW
28526 -2PROJECT LENGTH: 0.3510 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 20,387
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,328Bridge Replacement: Federal
0 0 0 0 0 0 664Concession Funds: State
1,681 0 0 0 0 0 0CTB Formula: Bridge - State
0 0 0 51 0 0 0CTB Formula: High Priority - State
0 0 0 0 0 0 5,908NHPP: Bridge - Federal
0 0 0 0 0 0 1,477NHPP: Bridge - Soft Match
0 0 0 0 0 0 389Primary Formula: Federal
0 0 0 0 0 0 255Primary Formula: State
0 0 0 0 0 0 97Primary Formula: State Match
0 0 0 0 0 0 1,410Priority Transportation Funds: State
0 0 0 0 0 0 103Residue Parcel Revenue: State
0 0 0 0 0 0 317Revenue Sharing Funds: Local Match
0 0 0 0 0 0 317Revenue Sharing Funds: State Match
0 0 0 0 0 0 332Soft Match: Federal
102 0 0 812 882 100 0STP: Bridge - Federal
26 0 0 203 220 25 0STP: Bridge - Soft Match
1,814 0 0 252 8 755 120STP: Statewide - Federal
454 0 0 63 2 189 30STP: Statewide - Soft Match
0 0 0 1,381 1,112 4,077 1,069 12,748Total
MPO Area
Tri-CitiesPrimary
PROGRAM/SYSTEM
RTE 1 - INTERSECTION IMPROVEMENT
PROJECT
UPC NO.:
ROUTE:
73268
NFO0001
MPO Project.REPORT NOTE:
Underway
SCHEDULE
530
ESTIMATED COST (000's)
JURISDICTION:
Boydton Plank RoadSTREET NAME:
PEDinwiddie County
FY2015 1,408CN
UnderwayFROM: On Rte 226, 0.041 Mile East of Rte 600 TO:
Intersection Rte 1 (0.1350 MI)
DESCRIPTION: 922RW
PROJECT LENGTH: 0.1350 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 2,860
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,950RSTP (STP Regional): Federal
0 0 0 0 0 0 910RSTP (STP Regional): State Match
0 0 0 0 0 0 0 2,860Total
716 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
Tri-CitiesPrimary
PROGRAM/SYSTEM
RTE 1 - INSTALL NB RTL
PROJECT
UPC NO.:
ROUTE:
90367
NFO0001
MPO Project.REPORT NOTE:
Underway
SCHEDULE
135
ESTIMATED COST (000's)
JURISDICTION:
JEFFERSON DAVIS HIGHWAYSTREET NAME:
PEChesterfield County
FY2015 341CN
FY2015FROM: 0.10 MI S RTE 620 (WOODS EDGE RD) TO:
RTE 620 (WOODS EDGE RD) (0.1000 MI)
DESCRIPTION: 300RW
PROJECT LENGTH: 0.1000 MISCOPE OF WORK: Safety TO 776
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 293CMAQ: Federal
0 0 0 0 214 0 108CMAQ: MPO - Federal
0 0 0 0 53 0 31CMAQ: MPO - State Match
0 0 0 0 0 0 77CMAQ: State Match
0 0 0 0 267 0 0 509Total
MPO Area
Tri-CitiesPrimary
PROGRAM/SYSTEM
RTE 1 SOUTH - BRIDGE REPLACEMENT OVER
CSX RW
PROJECT
UPC NO.:
ROUTE:
93094
NFO0001
Complete
SCHEDULE
850
ESTIMATED COST (000's)
JURISDICTION:
BOYDTON PLANK ROAD S.STREET NAME:
PEDinwiddie County
Underway 5,526CN
UnderwayFROM: 0.19 MI. NORTH RTE. 657 W. TO: 0.61 MI.
NORTH RTE. 657 W. (0.5900 MI)
DESCRIPTION: 223RW
29850 -1PROJECT LENGTH: 0.5900 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 6,599
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 80Bond Match: State Bond Match
0 0 0 0 0 0 453Bridge Replacement: Federal
0 0 0 0 0 0 33Soft Match: Federal
2,785 0 0 1,235 426 380 0STP: Bridge - Federal
696 0 0 309 107 95 0STP: Bridge - Soft Match
0 0 0 1,544 533 3,482 475 566Total
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 1 - IMPROVE INTERSECTION
PROJECT
UPC NO.:
ROUTE:
101021
NFO0001
MPO Project. Excess funds to be redistributed by MPO.REPORT NOTE:
Complete
SCHEDULE
1,095
ESTIMATED COST (000's)
JURISDICTION:
Jefferson Davis HighwaySTREET NAME:
PEChesterfield County
Underway 3,084CN
UnderwayFROM: 0.18 Mi. S. Int. Route 1/Route 618 TO: 0.25 Mi. N.
Int. Route 1/Route 618 (0.4400 MI)
DESCRIPTION: 858RW
PROJECT LENGTH: 0.4400 MISCOPE OF WORK: Safety TO 5,036
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,180Local Project Contributions: Local
0 0 0 0 0 0 800RSTP (STP Regional): Federal
0 0 0 0 0 1,600 800RSTP (STP Regional): MPO - Federal
0 0 0 0 0 400 200RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 200RSTP (STP Regional): State Match
-144 0 0 0 0 0 2,000 3,180Total
11/12/2014 717
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
RTE 1 - ADD TRAFFIC SIGNAL AND TURN
LANES
PROJECT
UPC NO.:
ROUTE:
104661
NFO0001
Underway
SCHEDULE
1,000
ESTIMATED COST (000's)
JURISDICTION:
JFFERSON DAVIS HIGHWAYSTREET NAME:
PEChesterfield County
FY2017 4,500CN
FY2015FROM: 0.154 MI S RTE 620 (WOODS EDGE RD) TO:
0.082 MI N RTE 619 (HAPPY HII RD) (0.3870 MI)
DESCRIPTION: 1,500RW
PROJECT LENGTH: 0.3870 MISCOPE OF WORK: Safety TO 7,000
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
2,025 0 0 0 2,025 1,350 900Highway Safety Improvements: Federal
225 0 0 0 225 150 100Highway Safety Improvements: Soft Match
0 0 0 0 2,250 2,250 1,500 1,000Total
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 1 - UPGRADE SIGNAL TO PROVIDE
PEDESTRIAN ACCOMMODATION
PROJECT
UPC NO.:
ROUTE:
104665
NFO0001
Underway
SCHEDULE
200
ESTIMATED COST (000's)
JURISDICTION:
BROOK ROADSTREET NAME:
PEHenrico County
FY2017 500CN
FY2015FROM: 0.14 MI N VILLA PARK DR TO: 0.152 MI S VILLA
PARK DR (0.2920 MI)
DESCRIPTION: 150RW
PROJECT LENGTH: 0.2920 MISCOPE OF WORK: Safety TO 850
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 450 315Highway Safety Improvements: Federal
0 0 0 0 0 50 35Highway Safety Improvements: Soft Match
0 0 0 0 0 0 500 350Total
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
RTE 5 - VIRGNIA CAPITAL TRAIL - SHERWOOD
FOREST PHASE
PROJECT
UPC NO.:
ROUTE:
81562
NFO0005
VA Capital Trail Project.REPORT NOTE:
Underway
SCHEDULE
1,496
ESTIMATED COST (000's)
JURISDICTION:
Virginia Capital TrailSTREET NAME:
PECharles City County
Underway 11,364CN
UnderwayFROM: 2.26 Miles East of the Charles City Courthouse
TO: 0.4 miles west of the Chickahominy River (10.4000
MI)
DESCRIPTION: 239RW
29455,29456,29457,29458,29459,29460,29473,29474,29475,29476,29477,29478,29479,29480-1PROJECT LENGTH: 10.4000 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 13,099
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 674 0NHPP: Statewide - Federal
0 0 0 0 0 169 0NHPP: Statewide - Soft Match
0 0 0 0 0 0 10,068Open Container Funds: Statewide
0 0 0 0 0 0 138State: State Match
0 0 0 0 0 0 2,050Transportation Enhancement Funds:
Federal
0 0 0 0 0 0 843 12,256Total
718 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 5 - VIRGINIA CAPITAL TRAIL - NEW
MARKET HEIGHTS PHASE
PROJECT
UPC NO.:
ROUTE:
86279
NFO0005
VA Capital Trail Project. PE only; RW phase on UPC 93199; CN phase on UPC 102793.REPORT NOTE:
Underway
SCHEDULE
1,510
ESTIMATED COST (000's)
JURISDICTION:
Virginia Capital TrailSTREET NAME:
PERichmond District-wide
CN
FY2012FROM: Long Bridge Road TO: Rte 658 - Kimages Rd
(10.5000 MI)
DESCRIPTION: 0RW
PROJECT LENGTH: 10.5000 MISCOPE OF WORK: Safety TO 1,510
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,581Open Container Funds: Statewide -71
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 5 - VIRGINIA CAPITAL TRAIL - VARINA
PHASE
PROJECT
UPC NO.:
ROUTE:
86280
NFO0005
VA Capital Trail Project.REPORT NOTE:
Underway
SCHEDULE
2,323
ESTIMATED COST (000's)
JURISDICTION:
VIRGINIA CAPITAL TRAIL - VARINA PHASESTREET NAME:
PEHenrico County
Underway 10,154CN
UnderwayFROM: FR 0.52 MI W ALMOND CR TO 0.10 MI E WOOD
MILL RD TO: FR 0.16 MI W FOURMILE CR TO 0.14 MI W
LONG BRIDGE RD (8.0850 MI)
DESCRIPTION: 1,009RW
PROJECT LENGTH: 8.0850 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 13,486
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 440Open Container Funds: Bike/Ped
0 0 0 0 0 0 12,368Open Container Funds: Statewide
0 0 0 0 0 0 135State: State Match
0 0 0 0 0 0 542Transportation Enhancement Funds:
Federal
0 0 0 0 0 0 0 13,486Total
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
VIRGINIA CAPITAL TRAIL - RICHMOND EAST
PROJECT
UPC NO.:
ROUTE:
86429
NFO0005
VA Capital Trail Project. Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
200
ESTIMATED COST (000's)
JURISDICTION:
VIRGINIA CAPITAL TRAILSTREET NAME:
PERichmond District-wide
FY2014 1,144CN
FROM: Ash Street TO: Henrico County Line (0.5800 MI)DESCRIPTION: RW
PROJECT LENGTH: 0.5000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 1,344
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 463Open Container Funds: Statewide
0 0 0 0 0 0 970Primary Formula: Federal/State
-89 0 0 0 0 0 0 1,433Total
11/12/2014 719
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 5 - VIRGINIA CAPITAL TRAIL- CHARLES
CITY COURTHOUSE EAST
PROJECT
UPC NO.:
ROUTE:
91931
NFO0005
VA Capital Trail Project. Complete estimate and schedule requiredREPORT NOTE:
Underway
SCHEDULE
292
ESTIMATED COST (000's)
JURISDICTION:
Virginia Capital TrailSTREET NAME:
PECharles City County
Underway 0CN
FY2011FROM: 0.10 Mile South of Intersection Rte 5 & Rte 644
TO: 2.26 Mile East of Charles City Courthouse (2.3640 MI)
DESCRIPTION: 0RW
29451,29452,29453,29454 -1PROJECT LENGTH: 2.3640 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 292
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 470Open Container Funds: Statewide -178
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 5 - VIRGINIA CAPITAL TRAIL - PARK
PHASE
PROJECT
UPC NO.:
ROUTE:
103665
NFO0005
VA Capital Trail Project.REPORT NOTE:
Underway
SCHEDULE
628
ESTIMATED COST (000's)
JURISDICTION:
Virginia Capital TrailSTREET NAME:
PEHenrico County
Underway 6,957CN
UnderwayFROM: 0.10 MI E WOODMILL DR TO: 0.22 MI W ROCKY
HILL FARM DR (3.5000 MI)
DESCRIPTION: 125RW
PROJECT LENGTH: 3.5000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 7,710
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 7,710Open Container Funds: Statewide 0
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 6 - IMPROVE INTERSECTION
PROJECT
UPC NO.:
ROUTE:
101034
NFO0006
HB2 ADJUSTMENT
MPO Project. Balance of funds to be provided for by MPO.REPORT NOTE:
Underway
SCHEDULE
2,400
ESTIMATED COST (000's)
JURISDICTION:
PATTERSON AVENUESTREET NAME:
PEHenrico County
FY2019 6,600CN
FY2017FROM: 0.27 MI W RTE 7518 (PARHAM RD) TO: 0.42 MI
E RTE 7518 (PARHAM RD) (0.6900 MI)
DESCRIPTION: 5,000RW
PROJECT LENGTH: 0.6900 MISCOPE OF WORK: Safety TO 14,000
REQ'D AFTER
2020*FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 50Bond Proceeds: CPR Bonds
0 1,600 2,400 0 0 0 0CMAQ: MPO - Federal
0 400 600 0 0 0 0CMAQ: MPO - State Match
0 0 0 0 0 0 1,920RSTP (STP Regional): Federal
0 0 0 0 0 0 480RSTP (STP Regional): State Match
6,550 2,000 3,000 0 0 0 0 2,450Total
720 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 10 - UPGRADE SIGNALS - 4 INT
PROJECT
UPC NO.:
ROUTE:
77071
NFO0010
MPO Project.REPORT NOTE:
Complete
SCHEDULE
98
ESTIMATED COST (000's)
JURISDICTION:
Iron Bridge RoadSTREET NAME:
PEChesterfield County
Underway 316CNFROM: Beach Road (Rte 655) TO: Chesterfield Meadows
Road (Rte 929) (0.6402 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.6402 MISCOPE OF WORK: Safety TO 414
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 160CMAQ: Federal
0 0 0 0 0 0 40CMAQ: State Match
0 0 0 0 0 0 115(X) Maintenance Funds: Federal
0 0 0 0 0 0 99(X) Maintenance Funds: Statewide
0 0 0 0 0 0 0 415Total
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
ARRA - CHESTERFIELD - RTE 10 - WIDEN TO
SIX LANES
PROJECT
UPC NO.: 94857
FOARRA09
PE on UPC 80529, ARRA UPC 94857, ARRA-C UPC 95574REPORT NOTE:
FROM: I-95 TO: WARE BOTTOM SPRINGS ROAD
(1.0100 MI)
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 10,394American Recovery and Reinvestment Act:
Urbanized Area > 200K
0 0 0 0 0 0 286CMAQ: Federal
0 0 0 0 0 0 15CMAQ: State Match
0 0 0 0 0 0 245Demonstration Funds: Federal
0 0 0 0 0 0 11,000Local Project Contributions: Local
0 0 0 0 0 0 436Non-Formula: State Match
0 0 0 0 0 0 640Primary Formula: Federal
0 0 0 0 0 0 585Primary Formula: State
0 0 0 0 0 0 160Primary Formula: State Match
0 0 0 0 0 0 2,058RSTP (STP Regional): Federal
0 0 0 0 0 0 78RSTP (STP Regional): State Match
0 0 0 0 0 0 716SAFETEA-LU Earmarks: Federal
0 0 0 0 0 0 179SAFETEA-LU Earmarks: State Match
0 0 0 0 0 0 26,793Total
11/12/2014 721
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 10 - MAJOR WIDENING
PROJECT
UPC NO.:
ROUTE:
101020
FO0010
HB2 ADJUSTMENT
MPO Project. Revised schedule required. Balance to be provided by MPO.REPORT NOTE:
Underway
SCHEDULE
2,100
ESTIMATED COST (000's)
JURISDICTION:
WEST HNDRD/Meadowville/OLD BERMUDA HNDRD/RvrsBndSTREET NAME:
PEChesterfield County
FY2019 35,860CN
FY2015FROM: 1.73 mi. W of Rte. 618 (OLD BERMUDA
HUNDRED RD) TO: 0.27 mi. E of Rte. 618 (OLD
BERMUDA HUNDRED ROAD) (2.0000 MI)
DESCRIPTION: 7,250RW
PROJECT LENGTH: 2.0000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 45,210
REQ'D AFTER
2020*FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 6,412Bond Proceeds: CPR Bonds
0 0 0 0 0 0 8Non-Formula: State Match
0 0 0 0 0 0 589RSTP (STP Regional): Federal
0 0 0 8,000 3,300 0 0RSTP (STP Regional): MPO - Federal
0 0 0 2,000 825 0 0RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 139RSTP (STP Regional): State Match
23,937 0 0 10,000 4,125 0 0 7,148Total
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 10 - WIDEN TO 6 LANES
PROJECT
UPC NO.:
ROUTE:
102952
NFO0010
MPO Project.REPORT NOTE:
Underway
SCHEDULE
800
ESTIMATED COST (000's)
JURISDICTION:
WEST HUNDRED ROADSTREET NAME:
PEChesterfield County
FY2018 4,200CN
FY2016FROM: RTE 1 TO: RTE 95 (0.3500 MI)DESCRIPTION: 3,000RW
PROJECT LENGTH: 0.3500 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 8,000
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2,000Revenue Sharing Funds: Local Match
0 0 0 0 0 0 2,000Revenue Sharing Funds: State Match
1,200 0 0 0 1,600 0 400RSTP (STP Regional): MPO - Federal
300 0 0 0 400 0 100RSTP (STP Regional): MPO - State Match
0 0 0 0 2,000 1,500 0 4,500Total
722 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 10 - UPGRADE CROSSWALKS
PROJECT
UPC NO.:
ROUTE:
102957
NFO0010
MPO Project. Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
127
ESTIMATED COST (000's)
JURISDICTION:
WEST HUNDRED ROADSTREET NAME:
PEChesterfield County
FY2014 600CNFROM: RTE 616 (OSBORNE RD) TO: CHESTERTOWNE
RD (1.0000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 1.0000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 727
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 304CMAQ: Federal
0 0 0 0 0 0 160CMAQ: MPO - Federal
0 0 0 0 0 0 40CMAQ: MPO - State Match
0 0 0 0 0 0 76CMAQ: State Match
0 0 0 0 0 0 100Revenue Sharing Funds: Local Match
0 0 0 0 0 0 100Revenue Sharing Funds: State Match
-52 0 0 0 0 0 0 779Total
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 10 - PROVIDE BICYCLE
ACCOMMODATIONS
PROJECT
UPC NO.:
ROUTE:
104662
NFO0010
Underway
SCHEDULE
200
ESTIMATED COST (000's)
JURISDICTION:
IRONBRIDGE ROADSTREET NAME:
PEChesterfield County
FY2015 2,300CNFROM: RTE 749 (WOMACK RD) TO: 0.134 MI W RTE 1
(JEFFERSON DAVIS HWY) (2.4600 MI)
DESCRIPTION: RW
PROJECT LENGTH: 2.4600 MISCOPE OF WORK: Safety TO 2,500
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 2,070 180Highway Safety Improvements: Federal
0 0 0 0 0 230 20Highway Safety Improvements: Soft Match
0 0 0 0 0 0 2,300 200Total
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RT 10 - WIDENING
PROJECT
UPC NO.:
ROUTE:
104889
NFO0010
MPO Project. Balance of funds to be provided for by MPO.REPORT NOTE:
FY2019
SCHEDULE
1,300
ESTIMATED COST (000's)
JURISDICTION:
IRONBRIDGE ROADSTREET NAME:
PEChesterfield County
FY2024 8,700CN
FY2021FROM: WHITEPINE ROAD TO: FRITH LANE (1.3500 MI)DESCRIPTION: 2,000RW
PROJECT LENGTH: 1.3500 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 12,000
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 1,040 0 0 0 0RSTP (STP Regional): MPO - Federal
0 0 260 0 0 0 0RSTP (STP Regional): MPO - State Match
10,700 0 1,300 0 0 0 0 0Total
11/12/2014 723
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
RTE 13 - REPLACE BRIDGE
PROJECT
UPC NO.:
ROUTE:
105108
NFO0013
Revised schedule requiredREPORT NOTE:
Underway
SCHEDULE
500
ESTIMATED COST (000's)
JURISDICTION:
Old Bucking Ham RoadSTREET NAME:
PEPowhatan County
FY2017 972CN
FY2016DESCRIPTION: 322RW
PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 1,794
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 218 439 396 200 182 0STP: Bridge - Federal
0 54 110 99 50 46 0STP: Bridge - Soft Match
0 272 549 495 250 0 228 0Total
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
REALIGN INTERSECTION OF RTE 33 & RTE 54
PROJECT
UPC NO.:
ROUTE:
18948
NFO0033
MPO Project.REPORT NOTE:
Complete
SCHEDULE
1,140
ESTIMATED COST (000's)
JURISDICTION:
MOUNTAIN RDSTREET NAME:
PEHanover County
Underway 2,894CN
UnderwayFROM: 0.337 MILE WEST RELOC. RTE 54 TO: 0.174
MILE EAST RELOC. RTE 54 (0.5110 MI)
DESCRIPTION: 1,562RW
PROJECT LENGTH: 0.5110 MISCOPE OF WORK: Safety TO 5,596
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2,094CMAQ: Federal
0 0 0 0 0 0 853CMAQ: State Match
0 0 0 0 0 0 574Non-Formula: State Match
0 0 0 0 0 0 8Primary Formula: State
0 0 0 0 0 0 2,713RSTP (STP Regional): Federal
0 0 0 0 0 0 104RSTP (STP Regional): State Match
-750 0 0 0 0 0 0 6,346Total
724 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 33 - INTERSECTION IMPROVEMENT AT
RTE 623
PROJECT
UPC NO.:
ROUTE:
56181
FO0033
MPO Project. Excess funds to be redistributed by MPO.REPORT NOTE:
Underway
SCHEDULE
1,610
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHanover County
FY2017 4,788CN
UnderwayFROM: 0.05 MI S RTE 623 (ASHLAND RD) TO: 0.05 MI N
RTE 623 (ASHLAND RD) (0.1000 MI)
DESCRIPTION: 1,250RW
PROJECT LENGTH: 0.1000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 7,648
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 5CMAQ: Federal
0 0 494 1,180 0 0 0CMAQ: MPO - Federal
0 0 124 295 0 0 0CMAQ: MPO - State Match
0 0 0 0 0 0 1CMAQ: State Match
0 0 0 0 0 0 1,914Primary Formula: Federal
0 0 0 0 0 0 2,750Primary Formula: State
0 0 0 0 0 0 478Primary Formula: State Match
0 0 0 0 0 0 502Priority Transportation Funds: State
-95 0 618 1,475 0 0 0 5,650Total
MPO Area
Tri-CitiesPrimary
PROGRAM/SYSTEM
RTE 36 - IMPROVEMENTS AT FT. LEE
ENTRANCE
PROJECT
UPC NO.:
ROUTE:
104697
NFO0036
MPO Project.REPORT NOTE:
Underway
SCHEDULE
210
ESTIMATED COST (000's)
JURISDICTION:
OAKLAWN BOULEVARDSTREET NAME:
PEPrince George County
FY2016 911CN
FY2015FROM: SIEGE RD TO: 19TH ST (0.5700 MI)DESCRIPTION: 750RW
PROJECT LENGTH: 0.5700 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 1,871
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,778Demonstration Funds: Federal
75 0 0 0 0 0 0RSTP (STP Regional): MPO - Federal
19 0 0 0 0 0 0RSTP (STP Regional): MPO - State Match
0 0 0 0 0 93 0 1,778Total
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
RTE 40 - RECONSTRUCT SIDEWALK AND
PAVING
PROJECT
UPC NO.:
ROUTE:
104276
NFO0040
Underway
SCHEDULE
5
ESTIMATED COST (000's)
JURISDICTION:
S MAIN STREETSTREET NAME:
PEBlackstone
FY2017 93CNFROM: BAPTIST CHURCH @ IRVIN ST TO: CHURCH ST
(0.0800 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.0800 MISCOPE OF WORK: Safety TO 98
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 49Revenue Sharing Funds: Local Match
0 0 0 0 0 0 49Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 98Total
11/12/2014 725
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
RTE 46 - BRIDGE REPLACEMENT
PROJECT
UPC NO.:
ROUTE:
18949
NFO0046
Complete
SCHEDULE
928
ESTIMATED COST (000's)
JURISDICTION:
Christanna HighwaySTREET NAME:
PEBrunswick County
Underway 6,350CN
UnderwayFROM: 0.283 mi South of Meherrin River TO: 0.342 mi
North of Meherrin River (0.6250 MI)
DESCRIPTION: 266RW
3582,27387 -2,91PROJECT LENGTH: 0.6250 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 7,544
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 835Bond Match: State Bond Match
0 0 0 0 0 0 2,863Bridge Replacement: Federal
0 0 0 0 0 0 971Federal STP: Federal
0 0 0 0 0 0 670Primary Formula: Federal
0 0 0 0 0 0 200Primary Formula: Federal/State
0 0 0 0 0 0 313Primary Formula: State
0 0 0 0 0 0 167Primary Formula: State Match
0 0 0 0 0 0 61Priority Transportation Funds: State
0 0 0 0 0 0 22Residue Parcel Revenue: State
0 0 0 0 0 0 123Soft Match: Federal
0 0 0 0 0 0 1,054STP: Statewide - Federal
0 0 0 0 0 0 263STP: Statewide - Soft Match
0 0 0 0 0 0 0 7,544Total
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
RTE 46 - REPLACE BRIDGE OVER NOTTOWAY
RIVER (SPILLWAY)
PROJECT
UPC NO.:
ROUTE:
93093
NFO0046
Underway
SCHEDULE
1,100
ESTIMATED COST (000's)
JURISDICTION:
BRUNSWICK ROADSTREET NAME:
PEBrunswick County
FY2017 10,564CN
FY2015FROM: 1.326 MI N RTE 615 (CEDAR CREEK RD) TO:
0.266 MI S RTE 645 (JONESBORO RD) (0.8920 MI)
DESCRIPTION: 450RW
29538 -1PROJECT LENGTH: 0.8920 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 12,114
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 63Bond Match: State Bond Match
0 0 0 0 0 0 382Bridge Replacement: Federal
0 2,239 487 0 0 0 0CTB Formula: Bridge - State
0 0 0 0 0 0 498NHPP: Bridge - Federal
0 0 0 0 0 0 125NHPP: Bridge - Soft Match
0 0 0 0 0 0 33Soft Match: Federal
180 5,008 1,000 283 139 20 0STP: Bridge - Federal
45 1,252 250 71 35 5 0STP: Bridge - Soft Match
0 8,499 1,737 354 174 225 25 1,100Total
726 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 54 - IMPROVE INTERSECTION
PROJECT
UPC NO.:
ROUTE:
104275
NFO0054
Underway
SCHEDULE
141
ESTIMATED COST (000's)
JURISDICTION:
E PATRICK HENRY ROADSTREET NAME:
PEHanover County
FY2016 1,170CN
FY2015AT WOODSIDE LNDESCRIPTION: 330RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 1,641
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 141Local Project Contributions: Local
0 0 0 0 0 0 750Revenue Sharing Funds: Local Match
0 0 0 0 0 0 750Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 1,641Total
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
RTE 58 - OUTSTANDING R/W & CN
PROJECT
UPC NO.: 68973
NFOProject Report Req'd
FROM: DISTRICTWIDE (UPC'S 9879, 9880, 9882, 9883,
11314, 13734, TO: 13835, 16093, 10178, 15538, 50434 &
50435)
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,234Bond Proceeds: Rt 58 Bond CDP Funds
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 60 - UPGRADE SIGNALS AT VARIOUS
LOCATIONS
PROJECT
UPC NO.:
ROUTE:
101019
NFO0060
Complete
SCHEDULE
127
ESTIMATED COST (000's)
JURISDICTION:
MIDLOTHIAN TURNPIKESTREET NAME:
PEChesterfield County
Underway 625CN
UnderwayFROM: 0.054 MI,. W. STONEBRIDGE PLAZA AVE TO:
0.114 MI. E. STONEBRIDGE PLAZA AVE (0.1670 MI)
DESCRIPTION: 167RW
PROJECT LENGTH: 0.1670 MISCOPE OF WORK: Safety TO 919
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 885Highway Safety Improvements: Federal
0 0 0 0 0 0 98Highway Safety Improvements: State Match
-64 0 0 0 0 0 0 983Total
11/12/2014 727
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 60 - WIDEN TO 6 LANES
PROJECT
UPC NO.:
ROUTE:
102959
NFO0060
MPO Project. Excess funds to be redistributed by MPO.REPORT NOTE:
Underway
SCHEDULE
1,750
ESTIMATED COST (000's)
JURISDICTION:
MIDLOTHIAN TURNPIKESTREET NAME:
PEChesterfield County
FY2017 12,785CN
FY2015FROM: Rte. 727 (ALVERSER DR) TO: Rte. 677 (OLD
BUCKINGHAM RD) (1.2500 MI)
DESCRIPTION: 2,400RW
5014,5015 86,96PROJECT LENGTH: 1.2500 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Reconstruction w/ Added Capacity TO 16,935
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 6,451Revenue Sharing Funds: Local Match
0 0 0 0 0 0 6,451Revenue Sharing Funds: State Match
1,600 0 0 0 0 1,200 480RSTP (STP Regional): MPO - Federal
400 0 0 0 0 300 120RSTP (STP Regional): MPO - State Match
-67 0 0 0 0 2,000 1,500 13,502Total
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 60 - ADD DUAL LEFT TURN LANES AT RTE
645 (BRANCHWAY RD)
PROJECT
UPC NO.:
ROUTE:
103576
NFO0060
MPO Project.REPORT NOTE:
Complete
SCHEDULE
120
ESTIMATED COST (000's)
JURISDICTION:
MIDLOTHIAN TURNPIKESTREET NAME:
PEChesterfield County
Underway 733CNFROM: 0.043 MI EAST OF HUGUENOT RD. (RTE. 147)
TO: 0.147 MI EAST OF HUGUENOT RD. (RTE. 147)
(0.1040 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.1040 MISCOPE OF WORK: Safety TO 853
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 400CMAQ: MPO - Federal
0 0 0 0 0 0 100CMAQ: MPO - State Match
0 0 0 0 0 0 31Non-Formula: State Match
0 0 0 0 0 0 282RSTP (STP Regional): Federal
0 0 0 0 0 0 40RSTP (STP Regional): State Match
0 0 0 0 0 0 0 853Total
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
I64 CORR TECH US 60, SIGNAL COMM CAM -
JAMES CTY TO HENRICO
PROJECT
UPC NO.:
ROUTE:
105444
NFO0060
Underway
SCHEDULE
180
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PERichmond District-wide
CNFROM: Richmond Corp Limits TO: James City CL
(29.3300 MI)
DESCRIPTION: RW
PROJECT LENGTH: 29.3300 MISCOPE OF WORK: Safety TO 180
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
120 0 0 0 0 60 0CTB Formula: ITS - State 0
728 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 60 CORRIDOR EAST SPECIAL AREA PLAN
- POWHATAN CO
PROJECT
UPC NO.:
ROUTE:
106217
NFO0060
MPO Project.REPORT NOTE:
FY2015
SCHEDULE
150
ESTIMATED COST (000's)
JURISDICTION:
ANDERSON HIGHWAYSTREET NAME:
PEPowhatan County
CNFROM: RTE 678 (ROCKY OAK RD) TO: CHESTERFIELD
CO LN (6.6100 MI)
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Other TO 150
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 120 0RSTP (STP Regional): MPO - Federal
0 0 0 0 0 30 0RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 150 0Total
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 73 - INSTALL SIDEWALK AND CURB AND
GUTTER
PROJECT
UPC NO.:
ROUTE:
100561
NFO0073
Underway
SCHEDULE
90
ESTIMATED COST (000's)
JURISDICTION:
Parham RoadSTREET NAME:
PEHenrico County
FY2015 509CNFROM: 0.208 mi. WEST OF INT. WITH VILLA PARK DR
TO: 0.041 mi. EAST OF INT. WITH VILLA PARK DR
(0.2490 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.2490 MISCOPE OF WORK: Safety TO 599
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 539Highway Safety Improvements: Federal
0 0 0 0 0 0 60Highway Safety Improvements: State Match
0 0 0 0 0 0 0 599Total
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
ELECTRONIC TOLL CUSTOMER SERV. &
VIOLATION ENFORCEMENT SYS.
PROJECT
UPC NO.: 80330
NFOProject Report Req'd
AT THE POWHITE PARKWAY EXTENSIONDESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,047IFRO: State
11/12/2014 729
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
BRIDGE REPLACEMENT RTE 92 OVER
BUTCHERS CREEK (FED ID 11943)
PROJECT
UPC NO.:
ROUTE:
104955
NFO0092
Revised schedule required.REPORT NOTE:
FY2019
SCHEDULE
950
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEMecklenburg County
FY2021 2,640CN
FY2020FROM: 0.03 mi.from Rte. 797 TO: 0.07 mi. from Rte. 797DESCRIPTION: 250RW
PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 3,840
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 343 692 0 0 0 0STP: Bridge - Federal
0 86 173 0 0 0 0STP: Bridge - Soft Match
2,546 429 865 0 0 0 0 0Total
MPO Area
Tri-CitiesPrimary
PROGRAM/SYSTEM
RTE 106 - INTERSECTION IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
105110
NFO0106
MPO Project. Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
120
ESTIMATED COST (000's)
JURISDICTION:
COURTHOUSE ROADSTREET NAME:
PEPrince George County
FY2018 294CN
FY2017FROM: RTE 616 (LAUREL SPRINGS ROAD) TO: RTE
616 (LAUREL SPRINGS ROAD)
DESCRIPTION: 200RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 615
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 96RSTP (STP Regional): Federal
0 492 0 0 0 0 0RSTP (STP Regional): MPO - Federal
0 123 0 0 0 0 0RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 24RSTP (STP Regional): State Match
-120 615 0 0 0 0 0 120Total
MPO Area
Tri-CitiesPrimary
PROGRAM/SYSTEM
RTE 106 - ROUNDABOUT LIGHTING AND
IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
105170
NFO0106
State Funds - AC for future federal conversion.REPORT NOTE:
Underway
SCHEDULE
85
ESTIMATED COST (000's)
JURISDICTION:
COURTHOUSE ROADSTREET NAME:
PEPrince George County
FY2015 200CN
FROM: AT INT RTE 634 TO: AT INT RTE 634DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 285
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 582Primary Formula: State -297
730 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 106 - ARTERIAL ACCESS MANAGEMENT
PLAN
PROJECT
UPC NO.:
ROUTE:
106216
NFO0106
MPO Project.REPORT NOTE:
FY2015
SCHEDULE
130
ESTIMATED COST (000's)
JURISDICTION:
EMMAUS CHURCH ROADSTREET NAME:
PENew Kent County
CN
FROM: RTE 64 TO: 1.0 MI S RTE 64 (1.0000 MI)DESCRIPTION: RW
PROJECT LENGTH: 1.0000 MISCOPE OF WORK: Other TO 130
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 104 0RSTP (STP Regional): MPO - Federal
0 0 0 0 0 26 0RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 130 0Total
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
RTE 137 - REPLACE BRIDGE
PROJECT
UPC NO.:
ROUTE:
87617
NFO0137
Complete
SCHEDULE
123
ESTIMATED COST (000's)
JURISDICTION:
Dundas RoadSTREET NAME:
PELunenburg County
Underway 941CNFROM: 0.062 MI S. Int. RTE 645 TO: 0.023 MI S Int RTE
645 (0.0390 MI)
DESCRIPTION: RW
30043 98PROJECT LENGTH: 0.0390 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 1,064
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 115Bond Match: State Bond Match
0 0 0 0 0 0 461Minimum Guarantee: Federal
0 0 0 0 0 0 672Primary Formula: Federal
0 0 0 0 0 0 168Primary Formula: State Match
-353 0 0 0 0 0 0 1,417Total
MPO Area
Tri-CitiesPrimary
PROGRAM/SYSTEM
RTE 144 (TEMPLE AVE) - TURN LANE AT
DIMMOCK PKWY
PROJECT
UPC NO.:
ROUTE:
97691
NFO0144
MPO Project.REPORT NOTE:
Complete
SCHEDULE
105
ESTIMATED COST (000's)
JURISDICTION:
TEMPLE AVENUESTREET NAME:
PEColonial Heights
Underway 467CNFROM: 0.02 Miles West OF DIMMOCK PKWY
intersection TO: 0.13 Miles East DIMMOCK PKWY
intersection (0.1500 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.1500 MISCOPE OF WORK: Resurfacing TO 572
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 328CMAQ: Federal
0 0 0 0 0 0 80CMAQ: MPO - Federal
0 0 0 0 0 0 20CMAQ: MPO - State Match
0 0 0 0 0 0 82CMAQ: State Match
0 0 0 0 0 0 62Local Project Contributions: Local
0 0 0 0 0 0 0 572Total
11/12/2014 731
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
Tri-CitiesPrimary
PROGRAM/SYSTEM
RTE 144 (TEMPLE AVE) - EXTEND TURN LANE
AT CONDUIT RD
PROJECT
UPC NO.:
ROUTE:
98882
NFO0144
MPO Project. Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
65
ESTIMATED COST (000's)
JURISDICTION:
TEMPLE AVENUESTREET NAME:
PEColonial Heights
FY2014 343CNFROM: 0.05 Miles EAST OF CONDUIT RD TO: 0.17 Miles
EAST CONDUIT RD (0.2200 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.2200 MISCOPE OF WORK: Safety TO 408
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 92CMAQ: Federal
0 0 0 0 0 0 268CMAQ: MPO - Federal
0 0 0 0 0 0 67CMAQ: MPO - State Match
0 0 0 0 0 0 23CMAQ: State Match
-42 0 0 0 0 0 0 450Total
MPO Area
Tri-CitiesPrimary
PROGRAM/SYSTEM
RTE 144 (TEMPLE AVE) - SIGNAL
COORDINATION
PROJECT
UPC NO.:
ROUTE:
98883
NFO0144
MPO Project.REPORT NOTE:
Underway
SCHEDULE
100
ESTIMATED COST (000's)
JURISDICTION:
TEMPLE AVENUESTREET NAME:
PEColonial Heights
FY2018 395CN
FROM: RTE 1 TO: ECL COLONIAL HEIGHTS (2.0000 MI)DESCRIPTION: RW
PROJECT LENGTH: 2.0000 MISCOPE OF WORK: Safety TO 495
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 284 32 80 0CMAQ: MPO - Federal
0 0 0 71 8 20 0CMAQ: MPO - State Match
0 0 0 355 40 0 100 0Total
MPO Area
Tri-CitiesPrimary
PROGRAM/SYSTEM
RTE 144 - ADD TURN LANE
PROJECT
UPC NO.:
ROUTE:
98994
NFO0144
MPO Project.REPORT NOTE:
Complete
SCHEDULE
419
ESTIMATED COST (000's)
JURISDICTION:
HARROWGATE ROADSTREET NAME:
PEChesterfield County
Underway 1,126CN
UnderwayFROM: 0.062 MI S RTE 1141 (SOUTH ST) TO: 0.095 MI N
RTE 1141 (SOUTH ST) (0.2260 MI)
DESCRIPTION: 254RW
PROJECT LENGTH: 0.1570 MISCOPE OF WORK: Safety TO 1,798
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 168CMAQ: Federal
400 0 0 0 341 321 208CMAQ: MPO - Federal
100 0 0 0 85 80 52CMAQ: MPO - State Match
0 0 0 0 0 0 42CMAQ: State Match
0 0 0 0 427 500 401 470Total
732 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 144 - CONSTRUCT CURB, GUTTER &
SIDEWALK
PROJECT
UPC NO.:
ROUTE:
104291
NFO0144
Revised schedule requiredREPORT NOTE:
Underway
SCHEDULE
100
ESTIMATED COST (000's)
JURISDICTION:
HARROWGATE ROADSTREET NAME:
PEChesterfield County
FY2015 181CN
FY2014FROM: INT. OF RTE 1508 (SCHOOL STREET) TO: 08
MI N OF THE INT. OF RTE 1508 (SCHOOL STREET)
(0.0800 MI)
DESCRIPTION: 10RW
PROJECT LENGTH: 0.0800 MISCOPE OF WORK: Safety TO 291
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 300Revenue Sharing Funds: Local Match
0 0 0 0 0 0 300Revenue Sharing Funds: State Match
-309 0 0 0 0 0 0 600Total
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 147 - HUGUENOT BRIDGE -
REPLACEMENT
PROJECT
UPC NO.:
ROUTE:
16519
NFO0147
State Funds - AC for future federal conversion.REPORT NOTE:
Complete
SCHEDULE
5,668
ESTIMATED COST (000's)
JURISDICTION:
Huguenot RoadSTREET NAME:
PEHenrico County
Underway 46,290CN
UnderwayFROM: 0.20 MILE SOUTH RIVERSIDE ROAD TO: 0.20
MILE WEST RIVER ROAD (0.9560 MI)
DESCRIPTION: 2,289RW
26545 82PROJECT LENGTH: 0.9560 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/ Added Capacity TO 54,246
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 106Accounts Receivable: Local
0 0 0 0 0 0 2,030Bond Match: State Bond Match
0 0 0 0 0 0 14,929Bridge Replacement: Federal
0 0 0 0 0 0 2,613Concession Funds: State
0 0 0 0 0 0 387Federal STP: Federal
0 0 0 0 0 0 6,372NHPP: Bridge - Federal
0 0 0 0 0 0 1,593NHPP: Bridge - Soft Match
0 0 0 0 0 0 5,583NHPP: Statewide - Federal
0 0 0 0 0 0 1,396NHPP: Statewide - Soft Match
0 0 0 0 0 0 6,515Primary Formula: Federal
0 0 0 0 0 0 9,790Primary Formula: State
0 0 0 0 0 0 1,629Primary Formula: State Match
0 0 0 0 0 0 410Residue Parcel Revenue: State
0 0 0 0 0 0 1,299Soft Match: Federal
-403 0 0 0 0 0 0 54,650Total
11/12/2014 733
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 147 (HUGUENOT ROAD) - SPOT WIDENING
PROJECT
UPC NO.:
ROUTE:
90346
NFO0147
MPO project - excess funds to be redistributed by MPO.REPORT NOTE:
Underway
SCHEDULE
874
ESTIMATED COST (000's)
JURISDICTION:
HUGUENOT ROADSTREET NAME:
PEChesterfield County
FY2015 1,420CN
UnderwayFROM: ROUTE 60 (MIDLOTHIAN TURNPIKE) TO: ROUTE
727 (KOGER CENTER BLVD.) (0.4100 MI)
DESCRIPTION: 1,245RW
PROJECT LENGTH: 0.4100 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 3,539
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 3,215RSTP (STP Regional): Federal
0 0 0 0 0 0 804RSTP (STP Regional): State Match
-480 0 0 0 0 0 0 4,019Total
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 147 - SHOULDER WIDENING
PROJECT
UPC NO.:
ROUTE:
93216
NFO0147
Complete
SCHEDULE
90
ESTIMATED COST (000's)
JURISDICTION:
Huguenot RoadSTREET NAME:
PEChesterfield County
Underway 843CNFROM: SR 5400 Polo Parkway TO: SR 633 Forest Hill
Ave (2.5000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 2.5000 MISCOPE OF WORK: Safety TO 933
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 851Highway Safety Improvements: Federal
0 0 0 0 0 0 95Highway Safety Improvements: State Match
-12 0 0 0 0 0 0 946Total
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 155 - SAFETY SHOULDER & BICYCLE
ACCOMMODATION
PROJECT
UPC NO.:
ROUTE:
67939
NFO0155
MPO project.REPORT NOTE:
Complete
SCHEDULE
992
ESTIMATED COST (000's)
JURISDICTION:
Courthouse RoadSTREET NAME:
PENew Kent County
Underway 1,669CN
UnderwayFROM: 0.685 Mi South of Boulevard Rd (Route 629) TO:
0.876 Mi North of Route 60 WBL (Pocahontas Trail)
(1.6950 MI)
DESCRIPTION: 1,680RW
PROJECT LENGTH: 1.6950 MISCOPE OF WORK: Safety TO 4,341
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 271Non-Formula: State Match
0 0 0 0 0 0 0Primary Formula: State
0 0 0 0 0 0 2,866RSTP (STP Regional): Federal
0 0 0 0 0 20 762RSTP (STP Regional): MPO - Federal
0 0 0 0 0 5 191RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 446RSTP (STP Regional): State Match
-220 0 0 0 0 0 26 4,536Total
734 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 155 - COURTHOUSE TO COURTHOUSE
CONNECTOR - PE ONLY
PROJECT
UPC NO.:
ROUTE:
92652
NFO0155
MPO Project. Revised schedule required. Balance of funds to be provided for by MPO.REPORT NOTE:
Underway
SCHEDULE
1,359
ESTIMATED COST (000's)
JURISDICTION:
North Courthouse RoadSTREET NAME:
PENew Kent County
FY2019 3,936CN
FY2015FROM: RTE 1047 (OLD FORGE ROAD) TO: RTE 249
(NEW KENT COUNTY HIGHWAY) (5.1200 MI)
DESCRIPTION: 2,275RW
PROJECT LENGTH: 5.1200 MISCOPE OF WORK: Safety TO 7,570
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 119Non-Formula: State Match
0 0 0 0 0 0 4Primary Formula: State
0 0 0 0 0 0 1,053RSTP (STP Regional): Federal
0 0 0 0 0 0 140RSTP (STP Regional): State Match
6,253 0 0 0 0 0 0 1,317Total
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 155 - SHARED-USE PATH
PROJECT
UPC NO.:
ROUTE:
97688
NFO0155
MPO Project. Revised schedule required. Excess funds to be redistributed by MPO.REPORT NOTE:
Underway
SCHEDULE
180
ESTIMATED COST (000's)
JURISDICTION:
COURTHOUSE ROADSTREET NAME:
PECharles City County
FY2017 545CN
FY2016FROM: RTE 5 TO: RTE 602 (LOTT CARY RD) (1.4400 MI)DESCRIPTION: 188RW
PROJECT LENGTH: 1.4400 MISCOPE OF WORK: Safety TO 913
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 200RSTP (STP Regional): Federal
0 400 400 0 0 0 81RSTP (STP Regional): MPO - Federal
0 100 100 0 0 0 20RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 50RSTP (STP Regional): State Match
-439 500 500 0 0 0 0 351Total
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 155 - CONSTRUCT TRAIL
PROJECT
UPC NO.:
ROUTE:
106296
NFO0155
MPO Project.REPORT NOTE:
FY2020
SCHEDULE
400
ESTIMATED COST (000's)
JURISDICTION:
COURTHOUSE ROADSTREET NAME:
PECharles City County
CNFROM: RTE 602 (LOTT CARY RD) TO: NEW KENT CO
LN
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 400
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 320 0 0 0 0 0RSTP (STP Regional): MPO - Federal
0 80 0 0 0 0 0RSTP (STP Regional): MPO - State Match
0 400 0 0 0 0 0 0Total
11/12/2014 735
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
Tri-CitiesPrimary
PROGRAM/SYSTEM
RTE 156 - INTERSECTION IMPROVEMENT
PROJECT
UPC NO.:
ROUTE:
97635
NFO0156
Complete
SCHEDULE
302
ESTIMATED COST (000's)
JURISDICTION:
PRINCE GEORGE DRIVESTREET NAME:
PEPrince George County
Underway 844CN
UnderwayFROM: 0.145 MI SOUTH RTE 616 N TO: 0.092 MI.
NORTH RTE 616 N (0.2370 MI)
DESCRIPTION: 240RW
PROJECT LENGTH: 0.2370 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 1,385
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 8CMAQ: Federal
0 0 0 0 0 0 250CMAQ: MPO - Federal
0 0 0 0 0 0 63CMAQ: MPO - State Match
0 0 0 0 0 0 2CMAQ: State Match
0 0 0 0 0 0 256(S) Federal Formula STP: Federal
0 0 0 0 0 0 64(S) Federal Formula STP: State Bond Match
0 0 0 0 0 0 93Revenue Sharing Funds: Local Match
0 0 0 0 0 0 93Revenue Sharing Funds: State Match
0 0 0 0 0 0 479(S) Secondary Formula: Federal/State
0 0 0 0 0 0 28(S) Secondary Formula: State
0 0 0 0 0 0 545(S) Telecommunications: State
-498 0 0 0 0 0 0 1,883Total
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 157 - STUDY ONLY
PROJECT
UPC NO.:
ROUTE:
101023
NFO0157
HB2 ADJUSTMENT
Underway
SCHEDULE
2,000
ESTIMATED COST (000's)
JURISDICTION:
SPRINGFIELD ROADSTREET NAME:
PEHenrico County
N/A 0CN
N/AFROM: NUCKOLS RD TO: RTE 33 (STAPLES MILL RD)
(2.0400 MI)
DESCRIPTION: 0RW
PROJECT LENGTH: 2.0400 MISCOPE OF WORK: Preliminary Engineering TO 2,000
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,296Bond Proceeds: CPR Bonds
0 0 0 0 0 0 204Residue Parcel Revenue: State
500 0 0 0 0 0 0 1,500Total
736 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 249 - CONSTRUCT ROUNDABOUT
PROJECT
UPC NO.:
ROUTE:
52414
NFO0249
MPO Project.REPORT NOTE:
Underway
SCHEDULE
485
ESTIMATED COST (000's)
JURISDICTION:
NEW KENT HIGHWAYSTREET NAME:
PENew Kent County
FY2015 1,499CN
UnderwayFROM: 0.09 MI W RTE 612 TO: 0.115 MI E RTE 612
(0.1780 MI)
DESCRIPTION: 760RW
PROJECT LENGTH: 0.1780 MISCOPE OF WORK: Safety TO 2,744
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 393Non-Formula: State Match
0 0 0 0 0 0 1,895RSTP (STP Regional): Federal
0 0 0 0 0 300 0RSTP (STP Regional): MPO - Federal
0 0 0 0 0 75 0RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 81RSTP (STP Regional): State Match
0 0 0 0 0 0 374 2,369Total
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 250 - 4 LANE
PROJECT
UPC NO.:
ROUTE:
52448
NFO0250
MPO Project. PE & RW only. See ARRA UPC 94854 for CN phase.REPORT NOTE:
Underway
SCHEDULE
1,287
ESTIMATED COST (000's)
JURISDICTION:
Broad Street RoadSTREET NAME:
PEGoochland County
CN
UnderwayFROM: 0.226 MILE WEST INTERSECTION ROUTE 621
TO: 0.133 MILE EAST INTERSECTION ROUTE 623
WEST (0.8610 MI)
DESCRIPTION: 3,379RW
PROJECT LENGTH: 0.8610 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 4,666
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 610Non-Formula: State Match
0 0 0 0 0 0 28Non-Formula: Statewide
0 0 0 0 0 0 276Primary Formula: State
0 0 0 0 0 0 3,399RSTP (STP Regional): Federal
0 0 0 0 0 0 240RSTP (STP Regional): State Match
0 0 0 0 0 0 113RSTP (STP Regional): Statewide
0 0 0 0 0 0 0 4,666Total
11/12/2014 737
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
RTE 250 (BROAD STREET RD)- ACCELERATION
LANE AT RTE 632
PROJECT
UPC NO.:
ROUTE:
81242
NFO0250
Revised estimate required.REPORT NOTE:
Complete
SCHEDULE
155
ESTIMATED COST (000's)
JURISDICTION:
BROAD STREET ROADSTREET NAME:
PEGoochland County
Underway 381CN
UnderwayFROM: 0.055 Mi. E. Rte. 632 TO: 0.197 Mi. E. Rte. 632
(0.2410 MI)
DESCRIPTION: 351RW
PROJECT LENGTH: 0.2410 MISCOPE OF WORK: Safety TO 887
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 35Discretionary Grants: State Match
0 0 0 0 0 0 693Highway Safety Improvements: Federal
0 0 0 0 0 0 42Highway Safety Improvements: State Match
0 0 0 0 0 0 100Primary Formula: State
17 0 0 0 0 0 0 870Total
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
ARRA - GOOCHLAND 250 WIDEN TO 4 LANES
(MANAKIN TO HOCKETT)
PROJECT
UPC NO.: 94854
NFOARRA09
PE and RW on UPC 52448REPORT NOTE:
FROM: 0.226 MILE WEST INTERSECTION ROUTE 621
TO: 0.133 MILE EAST INTERSECTION ROUTE 623
WEST (0.8610 MI)
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 4,434American Recovery and Reinvestment Act:
Urbanized Area > 200K
0 0 0 0 0 0 73Non-Formula: State Match
0 0 0 0 0 0 342Primary Formula: Federal
0 0 0 0 0 0 60Primary Formula: State
0 0 0 0 0 0 85Primary Formula: State Match
0 0 0 0 0 0 293RSTP (STP Regional): Federal
0 0 0 0 0 0 5,287Total
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 250 - UPGRADE SIGNAL & ADD
SIDEWALK AT BETHLEHEM RD
PROJECT
UPC NO.:
ROUTE:
98381
NFO0250
Complete
SCHEDULE
95
ESTIMATED COST (000's)
JURISDICTION:
BROAD STREETSTREET NAME:
PEHenrico County
Underway 306CN
UnderwayFROM: 0.01 MI. WEST OF BETHLEHEM RD. TO: 0.07
MI. EAST OF BETHLEHEM RD. (0.0800 MI)
DESCRIPTION: 99RW
PROJECT LENGTH: 0.0600 MISCOPE OF WORK: Safety TO 500
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 471Highway Safety Improvements: Federal
0 0 0 0 0 0 52Highway Safety Improvements: State Match
0 0 0 0 0 0 0Primary Formula: State
0 0 0 0 0 0 1Safety Funds: Hazard Elimination
-24 0 0 0 0 0 0 524Total
738 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 250 - RECONSTRUCT MEDIAN AT
TUCKERNUCK DR
PROJECT
UPC NO.:
ROUTE:
98382
NFO0250
Complete
SCHEDULE
58
ESTIMATED COST (000's)
JURISDICTION:
BROAD STREETSTREET NAME:
PEHenrico County
Underway 65CNFROM: 0.14 MI. WEST OF TUCKERNUCK DR. TO: 0.05
MI. WEST OF TUCKERNUCK DR. (0.0900 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.0900 MISCOPE OF WORK: Safety TO 123
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 167Highway Safety Improvements: Federal
0 0 0 0 0 0 19Highway Safety Improvements: State Match
-63 0 0 0 0 0 0 186Total
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 250 - UPGRADE SIGNAL & ADD LIGHTING
AT WEST END DR
PROJECT
UPC NO.:
ROUTE:
98383
NFO0250
Complete
SCHEDULE
80
ESTIMATED COST (000's)
JURISDICTION:
BROAD STREETSTREET NAME:
PEHenrico County
Underway 359CN
UnderwayFROM: 0.11 MI. WEST OF WEST END DR. TO: 0.02 MI.
EAST OF WEST END DR. (0.0900 MI)
DESCRIPTION: 39RW
PROJECT LENGTH: 0.0900 MISCOPE OF WORK: Safety TO 478
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 464Highway Safety Improvements: Federal
0 0 0 0 0 0 52Highway Safety Improvements: State Match
-38 0 0 0 0 0 0 516Total
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
BROAD ST RD/RTE 288 INTERCHANGE
FEASIBILITY STUDY
PROJECT
UPC NO.:
ROUTE:
104090
NFO0250
MPO Project.REPORT NOTE:
Underway
SCHEDULE
200
ESTIMATED COST (000's)
JURISDICTION:
BROAD STREET ROADSTREET NAME:
PEGoochland County
CN
FROM: HENRICO COUNTY LINE TO: MILLS ROADDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Preliminary Engineering TO 200
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 160RSTP (STP Regional): MPO - Federal
0 0 0 0 0 0 40RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 0 200Total
11/12/2014 739
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 250 - PROVIDE PEDESTRIAN
ACCOMMODATIONS
PROJECT
UPC NO.:
ROUTE:
104666
NFO0250
Underway
SCHEDULE
200
ESTIMATED COST (000's)
JURISDICTION:
BROAD STREETSTREET NAME:
PEHenrico County
FY2016 800CN
N/AFROM: RICHMOND CITY LIMITS TO: I-64 INTERCHANGE
(1.9500 MI)
DESCRIPTION: 0RW
PROJECT LENGTH: 1.9500 MISCOPE OF WORK: Safety TO 1,000
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 720 180Highway Safety Improvements: Federal
0 0 0 0 0 80 20Highway Safety Improvements: Soft Match
0 0 0 0 0 0 800 200Total
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 288 - INTERCHANGE MODIFICATION AT
RTE 145
PROJECT
UPC NO.:
ROUTE:
90349
NFO0288
MPO Project. Excess funds to be redistributed by MPO.REPORT NOTE:
Complete
SCHEDULE
448
ESTIMATED COST (000's)
JURISDICTION:
World War II Veterans Memorial HighwaySTREET NAME:
PEChesterfield County
Underway 1,984CNFROM: RTE 288 TO: RTE 145 WB (Chester Road)
(0.2810 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.2810 MISCOPE OF WORK: New Construction Roadway TO 2,431
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2,096CMAQ: Federal
0 0 0 0 0 0 524CMAQ: State Match
-189 0 0 0 0 0 0 2,621Total
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE. 288 NB - PATCH AND OVERLAY -
CHESTERFIELD CO
PROJECT
UPC NO.:
ROUTE:
104491
NFO0288
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEChesterfield County
Underway 7,440CNFROM: RTE. 654 (BAILEY BRIDGE RD.) TO: RTE. 76
(POWHITE PARKWAY) (3.7600 MI)
DESCRIPTION: RW
PROJECT LENGTH: 3.7600 MISCOPE OF WORK: Resurfacing TO 7,440
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 400 0CTB Formula: Paving - Federal
0 0 0 0 0 100 0CTB Formula: Paving - Soft Match
3,405 0 0 0 3,536 0 0CTB Formula: Paving - State
0 0 0 0 0 0 0(X) Maintenance Funds: Statewide
0 0 0 0 3,536 3,405 500 0Total
740 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 288 - IMPROVE INTERCHANGE AT RTE 360
(PE ONLY)
PROJECT
UPC NO.:
ROUTE:
104862
NFO0288
HB2 ADJUSTMENT
Underway
SCHEDULE
2,000
ESTIMATED COST (000's)
JURISDICTION:
RTE 288STREET NAME:
PEChesterfield County
CNFROM: INTERCHANGE AREA AT RTE 360 (HULL ST)
TO: INTERCHANGE AREA AT RTE 360 (HULL ST)
(0.0100 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.0100 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 2,000
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,000Bond Proceeds: CPR Bonds
0 0 0 0 0 0 400NHPP: Statewide - Federal
0 0 0 0 0 0 100NHPP: Statewide - Soft Match
500 0 0 0 0 0 0 1,500Total
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 301 - REPLACE BRIDGE
PROJECT
UPC NO.:
ROUTE:
105107
NFO0301
Revised schedule requiredREPORT NOTE:
Underway
SCHEDULE
650
ESTIMATED COST (000's)
JURISDICTION:
Hanover Courthouse RoadSTREET NAME:
PEHanover County
FY2019 2,260CN
FY2017DESCRIPTION: 360RW
PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 3,270
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
800 1,068 0 0 0 0 0CTB Formula: Bridge - State
215 0 360 262 285 0 0STP: Bridge - Federal
54 0 90 65 71 0 0STP: Bridge - Soft Match
0 1,068 450 327 356 1,068 0 0Total
MPO Area
Tri-CitiesPrimary
PROGRAM/SYSTEM
RTE. 327 (HAYDEN ST) - REMOVE BRIDGE
PROJECT
UPC NO.:
ROUTE:
87618
NFO0327
Complete
SCHEDULE
235
ESTIMATED COST (000's)
JURISDICTION:
Hayden StreetSTREET NAME:
PEChesterfield County
Underway 779CN
UnderwayFROM: 0.010 MI West OF CARTER G. WOODSON AVE
TO: 0.054 MI EAST OF CARTER G. WOODSON AVE
(0.0640 MI)
DESCRIPTION: 431RW
23270 50PROJECT LENGTH: 0.0640 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 1,444
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 764Primary Formula: Federal
0 0 0 0 0 0 225Primary Formula: Federal/State
0 0 0 0 0 0 379Primary Formula: State
0 0 0 0 0 0 191Primary Formula: State Match
-115 0 0 0 0 0 0 1,559Total
11/12/2014 741
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 360 WIDENING
PROJECT
UPC NO.:
ROUTE:
13551
NFO0360
MPO Project. Excess funds to be redistributed by MPO.REPORT NOTE:
Underway
SCHEDULE
1,373
ESTIMATED COST (000's)
JURISDICTION:
Mechanicsville TurnpikeSTREET NAME:
PEHanover County
FY2018 9,692CN
UnderwayFROM: INT w/Wynbrook Lane (Rt 1133) TO: 0.2 Miles
East of Lee Davis Road (0.7700 MI)
DESCRIPTION: 3,247RW
PROJECT LENGTH: 0.7700 MISCOPE OF WORK: Safety TO 14,313
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 656CMAQ: Federal
0 0 1,200 800 432 0 0CMAQ: MPO - Federal
0 0 300 200 108 0 0CMAQ: MPO - State Match
0 0 0 0 0 0 164Primary Formula: State
0 0 0 0 0 0 1,809RSTP (STP Regional): Federal
0 0 3,440 800 352 800 1,195RSTP (STP Regional): MPO - Federal
0 0 860 200 88 200 299RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 452RSTP (STP Regional): State Match
-42 0 5,800 2,000 980 0 1,000 4,575Total
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 360 - WIDENING FROM 4 TO 6 & 8 LANES
PROJECT
UPC NO.:
ROUTE:
17768
NFO0360
Underway
SCHEDULE
2,455
ESTIMATED COST (000's)
JURISDICTION:
MECHANICSVILLE TURNPIKESTREET NAME:
PEHanover County
FY2015 5,055CN
UnderwayFROM: RTE 295N BRIDGE TO: RTE 1133 (WYNBROOK
LN) (0.6340 MI)
DESCRIPTION: 1,893RW
PROJECT LENGTH: 0.6340 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 9,403
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 425Bond Match: State Bond Match
0 0 0 0 0 0 989Concession Funds: State
0 0 0 0 0 0 1,620Federal STP: Federal
0 0 0 0 0 0 1,592Minimum Guarantee: Federal
0 0 0 0 0 0 1,930Primary Formula: Federal
0 0 0 0 0 0 3,687Primary Formula: State
0 0 0 0 0 0 483Primary Formula: State Match
0 0 0 0 0 0 2,223RSTP (STP Regional): Federal
0 0 0 0 0 0 556RSTP (STP Regional): State Match
-4,101 0 0 0 0 0 0 13,504Total
742 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
ROUTE 360 - BRIDGE REPLACEMENT
PROJECT
UPC NO.:
ROUTE:
17959
NFO0360
State Funds - AC for future federal conversion.REPORT NOTE:
Complete
SCHEDULE
1,077
ESTIMATED COST (000's)
JURISDICTION:
Mechanicsville TurnpikeSTREET NAME:
PERichmond District-wide
Underway 12,801CN
UnderwayFROM: 0.498 Mi. West of Hanover/Henrico Line TO: 0.164
Mi. East of Hanover/Henrico Line (0.6620 MI)
DESCRIPTION: 937RW
28896,28897,28898,28899 -2PROJECT LENGTH: 0.6620 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 14,815
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 40Bond Match: State Bond Match
0 0 0 0 0 0 6,212Bond Proceeds: CPR Bonds
0 0 0 0 0 0 260Bridge Replacement: Federal
6 0 0 0 0 0 0CTB Formula: Bridge - State
414 0 0 0 0 957 3,937NHPP: Bridge - Federal
104 0 0 0 0 239 984NHPP: Bridge - Soft Match
0 0 0 0 0 0 323Primary Formula: Federal
0 0 0 0 0 0 1,233Primary Formula: State
0 0 0 0 0 0 81Primary Formula: State Match
0 0 0 0 0 0 25Soft Match: Federal
0 0 0 0 0 523 1,196 13,096Total
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 360 - INTERSECTION RELOCATION
PROJECT
UPC NO.:
ROUTE:
18962
NFO0360
State Funds - AC for future federal conversion. Revised estimate required.REPORT NOTE:
Underway
SCHEDULE
1,044
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHanover County
FY2015 2,625CN
UnderwayFROM: 0.012 MI S RTE 360 TO: 0.333 MI S RTE 360
(0.3200 MI)
DESCRIPTION: 5,243RW
PROJECT LENGTH: 0.3200 MISCOPE OF WORK: Relocation TO 8,912
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 291Bond Match: State Bond Match
0 0 0 0 0 0 2,321Concession Funds: State
0 0 0 0 0 0 3,498Minimum Guarantee: Federal
0 0 0 0 0 0 477Primary Formula: Federal
0 0 0 0 0 0 203Primary Formula: State
0 0 0 0 0 0 119Primary Formula: State Match
0 0 0 0 0 0 647Priority Transportation Funds: State
1,357 0 0 0 0 0 0 7,555Total
11/12/2014 743
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 360 - WIDENING FROM 4 TO 6 LANES
PROJECT
UPC NO.:
ROUTE:
18963
FO0360
Revised estimate requiredREPORT NOTE:
Underway
SCHEDULE
3,123
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHanover County
CNFROM: 0.2 MILE EAST LEE DAVIS ROAD TO: WALNUT
GROVE ROAD
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 3,123
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 20Bond Match: State Bond Match
0 0 0 0 0 0 81Federal STP: Federal
0 0 0 0 0 0 179Minimum Guarantee: Federal
0 0 0 0 0 0 240Primary Formula: Federal
0 0 0 0 0 0 85Primary Formula: State
0 0 0 0 0 0 60Primary Formula: State Match
2,458 0 0 0 0 0 0 665Total
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 360 - ADD SIDEWALK
PROJECT
UPC NO.:
ROUTE:
93386
NFO0360
Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
175
ESTIMATED COST (000's)
JURISDICTION:
HULL STREETSTREET NAME:
PEChesterfield County
FY2014 525CNFROM: RTE 2023 (MOCKINGBIRD LA) TO: RTE 5655
(BRAD MCNEER PKY) (0.6000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.6000 MISCOPE OF WORK: Safety TO 700
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 873Highway Safety Improvements: Federal
0 0 0 0 0 0 97Highway Safety Improvements: State Match
-271 0 0 0 0 0 0 971Total
744 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 360 - WIDENING
PROJECT
UPC NO.:
ROUTE:
97687
NFO0360
MPO Project. Excess funds to be redistributed by MPO.REPORT NOTE:
Complete
SCHEDULE
1,300
ESTIMATED COST (000's)
JURISDICTION:
HULL STREET ROADSTREET NAME:
PEChesterfield County
Underway 9,350CN
UnderwayFROM: 0.284 MI. W. WOODLAKE VILLAGE PARKWAY
(RTE. 3600) TO: 0.431.MI. E. WOODLAKE VILLAGE
PARKWAY (RTE. 3600) (0.7150 MI)
DESCRIPTION: 1,800RW
5223,5229 81,97PROJECT LENGTH: 0.7150 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Reconstruction w/ Added Capacity TO 12,450
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 250Revenue Sharing Funds: Local Match
0 0 0 0 0 0 250Revenue Sharing Funds: State Match
0 0 0 0 0 0 3,040RSTP (STP Regional): Federal
1,600 0 0 0 1,800 800 2,360RSTP (STP Regional): MPO - Federal
400 0 0 0 450 200 590RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 760RSTP (STP Regional): State Match
-50 0 0 0 2,250 2,000 1,000 7,250Total
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 360 - UPGRADE SIGNAL
PROJECT
UPC NO.:
ROUTE:
100565
NFO0360
Revised schedule requiredREPORT NOTE:
Underway
SCHEDULE
155
ESTIMATED COST (000's)
JURISDICTION:
Mechanicsville TurnpikeSTREET NAME:
PEHanover County
FY2014 566CN
UnderwayFROM: INT. RTE 1108 AND RTE 360 BUSINESS TO: INT.
RTE 1108 AND RTE 360 BYPASS
DESCRIPTION: 50RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 771
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 21Discretionary Grants: State Match
0 0 0 0 0 0 738Highway Safety Improvements: Federal
0 0 0 0 0 0 61Highway Safety Improvements: State Match
0 0 0 0 0 0 1Primary Formula: State
0 0 0 0 0 0 9Safety Funds: Hazard Elimination
-59 0 0 0 0 0 0 830Total
11/12/2014 745
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 360 - WIDEN TO SIX LANES
PROJECT
UPC NO.:
ROUTE:
101022
NFO0360
MPO Project.REPORT NOTE:
Complete
SCHEDULE
500
ESTIMATED COST (000's)
JURISDICTION:
HULL STREET ROADSTREET NAME:
PEChesterfield County
Underway 1,509CN
UnderwayFROM: 0.093 MI EAST WARBRO ROAD (RTE 907) TO:
0.166 MI WEST GENITO ROAD (RTE 604) (0.8480 MI)
DESCRIPTION: 1,000RW
PROJECT LENGTH: 0.8480 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 3,009
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 400RSTP (STP Regional): Federal
0 0 0 0 0 407 1,600RSTP (STP Regional): MPO - Federal
0 0 0 0 0 102 400RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 100RSTP (STP Regional): State Match
0 0 0 0 0 0 509 2,500Total
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 360 - INTERSECTION IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
104886
NFO0360
MPO Project.REPORT NOTE:
FY2017
SCHEDULE
250
ESTIMATED COST (000's)
JURISDICTION:
HULL STREET ROADSTREET NAME:
PEChesterfield County
FY2021 2,300CN
FY2018FROM: 0.25 MILE WEST OF SPRING RUN ROAD TO:
0.25 MILE EAST OF SPRING RUN ROAD (0.5000 MI)
DESCRIPTION: 450RW
PROJECT LENGTH: 0.5000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 3,000
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 1,840 0 360 200 0 0CMAQ: MPO - Federal
0 460 0 90 50 0 0CMAQ: MPO - State Match
0 2,300 0 450 250 0 0 0Total
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTE 360 - WIDENING
PROJECT
UPC NO.:
ROUTE:
104890
NFO0360
MPO Project. Balance to be provided for by MPO.REPORT NOTE:
FY2019
SCHEDULE
800
ESTIMATED COST (000's)
JURISDICTION:
HULL STREET ROADSTREET NAME:
PEChesterfield County
FY2022 3,700CN
FY2020FROM: LONAS PARKWAY TO: CASTLE ROCK ROAD
(0.9000 MI)
DESCRIPTION: 1,000RW
PROJECT LENGTH: 0.9000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 5,500
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 800 640 0 0 0 0RSTP (STP Regional): MPO - Federal
0 200 160 0 0 0 0RSTP (STP Regional): MPO - State Match
3,700 1,000 800 0 0 0 0 0Total
746 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
RTE 360 - REPLACE BRIDGES
PROJECT
UPC NO.:
ROUTE:
104953
NFO0360
Revised schedule requiredREPORT NOTE:
FY2016
SCHEDULE
3,000
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEAmelia County
FY2020 8,252CN
FY2018DESCRIPTION: 2,000RW
PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 13,252
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 3,221 1,376 0 0 0 0NHPP: Bridge - Federal
0 805 344 0 0 0 0NHPP: Bridge - Soft Match
0 0 840 0 0 0 0STP: Bridge - Federal
0 0 210 0 0 0 0STP: Bridge - Soft Match
6,455 4,026 2,771 0 0 0 0 0Total
MPO Area
Tri-CitiesPrimary
PROGRAM/SYSTEM
RTE 460 - ADD LEFT TURN LANE WESTBOUND
AT RTE 657
PROJECT
UPC NO.:
ROUTE:
100499
NFO0460
MPO Project. Balance to be provided for by MPO.REPORT NOTE:
Underway
SCHEDULE
250
ESTIMATED COST (000's)
JURISDICTION:
COUNTY DRIVESTREET NAME:
PEPrince George County
FY2016 1,044CN
FY2015FROM: 0.102 MI. W OF RTE. 657 (Enterprise Drive) TO:
0.163 MI. E OF RTE. 657 (Enterprise Drive) (0.2700 MI)
DESCRIPTION: 939RW
PROJECT LENGTH: 0.2700 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 2,234
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 383CMAQ: Federal
490 0 0 0 124 16 136CMAQ: MPO - Federal
123 0 0 0 31 4 34CMAQ: MPO - State Match
0 0 0 0 0 0 96CMAQ: State Match
796 0 0 0 155 613 20 649Total
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
RTE 460B - ADD ACCELERATION LANE
PROJECT
UPC NO.:
ROUTE:
104116
NFO0460
Revised schedule required.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
COX ROAD (RTE 460 BUS)/RTE 460 BYPASSSTREET NAME:
PENottoway County
FY2014 1,500CNFROM: 0.116 MI S RTE 460 BYPASS TO: 0.315 MI E
RTE 460 BUS (0.4260 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.4260 MISCOPE OF WORK: Safety TO 1,500
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,500Bond Proceeds: CPR Bonds 0
11/12/2014 747
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
RTE 460 BUS - BRIDGE REPLACEMENT
PROJECT
UPC NO.:
ROUTE:
18964
NFO7460
Underway
SCHEDULE
1,150
ESTIMATED COST (000's)
JURISDICTION:
COX ROADSTREET NAME:
PENottoway County
FY2015 10,445CN
UnderwayFROM: 0.421MI S Rte 641 TO: 0.123 MI N Rte 641
(0.5450 MI)
DESCRIPTION: 710RW
28704 -2PROJECT LENGTH: 0.5450 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 12,305
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
2,525 0 0 4,531 1,759 0 0CTB Formula: Bridge - State
0 0 0 0 0 0 1,913Primary Formula: Federal
0 0 0 0 0 0 1,098Primary Formula: State
0 0 0 0 0 0 478Primary Formula: State Match
0 0 0 4,531 1,759 2,525 0 3,489Total
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
RTES. 145 & 632 MILL, PATCH, & OVERLAY
CHESTERFIELD CO.
PROJECT
UPC NO.:
ROUTE:
104493
NFO9999
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
CENTRALIA RD/CHALKEY RD./CHESTER RD.STREET NAME:
PEChesterfield County
Underway 1,381CN
FROM: 3 LOCATIONS TO: VARIOUS (4.4900 MI)DESCRIPTION: RW
PROJECT LENGTH: 4.4900 MISCOPE OF WORK: Restoration and Rehabilitation TO 1,381
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 331 0CTB Formula: Paving - Federal
0 0 0 0 0 83 0CTB Formula: Paving - Soft Match
967 0 0 0 0 0 0CTB Formula: Paving - State
0 0 0 0 0 0 0(X) Maintenance Funds: Statewide
0 0 0 0 0 967 414 0Total
MPO Area
RichmondPrimary
PROGRAM/SYSTEM
REPLACE SIGNALS - 3 INTERSECTIONS
PROJECT
UPC NO.:
ROUTE:
106293
NFO9999
PE & RW on UPC 104664.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
VARIOUSSTREET NAME:
PERichmond District-wide
FY2015 930CNFROM: HENRICO - 2 LOC ON RTE 33 TO:
CHESTERFIELD - 1 LOC ON RTE 637
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 930
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 837 0Highway Safety Improvements: Federal
0 0 0 0 0 93 0Highway Safety Improvements: Soft Match
0 0 0 0 0 0 930 0Total
748 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Primary
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
2014 PLANT MIX SCHEDULE SOUTH HILL
RESIDENCY (PRIMARY)
PROJECT
UPC NO.:
ROUTE:
104480
NFOPM4B
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEMecklenburg County
Underway 5,983CN
FROM: VARIOUS TO: VARIOUSDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Resurfacing TO 5,983
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 1,280 156 0CTB Formula: Paving - Federal
0 0 0 0 320 39 0CTB Formula: Paving - Soft Match
4,188 0 0 0 0 0 0CTB Formula: Paving - State
0 0 0 0 0 0 0(X) Maintenance Funds: Statewide
0 0 0 0 1,600 4,188 195 0Total
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
GENERAL R/W EXPENSES, VARIOUS
LOCATIONS DISTRICTWIDE
PROJECT
UPC NO.: 63839
NFOProject Report Req'd
DISTRICTWIDEDESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,167Primary Formula: State
11/12/2014 749
FY15 REVISED FINAL
FY2015-2020 Six-Year Improvement Program RICHMOND DISTRICTSecondary
PROJECT PROGRAM/SYSTEM
SecondaryRICHMOND DISTRICT SSYP
DESCRIPTION:
REQUIRED ALLOCATIONS (000's)
Total available secondary allocations by locality and fund source.
Fund Source NameCounty FY2016 FY2018 FY2019 FY2020FY2017 TotalFY2015
Amelia County
CTB Formula
167 174 161 159 98 18Unpaved - State 777
Telecommunications
38 38 38 38 38 38State 228
56 136 197 199 212 205Amelia County Total 1,005
Brunswick County
CTB Formula
72 75 70 69 42 8Unpaved - State 337
Telecommunications
51 51 51 51 51 51State 309
59 94 121 121 127 124Brunswick County Total 646
Charles City County
CTB Formula
6 6 5 5 3 1Unpaved - State 26
Telecommunications
22 22 22 22 22 22State 129
22 25 27 27 27 27Charles City County Total 155
Chesterfield County
CTB Formula
30 31 29 29 18 3Unpaved - State 140
Residue Parcel Revenue
0 0 0 0 0 59State 59
Telecommunications
945 945 945 945 945 945State 5,672
1,007 963 974 974 977 975Chesterfield County Total 5,871
Dinwiddie County
CTB Formula
145 151 140 139 85 16Unpaved - State 676
Telecommunications
83 83 83 83 83 83State 497
98 168 221 223 234 228Dinwiddie County Total 1,173
Goochland County
CTB Formula
16 17 16 15 10 2Unpaved - State 75
Telecommunications
64 64 64 64 64 64State 386
66 74 80 80 81 81Goochland County Total 461
Hanover County
Telecommunications
276 276 276 276 276 276State 1,658
276 276 276 276 276 276Hanover County Total 1,658
Henrico County
0 0 0 0 0 0Henrico County Total 0
750 11/12/2014
FY15 REVISED FINAL
FY2015-2020 Six-Year Improvement Program RICHMOND DISTRICTSecondary
PROJECT PROGRAM/SYSTEM
SecondaryRICHMOND DISTRICT SSYP
DESCRIPTION:
REQUIRED ALLOCATIONS (000's)
Total available secondary allocations by locality and fund source.
Fund Source NameCounty FY2016 FY2018 FY2019 FY2020FY2017 TotalFY2015
Lunenburg County
CTB Formula
230 239 222 220 135 25Unpaved - State 1,070
Telecommunications
38 38 38 38 38 38State 230
63 173 258 260 278 268Lunenburg County Total 1,300
Mecklenburg County
CTB Formula
281 293 272 268 165 30Unpaved - State 1,309
Telecommunications
77 77 77 77 77 77State 461
107 242 345 348 369 358Mecklenburg County Total 1,769
New Kent County
CTB Formula
44 46 42 42 26 5Unpaved - State 204
Telecommunications
56 56 56 56 56 56State 334
60 81 98 98 101 100New Kent County Total 538
Nottoway County
CTB Formula
62 64 59 59 36 7Unpaved - State 287
Telecommunications
36 36 36 36 36 36State 218
43 72 95 96 100 98Nottoway County Total 505
Powhatan County
CTB Formula
5 5 5 4 3 1Unpaved - State 22
Telecommunications
84 84 84 84 84 84State 502
84 86 88 88 89 88Powhatan County Total 524
Prince George County
Telecommunications
106 106 106 106 106 106State 636
106 106 106 106 106 106Prince George County Total 636
Grand Total 2,935 2,977 2,898 2,886 2,497 2,049 16,242
11/12/2014 751
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 609 - BRIDGE & APPROACHES OVER
APPOMATTOX RIVER
PROJECT
UPC NO.:
ROUTE:
87943
NFO0609
Complete
SCHEDULE
920
ESTIMATED COST (000's)
JURISDICTION:
ROYALTON ROADSTREET NAME:
PEAmelia County
Underway 5,880CN
UnderwayFROM: 0.25 MI S OF AMELIA/POWHATAN CO LINE TO:
0.28 MI N OF AMELIA/POWHATAN CO LINE (0.5320 MI)
DESCRIPTION: 39RW
29424 -1PROJECT LENGTH: 0.5320 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 6,838
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 313Bond Match: State Bond Match
0 0 0 0 0 0 122Bond Proceeds: CPR Bonds
0 0 0 0 0 0 1,511Bridge Replacement: Federal
0 0 0 0 0 0 242(S) Federal Formula STP: Federal
0 0 0 0 0 0 61(S) Federal Formula STP: State Bond Match
0 0 0 0 0 0 159(S) Secondary Formula: Federal
0 0 0 0 0 0 321(S) Secondary Formula: Federal/State
0 0 0 0 0 0 40(S) Secondary Formula: State Match
0 0 0 0 0 0 65Soft Match: Federal
0 0 0 0 0 218 0STP: Bridge - Federal
0 0 0 0 0 54 0STP: Bridge - Soft Match
39 0 0 0 0 1,240 1,676STP: BROS - Federal
10 0 0 0 0 310 419STP: BROS - Soft Match
0 0 0 0 0 0 41(S) Telecommunications: State
0 0 0 0 0 49 1,821 4,968Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 617 - BRIDGE REPLACEMENT OVER
SAILORS CREEK
PROJECT
UPC NO.:
ROUTE:
84738
NFO0617
Complete
SCHEDULE
332
ESTIMATED COST (000's)
JURISDICTION:
SAYLERS CREEK ROADSTREET NAME:
PEAmelia County
Underway 777CNFROM: 1.450 MILE SOUTH OF RTE 618 TO: 1.497 MILE
SOUTH OF RTE 618 (0.0470 MI)
DESCRIPTION: RW
29291 81PROJECT LENGTH: 0.0470 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 1,109
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 60Bond Match: State Bond Match
0 0 0 0 0 0 240Bridge Replacement: Federal
0 0 0 0 0 0 382(S) Federal Formula STP: Federal
0 0 0 0 0 0 54(S) Federal Formula STP: State Bond Match
0 0 0 0 0 0 89(S) Secondary Formula: Federal
0 0 0 0 0 0 211(S) Secondary Formula: Federal/State
0 0 0 0 0 0 64(S) Secondary Formula: State Match
0 0 0 0 0 0 2(S) SSYP - Incidental: Federal
0 0 0 0 0 0 8(S) Telecommunications: State
0 0 0 0 0 0 0 1,109Total
752 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 620 - BRIDGE REPLACEMENT
PROJECT
UPC NO.:
ROUTE:
91755
NFO0620
Underway
SCHEDULE
705
ESTIMATED COST (000's)
JURISDICTION:
STONEY POINT ROADSTREET NAME:
PEAmelia County
FY2015 1,305CN
UnderwayFROM: 1.567 MI N OF RTE 621 TO: 1.642 MI N OF RTE
621 (0.0620 MI)
DESCRIPTION: 119RW
29563 -1PROJECT LENGTH: 0.0740 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/ Added Capacity TO 2,129
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 22Bond Match: State Bond Match
0 0 0 0 0 0 366Bridge Replacement: Federal
0 0 0 0 0 0 50(S) Federal Formula STP: Federal
0 0 0 0 0 0 12(S) Federal Formula STP: State Bond Match
0 0 0 0 0 0 365(S) Secondary Formula: Federal/State
0 0 0 0 0 0 293(S) Secondary Formula: State
0 0 0 0 0 0 70Soft Match: Federal
0 0 0 0 0 0 124(S) State Formula: Secondary - Unpaved
0 0 0 0 177 57 0STP: Bridge - Federal
0 0 0 0 44 14 0STP: Bridge - Soft Match
392 0 0 0 55 30 75STP: BROS - Federal
98 0 0 0 14 7 19STP: BROS - Soft Match
0 0 0 0 0 0 37(S) Telecommunications: State
-192 0 0 0 290 490 108 1,433Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 660 - RURAL RUSTIC
PROJECT
UPC NO.:
ROUTE:
104200
NFO0660
Complete
SCHEDULE
5
ESTIMATED COST (000's)
JURISDICTION:
MILLS LANESTREET NAME:
PEAmelia County
Underway 108CNFROM: RTE 704 (MILLS CT) TO: END STATE
MAINTENANCE (0.9500 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.9500 MISCOPE OF WORK: Resurfacing TO 113
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 56Revenue Sharing Funds: Local Match
0 0 0 0 0 0 56Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 113Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 666 - RURAL RUSTIC
PROJECT
UPC NO.:
ROUTE:
104199
NFO0666
Complete
SCHEDULE
5
ESTIMATED COST (000's)
JURISDICTION:
CEDAR LANESTREET NAME:
PEAmelia County
Underway 102CNFROM: RTE 614 (DENNISVILLE RD) TO: END STATE
MAINTENANCE (0.9000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.9000 MISCOPE OF WORK: Resurfacing TO 107
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 54Revenue Sharing Funds: Local Match
0 0 0 0 0 0 54Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 107Total
11/12/2014 753
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 667 - PAVE UNPAVED ROAD
PROJECT
UPC NO.:
ROUTE:
105697
NFO0667
FY2015
SCHEDULE
5
ESTIMATED COST (000's)
JURISDICTION:
HAW BRANCH LANESTREET NAME:
PEAmelia County
FY2016 140CN
FROM: 1.00 ME 681 TO: DEAD END (0.9100 MI)DESCRIPTION: RW
PROJECT LENGTH: 1.0000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 145
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 73 0Revenue Sharing Funds: Local Match
0 0 0 0 0 73 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 145 0Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 680 - RURAL RUSTIC
PROJECT
UPC NO.:
ROUTE:
104206
NFO0680
Complete
SCHEDULE
2
ESTIMATED COST (000's)
JURISDICTION:
MAXEY LANESTREET NAME:
PEAmelia County
Underway 54CNFROM: RTE 614 (DENNISVILLE RD) TO: END STATE
MAINTENANCE (0.4500 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.4500 MISCOPE OF WORK: Resurfacing TO 56
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 28Revenue Sharing Funds: Local Match
0 0 0 0 0 0 28Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 56Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 683 - RURAL RUSTIC
PROJECT
UPC NO.:
ROUTE:
104210
NFO0683
Complete
SCHEDULE
5
ESTIMATED COST (000's)
JURISDICTION:
CHULA SCHOOL LANESTREET NAME:
PEAmelia County
Underway 74CNFROM: RTE 705 (MT OLIVE LN) TO: END STATE
MAINTENANCE (0.6500 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.6500 MISCOPE OF WORK: Resurfacing TO 79
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 39Revenue Sharing Funds: Local Match
0 0 0 0 0 0 39Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 79Total
754 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 684 - PAVE UNPAVED ROAD
PROJECT
UPC NO.:
ROUTE:
105696
NFO0684
FY2015
SCHEDULE
5
ESTIMATED COST (000's)
JURISDICTION:
MORRIS LANESTREET NAME:
PEAmelia County
FY2016 98CNFROM: 658 DRUNKARD LANE TO: END LANE (0.5400
MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.7000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 103
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 52 0Revenue Sharing Funds: Local Match
0 0 0 0 0 52 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 103 0Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 688 - PAVE UNPAVED ROAD
PROJECT
UPC NO.:
ROUTE:
105698
NFO0688
FY2015
SCHEDULE
5
ESTIMATED COST (000's)
JURISDICTION:
SHADY LANESTREET NAME:
PEAmelia County
FY2016 84CN
FROM: 616 GENITO ROAD TO: DEAD END (0.6000 MI)DESCRIPTION: RW
PROJECT LENGTH: 0.6000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 89
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 45 0Revenue Sharing Funds: Local Match
0 0 0 0 0 45 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 89 0Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 689 - RURAL RUSTIC
PROJECT
UPC NO.:
ROUTE:
104208
NFO0689
Complete
SCHEDULE
2
ESTIMATED COST (000's)
JURISDICTION:
FLIPPEN LANESTREET NAME:
PEAmelia County
Underway 48CNFROM: DENNISVILLE RD (RTE 614) TO: END STATE
MAINTENANCE (0.4000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.4000 MISCOPE OF WORK: Resurfacing TO 50
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 25Revenue Sharing Funds: Local Match
0 0 0 0 0 0 25Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 50Total
11/12/2014 755
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 695 - RURAL RUSTIC
PROJECT
UPC NO.:
ROUTE:
104209
NFO0695
Complete
SCHEDULE
2
ESTIMATED COST (000's)
JURISDICTION:
FLINN LANESTREET NAME:
PEAmelia County
Underway 48CNFROM: RTE 607 (WEST CREEK RD) TO: END STATE
MAINTENANCE (0.4000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.4000 MISCOPE OF WORK: Resurfacing TO 50
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 25Revenue Sharing Funds: Local Match
0 0 0 0 0 0 25Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 50Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 704 - RURAL RUSTIC
PROJECT
UPC NO.:
ROUTE:
104201
NFO0704
Complete
SCHEDULE
2
ESTIMATED COST (000's)
JURISDICTION:
MILLS COURTSTREET NAME:
PEAmelia County
Underway 37CNFROM: RTE 660 (MILLS LN) TO: END STATE
MAINTENANCE (0.3000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.3000 MISCOPE OF WORK: Resurfacing TO 39
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 20Revenue Sharing Funds: Local Match
0 0 0 0 0 0 20Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 39Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 710 - RURAL RUSTIC
PROJECT
UPC NO.:
ROUTE:
104211
NFO0710
Complete
SCHEDULE
2
ESTIMATED COST (000's)
JURISDICTION:
HILLS LANESTREET NAME:
PEAmelia County
Underway 20CNFROM: RTE 683 (CHULA SCHOOL LN) TO: END STATE
MAINTENANCE (0.1500 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.1500 MISCOPE OF WORK: Resurfacing TO 22
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 11Revenue Sharing Funds: Local Match
0 0 0 0 0 0 11Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 22Total
756 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 714 - PAVE UNPAVED ROAD
PROJECT
UPC NO.:
ROUTE:
105699
NFO0714
FY2015
SCHEDULE
5
ESTIMATED COST (000's)
JURISDICTION:
PRIDES LANESTREET NAME:
PEAmelia County
FY2016 70CNFROM: 681 PRIDESVILLE ROAD TO: DEAD END (0.5000
MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.5000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 75
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 38 0Revenue Sharing Funds: Local Match
0 0 0 0 0 38 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 75 0Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 717 - RURAL RUSTIC
PROJECT
UPC NO.:
ROUTE:
104207
NFO0717
Complete
SCHEDULE
2
ESTIMATED COST (000's)
JURISDICTION:
HALL ROADSTREET NAME:
PEAmelia County
Underway 26CNFROM: RTE 614 (DENNISVILLE RD) TO: END STATE
MAINTENANCE (0.2000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.2000 MISCOPE OF WORK: Resurfacing TO 28
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 14Revenue Sharing Funds: Local Match
0 0 0 0 0 0 14Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 28Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 735 - PAVE UNPAVED ROAD
PROJECT
UPC NO.:
ROUTE:
105695
NFO0735
FY2015
SCHEDULE
5
ESTIMATED COST (000's)
JURISDICTION:
BAILEY LANESTREET NAME:
PEAmelia County
FY2016 66CNFROM: 681 CLEMENTOWN ROAD TO: DEAD END
(0.4700 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.4700 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 71
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 35 0Revenue Sharing Funds: Local Match
0 0 0 0 0 35 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 71 0Total
11/12/2014 757
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RURAL ADDITION FOR BRUNSWICK COUNTY
(RS FY13)
PROJECT
UPC NO.:
ROUTE:
102923
NFO
Underway
SCHEDULE
2
ESTIMATED COST (000's)
JURISDICTION:
JOHNSON RUN ROADSTREET NAME:
PEBrunswick County
FY2015 48CNFROM: BRUNSWICK/GREENSVILLE COUNTY LINE TO:
END OF STATE MAINTENANCE (0.2000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 1.2000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 50
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 50Revenue Sharing Funds: Local Match
0 0 0 0 0 0 50Revenue Sharing Funds: State Match
0 0 0 0 0 0 1(S) Telecommunications: State
-51 0 0 0 0 0 0 101Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
BRIDGE ( FED ID 3658) RTE 609 OVER
NOTTOWAY RIVER
PROJECT
UPC NO.:
ROUTE:
105490
NFO0609
FY2018
SCHEDULE
314
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEBrunswick County
FY2020 1,568CN
FY2019DESCRIPTION: 209RW
PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/ Added Capacity TO 2,090
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 500 254 80 0 0 0STP: BROS - Federal
0 125 64 20 0 0 0STP: BROS - Soft Match
1,047 625 318 100 0 0 0 0Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 630 - BRIDGE REPLACEMENT
PROJECT
UPC NO.:
ROUTE:
101241
NFO0630
.REPORT NOTE:
FY2017
SCHEDULE
200
ESTIMATED COST (000's)
JURISDICTION:
Waqua Creek RoadSTREET NAME:
PEBrunswick County
FY2019 1,125CN
FY2018FROM: APPROACHES AND BRIDGE OVER WAQUA
CREEK (STR 6033) TO: APPROACHES AND BRIDGE
OVER WAQUA CREEK (STR 6033) (4.0300 MI)
DESCRIPTION: 100RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 1,425
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 740 60 40 300 0 0STP: BROS - Federal
0 185 15 10 75 0 0STP: BROS - Soft Match
0 925 75 50 375 0 0 0Total
758 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 642 - PAVE UNPAVED ROAD
PROJECT
UPC NO.:
ROUTE:
105700
NFO0642
FY2015
SCHEDULE
2
ESTIMATED COST (000's)
JURISDICTION:
ZERO ROADSTREET NAME:
PEBrunswick County
FY2016 48CNFROM: INTERSECTION OF RTE 643, FLAT TOCK ROAD
TO: .4 MI NORTH OF RTE 643, FLAT ROCK ROAD
(0.4000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.4000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 50
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 25 0Revenue Sharing Funds: Local Match
0 0 0 0 0 25 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 50 0Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 712 - BRIDGE REPLACEMENT
PROJECT
UPC NO.:
ROUTE:
77053
NFO0712
Underway
SCHEDULE
765
ESTIMATED COST (000's)
JURISDICTION:
OLD STAGE ROADSTREET NAME:
PEBrunswick County
FY2015 3,355CN
UnderwayFROM: 1.617 MI. S. Rte. 85 TO: 1.9 MI. S. Rte. 85
(0.2830 MI)
DESCRIPTION: 96RW
PROJECT LENGTH: 0.2830 MISCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 4,216
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 58Bridge Replacement: Federal
0 0 0 0 0 0 224(S) Federal Formula STP: Federal
0 0 0 0 0 0 48(S) Federal Formula STP: State Bond Match
0 0 0 0 0 0 140(S) Secondary Formula: Federal
0 0 0 0 0 0 43(S) Secondary Formula: State Match
0 0 0 0 0 0 15Soft Match: Federal
1,133 0 0 0 968 765 168STP: Bridge - Federal
283 0 0 0 242 191 42STP: Bridge - Soft Match
0 0 0 0 0 0 9(S) Telecommunications: State
-111 0 0 0 1,210 1,416 956 746Total
11/12/2014 759
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 712 - APPROACHES & BRIDGE OVER
STURGEON CREEK
PROJECT
UPC NO.:
ROUTE:
85441
NFO0712
Underway
SCHEDULE
711
ESTIMATED COST (000's)
JURISDICTION:
OLD STAGE ROADSTREET NAME:
PEBrunswick County
FY2015 2,200CN
UnderwayFROM: 0.131 MI S STURGEON CR TO: 0.113 MI N
STURGEON CR (0.2200 MI)
DESCRIPTION: 144RW
29521 -1PROJECT LENGTH: 0.2440 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 3,055
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 42Bond Match: State Bond Match
0 0 0 0 0 0 666Bridge Replacement: Federal
0 0 0 0 0 0 125Soft Match: Federal
564 0 0 538 233 630 0STP: Bridge - Federal
141 0 0 135 58 158 0STP: Bridge - Soft Match
0 0 0 0 0 0 1(S) Telecommunications: State
-235 0 0 673 291 705 788 834Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 715 - BRIDGE REPLACEMENT
PROJECT
UPC NO.:
ROUTE:
93091
NFO0715
Underway
SCHEDULE
700
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEBrunswick County
FY2018 3,514CN
FY2018At Meherrin River (0.1400 MI)DESCRIPTION: 104RW
PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 4,319
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 600 565 0 0 0 0CTB Formula: Bridge - State
219 992 294 285 80 225 0STP: Bridge - Federal
55 248 73 71 20 56 0STP: Bridge - Soft Match
535 1,840 932 356 100 273 282 0Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 607 - MINOR WIDENING
PROJECT
UPC NO.:
ROUTE:
59166
NFO0607
MPO Project.REPORT NOTE:
Underway
SCHEDULE
500
ESTIMATED COST (000's)
JURISDICTION:
WAYSIDE ROADSTREET NAME:
PECharles City County
FY2017 1,096CN
UnderwayFROM: 0.035 Miles East Rte 639 (The New Road) TO:
0.518 Miles East Rte 639 (The New Road) (0.4830 MI)
DESCRIPTION: 535RW
PROJECT LENGTH: 0.4830 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 2,131
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 252Non-Formula: State Match
0 0 0 0 0 0 1,946RSTP (STP Regional): Federal
0 0 0 0 0 0 234RSTP (STP Regional): State Match
-301 0 0 0 0 0 0 2,433Total
760 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 609 - RECONSTRUCTION
PROJECT
UPC NO.:
ROUTE:
85337
NFO0609
MPO Project. Revised schedule required. Balance to be provided by MPO.REPORT NOTE:
Underway
SCHEDULE
665
ESTIMATED COST (000's)
JURISDICTION:
BARNETTS ROADSTREET NAME:
PECharles City County
FY2015 823CN
FY2014FROM: RTE 602 (LOTT CARY RD) TO: RTE 603 (OLD
UNION RD) (0.2400 MI)
DESCRIPTION: 802RW
PROJECT LENGTH: 1.1900 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 2,290
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,779RSTP (STP Regional): Federal
0 0 0 0 0 0 445RSTP (STP Regional): State Match
66 0 0 0 0 0 0 2,224Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
ROUTE 618 - MULTI-USE TRAIL
PROJECT
UPC NO.:
ROUTE:
102507
NFO0618
MPO Project. Excess funds to be redistributed by MPO. Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
185
ESTIMATED COST (000's)
JURISDICTION:
WILCOX WHARF ROADSTREET NAME:
PECharles City County
FY2014 509CN
UnderwayFROM: ROUTE 5 TO: 0.801 MI. S. RTE 5 (0.8010 MI)DESCRIPTION: 54RW
PROJECT LENGTH: 0.8010 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 748
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 63Non-Formula: State Match
0 0 0 0 0 0 712RSTP (STP Regional): Federal
0 0 0 0 0 0 115RSTP (STP Regional): State Match
-142 0 0 0 0 0 0 890Total
MPO Area
Tri-CitiesSecondary
PROGRAM/SYSTEM
RTE 600 - REALIGN INTERSECTION
PROJECT
UPC NO.:
ROUTE:
101028
NFO0600
MPO Project. Excess funds to be redistributed by MPO.REPORT NOTE:
Underway
SCHEDULE
254
ESTIMATED COST (000's)
JURISDICTION:
Matoaca RoadSTREET NAME:
PEChesterfield County
FY2019 1,385CN
FY2018FROM: 0.2 MI S RTE 626 (Hickory Road) TO: 0.2 MI N
RTE 626 (Hickory Road) (0.4000 MI)
DESCRIPTION: 650RW
PROJECT LENGTH: 0.4000 MISCOPE OF WORK: Safety TO 2,290
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 91RSTP (STP Regional): Federal
17 884 537 207 0 113 0RSTP (STP Regional): MPO - Federal
4 221 134 52 0 28 0RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 23RSTP (STP Regional): State Match
-21 1,105 672 259 0 21 141 113Total
11/12/2014 761
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 604 - ADD SIDEWALK
PROJECT
UPC NO.:
ROUTE:
96733
NFO0604
Underway
SCHEDULE
101
ESTIMATED COST (000's)
JURISDICTION:
GENITO ROADSTREET NAME:
PEChesterfield County
FY2015 149CN
UnderwayFROM: 0.003 MI RTE 759 (STIGALL DR) TO: 0.007 MI
RTE 906 (PRICE CLUB BLVD) (0.1894 MI)
DESCRIPTION: 29RW
PROJECT LENGTH: 0.1894 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 280
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 286Highway Safety Improvements: Federal
0 0 0 0 0 0 32Highway Safety Improvements: State Match
-39 0 0 0 0 0 0 318Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 604 - ADD SIDEWALK
PROJECT
UPC NO.:
ROUTE:
100560
NFO0604
Underway
SCHEDULE
151
ESTIMATED COST (000's)
JURISDICTION:
GENITO ROADSTREET NAME:
PEChesterfield County
FY2015 227CN
UnderwayFROM: 0.003 MI E RTE 759 (STIGALL DR) TO: 0.007 MI
W RTE 906 (PRICE CLUB BLVD) (0.3551 MI)
DESCRIPTION: 99RW
PROJECT LENGTH: 0.3551 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 477
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 439Highway Safety Improvements: Federal
0 0 0 0 0 0 49Highway Safety Improvements: State Match
-10 0 0 0 0 0 0 487Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 604 - REPLACE BRIDGE OVER
TOMAHAWK CREEK
PROJECT
UPC NO.:
ROUTE:
101243
NFO0604
Underway
SCHEDULE
750
ESTIMATED COST (000's)
JURISDICTION:
Genito RoadSTREET NAME:
PEChesterfield County
FY2016 3,075CN
FY2015FROM: 0.651 Mi. E. Rte 668 (Woolridge Road) TO: 0.712
Mi. E. Rte 668 (Woolridge Road) (0.0610 MI)
DESCRIPTION: 112RW
30028 -1PROJECT LENGTH: 0.0610 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 3,937
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 270Bridge Replacement: Federal
0 0 0 0 0 0 68Soft Match: Federal
100 0 0 1,636 690 453 0STP: Bridge - Federal
25 0 0 409 173 113 0STP: Bridge - Soft Match
0 0 0 2,045 863 125 567 338Total
762 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 609 - INSTALL SIDEWALK
PROJECT
UPC NO.:
ROUTE:
104288
NFO0609
Underway
SCHEDULE
100
ESTIMATED COST (000's)
JURISDICTION:
OLD CENTRALIA ROADSTREET NAME:
PEChesterfield County
FY2015 380CN
FY2015FROM: CASTLEBURY DR TO: GLEN OAKS CT (0.5000
MI)
DESCRIPTION: 20RW
PROJECT LENGTH: 0.5000 MISCOPE OF WORK: Safety TO 500
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 250Revenue Sharing Funds: Local Match
0 0 0 0 0 0 250Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 500Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 618 - RECONSTRUCT SHOULDER AND
DITCHES
PROJECT
UPC NO.:
ROUTE:
104286
NFO0618
Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
400
ESTIMATED COST (000's)
JURISDICTION:
OLD BERMUDA HUNDRED ROADSTREET NAME:
PEChesterfield County
FY2015 1,800CN
FY2014FROM: RTE 95 TO: EAST OF OLD STAGE RD (0.4000
MI)
DESCRIPTION: 300RW
PROJECT LENGTH: 0.4000 MISCOPE OF WORK: Safety TO 2,500
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,250Revenue Sharing Funds: Local Match
0 0 0 0 0 0 1,250Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 2,500Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 618 - RECONSTRUCTION
PROJECT
UPC NO.:
ROUTE:
105648
NFO0618
Underway
SCHEDULE
800
ESTIMATED COST (000's)
JURISDICTION:
OLD BERMUDA HUNDRED RDSTREET NAME:
PEChesterfield County
FY2020 6,400CN
FY2017FROM: OLD STAGE RD, RT 732 TO: RT 10 (2.2000 MI)DESCRIPTION: 800RW
PROJECT LENGTH: 2.2000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 8,000
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 4,000 0Local Project Contributions: Local
0 0 0 0 0 2,000 0Revenue Sharing Funds: Local Match
0 0 0 0 0 2,000 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 8,000 0Total
11/12/2014 763
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 636 - WIDENING & RECONSTRUCTION
PROJECT
UPC NO.:
ROUTE:
16409
NFO0636
Complete
SCHEDULE
724
ESTIMATED COST (000's)
JURISDICTION:
NASH ROADSTREET NAME:
PEChesterfield County
Underway 2,808CN
UnderwayFROM: 0.108 MILE SOUTH ROUTE 5186 (EAST FAIR
DRIVE) TO: 0.703 MILE SOUTH ROUTE 655 (BEACH
ROAD) (1.0800 MI)
DESCRIPTION: 1,150RW
PROJECT LENGTH: 1.0800 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 4,682
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 587Non-Formula: State Match
0 0 0 0 0 0 109Revenue Sharing Funds: Local Match
0 0 0 0 0 0 109Revenue Sharing Funds: State Match
0 0 0 0 0 0 3,390RSTP (STP Regional): Federal
0 0 0 0 0 0 260RSTP (STP Regional): State Match
0 0 0 0 0 0 14(S) Secondary Formula: Federal
0 0 0 0 0 0 194(S) Secondary Formula: Federal/State
0 0 0 0 0 0 240(S) Secondary Formula: State
0 0 0 0 0 0 4(S) Secondary Formula: State Match
-224 0 0 0 0 0 0 4,906Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 636 - BRIDGE REPLACEMENT
PROJECT
UPC NO.:
ROUTE:
103469
NFO0636
Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
400
ESTIMATED COST (000's)
JURISDICTION:
NASH ROADSTREET NAME:
PEChesterfield County
FY2019 2,200CN
FY2018FROM: 0.50 MI S RTE 635 (REEDY BRANCH ROAD) TO:
0.52 MI S RTE 635 (REEDY BRANCH ROAD)
(0.0020 MI)
DESCRIPTION: 400RW
PROJECT LENGTH: 0.0020 MISCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 3,000
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 165 0 0 0 0CTB Formula: Bridge - State
0 0 95 0 0 0 0CTB Formula: High Priority - State
400 0 728 945 666 0 0(S) Telecommunications: State
0 0 988 945 666 400 0 0Total
MPO Area
Tri-CitiesSecondary
PROGRAM/SYSTEM
RTE 638 & 611 - CONSTRUCT ROUNDABOUT
PROJECT
UPC NO.:
ROUTE:
106197
NFO0638
FY2016
SCHEDULE
300
ESTIMATED COST (000's)
JURISDICTION:
Hopkins RoadSTREET NAME:
PEChesterfield County
FY2018 1,200CN
FY2017FROM: 0.20 Mi. North Rte. 638 TO: 0.20 Mi. South Rte.
638 (0.4000 MI)
DESCRIPTION: 150RW
PROJECT LENGTH: 0.4000 MISCOPE OF WORK: Safety TO 1,650
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
270 0 0 1,080 135 0 0Highway Safety Improvements: Federal
30 0 0 120 15 0 0Highway Safety Improvements: Soft Match
0 0 0 1,200 150 300 0 0Total
764 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 641 - RECONSTRUCTION
PROJECT
UPC NO.:
ROUTE:
105673
NFO0641
Underway
SCHEDULE
300
ESTIMATED COST (000's)
JURISDICTION:
BEULAH RDSTREET NAME:
PEChesterfield County
FY2019 1,800CN
FY2017FROM: KINGSLAND RD RT 611 TO: PINELEAF DR RT
3428 (0.4000 MI)
DESCRIPTION: 400RW
PROJECT LENGTH: 0.4000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 2,500
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 1,900 0Local Project Contributions: Local
0 0 0 0 0 300 0Revenue Sharing Funds: Local Match
0 0 0 0 0 300 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 2,500 0Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 642 - ADD SIDEWALK
PROJECT
UPC NO.:
ROUTE:
96732
NFO0642
Complete
SCHEDULE
155
ESTIMATED COST (000's)
JURISDICTION:
SALEM CHURCH ROADSTREET NAME:
PEChesterfield County
Underway 420CN
UnderwayFROM: 0.030 MI South of Rte. 1903 (Chanson Road) TO:
0.17 MI North of Rte. 1903 (Chanson Road) (0.2000 MI)
DESCRIPTION: 100RW
PROJECT LENGTH: 0.2000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 675
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 664Highway Safety Improvements: Federal
0 0 0 0 0 0 74Highway Safety Improvements: State Match
-62 0 0 0 0 0 0 738Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 642 - ADD SIDEWALK
PROJECT
UPC NO.:
ROUTE:
104883
NFO0642
MPO Project. Balance to be provided by MPO.REPORT NOTE:
Underway
SCHEDULE
100
ESTIMATED COST (000's)
JURISDICTION:
SALEM CHURCH ROADSTREET NAME:
PEChesterfield County
FY2016 275CNFROM: FOX HOLLOW DR TO: SARA KAY DR (0.1100
MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.1100 MISCOPE OF WORK: Safety TO 375
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
176 0 0 0 0 0 104CMAQ: MPO - Federal
44 0 0 0 0 0 26CMAQ: MPO - State Match
25 0 0 0 0 220 0 130Total
11/12/2014 765
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 643 - RECONSTRUCTION
PROJECT
UPC NO.:
ROUTE:
105669
NFO0643
Underway
SCHEDULE
400
ESTIMATED COST (000's)
JURISDICTION:
JESSUP RDSTREET NAME:
PEChesterfield County
FY2019 2,500CN
FY2017FROM: RT 10 TO: PINELAND RD RT 2145 (0.3000 MI)DESCRIPTION: 500RW
PROJECT LENGTH: 0.3000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 3,400
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 1,700 0Revenue Sharing Funds: Local Match
0 0 0 0 0 1,700 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 3,400 0Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 647 (REAMS RD) - INTERSECTION
IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
70092
NFO0647
MPO Project. Excess funds to be redistributed by MPO.REPORT NOTE:
Complete
SCHEDULE
523
ESTIMATED COST (000's)
JURISDICTION:
REAMS ROADSTREET NAME:
PEChesterfield County
Underway 2,414CN
UnderwayFROM: 0.047 MILE WEST INTERSECTION RTE 2588
(ROSEGILL) TO: 0.062 MILE EAST INTERSECTION RTE
2588 (ROSEGILL) (0.1090 MI)
DESCRIPTION: 1,045RW
PROJECT LENGTH: 0.1090 MISCOPE OF WORK: Safety TO 3,982
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 192Non-Formula: State Match
0 0 0 0 0 0 2,598RSTP (STP Regional): Federal
0 0 0 0 0 393 180RSTP (STP Regional): MPO - Federal
0 0 0 0 0 98 45RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 458RSTP (STP Regional): State Match
0 0 0 0 0 0 289(S) Secondary Formula: Federal/State
-271 0 0 0 0 0 491 3,762Total
766 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 649 - RECONSTRUCTION
PROJECT
UPC NO.:
ROUTE:
17179
NFO0649
Revised schedule requiredREPORT NOTE:
Complete
SCHEDULE
423
ESTIMATED COST (000's)
JURISDICTION:
NEWBYS BRIDGE RDSTREET NAME:
PEChesterfield County
Underway 1,755CN
FY2014FROM: 0.307 MI S RTE 3186 (SUSSEX DR) TO: RTE
3186 (SUSSEX DR) (0.3300 MI)
DESCRIPTION: 683RW
PROJECT LENGTH: 0.3070 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 2,861
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 27(S) Residue Parcel Revenue: State
0 0 0 0 0 0 404Revenue Sharing Funds: Local Match
0 0 0 0 0 0 404Revenue Sharing Funds: State Match
0 0 0 0 0 0 746RSTP (STP Regional): Federal
0 0 0 0 0 0 187RSTP (STP Regional): State Match
0 0 0 0 0 0 387(S) Secondary Formula: Federal/State
0 0 0 0 0 0 3(S) Secondary Formula: State
0 0 0 0 0 0 1,260(S) Telecommunications: State
-555 0 0 0 0 0 0 3,416Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 649 - MINOR WIDENING
PROJECT
UPC NO.:
ROUTE:
104289
NFO0649
Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
300
ESTIMATED COST (000's)
JURISDICTION:
NEWBY'S BRIDGE ROADSTREET NAME:
PEChesterfield County
FY2015 3,435CN
FY2014FROM: Rte. 914 (HAGOOD LN) TO: Rte. 638 (BELMONT
RD) (0.5900 MI)
DESCRIPTION: 300RW
PROJECT LENGTH: 0.7000 MISCOPE OF WORK: Safety TO 4,035
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 1,068 950Revenue Sharing Funds: Local Match
0 0 0 0 0 1,068 950Revenue Sharing Funds: State Match
0 0 0 0 0 0 2,135 1,900Total
11/12/2014 767
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 653 - SB RIGHT TURN LANE
IMPROVEMENT
PROJECT
UPC NO.:
ROUTE:
67967
NFO0653
MPO Project.REPORT NOTE:
Complete
SCHEDULE
906
ESTIMATED COST (000's)
JURISDICTION:
COURTHOUSE ROADSTREET NAME:
PEChesterfield County
Underway 3,086CN
UnderwayFROM: RTE 360 TO: RTE 679 CONNECTOR (0.3740 MI)DESCRIPTION: 2,365RW
PROJECT LENGTH: 0.3740 MISCOPE OF WORK: Safety TO 6,356
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 4,015CMAQ: Federal
0 0 0 0 0 0 362CMAQ: MPO - Federal
0 0 0 0 0 0 90CMAQ: MPO - State Match
0 0 0 0 0 0 620CMAQ: State Match
0 0 0 0 0 0 20Non-Formula: State Match
0 0 0 0 0 0 3(S) Residue Parcel Revenue: State
0 0 0 0 0 0 82RSTP (STP Regional): Federal
0 0 0 0 0 0 384(S) Secondary Formula: Federal/State
0 0 0 0 0 0 165(S) Secondary Formula: State
0 0 0 0 0 0 1,118(S) Telecommunications: State
-502 0 0 0 0 0 0 6,859Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 668 - IMPROVE CURVE
PROJECT
UPC NO.:
ROUTE:
19060
NFO0668
Complete
SCHEDULE
211
ESTIMATED COST (000's)
JURISDICTION:
WOOLRIDGE ROADSTREET NAME:
PEChesterfield County
Underway 1,320CN
UnderwayFROM: 0.105 mi N of intersection with Red Fern Ct (Rte
7190) TO: 0.126 mi S of Intersection with Crown Point Rd
(Rte 3699) (0.1750 MI)
DESCRIPTION: 239RW
PROJECT LENGTH: 0.1750 MISCOPE OF WORK: Safety TO 1,770
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 63Highway Safety Improvements: Federal
0 0 0 0 0 0 7Highway Safety Improvements: State Match
0 0 0 0 0 0 1,104Local Project Contributions: Local
0 0 0 0 0 0 532Safety Funds: Hazard Elimination
0 0 0 0 0 0 63(S) Secondary Formula: Federal/State
0 0 0 0 0 0 0 1,770Total
768 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 672 - WIDENING (EX. 2 TO 4 LANES)
PROJECT
UPC NO.:
ROUTE:
105676
NFO0672
Underway
SCHEDULE
400
ESTIMATED COST (000's)
JURISDICTION:
ARCH RDSTREET NAME:
PEChesterfield County
FY2019 1,500CN
FY2017FROM: RT 60 TO: BRUNDIDGE RD (0.3000 MI)DESCRIPTION: 600RW
PROJECT LENGTH: 0.3000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 2,500
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 1,135 0Local Project Contributions: Local
0 0 0 0 0 683 0Revenue Sharing Funds: Local Match
0 0 0 0 0 683 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 2,500 0Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 678 - CONSTRUCT CURB, GUTTER &
SIDEWALK
PROJECT
UPC NO.:
ROUTE:
104287
NFO0678
Underway
SCHEDULE
200
ESTIMATED COST (000's)
JURISDICTION:
PROVIDENCE ROADSTREET NAME:
PEChesterfield County
FY2015 3,000CN
UnderwayFROM: RTE 60 TO: RTE 2661 (WOODWARD DR) (0.5140
MI)
DESCRIPTION: 400RW
PROJECT LENGTH: 0.5030 MISCOPE OF WORK: Safety TO 3,600
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,800Revenue Sharing Funds: Local Match
0 0 0 0 0 0 1,800Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 3,600Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 711 - PAVE SHOULDER
PROJECT
UPC NO.:
ROUTE:
104884
NFO0711
MPO Project.REPORT NOTE:
Underway
SCHEDULE
130
ESTIMATED COST (000's)
JURISDICTION:
ROBIOUS ROADSTREET NAME:
PEChesterfield County
FY2017 270CN
FY2016FROM: SALISBURY DRIVE TO: JAMES RIVER ROAD
(1.2640 MI)
DESCRIPTION: 100RW
PROJECT LENGTH: 1.2640 MISCOPE OF WORK: Safety TO 500
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
296 0 0 0 0 0 104CMAQ: MPO - Federal
74 0 0 0 0 0 26CMAQ: MPO - State Match
0 0 0 0 0 370 0 130Total
11/12/2014 769
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 720 - WIDEN TO 4 LANES
PROJECT
UPC NO.:
ROUTE:
104290
NFO0720
Underway
SCHEDULE
400
ESTIMATED COST (000's)
JURISDICTION:
LUCKS LANESTREET NAME:
PEChesterfield County
FY2015 3,100CN
UnderwayFROM: RTE 2780 (SPIREA RD) TO: RTE 3970 (EAST
EVERGREEN PKWY) (0.5300 MI)
DESCRIPTION: 100RW
PROJECT LENGTH: 0.5300 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 3,600
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,800Revenue Sharing Funds: Local Match
0 0 0 0 0 0 1,800Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 3,600Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 720 - WIDENING (EX. 2 TO 4 LANES)
PROJECT
UPC NO.:
ROUTE:
105674
NFO0720
Underway
SCHEDULE
600
ESTIMATED COST (000's)
JURISDICTION:
LUCKS LANESTREET NAME:
PEChesterfield County
FY2019 5,100CN
FY2017FROM: E. EVERGREEN PKWY RT 3970 TO: RT 288
(1.2000 MI)
DESCRIPTION: 800RW
PROJECT LENGTH: 1.2000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 6,500
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 3,000 0Local Project Contributions: Local
0 0 0 0 0 1,750 0Revenue Sharing Funds: Local Match
0 0 0 0 0 1,750 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 6,500 0Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 754 - ADD SIDEWALK
PROJECT
UPC NO.:
ROUTE:
100559
NFO0754
Complete
SCHEDULE
117
ESTIMATED COST (000's)
JURISDICTION:
COALFIELD ROADSTREET NAME:
PEChesterfield County
Underway 207CN
UnderwayFROM: 0.015 MI NORTH OF WATKINS ELEMENTARY
SCHOOL TO: 0.007 MI SOUTH OF RTE 4671
(SYCAMORE VILLAGE DRIVE) (0.1220 MI)
DESCRIPTION: 109RW
PROJECT LENGTH: 0.1220 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 434
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 397Highway Safety Improvements: Federal
0 0 0 0 0 0 44Highway Safety Improvements: State Match
-7 0 0 0 0 0 0 441Total
770 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
Tri-CitiesSecondary
PROGRAM/SYSTEM
RTE 1107 - WIDENING
PROJECT
UPC NO.:
ROUTE:
104083
NFO1107
Complete
SCHEDULE
600
ESTIMATED COST (000's)
JURISDICTION:
EAST RIVER ROADSTREET NAME:
PEChesterfield County
Underway 6,250CN
UnderwayFROM: INT. ROUTE 36 (CHESTERFIELD AVENUE) TO:
INT. ROUTE 1106 (DUPUY ROAD) (0.7400 MI)
DESCRIPTION: 650RW
PROJECT LENGTH: 0.7400 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 7,500
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 4,750Revenue Sharing Funds: Local Match
0 0 0 0 0 0 4,750Revenue Sharing Funds: State Match
-2,000 0 0 0 0 0 0 9,500Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 4700 - CONSTRUCT CURB, GUTTER AND
SIDEWALK
PROJECT
UPC NO.:
ROUTE:
104285
NFO4700
Underway
SCHEDULE
110
ESTIMATED COST (000's)
JURISDICTION:
DEER RUN DRIVESTREET NAME:
PEChesterfield County
FY2015 1,870CN
FY2015FROM: HULL STREET ROAD (RTE 360) TO: CHITAL
DRIVE (RTE4730) (0.5500 MI)
DESCRIPTION: 20RW
PROJECT LENGTH: 0.5500 MISCOPE OF WORK: Safety TO 2,000
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 865Local Project Contributions: Local
0 0 0 0 0 500 67Revenue Sharing Funds: Local Match
0 0 0 0 0 500 67Revenue Sharing Funds: State Match
0 0 0 0 0 0 1,000 1,000Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
WALTON PARK LANE IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
102945
NFO9999
Complete
SCHEDULE
100
ESTIMATED COST (000's)
JURISDICTION:
WALTON PARK LANESTREET NAME:
PEChesterfield County
Underway 360CN
UnderwayFROM: VARIOUS TO: VARIOUS (0.3200 MI)DESCRIPTION: 40RW
PROJECT LENGTH: 0.3200 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 500
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 633Revenue Sharing Funds: Local Match
0 0 0 0 0 0 633Revenue Sharing Funds: State Match
-765 0 0 0 0 0 0 1,265Total
11/12/2014 771
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
Tri-CitiesSecondary
PROGRAM/SYSTEM
RTE 600 - ROUNDABOUT
PROJECT
UPC NO.:
ROUTE:
80993
NFO0600
MPO Project. Accruing for CNREPORT NOTE:
Underway
SCHEDULE
543
ESTIMATED COST (000's)
JURISDICTION:
FERNDALE ROADSTREET NAME:
PEDinwiddie County
FY2015 3,268CN
UnderwayFROM: On Rte 226, 0.105 Mile West of Rte 600 TO: On
Rte 226, 0.041 Mile East of Rte 600 (0.2980 MI)
DESCRIPTION: 1,096RW
PROJECT LENGTH: 0.1470 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 4,907
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 396(S) Federal Formula STP: Federal
0 0 0 0 0 0 60(S) Federal Formula STP: State Bond Match
0 0 0 0 0 0 1,660RSTP (STP Regional): Federal
1,146 0 0 0 0 272 0RSTP (STP Regional): MPO - Federal
286 0 0 0 0 68 0RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 415RSTP (STP Regional): State Match
0 0 0 0 0 0 6(S) Secondary Formula: Federal
0 0 0 0 0 0 120(S) Secondary Formula: State
0 0 0 0 0 0 40(S) Secondary Formula: State Match
83 0 0 0 83 68 186(S) Telecommunications: State
17 0 0 0 83 1,515 408 2,884Total
MPO Area
Tri-CitiesSecondary
PROGRAM/SYSTEM
BRIDGE (FED ID 6051) RTE 624 OVER WHITE
OAK CREEK
PROJECT
UPC NO.:
ROUTE:
105954
NFO0624
Revised schedule required.REPORT NOTE:
FY2018
SCHEDULE
158
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEDinwiddie County
FY2019 788CN
FY2019DESCRIPTION: 105RW
PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/ Added Capacity TO 1,051
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 549 0 0 0 0 0CTB Formula: Bridge - State
0 309 92 0 0 0 0STP: BROS - Federal
0 77 23 0 0 0 0STP: BROS - Soft Match
0 936 115 0 0 0 0 0Total
772 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 703 - REPLACE BRIDGE OVER ROWANTY
CREEK
PROJECT
UPC NO.:
ROUTE:
101235
NFO0703
Underway
SCHEDULE
495
ESTIMATED COST (000's)
JURISDICTION:
CARSON ROADSTREET NAME:
PEDinwiddie County
FY2017 1,857CNFROM: APPROACHES & BRIDGE REPLACEMENT
OVER ROWANTY CR TO: 0.50 MI E RTE 667 (0.1500 MI)
DESCRIPTION: RW
29956 -1PROJECT LENGTH: 0.1500 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 2,352
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 256Bridge Replacement: Federal
0 0 0 0 0 0 64Soft Match: Federal
157 0 0 1,140 144 263 0STP: Bridge - Federal
39 0 0 285 36 66 0STP: Bridge - Soft Match
-98 0 0 1,425 180 197 328 320Total
MPO Area
Tri-CitiesSecondary
PROGRAM/SYSTEM
RTE 708 - REPLACE BRIDGE
PROJECT
UPC NO.:
ROUTE:
93092
NFO0708
Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
188
ESTIMATED COST (000's)
JURISDICTION:
NAMOZINE ROADSTREET NAME:
PEDinwiddie County
FY2017 2,891CN
FY2014FROM: 0.233 MI W RTE 746 (BIRD NEST RD) TO: 0.339
MI W RTE 746 (BIRD NEST RD) (0.1060 MI)
DESCRIPTION: 94RW
PROJECT LENGTH: 0.1060 MISCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 3,173
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 184Bridge Replacement: Federal
0 0 0 0 0 0 46Soft Match: Federal
324 872 699 266 93 167 0STP: Bridge - Federal
81 218 175 67 23 42 0STP: Bridge - Soft Match
-81 1,089 873 333 116 405 209 229Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
ASHLAND ROAD / I-64 FEASIBILITY STUDY
PROJECT
UPC NO.:
ROUTE:
104089
NFO0623
MPO Project.REPORT NOTE:
Underway
SCHEDULE
200
ESTIMATED COST (000's)
JURISDICTION:
ASHLAND ROADSTREET NAME:
PEGoochland County
CN
@ 64 INTERCHANGEDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Preliminary Engineering TO 200
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 160RSTP (STP Regional): MPO - Federal
0 0 0 0 0 0 40RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 0 200Total
11/12/2014 773
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 623 - IMPROVE INTERSECTION
PROJECT
UPC NO.:
ROUTE:
105733
NFO0623
MPO Project.REPORT NOTE:
FY2016
SCHEDULE
400
ESTIMATED COST (000's)
JURISDICTION:
HOCKETT ROADSTREET NAME:
PEGoochland County
FY2017 1,500CN
N/AFROM: RTE 1006 (HOLLY LN) TO: RTE 250/RTE 623
(ASHLAND RD) (0.5050 MI)
DESCRIPTION: 0RW
PROJECT LENGTH: 0.5050 MISCOPE OF WORK: Safety TO 1,900
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
400 0 0 0 400 400 0RSTP (STP Regional): MPO - Federal
100 0 0 0 100 100 0RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 320(S) Secondary Formula: Federal/State
0 0 0 0 0 0 80(S) Secondary Formula: State
0 0 0 0 500 500 500 400Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 606 - ROUNDABOUT
PROJECT
UPC NO.:
ROUTE:
104875
NFO0606
MPO Project. Excess funds to be redistributed by MPO.REPORT NOTE:
Underway
SCHEDULE
200
ESTIMATED COST (000's)
JURISDICTION:
STUDLEY ROADSTREET NAME:
PEHanover County
FY2021 700CN
FY2016DESCRIPTION: 50RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 950
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 700Local Project Contributions: Local
896 0 0 0 0 200 200RSTP (STP Regional): MPO - Federal
224 0 0 0 0 50 50RSTP (STP Regional): MPO - State Match
-1,370 0 0 0 0 1,120 250 950Total
774 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 615 (CREIGHTON RD) - IMPROVE
INTERSECTION
PROJECT
UPC NO.:
ROUTE:
81667
NFO0615
VDOT records do not include additional previous funds. County and VODT working together to
identify funds and have them posted into the VDOT system. Balance to complete will be funded
with other funds
REPORT NOTE:
Underway
SCHEDULE
802
ESTIMATED COST (000's)
JURISDICTION:
CREIGHTON ROAD & COLD HARBOR ROADSTREET NAME:
PEHanover County
FY2016 4,790CN
UnderwayFROM: COLD HARBOR RD - FR 0.22 MI W CREIGHTON
RD TO 0.22 MI E TO: CREIGHTON RD - FR 0.38 MI S
COLD HARBOR RD TO 0.12 MI N (0.9400 MI)
DESCRIPTION: 1,789RW
PROJECT LENGTH: 0.9400 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 7,381
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 3,869CMAQ: Federal
0 0 0 0 0 0 807CMAQ: MPO - Federal
0 0 0 0 0 0 202CMAQ: MPO - State Match
0 0 0 0 0 0 967CMAQ: State Match
0 0 0 0 0 0 0(S) Secondary Formula: State
1,537 0 0 0 0 0 0 5,845Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
BRIDGE (FED ID 9492) RTE. 617 OVER SOUTH
ANNA RIVER
PROJECT
UPC NO.:
ROUTE:
T11967
NFO0617
Revised schedule required.REPORT NOTE:
FY2018
SCHEDULE
684
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHanover County
FY2019 2,546CN
FY2019FROM: 1.1 To Rte 611 & 1.3 To 610 TO: 1.1 To Rte 611 &
1.3 To 610
DESCRIPTION: 570RW
PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/ Added Capacity TO 3,800
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 260 104 0 0 0 0STP: BROS - Federal
0 65 26 0 0 0 0STP: BROS - Soft Match
3,345 325 130 0 0 0 0 0Total
11/12/2014 775
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RT 623 - IMPROVE INTERSECTION
PROJECT
UPC NO.:
ROUTE:
103014
NFO0623
Underway
SCHEDULE
472
ESTIMATED COST (000's)
JURISDICTION:
CEDAR LANESTREET NAME:
PEHanover County
FY2016 3,781CN
FY2015FROM: 0.18 mi W of Int. Rte 1(Wash Hwy)/Rte 623(Cedar
Ln) TO: Int. Rte 1(Wash Hwy)/Rte 623(Cedar Ln) (0.2500
MI)
DESCRIPTION: 914RW
PROJECT LENGTH: 0.1800 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 5,167
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,500Revenue Sharing Funds: Local Match
0 0 0 0 0 0 1,500Revenue Sharing Funds: State Match
0 0 0 0 0 1,200 400RSTP (STP Regional): MPO - Federal
0 0 0 0 0 300 100RSTP (STP Regional): MPO - State Match
0 1 0 0 0 0 0(S) Telecommunications: State
166 1 0 0 0 0 1,500 3,500Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 623 - SHOULDER WEDGING
PROJECT
UPC NO.:
ROUTE:
104025
NFO0623
MPO Project.REPORT NOTE:
Complete
SCHEDULE
20
ESTIMATED COST (000's)
JURISDICTION:
Ashland RoadSTREET NAME:
PEHanover County
Underway 930CNFROM: RTE 623 FROM RTE 271 TO RTE 666 TO: RTE
666 FROM RTE 623 TO RTE 657 (6.1600 MI)
DESCRIPTION: RW
PROJECT LENGTH: 6.1600 MISCOPE OF WORK: Safety TO 950
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 760RSTP (STP Regional): MPO - Federal
0 0 0 0 0 0 190RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 0 950Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 623 - SHOULDER WEDGING
PROJECT
UPC NO.:
ROUTE:
104876
NFO0623
MPO Project.REPORT NOTE:
Complete
SCHEDULE
20
ESTIMATED COST (000's)
JURISDICTION:
CEDAR LANE RDSTREET NAME:
PEHanover County
Underway 980CNFROM: RTE 666 (ASHLAND RD) TO: 0.5 MI WEST OF
RTE 1 (5.6700 MI)
DESCRIPTION: RW
PROJECT LENGTH: 5.6700 MISCOPE OF WORK: Safety TO 1,000
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 800RSTP (STP Regional): MPO - Federal
0 0 0 0 0 0 200RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 0 1,000Total
776 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 625 - BRIDGE REPLACEMENT
PROJECT
UPC NO.:
ROUTE:
82399
NFO0625
Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
664
ESTIMATED COST (000's)
JURISDICTION:
GREENWOOD ROADSTREET NAME:
PEHanover County
FY2015 1,845CN
FY2014FROM: .025 W OF HENRICO COUNTY LINE TO: .025 E
OF HANOVER COUNTY LINE (0.0500 MI)
DESCRIPTION: 207RW
29485 -1PROJECT LENGTH: 0.0500 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Rehab w/o Added Capacity TO 2,716
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 29Bond Match: State Bond Match
0 0 0 0 0 0 265Bridge Replacement: Federal
0 0 0 0 0 0 37Soft Match: Federal
78 0 0 0 1,491 80 266STP: Bridge - Federal
20 0 0 0 373 20 67STP: Bridge - Soft Match
-10 0 0 0 1,864 98 100 664Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RT 627 (POLE GREEN RD) - INT IMPR @RTE
636 (WALNUT GROVE RD)
PROJECT
UPC NO.:
ROUTE:
97685
NFO0627
Underway
SCHEDULE
132
ESTIMATED COST (000's)
JURISDICTION:
POLE GREEN ROADSTREET NAME:
PEHanover County
FY2016 659CN
UnderwayFROM: 0.07 MI W RTE 636 (WALNUT GROVE ROAD)
TO: 0.14 MI E RTE 636 (WALNUT GROVE ROAD)
(0.2000 MI)
DESCRIPTION: 272RW
PROJECT LENGTH: 0.2000 MISCOPE OF WORK: Safety TO 1,064
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 400CMAQ: Federal
0 0 0 0 0 0 161CMAQ: MPO - Federal
0 0 0 0 0 0 40CMAQ: MPO - State Match
0 0 0 0 0 0 100CMAQ: State Match
0 0 0 0 0 0 150Local Project Contributions: Local
0 0 0 0 0 0 12(S) Residue Parcel Revenue: State
0 0 0 0 0 0 343(S) Telecommunications: State
-142 0 0 0 0 0 0 1,206Total
11/12/2014 777
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
POLE GREEN RD (RT. 627)/RURAL POINT RD
(RT. 643) INT. IMPR.
PROJECT
UPC NO.:
ROUTE:
97686
NFO0627
Complete
SCHEDULE
108
ESTIMATED COST (000's)
JURISDICTION:
Pole Green RoadSTREET NAME:
PEHanover County
Underway 591CN
UnderwayFROM: .06 mile west of Rural Point Road TO: .09mile
east of Rural Point Road (0.1480 MI)
DESCRIPTION: 44RW
PROJECT LENGTH: 0.1480 MISCOPE OF WORK: Safety TO 743
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 203CMAQ: Federal
0 0 0 0 0 0 76CMAQ: MPO - Federal
0 0 0 0 0 0 19CMAQ: MPO - State Match
0 0 0 0 0 0 51CMAQ: State Match
0 0 0 0 0 0 75(S) Federal Formula STP: Federal
0 0 0 0 0 0 19(S) Federal Formula STP: State Bond Match
0 0 0 0 0 0 104Local Project Contributions: Local
0 0 0 0 0 0 12(S) Residue Parcel Revenue: State
0 0 0 0 0 0 125(S) Secondary Formula: Federal
0 0 0 0 0 0 31(S) Secondary Formula: State Match
0 0 0 0 0 0 28(S) Telecommunications: State
0 0 0 0 0 0 0 743Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 638 - CONSTRUCT LTL & ADD SB REC. LN
PROJECT
UPC NO.:
ROUTE:
77121
NFO0638
MPO project.REPORT NOTE:
Underway
SCHEDULE
448
ESTIMATED COST (000's)
JURISDICTION:
Atlee RoadSTREET NAME:
PEHanover County
FY2016 1,691CN
UnderwayFROM: 0.2 MILE SOUTH OF ROUTE 301 TO:
INTERSECTION ROUTE 301 (0.2000 MI)
DESCRIPTION: 579RW
PROJECT LENGTH: 0.2000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 2,717
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 622CMAQ: Federal
0 0 0 0 0 0 155CMAQ: State Match
0 0 0 0 0 0 958(X) Maintenance Funds: Federal
0 0 0 0 0 0 982(X) Maintenance Funds: Statewide
0 0 0 0 0 0 0 2,717Total
778 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 638 - EXTEND ATLEE RD TO CONNECT TO
ATLEE STATION RD
PROJECT
UPC NO.:
ROUTE:
98236
NFO0638
Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
1,195
ESTIMATED COST (000's)
JURISDICTION:
Atlee Road (Rte 638)STREET NAME:
PEHanover County
FY2016 11,447CN
UnderwayFROM: 0. 234 MI. NORTH OF BUCKINGHAM BRANCH
RAILROAD TO: 0. 244 MI. SOUTH OF BUCKINGHAM
BRANCH RAILROAD (0.4780 MI)
DESCRIPTION: 2,583RW
PROJECT LENGTH: 0.4780 MISCOPE OF WORK: New Construction Roadway TO 15,225
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 384Local Project Contributions: Local
0 0 0 0 0 0 28Non-Formula: State Match
0 0 0 0 0 0 101(S) Residue Parcel Revenue: State
0 0 0 0 0 0 3,461Revenue Sharing Funds: Local Match
0 0 0 0 0 0 3,461Revenue Sharing Funds: State Match
0 0 0 0 0 0 2,193RSTP (STP Regional): Federal
0 0 0 0 0 0 1,341RSTP (STP Regional): MPO - Federal
0 0 0 0 0 0 335RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 520RSTP (STP Regional): State Match
276 274 276 276 276 276 512(S) Telecommunications: State
1,234 274 276 276 276 276 276 12,335Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 651 (GEORGETOWN RD) - BRIDGE
REPLACEMENT
PROJECT
UPC NO.:
ROUTE:
51261
NFO0651
Complete
SCHEDULE
614
ESTIMATED COST (000's)
JURISDICTION:
GEORGETOWN ROADSTREET NAME:
PEHanover County
Underway 1,786CN
UnderwayFROM: APPROACHES AND BRIDGE AT CRUMP CR
TO: (0.21 MI S RTE 325) (0.1430 MI)
DESCRIPTION: 114RW
29315 -1PROJECT LENGTH: 0.1430 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 2,514
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 236Bond Match: State Bond Match
0 0 0 0 0 0 1,160Bridge Replacement: Federal
0 0 0 0 0 0 244Priority Transportation Funds: State
0 0 0 0 0 0 369(S) Secondary Formula: Federal
0 0 0 0 0 0 92(S) Secondary Formula: State Match
0 0 0 0 0 0 54Soft Match: Federal
60 0 0 0 0 21 205STP: BROS - Federal
15 0 0 0 0 5 51STP: BROS - Soft Match
-1 0 0 0 0 76 27 2,413Total
11/12/2014 779
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 656 - INSTALL LEFT TURN LANE ONTO
RTE 813
PROJECT
UPC NO.:
ROUTE:
71354
NFO0656
Complete
SCHEDULE
480
ESTIMATED COST (000's)
JURISDICTION:
SLIDING HILL RDSTREET NAME:
PEHanover County
Underway 1,770CN
UnderwayFROM: 0.093 mile west of Rte 813 (Air Park Road) TO:
0.13 mile east of Rte 813 (Air Park Road) (0.2230 MI)
DESCRIPTION: 180RW
PROJECT LENGTH: 0.2230 MISCOPE OF WORK: Safety TO 2,430
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 380CMAQ: Federal
0 0 0 0 0 0 95CMAQ: State Match
0 0 0 0 0 0 774(S) Federal Formula STP: Federal
0 0 0 0 0 0 194(S) Federal Formula STP: State Bond Match
0 0 0 0 0 0 88(S) Secondary Formula: Federal
0 0 0 0 0 0 721(S) Secondary Formula: Federal/State
0 0 0 0 0 0 9(S) Secondary Formula: State
0 0 0 0 0 0 22(S) Secondary Formula: State Match
0 0 0 0 0 0 267(S) SSYP - Incidental: Federal
0 0 0 0 0 0 85(S) Telecommunications: State
-206 0 0 0 0 0 0 2,636Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 656 - SLIDING HILL ROAD CORRIDOR (PE
ONLY)
PROJECT
UPC NO.:
ROUTE:
104957
NFO0656
Underway
SCHEDULE
500
ESTIMATED COST (000's)
JURISDICTION:
SLIDING HILL ROADSTREET NAME:
PEHanover County
CNFROM: ATLEE STATION RD TO: NEW ASHCAKE RD
(0.9500 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.9500 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 500
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 400RSTP (STP Regional): MPO - Federal
0 0 0 0 0 0 100RSTP (STP Regional): MPO - State Match
0 1 0 0 0 0 0(S) Telecommunications: State
-1 1 0 0 0 0 0 500Total
780 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 657 - SHOULDER WEDGE & OVERLAY
PROJECT
UPC NO.:
ROUTE:
106206
NFO0657
MPO Project.REPORT NOTE:
FY2015
SCHEDULE
20
ESTIMATED COST (000's)
JURISDICTION:
ASHCAKE ROADSTREET NAME:
PEHanover County
FY2015 580CNFROM: ECL ASHLAND TO: RTE 656 (SLIDING HILL RD)
(3.4300 MI)
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Resurfacing TO 600
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
240 0 0 0 0 240 0RSTP (STP Regional): MPO - Federal
60 0 0 0 0 60 0RSTP (STP Regional): MPO - State Match
0 0 0 0 0 300 300 0Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 689 - BRIDGE REPLACEMENT OVER
LITTLE RIVER
PROJECT
UPC NO.:
ROUTE:
82378
NFO0689
Underway
SCHEDULE
580
ESTIMATED COST (000's)
JURISDICTION:
TAYLORSVILLE ROADSTREET NAME:
PEHanover County
FY2015 1,213CN
UnderwayFROM: 0.20 MI. S. OF RTE 725 TO: 0.10 MI. S. OF RTE
725 (0.1000 MI)
DESCRIPTION: 84RW
29221 -2PROJECT LENGTH: 0.1000 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 1,877
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 131Bond Match: State Bond Match
0 0 0 0 0 0 912Bridge Replacement: Federal
0 0 0 0 0 0 5Federal STP: Federal
0 0 0 0 0 0 99Soft Match: Federal
240 0 0 0 171 0 0STP: Bridge - Federal
60 0 0 0 43 0 0STP: Bridge - Soft Match
243 0 0 0 116 0 225STP: BROS - Federal
61 0 0 0 29 0 56STP: BROS - Soft Match
-514 0 0 0 359 604 0 1,428Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
BRIDGE (FED ID 9578) RTE 715 OVER NEW
FOUND RIVER
PROJECT
UPC NO.:
ROUTE:
T11964
NFO0715
Revised schedule requiredREPORT NOTE:
FY2018
SCHEDULE
289
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHanover County
FY2019 1,444CN
FY2019FROM: 0.70 Fr Rte 781 & 1.25 TO Rte 631 TO: 0.70 Fr
Rte 781 & 1.25 TO Rte 631
DESCRIPTION: 193RW
PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/ Added Capacity TO 1,925
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 1,540 0 0 0 0 0STP: Bridge - Federal
0 385 0 0 0 0 0STP: Bridge - Soft Match
0 1,925 0 0 0 0 0 0Total
11/12/2014 781
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
HENRICO COUNTY AUTOMATIC TRAFFIC
MANAGEMENT SYSTEM (ATMS)
PROJECT
UPC NO.:
ROUTE:
T11908
NFO
MPO Project.REPORT NOTE:
FY2015
SCHEDULE
800
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHenrico County
FY2018 7,213CN
VARIOUSDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 8,013
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
1,089 0 0 1,600 1,806 958 958CMAQ: MPO - Federal
272 0 0 400 451 240 240CMAQ: MPO - State Match
0 0 0 2,000 2,257 1,361 1,198 1,198Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
HENRICO COUNTY TRAFFIC SIGNAL SYSTEM
PROJECT
UPC NO.:
ROUTE:
12945
NFO
MPO project.REPORT NOTE:
Underway
SCHEDULE
984
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHenrico County
CN
COUNTYWIDE TRAFFIC SIGNAL CONTROL SYSTEMDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 984
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 851CMAQ: Federal
0 0 0 0 0 0 133CMAQ: State Match
0 0 0 0 0 0 0 984Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
COMPUTERIZED SIGNAL SYSTEM
PROJECT
UPC NO.:
ROUTE:
13553
NFO
MPO Project. Administered by Henrico County. Excess funds to be redistributed by MPO.
100% Fed CMAQ-funded project.
REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHenrico County
Underway 2,830CNFROM: VARIOUS LOCATIONS TO: HENRICO
COUNTYWIDE
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 2,830
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2,864CMAQ: Federal
0 0 0 0 0 0 13CMAQ: State Match
-47 0 0 0 0 0 0 2,877Total
782 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
SADLER RD IMP FROM DOMINION BLVD TO
CEDAR BRANCH CT PH 2 CN
PROJECT
UPC NO.:
ROUTE:
T14882
NFO0000
MPO Project. Balance to be provided for by MPO.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
Sadler RoadSTREET NAME:
PEHenrico County
FY2020 7,200CN
FROM: Dominion Blvd TO: Cedar Branch CtDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Reconstruction w/ Added Capacity TO 7,200
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 3,360 0 0 0 0 0RSTP (STP Regional): MPO - Federal
0 840 0 0 0 0 0RSTP (STP Regional): MPO - State Match
3,000 4,200 0 0 0 0 0 0Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
SIDEWALK (NEW CONSTRUCTION)
PROJECT
UPC NO.:
ROUTE:
105647
NFO0000
FY2015
SCHEDULE
183
ESTIMATED COST (000's)
JURISDICTION:
WISTAR ROADSTREET NAME:
PEHenrico County
FY2016 1,150CN
FY2015FROM: 300 FEET WEST OF SHRADER ROAD TO: 200
FEET EAST OF BIRCHBROOK ROAD (1.4000 MI)
DESCRIPTION: 95RW
PROJECT LENGTH: 1.4000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 1,428
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 707 0Revenue Sharing Funds: Local Match
0 0 0 0 0 707 0Revenue Sharing Funds: State Match
15 0 0 0 0 0 1,413 0Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
SIDEWALK (NEW CONSTRUCTION)
PROJECT
UPC NO.:
ROUTE:
105657
NFO0000
FY2015
SCHEDULE
11
ESTIMATED COST (000's)
JURISDICTION:
PRINCE HENRY DRIVESTREET NAME:
PEHenrico County
FY2019 70CN
FY2017FROM: E. PARHAM RD TO: HUNGARY SPRING RD
(0.4500 MI)
DESCRIPTION: 15RW
PROJECT LENGTH: 0.4500 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 96
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 35 0Revenue Sharing Funds: Local Match
0 0 0 0 0 35 0Revenue Sharing Funds: State Match
26 0 0 0 0 0 70 0Total
11/12/2014 783
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
SIDEWALK (NEW CONSTRUCTION)
PROJECT
UPC NO.:
ROUTE:
105658
NFO0000
FY2015
SCHEDULE
13
ESTIMATED COST (000's)
JURISDICTION:
BEULAH ROADSTREET NAME:
PEHenrico County
FY2019 94CN
FY2017FROM: HUNSTMAN ROAD TO: GREEN HOLLOW LANE
(0.1200 MI)
DESCRIPTION: 15RW
PROJECT LENGTH: 0.1200 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 122
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 47 0Revenue Sharing Funds: Local Match
0 0 0 0 0 47 0Revenue Sharing Funds: State Match
28 0 0 0 0 0 94 0Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 615 - REPLACE BRIDGE
PROJECT
UPC NO.:
ROUTE:
104274
NFO0615
Underway
SCHEDULE
1,528
ESTIMATED COST (000's)
JURISDICTION:
CREIGHTON ROADSTREET NAME:
PEHenrico County
CN
UnderwayFROM: SANDY LN TO: CITY OF RICHMOND
CORPORATE LIMITS (1.0800 MI)
DESCRIPTION: 3,000RW
PROJECT LENGTH: 1.1200 MISCOPE OF WORK: Bridge Replacement w/ Added Capacity TO 4,528
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 6,392Local Project Contributions: Local
0 0 0 0 0 0 1,495Revenue Sharing Funds: Local Match
0 0 0 0 0 0 1,495Revenue Sharing Funds: State Match
-4,854 0 0 0 0 0 0 9,382Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 627 - MEADOWBRIDGE ROAD -
RECONSTRUCTION
PROJECT
UPC NO.:
ROUTE:
18122
NFO0627
MPO Project. Balance to be provided by MPO.REPORT NOTE:
Underway
SCHEDULE
1,685
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHenrico County
CN
UnderwayFROM: 0.41 KILOMETER WEST OF AZALEA AVENUE
TO: 0.04 KILOMETER WEST OF HENRICO/HANOVER
COUNTY LINE (2.2130 KM)
DESCRIPTION: 1,863RW
PROJECT LENGTH: 2.2130 KMSCOPE OF WORK: Reconstruction w/ Added Capacity TO 3,549
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 519Non-Formula: State Match
0 0 0 0 0 0 2,074RSTP (STP Regional): Federal
956 0 0 0 0 0 0 2,593Total
784 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
AZALEA AVE PEDESTRIAN & SIGNAL
IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
106299
NFO6010
MPO Project.REPORT NOTE:
FY2016
SCHEDULE
130
ESTIMATED COST (000's)
JURISDICTION:
AZALEA AVENUESTREET NAME:
PEHenrico County
FY2019 1,400CN
FY2017FROM: THRUSH LANE TO: RICHMOND-HENRICO
TURNPIKE
DESCRIPTION: 85RW
PROJECT LENGTH: _SCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 1,615
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
104 0 560 560 68 0 0CMAQ: MPO - Federal
26 0 140 140 17 0 0CMAQ: MPO - State Match
0 0 700 700 85 130 0 0Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 7555 - LABURNUM AVENUE - WIDENING
PROJECT
UPC NO.:
ROUTE:
16153
NFO7555
MPO project. Partial PE. Balance to be provided by MPOREPORT NOTE:
Underway
SCHEDULE
1,009
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHenrico County
FY2021 5,515CNFROM: ECL RICHMOND TO: CAROLINA AVENUE
(1.9900 MI)
DESCRIPTION: RW
PROJECT LENGTH: 1.9900 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 6,524
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 167Non-Formula: State Match
0 0 0 0 0 0 668RSTP (STP Regional): Federal
5,689 0 0 0 0 0 0 835Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 9999 - INTERSECTION IMPROVEMENT
AND SIGNALIZATION
PROJECT
UPC NO.:
ROUTE:
18124
NFO9999
Henrico County Federal Escrow Project. Balance to be provided by County.REPORT NOTE:
Complete
SCHEDULE
250
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHenrico County
Underway 1,091CN
UnderwayAT MASONIC LANE, GAY AVENUE, AND BRITTLES
LANE (0.2930 MI)
DESCRIPTION: 180RW
PROJECT LENGTH: 0.2930 MISCOPE OF WORK: Safety TO 1,521
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 762Local Partnership: State
0 0 0 0 0 0 280(S) Secondary Formula: Federal
0 0 0 0 0 0 70(S) Secondary Funds: Federal/State
408 0 0 0 0 0 0 1,112Total
11/12/2014 785
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 9999 (THREE CHOPT ROAD) WIDEN TO 4
LANES
PROJECT
UPC NO.:
ROUTE:
50525
NFO9999
MPO project - Balance to be provided by MPO. Revised schedule required.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHenrico County
FY2016 6,346CN
UnderwayFROM: BARRINGTON HILLS DRIVE TO: COX ROAD
(1.0800 MI)
DESCRIPTION: 900RW
PROJECT LENGTH: 0.7500 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 7,246
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 648Non-Formula: State Match
0 0 0 0 0 0 5,551RSTP (STP Regional): Federal
0 0 0 0 0 0 740RSTP (STP Regional): State Match
308 0 0 0 0 0 0 6,938Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
THREE CHOPT ROAD - WIDENING - PE ONLY
PROJECT
UPC NO.:
ROUTE:
50528
NFO9999
MPO Project.REPORT NOTE:
Underway
SCHEDULE
2,583
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHenrico County
CNFROM: BARRINGTON HILL DRIVE TO: GASKINS ROAD
(1.5000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 1.5000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 2,583
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 395Non-Formula: State Match
0 0 0 0 0 0 2,066RSTP (STP Regional): Federal
0 0 0 0 0 0 122RSTP (STP Regional): State Match
0 0 0 0 0 0 0 2,583Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 9999 (THREE CHOPT ROAD) WIDEN TO 4
LANES
PROJECT
UPC NO.:
ROUTE:
50529
NFO9999
MPO project - balance to be provided by MPO. Revised schedule required.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHenrico County
FY2016 6,772CN
UnderwayFROM: COX ROAD TO: GASKINS ROAD (1.0900 MI)DESCRIPTION: 126RW
PROJECT LENGTH: 0.7500 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 6,898
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 18Non-Formula: State Match
0 0 0 0 0 0 4,138RSTP (STP Regional): Federal
0 0 0 0 0 0 1,280RSTP (STP Regional): MPO - Federal
0 0 0 0 0 0 320RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 1,016RSTP (STP Regional): State Match
126 0 0 0 0 0 0 6,772Total
786 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
JOHN ROLFE PARKWAY - NEW
CONSTRUCTION
PROJECT
UPC NO.:
ROUTE:
53315
NFO9999
Henrico Co. - Federal Escrow Project. Balance to be redistributed by County.REPORT NOTE:
Complete
SCHEDULE
5,000
ESTIMATED COST (000's)
JURISDICTION:
John Rolfe ParkwaySTREET NAME:
PEHenrico County
Underway 12,228CN
UnderwayFROM: 0.31 Mile South of Church Road TO: 0.026 MILE
SOUTH WEST BROAD STREET (ROUTE 250) (2.6900
MI)
DESCRIPTION: 7,800RW
PROJECT LENGTH: 2.6900 MISCOPE OF WORK: New Construction Roadway TO 25,028
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 37Accounts Receivable: Local
0 0 0 0 0 0 11,132Federal Aid: Federal Escrow
0 0 0 0 0 0 4,469(S) Federal Aid: Federal/State
0 0 0 0 0 0 241(S) Federal Formula STP: Federal
0 0 0 0 0 0 7,555(S) Secondary Formula: Federal
0 0 0 0 0 0 2,294(S) Secondary Formula: Federal/State
0 0 0 0 0 0 51(S) Secondary Funds: Federal/State
-750 0 0 0 0 0 0 25,778Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 9999 - DABBS HOUSE RD; WIDEN TO 4
LANES; FED ESCROW PROJ
PROJECT
UPC NO.:
ROUTE:
60933
NFO9999
MPO Project. Balance to be redistributed by MPO. Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
1,750
ESTIMATED COST (000's)
JURISDICTION:
Dabbs House RoadSTREET NAME:
PEHenrico County
FY2017 6,472CN
FY2014FROM: NINE MILE ROAD TO: EAST RICHMOND ROAD
(0.8920 MI)
DESCRIPTION: 2,565RW
PROJECT LENGTH: 0.9200 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 10,787
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,091RSTP (STP Regional): Federal
800 0 1,040 800 800 0 1,956RSTP (STP Regional): MPO - Federal
200 0 260 200 200 0 489RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 273RSTP (STP Regional): State Match
0 0 0 0 0 0 4,145(S) Secondary Formula: Federal
0 0 0 0 0 0 1,036(S) Secondary Funds: Federal/State
-2,502 0 1,300 1,000 1,000 1,000 0 8,990Total
11/12/2014 787
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 9999 - SADLER RD; WIDEN &
RECONSTRUCT; FED ESCROW PROJ
PROJECT
UPC NO.:
ROUTE:
60934
NFO9999
PE Only.REPORT NOTE:
Underway
SCHEDULE
2,500
ESTIMATED COST (000's)
JURISDICTION:
Sadler RoadSTREET NAME:
PEHenrico County
CNFROM: DOMINION BOULEVARD TO: CEDAR BRANCH
COURT (1.8000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 1.8000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 2,500
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,142RSTP (STP Regional): Federal
0 0 0 0 0 0 285RSTP (STP Regional): State Match
0 0 0 0 0 0 858(S) Secondary Formula: Federal
0 0 0 0 0 0 215(S) Secondary Funds: Federal/State
0 0 0 0 0 0 0 2,500Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
SADLER RD - RECONSTRUCTION - PHASE I
PROJECT
UPC NO.:
ROUTE:
104148
NFO9999
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
SADLER ROADSTREET NAME:
PEHenrico County
FY2017 6,995CN
FY2015FROM: DOMINION BLVD TO: SADLER GROVE RD
(1.0000 MI)
DESCRIPTION: 2,905RW
PROJECT LENGTH: 1.0000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 9,900
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,178RSTP (STP Regional): Federal
720 0 0 0 400 0 0RSTP (STP Regional): MPO - Federal
180 0 0 0 100 0 0RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 295RSTP (STP Regional): State Match
0 0 0 0 0 0 4,462(S) Secondary Formula: Federal
0 0 0 0 0 0 1,116(S) Secondary Funds: Federal/State
1,449 0 0 0 500 900 0 7,051Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RIDGEFIELD PKWY - CONSTRUCT SIDEWALK
PROJECT
UPC NO.:
ROUTE:
104880
NFO9999
MPO Project. Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
175
ESTIMATED COST (000's)
JURISDICTION:
RIDGEFIELD PARKWAYSTREET NAME:
PEHenrico County
FY2017 325CN
FY2016FROM: PUMP ROAD TO: FALCONBRIDGE DRIVE
(1.0000 MI)
DESCRIPTION: 100RW
PROJECT LENGTH: 1.0000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 600
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
340 0 0 0 0 0 140CMAQ: MPO - Federal
85 0 0 0 0 0 35CMAQ: MPO - State Match
0 0 0 0 0 425 0 175Total
788 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
JOHN ROLFE PKWY - ADD SIDEWALK
PROJECT
UPC NO.:
ROUTE:
104881
NFO9999
MPO Project.REPORT NOTE:
Underway
SCHEDULE
120
ESTIMATED COST (000's)
JURISDICTION:
JOHN ROLFE ROADSTREET NAME:
PEHenrico County
FY2017 320CN
FY2016DESCRIPTION: 100RW
PROJECT LENGTH: _SCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 540
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
336 0 0 0 0 0 96CMAQ: MPO - Federal
84 0 0 0 0 0 24CMAQ: MPO - State Match
0 0 0 0 0 420 0 120Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 621 - REPLACE BRIDGE
PROJECT
UPC NO.:
ROUTE:
60007
NFO0621
Revised schedule required. Partial PE fundingREPORT NOTE:
Underway
SCHEDULE
530
ESTIMATED COST (000's)
JURISDICTION:
DIX DRIVESTREET NAME:
PELunenburg County
FY2016 1,491CN
FY2015FROM: BRIDGE AND APPROACHES OVER MEHERRIN
RIVER TO: (0.55 MI S RTE 602 (LONGVIEW DR)) (0.0760
MI)
DESCRIPTION: 229RW
30021 -1PROJECT LENGTH: 0.0760 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/ Added Capacity TO 2,250
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 177Bridge Replacement: Federal
0 0 0 0 0 0 44Soft Match: Federal
331 0 719 392 145 35 0STP: BROS - Federal
83 0 180 98 36 9 0STP: BROS - Soft Match
0 0 899 490 181 413 44 222Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 631 - BRIDGE REPLACEMENT
PROJECT
UPC NO.:
ROUTE:
100977
NFO0631
Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
460
ESTIMATED COST (000's)
JURISDICTION:
LEE'S MILL ROADSTREET NAME:
PELunenburg County
FY2016 1,206CN
FY2015FROM: BRIDGE AND APPROACHES OVER MIDDLE
MEHERRIN RIVER TO: 0.81 MW RTE 771
(ARROWHEAD RD) (0.0360 MI)
DESCRIPTION: 64RW
30027 -1PROJECT LENGTH: 0.1550 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/ Added Capacity TO 1,730
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 150Bridge Replacement: Federal
0 0 0 0 0 0 37Soft Match: Federal
85 0 0 871 212 0 65STP: BROS - Federal
21 0 0 218 53 0 16STP: BROS - Soft Match
1 0 0 0 0 1 0(S) Telecommunications: State
-1 0 0 1,088 265 108 1 269Total
11/12/2014 789
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 712 - RECONSTRUCTION AND BRIDGE
REPLACEMENT
PROJECT
UPC NO.:
ROUTE:
1491
NFO0712
Underway
SCHEDULE
540
ESTIMATED COST (000's)
JURISDICTION:
WALLACES BRIDGESTREET NAME:
PELunenburg County
FY2015 1,942CN
UnderwayFROM: 1.08 MILES EAST OF ROUTE 622 TO: 1.27
MILES WEST OF ROUTE 658 (0.0760 MI)
DESCRIPTION: 128RW
28720 -2PROJECT LENGTH: 0.0760 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 2,610
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 30Bond Match: State Bond Match
0 0 0 0 0 0 122Bridge Replacement: Federal
0 0 0 0 0 0 57(S) Federal Formula STP: Federal
0 0 0 0 0 0 0(S) Federal Formula STP: State Bond Match
0 0 0 0 0 0 101(S) Secondary Formula: Federal
0 0 0 0 0 0 509(S) Secondary Formula: Federal/State
0 0 0 0 0 0 234(S) Secondary Formula: State
0 0 0 0 0 0 39(S) Secondary Formula: State Match
0 0 0 0 0 0 0Soft Match: Federal
0 0 0 0 0 0 637(S) State Formula: Secondary - Unpaved
409 0 0 0 0 217 0STP: BROS - Federal
102 0 0 0 0 54 0STP: BROS - Soft Match
0 0 0 0 0 35 81(S) Telecommunications: State
-18 0 0 0 0 511 307 1,811Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 718 - BRIDGE REPLACEMENT
PROJECT
UPC NO.:
ROUTE:
97690
NFO0718
Underway
SCHEDULE
17
ESTIMATED COST (000's)
JURISDICTION:
MANSON ROADSTREET NAME:
PELunenburg County
CNFROM: APPROACHES & BRIDGE OVER BEAVER
POND CR TO: (0.9 MI. RTE. 612) (0.2000 MI)
DESCRIPTION: RW
29533 -1PROJECT LENGTH: 0.2000 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 17
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 3Bond Match: State Bond Match
0 0 0 0 0 0 14Bridge Replacement: Federal
0 0 0 0 0 0 0 17Total
790 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 621 - BRIDGE REPLACEMENT
PROJECT
UPC NO.:
ROUTE:
91144
NFO0621
Underway
SCHEDULE
535
ESTIMATED COST (000's)
JURISDICTION:
COUNTRY CLUB ROADSTREET NAME:
PEMecklenburg County
FY2015 1,621CN
UnderwayFROM: 0.684 MI N. OF RTE 778 (TAYLOR ROAD) TO:
0.779 MI N. OF RTE 778 (TAYLOR ROAD) (0.0950 MI)
DESCRIPTION: 76RW
30022 -1PROJECT LENGTH: 0.0760 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 2,232
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 73Bridge Replacement: Federal
0 0 0 0 0 0 582(S) Federal Formula STP: Federal
0 0 0 0 0 0 145(S) Federal Formula STP: State Bond Match
0 0 0 0 0 0 74(S) Secondary Formula: Federal
0 0 0 0 0 0 19(S) Secondary Formula: State Match
0 0 0 0 0 0 18Soft Match: Federal
464 0 0 0 452 60 0STP: Bridge - Federal
116 0 0 0 113 15 0STP: Bridge - Soft Match
0 0 0 0 0 19 82(S) Telecommunications: State
0 0 0 0 565 580 94 993Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 633 - BRIDGE REPLACEMENT
PROJECT
UPC NO.:
ROUTE:
93090
NFO0633
Underway
SCHEDULE
113
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEMecklenburg County
FY2017 1,132CN
FY2016 (0.1900 MI)DESCRIPTION: 57RW
PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 1,302
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
52 0 627 148 89 0 124STP: BROS - Federal
13 0 157 37 22 0 31STP: BROS - Soft Match
0 0 784 185 112 65 0 155Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 601 - BRIDGE REPLACEMENT
PROJECT
UPC NO.:
ROUTE:
99006
NFO0601
Underway
SCHEDULE
666
ESTIMATED COST (000's)
JURISDICTION:
Flat Rock RoadSTREET NAME:
PENottoway County
FY2016 1,527CN
UnderwayAPPROACHES & BRIDGE OVER WHETSTONE CR
(0.0800 MI)
DESCRIPTION: 100RW
12834 26PROJECT LENGTH: _ STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 2,293
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 120Bridge Replacement: Federal
0 0 0 0 194 0 0CTB Formula: Bridge - State
0 0 0 0 0 0 30Soft Match: Federal
292 0 0 522 237 15 492STP: BROS - Federal
73 0 0 131 59 4 123STP: BROS - Soft Match
0 0 0 653 491 365 19 765Total
11/12/2014 791
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 618 - BRIDGE REPLACEMENT
PROJECT
UPC NO.:
ROUTE:
101238
NFO0618
Underway
SCHEDULE
550
ESTIMATED COST (000's)
JURISDICTION:
Indian Oak RoadSTREET NAME:
PENottoway County
FY2019 1,778CN
FY2018FROM: 1.028 MI S RTE 613 (TURKEY ISLAND RD) TO:
1.042 MI S RTE 613 (TURKEY ISLAND RD) (0.0140 MI)
DESCRIPTION: 200RW
PROJECT LENGTH: 0.0140 MISCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 2,528
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 600 824 0 0 0 0CTB Formula: Bridge - State
0 0 483 0 0 0 0STP: Bridge - Federal
0 0 121 0 0 0 0STP: Bridge - Soft Match
0 0 60 40 300 0 0STP: BROS - Federal
0 0 15 10 75 0 0STP: BROS - Soft Match
0 600 1,503 50 375 0 0 0Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 665 - ADD SIDEWALK
PROJECT
UPC NO.:
ROUTE:
105650
NFO0665
FY2015
SCHEDULE
11
ESTIMATED COST (000's)
JURISDICTION:
NOTTOWAY AVENUESTREET NAME:
PENottoway County
FY2016 94CN
FY2015FROM: BLACKSTONE CORP LIMITS TO: END STATE
MAINT (0.2300 MI)
DESCRIPTION: 6RW
PROJECT LENGTH: 0.2300 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 111
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 55 0Revenue Sharing Funds: Local Match
0 0 0 0 0 55 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 111 0Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 609 - BRIDGE REPLACEMENT (R/W)
PROJECT
UPC NO.:
ROUTE:
95072
NFO0609
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
Giles Bridge RoadSTREET NAME:
PEPowhatan County
CN
UnderwayFROM: 0.26 MI S OF AMELIA/POWHATAN COUNTY
LINE TO: 0.30 MI N OF AMELIA/POWHATAN COUNTY
LINE (0.5600 MI)
DESCRIPTION: 33RW
PROJECT LENGTH: 0.5600 MISCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 33
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 13Bond Match: State Bond Match
0 0 0 0 0 0 54Bridge Replacement: Federal
-34 0 0 0 0 0 0 67Total
792 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
ROUTE 622 - REALIGN INTERSECTION
PROJECT
UPC NO.:
ROUTE:
103116
NFO0622
Underway
SCHEDULE
400
ESTIMATED COST (000's)
JURISDICTION:
DORSET ROADSTREET NAME:
PEPowhatan County
FY2016 1,500CN
FY2015FROM: AT ROUTE 677 (BATTERSON ROAD) TO: AT
ROUTE 677 (BATTERSON ROAD)
DESCRIPTION: 100RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 2,000
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2,500Revenue Sharing Funds: Local Match
0 0 0 0 0 0 2,500Revenue Sharing Funds: State Match
-3,000 0 0 0 0 0 0 5,000Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 676 - EXTEND EXISTING ROAD
PROJECT
UPC NO.:
ROUTE:
104213
NFO0676
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
URBINE ROADSTREET NAME:
PEPowhatan County
CN
FROM: STAVE MILL ROAD TO: ROUTE 60 (0.5000 MI)DESCRIPTION: RW
PROJECT LENGTH: 0.5000 MISCOPE OF WORK: New Construction Roadway TO 0
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,000Revenue Sharing Funds: Local Match
0 0 0 0 0 0 1,000Revenue Sharing Funds: State Match
-2,000 0 0 0 0 0 0 2,000Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
ROUTE 681 - BRIDGE REPLACEMENT OVER
APPOMATTOX RIVER
PROJECT
UPC NO.:
ROUTE:
101246
NFO0681
Revised schedule required.REPORT NOTE:
FY2017
SCHEDULE
500
ESTIMATED COST (000's)
JURISDICTION:
CLEMENTON ROADSTREET NAME:
PEPowhatan County
FY2019 3,871CN
FY2018Rte 681 Over Appomattox River (VA Str 6910) (0.2700 MI)DESCRIPTION: 200RW
PROJECT LENGTH: 0.2700 MISCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 4,571
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 546 0 0 0 0 0CTB Formula: Bridge - State
0 500 347 100 248 0 0STP: BROS - Federal
0 125 87 25 62 0 0STP: BROS - Soft Match
2,532 1,171 434 125 310 0 0 0Total
11/12/2014 793
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 684 - REPLACE BRIDGE
PROJECT
UPC NO.:
ROUTE:
93089
NFO0684
Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
600
ESTIMATED COST (000's)
JURISDICTION:
Cartersville RdSTREET NAME:
PEPowhatan County
FY2020 2,862CN
FY2018FROM: 0.89 MI W RTE 600 / 621 TO: 1.06 MI W RTE 600
/ 621 (0.1700 MI)
DESCRIPTION: 103RW
PROJECT LENGTH: 0.1700 MISCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 3,565
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 1,997 0 0 0 0 0CTB Formula: Bridge - State
0 0 793 0 0 0 0STP: Bridge - Federal
0 0 198 0 0 0 0STP: Bridge - Soft Match
170 0 0 41 250 0 0STP: BROS - Federal
43 0 0 10 62 0 0STP: BROS - Soft Match
0 1,997 991 52 312 213 0 0Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 711 - WIDEN TO 4 LANES
PROJECT
UPC NO.:
ROUTE:
86442
NFO0711
Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
2,404
ESTIMATED COST (000's)
JURISDICTION:
HUGUENOT TRAILSTREET NAME:
PEPowhatan County
FY2016 16,079CN
UnderwayFROM: 0.370 MI. EAST OF RTE. 288 TO: 0.142 MI.
EAST OF THE POWHATAN / CHESTERFIELD COUNTY
LINE (1.2000 MI)
DESCRIPTION: 2,110RW
29606 -1PROJECT LENGTH: 1.2000 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Reconstruction w/ Added Capacity TO 20,593
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 570Bond Proceeds: CPR Bonds
0 0 3,978 1,885 2,767 0 0CTB Formula: Bridge - State
0 0 0 0 0 0 166Non-Formula: State Match
0 0 0 0 0 0 671RSTP (STP Regional): Federal
0 0 0 0 0 0 2RSTP (STP Regional): State Match
0 0 0 0 0 0 126(S) Secondary Formula: Federal
0 0 0 0 0 0 32(S) Secondary Formula: State Match
88 0 0 721 963 63 0STP: Bridge - Federal
22 0 0 180 241 16 0STP: Bridge - Soft Match
0 0 0 0 0 0 758STP: Statewide - Federal
0 0 0 0 0 0 190STP: Statewide - Soft Match
7,157 0 3,978 2,785 3,971 109 78 2,514Total
794 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 711 - REPLACE BRIDGE
PROJECT
UPC NO.:
ROUTE:
104954
NFO0711
FY2019
SCHEDULE
1,200
ESTIMATED COST (000's)
JURISDICTION:
HUGUENOT TRAILSTREET NAME:
PEPowhatan County
FY2022 3,360CN
FY2020DESCRIPTION: 400RW
PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 4,960
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 1,638 980 0 0 0 0STP: Bridge - Federal
0 409 245 0 0 0 0STP: Bridge - Soft Match
1,688 2,047 1,225 0 0 0 0 0Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 714 - CONSTRUCT NEW ROAD
PROJECT
UPC NO.:
ROUTE:
104212
NFO0714
Revised schedule required.REPORT NOTE:
FY2014
SCHEDULE
300
ESTIMATED COST (000's)
JURISDICTION:
WINTERFIELD ROADSTREET NAME:
PEPowhatan County
FY2016 1,300CN
FROM: ROUTE 714 TO: ROUTE 711 (0.4500 MI)DESCRIPTION: RW
PROJECT LENGTH: 0.4500 MISCOPE OF WORK: New Construction Roadway TO 1,600
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 800Revenue Sharing Funds: Local Match
0 0 0 0 0 0 800Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 1,600Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
RTE 1343 - NEW ROADWAY CONSTRUCTION
PROJECT
UPC NO.:
ROUTE:
8216
NFO1343
Complete
SCHEDULE
1,246
ESTIMATED COST (000's)
JURISDICTION:
Carter Gallier BoulevardSTREET NAME:
PEPowhatan County
Underway 2,595CN
FY2015FROM: Intersection Luck Stone Entrance TO: Intersection
Route 60 (State Police Crossover) (0.5500 MI)
DESCRIPTION: 1,772RW
PROJECT LENGTH: 0.5500 MISCOPE OF WORK: New Construction Roadway TO 5,613
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 385Non-Formula: State Match
0 0 0 0 0 0 3,321RSTP (STP Regional): Federal
0 0 0 0 440 0 0RSTP (STP Regional): MPO - Federal
0 0 0 0 110 0 0RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 446RSTP (STP Regional): State Match
0 0 0 0 0 0 127(S) Secondary Formula: Federal/State
0 0 0 0 0 0 14(S) Secondary Formula: State
83 0 0 83 83 0 0(S) Telecommunications: State
523 0 0 83 633 83 0 4,292Total
11/12/2014 795
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
Tri-CitiesSecondary
PROGRAM/SYSTEM
RTE 630 - ADD LEFT TURN LANE
PROJECT
UPC NO.:
ROUTE:
82849
NFO0630
MPO Project. Balance of funds to be provided by MPO. Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
25
ESTIMATED COST (000's)
JURISDICTION:
BULL HILL ROADSTREET NAME:
PEPrince George County
FY2020 249CN
FROM: 0.10 MI S RTE 460 TO: RTE 460 (0.1000 MI)DESCRIPTION: RW
PROJECT LENGTH: 0.1000 MISCOPE OF WORK: Safety TO 274
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 53CMAQ: Federal
0 0 0 0 0 0 13CMAQ: State Match
208 0 0 0 0 0 0 66Total
MPO Area
Tri-CitiesSecondary
PROGRAM/SYSTEM
RTE 630 - ROUNDABOUT
PROJECT
UPC NO.:
ROUTE:
87941
NFO0630
Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
60
ESTIMATED COST (000's)
JURISDICTION:
JEFFERSON PARK ROADSTREET NAME:
PEPrince George County
FY2013 77CN
UnderwayAT AVENUE A - FT LEE (0.2000 KM)DESCRIPTION: 56RW
PROJECT LENGTH: 0.2000 KMSCOPE OF WORK: Safety TO 192
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 116Priority Transportation Funds: State
0 0 0 0 0 0 121Special Grant Projects: Federal
-45 0 0 0 0 0 0 238Total
MPO Area
Tri-CitiesSecondary
PROGRAM/SYSTEM
RTE 645 - WIDENING
PROJECT
UPC NO.:
ROUTE:
105131
NFO0645
MPO Project. Balance to be provided by MPO.REPORT NOTE:
Underway
SCHEDULE
200
ESTIMATED COST (000's)
JURISDICTION:
PUDDLEDOCK ROADSTREET NAME:
PEPrince George County
FY2022 3,369CN
FY2020FROM: RTE 144 (TEMPLE AVE) TO: PETERSBURG
CITY LIMITS (0.5283 MI)
DESCRIPTION: 1,500RW
PROJECT LENGTH: 0.5283 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 5,069
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
85 0 0 825 557 0 423RSTP (STP Regional): MPO - Federal
21 0 0 206 139 0 106RSTP (STP Regional): MPO - State Match
2,706 0 0 1,032 696 107 0 528Total
796 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
DISTRICT SECONDARY ALLOCATIONS
PROJECT
UPC NO.: T1079
NFOSecondary Allocation
BALANCE OF SECONDARY FUNDS FOR PROJECTS NOT IN SYIP.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
Principal Fund Source:
0 0 0 0 0 428(S) Federal Formula STP: Federal: Federal
Formula STP - Secondary : Henrico
(CNF675)
0
0 0 0 0 0 0 428(S) Federal Formula STP: Federal
0 0 0 0 0 167(S) Federal Formula STP: State Bond Match:
Federal Formula - Secondary Bond Match :
Henrico (CNB653)
0
0 0 0 0 0 0 167(S) Federal Formula STP: State Bond Match
0 0 0 0 0 0(S) Residue Parcel Revenue: State: Residue
Parcel - Henrico County (CNS620)
0
0 0 0 0 0 0 0(S) Residue Parcel Revenue: State
0 0 0 0 0 1,025(S) Secondary Formula: Federal: Secondary
Formula - Bridge : Henrico (CNF669)
0
0 0 0 0 0 811(S) Secondary Formula: Federal: Secondary
Formula - EB(MG) : Henrico (CNF668)
0
0 0 0 0 0 577(S) Secondary Formula: Federal: Secondary
Formula - IM to STP : Henrico (CNF626)
0
0 0 0 0 0 193(S) Secondary Formula: Federal: Secondary
Formula - STP : Henrico (CNF667)
0
0 0 0 0 0 0 2,607(S) Secondary Formula: Federal
0 0 0 0 0 1,264(S) Secondary Formula: Federal/State:
Federal/State - Henrico (CNS601)
0
0 0 0 0 0 0 1,264(S) Secondary Formula: Federal/State
0 0 0 0 0 4,439(X) Secondary Formula: State: Secondary
Formula - State : Henrico
0
0 0 0 0 0 0 4,439(X) Secondary Formula: State
0 0 0 0 0 714(S) Secondary Formula: State Match:
Secondary Formula - Match : Henrico
(CNB670)
0
0 0 0 0 0 0 714(S) Secondary Formula: State Match
0 0 0 0 0 0 9,619Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
ADA COMPLIANCE
PROJECT
UPC NO.:
ROUTE:
106352
NFO
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PERichmond District-wide
FY2015 473CN
FROM: various TO: variousDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 473
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 496Bond Proceeds: CPR Bonds -23
11/12/2014 797
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Secondary
MPO Area
Tri-CitiesSecondary
PROGRAM/SYSTEM
ARRA - TRI-CITIES RESURFACING - CN ONLY
PROJECT
UPC NO.: 94858
NFOARRA09
ARRA CN for PE project UPC 95041REPORT NOTE:
FROM: VARIOUS LOCATIONS IN CHESTERFIELD,
DINWIDDIE, TO: PETERSBURG, PRINCE GEORGE &
HOPEWELL (10.5000 MI)
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2,344American Recovery and Reinvestment Act:
Urbanized Area > 200K
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
DISTRICTWIDE - HIGH FRICTION CORRIDOR
PAVEMENT TREATMENTS
PROJECT
UPC NO.:
ROUTE:
104699
NFO9999
Complete
SCHEDULE
80
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PERichmond District-wide
Underway 1,776CN
FROM: VARIOUS TO: VARIOUSDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 1,856
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,772High Risk Rural: Federal
0 0 0 0 0 0 197High Risk Rural: State Match
-113 0 0 0 0 0 0 1,969Total
MPO Area
RichmondSecondary
PROGRAM/SYSTEM
DISTRICTWIDE - HIGH FRICTION CORRIDOR
PAVEMENT
PROJECT
UPC NO.:
ROUTE:
106239
NFO9999
Underway
SCHEDULE
150
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PERichmond District-wide
FY2016 2,000CN
FROM: VARIOUS TO: VARIOUSDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 2,150
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
1,800 0 0 0 0 135 0Highway Safety Improvements: Federal
200 0 0 0 0 15 0Highway Safety Improvements: Soft Match
0 0 0 0 0 2,000 150 0Total
798 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
RichmondUrban
PROGRAM/SYSTEM
RTE 1 - WIDEN TO 6 LANES
PROJECT
UPC NO.:
ROUTE:
8651
NFO0001
PE only. Revised schedule required. Project linked to UPC 13463.REPORT NOTE:
Underway
SCHEDULE
545
ESTIMATED COST (000's)
JURISDICTION:
ROUTE 1STREET NAME:
PEAshland
FY2022 1,543CN
UnderwayFROM: 0.008 MILE NORTH OF ASHCAKE ROAD TO:
0.015 MILE SOUTH OF PLEASANT ROAD (0.4240 MI)
DESCRIPTION: 1,700RW
PROJECT LENGTH: 0.4240 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 3,788
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 15Federal Formula STP: Federal
0 0 0 0 0 0 0Federal Formula STP: State Bond Match
0 0 0 0 0 0 2Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 10State Formula: Urban - Local Match
0 0 0 0 0 0 86Urban Formula: Federal
0 0 0 0 0 0 435Urban Formula: State
0 0 0 0 0 0 22Urban Formula: State Match
3,217 0 0 0 0 0 0 571Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
RTE 1 - IMPROVE INTERSECTION AT RTE 54
PROJECT
UPC NO.:
ROUTE:
13463
NFO0001
Project linked to UPC 8651. MPO project.REPORT NOTE:
Underway
SCHEDULE
751
ESTIMATED COST (000's)
JURISDICTION:
NORTH & SOUTH WASHINGTON HWYSTREET NAME:
PEAshland
FY2015 3,158CN
UnderwayFROM: 0.119 MI. S. OF INT. W/ RTE 54 TO: 0.086 MI. N.
OF INT. W/ RTE 54 (0.2070 MI)
DESCRIPTION: 2,500RW
PROJECT LENGTH: 0.2050 MISCOPE OF WORK: Safety TO 6,409
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 366CMAQ: Federal
400 0 0 0 0 200 3,115CMAQ: MPO - Federal
100 0 0 0 0 50 779CMAQ: MPO - State Match
0 0 0 0 0 0 3Federal Formula STP: Federal
0 0 0 0 0 0 1Federal Formula STP: State Bond Match
0 0 0 0 0 0 3Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 49Non-Formula: State
0 0 0 0 0 0 450Proffers: State
0 0 0 0 0 0 195RSTP (STP Regional): Federal
0 0 0 0 0 0 15State Formula: Urban - Local Match
0 0 0 0 0 0 63Urban Formula: Federal
0 0 0 0 0 0 168Urban Formula: Federal/State
0 0 0 0 0 0 736Urban Formula: State
0 0 0 0 0 0 14Urban Formula: State Match
-299 0 0 0 0 500 250 5,958Total
11/12/2014 799
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
RichmondUrban
PROGRAM/SYSTEM
RTE 1 - INTERSECTION IMPROVEMENT
PROJECT
UPC NO.:
ROUTE:
105677
NFO0001
FY2015
SCHEDULE
66
ESTIMATED COST (000's)
JURISDICTION:
WASHINGTON HIGHWAYSTREET NAME:
PEAshland
FY2019 614CN
FY2017FROM: .17 MI NORTH THE VITAMIN SHOPPE WAY TO:
.15 MI SOUTH OF THE VITAMIN SHOPPE WAY (0.3200
MI)
DESCRIPTION: 20RW
PROJECT LENGTH: 0.3200 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 700
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 350 0Revenue Sharing Funds: Local Match
0 0 0 0 0 350 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 700 0Total
MPO Area
NonMPOUrban
PROGRAM/SYSTEM
N. AMELIA AVENUE - REPLACE BRIDGE DECK
PROJECT
UPC NO.:
ROUTE:
100809
NFO
Complete
SCHEDULE
408
ESTIMATED COST (000's)
JURISDICTION:
NORTH AMELIA AVENUESTREET NAME:
PEBlackstone
Underway 1,409CNFROM: 0.03 mi N. Rte 460 (Chruch Street) TO: 0.073 mi
N. Rte 460 (Church Street) (0.0430 MI)
DESCRIPTION: RW
22419 68PROJECT LENGTH: 0.0430 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Rehab w/o Added Capacity TO 1,817
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 16Bond Match: State Bond Match
0 0 0 0 0 0 246Bridge Replacement: Federal
0 0 0 0 0 0 100Federal Formula STP: Federal
0 0 0 0 0 0 25Federal Formula STP: State Bond Match
0 0 0 0 0 0 595Federal STP: Federal
0 0 0 0 0 0 0Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 194Soft Match: Federal
0 0 0 0 0 0 0State Formula: Urban - Local Match
0 0 0 0 0 129 485STP: Bridge - Federal
0 0 0 0 0 32 121STP: Bridge - Soft Match
0 0 0 0 0 0 77STP: BROS - Federal
0 0 0 0 0 0 19STP: BROS - Soft Match
0 0 0 0 0 0 107STP: Statewide - Federal
0 0 0 0 0 0 27STP: Statewide - Soft Match
0 0 0 0 0 0 4Urban Formula: Federal
0 0 0 0 0 0 19Urban Formula: State
0 0 0 0 0 0 1Urban Formula: State Match
-380 0 0 0 0 0 161 2,036Total
800 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
NonMPOUrban
PROGRAM/SYSTEM
SOUTH MAIN STREET, PHASE III
PROJECT
UPC NO.:
ROUTE:
90175
NFO0040
Local Priority 2. Complete & revised schedule required.REPORT NOTE:
Underway
SCHEDULE
253
ESTIMATED COST (000's)
JURISDICTION:
South Main streetSTREET NAME:
PEBlackstone
CN
FROM: Tenth Street TO: SCL (1.0000 MI)DESCRIPTION: RW
PROJECT LENGTH: 1.0000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 253
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 8Federal Formula STP: Federal
0 0 0 0 0 0 2Federal Formula STP: State Bond Match
243 0 0 0 0 0 0 10Total
MPO Area
NonMPOUrban
PROGRAM/SYSTEM
NOTTOWAY AVE - ADD SIDEWALK
PROJECT
UPC NO.:
ROUTE:
105651
NFOU000
FY2015
SCHEDULE
41
ESTIMATED COST (000's)
JURISDICTION:
NOTTOWAY AVENUESTREET NAME:
PEBlackstone
FY2016 350CN
FY2015FROM: N AMELIA ST TO: CORP LIMITS (0.3800 MI)DESCRIPTION: 11RW
PROJECT LENGTH: 0.3800 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 402
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 201 0Revenue Sharing Funds: Local Match
0 0 0 0 0 201 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 402 0Total
MPO Area
Tri-CitiesUrban
PROGRAM/SYSTEM
CITY OF COLONIAL HEIGHTS - FORMULA CITY
PAYMENT
PROJECT
UPC NO.: T7749
NFOTown/City-wide
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0Urban Formula: State
0 0 0 0 0 0Urban Formula: State Match
0 0 0 0 0 0Total
11/12/2014 801
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
Tri-CitiesUrban
PROGRAM/SYSTEM
BRANDERS BRIDGE ROAD AND ROUTE 1 -
INTERSECTION IMPROVEMENT
PROJECT
UPC NO.:
ROUTE:
99194
NFO
MPO Project. Locally Administered. Revised schedule required.REPORT NOTE:
FY2017
SCHEDULE
35
ESTIMATED COST (000's)
JURISDICTION:
Branders Bridge RoadSTREET NAME:
PEColonial Heights
FY2018 210CN
FROM: west of Route 1 TO: Route 1 (0.1000 MI)DESCRIPTION: RW
PROJECT LENGTH: 0.1000 MISCOPE OF WORK: Resurfacing TO 245
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 196 0 0 0 0CMAQ: MPO - Federal
0 0 49 0 0 0 0CMAQ: MPO - State Match
0 0 245 0 0 0 0 0Total
MPO Area
Tri-CitiesUrban
PROGRAM/SYSTEM
ROUTE 1 AND WESTOVER AVENUE
INTERSECTION
PROJECT
UPC NO.:
ROUTE:
100501
NFO
MPO Project. Locally Administered.REPORT NOTE:
FY2019
SCHEDULE
125
ESTIMATED COST (000's)
JURISDICTION:
Westover AvenueSTREET NAME:
PEColonial Heights
FY2020 656CN
FY2020FROM: Route 1 TO: .2 miles east of Route 1 (0.2000 MI)DESCRIPTION: 19RW
PROJECT LENGTH: 0.2000 MISCOPE OF WORK: Safety TO 800
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 525 115 0 0 0 0CMAQ: MPO - Federal
0 131 29 0 0 0 0CMAQ: MPO - State Match
0 656 144 0 0 0 0 0Total
MPO Area
Tri-CitiesUrban
PROGRAM/SYSTEM
DUPUY AVE - MINOR WIDENING
PROJECT
UPC NO.:
ROUTE:
101287
NFO
MPO Project. Locally Administered.REPORT NOTE:
Underway
SCHEDULE
480
ESTIMATED COST (000's)
JURISDICTION:
DUPUY AVENUESTREET NAME:
PEColonial Heights
FY2015 2,602CN
FY2014FROM: WCL COLONIAL HTS TO: 0.1 MI. WEST RTE. 1
(BOULEVARD) (0.3800 MI)
DESCRIPTION: 1,001RW
PROJECT LENGTH: 0.3800 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 4,083
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,091RSTP (STP Regional): Federal
81 0 0 0 0 119 1,975RSTP (STP Regional): MPO - Federal
20 0 0 0 0 30 494RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 273RSTP (STP Regional): State Match
0 0 0 0 0 101 149 3,833Total
802 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
Tri-CitiesUrban
PROGRAM/SYSTEM
LAKEVIEW AVE - MINOR WIDENING
PROJECT
UPC NO.:
ROUTE:
101288
NFO
MPO Project. Locally Administered.REPORT NOTE:
Underway
SCHEDULE
414
ESTIMATED COST (000's)
JURISDICTION:
LAKEVIEW AVENUESTREET NAME:
PEColonial Heights
FY2015 2,550CN
FY2014FROM: BRIJIDAN LA TO: BOULEVARD (RTE 1) (0.4000
MI)
DESCRIPTION: 350RW
PROJECT LENGTH: 0.4000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 3,314
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 331RSTP (STP Regional): Federal
83 0 0 0 0 1,368 869RSTP (STP Regional): MPO - Federal
21 0 0 0 0 342 217RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 83RSTP (STP Regional): State Match
0 0 0 0 0 104 1,710 1,501Total
MPO Area
Tri-CitiesUrban
PROGRAM/SYSTEM
WHITE SAND CT - REPAIR PAVEMENT
PROJECT
UPC NO.:
ROUTE:
104508
NFO0000
Underway
SCHEDULE
6
ESTIMATED COST (000's)
JURISDICTION:
WHITE SAND COURTSTREET NAME:
PEColonial Heights
FY2015 160CN
FROM: HERON RUN DR TO: END ST MAINT (0.1500 MI)DESCRIPTION: RW
PROJECT LENGTH: 0.1500 MISCOPE OF WORK: Restoration and Rehabilitation TO 166
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 0Local Project Contributions: Local
0 0 0 0 0 0 83Revenue Sharing Funds: Local Match
0 0 0 0 0 0 83Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 166Total
MPO Area
Tri-CitiesUrban
PROGRAM/SYSTEM
CITY OF COLONIAL HEIGHTS - SRTS - NORTH
ES - SIDEWALKS
PROJECT
UPC NO.:
ROUTE:
105233
NFO0000
Locally Administered. Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
20
ESTIMATED COST (000's)
JURISDICTION:
VARIOUSSTREET NAME:
PEColonial Heights
FY2017 200CN
FY2017FROM: HARGRAVE AVE TO: EASTMAN AVEDESCRIPTION: 30RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 250
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 250Safe Routes to School: Federal
0 0 0 0 0 0 0 250Total
11/12/2014 803
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
Tri-CitiesUrban
PROGRAM/SYSTEM
RTE 1 - IMPROVE INT AT DUPUY AVE
PROJECT
UPC NO.:
ROUTE:
3945
NFO0001
Urban Construction Initiative project. MPO Project. Excess funds to be redistributed by MPO.REPORT NOTE:
Complete
SCHEDULE
740
ESTIMATED COST (000's)
JURISDICTION:
DUPUY AVENUE & BOULEVARDSTREET NAME:
PEColonial Heights
Underway 4,002CN
UnderwayFROM: DUPUY AVE - FR: BATTERY PLACE TO:
BOULEVARD TO: ROUTE 1 - FR: PICKWICK AVE TO:
LAFAYETTE AVE (0.3800 MI)
DESCRIPTION: 1,960RW
PROJECT LENGTH: 0.3800 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 6,702
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,796CMAQ: Federal
0 0 0 0 0 108 576CMAQ: MPO - Federal
0 0 0 0 0 27 144CMAQ: MPO - State Match
0 0 0 0 0 0 453CMAQ: State Match
0 0 0 0 0 0 1,715(X) Local Project Contributions: State Match
0 0 0 0 0 0 58Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 11State Formula: Urban - Local Match
0 0 0 0 0 0 1,523Urban Formula: Federal
0 0 0 0 0 0 132Urban Formula: State
0 0 0 0 0 0 175Urban Formula: State Match
-16 0 0 0 0 0 135 6,584Total
MPO Area
Tri-CitiesUrban
PROGRAM/SYSTEM
RTE 1 - ADD CENTER TURN LANE
PROJECT
UPC NO.:
ROUTE:
52434
NFO0001
Locally Administered - MPO Project. Excess funds to be redistributed by MPO.REPORT NOTE:
Complete
SCHEDULE
291
ESTIMATED COST (000's)
JURISDICTION:
BOULEVARDSTREET NAME:
PEColonial Heights
Underway 1,668CN
UnderwayFROM: WESTOVER AVE TO: WINDSOR AVE (0.1800
MI)
DESCRIPTION: 630RW
PROJECT LENGTH: 0.1800 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 2,589
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2,007CMAQ: Federal
0 0 0 0 0 0 338CMAQ: State Match
0 0 0 0 0 0 2Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 247Minimum Guarantee: Federal
0 0 0 0 0 0 62Soft Match: Federal
0 0 0 0 0 0 1State Formula: Urban - Local Match
0 0 0 0 0 0 44Urban Formula: State
0 0 0 0 0 0 116Urban Formula: State Match
-228 0 0 0 0 0 0 2,817Total
804 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
Tri-CitiesUrban
PROGRAM/SYSTEM
RTE 1 - ADD CENTER TURN LANE
PROJECT
UPC NO.:
ROUTE:
90374
NFO0001
MPO project. Excess funds to be redistributed by MPO. Locally AdministeredREPORT NOTE:
Complete
SCHEDULE
179
ESTIMATED COST (000's)
JURISDICTION:
BOULEVARDSTREET NAME:
PEColonial Heights
Underway 932CN
UnderwayFROM: WINDSOR AVE TO: PICKWICK AVE (0.0800 MI)DESCRIPTION: 475RW
PROJECT LENGTH: 0.0800 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 1,587
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,241CMAQ: Federal
0 0 0 0 0 0 179CMAQ: MPO - Federal
0 0 0 0 0 0 45CMAQ: MPO - State Match
0 0 0 0 0 0 310CMAQ: State Match
-188 0 0 0 0 0 0 1,775Total
MPO Area
Tri-CitiesUrban
PROGRAM/SYSTEM
REHABILITATE BRIDGES -VARIOUS
LOCATIONS
PROJECT
UPC NO.:
ROUTE:
105109
NFO9999
MPO Project. Locally administered. Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
135
ESTIMATED COST (000's)
JURISDICTION:
VARIOUSSTREET NAME:
PEColonial Heights
FY2018 465CN
FY2017FROM: VARIOUS LOCATIONS TO: VARIOUS
LOCATIONS
DESCRIPTION: 50RW
PROJECT LENGTH: _SCOPE OF WORK: Bridge Rehab w/o Added Capacity TO 650
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 412 108 0 0 0 0RSTP (STP Regional): MPO - Federal
0 103 27 0 0 0 0RSTP (STP Regional): MPO - State Match
0 515 135 0 0 0 0 0Total
MPO Area
Tri-CitiesUrban
PROGRAM/SYSTEM
HOLLY AVE - RECONSTRUCTION
PROJECT
UPC NO.:
ROUTE:
105690
NFOU000
FY2015
SCHEDULE
6
ESTIMATED COST (000's)
JURISDICTION:
HOLLY AVENUESTREET NAME:
PEColonial Heights
FY2016 133CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Reconstruction w/o Added Capacity TO 139
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 251 0Revenue Sharing Funds: Local Match
0 0 0 0 0 251 0Revenue Sharing Funds: State Match
-363 0 0 0 0 0 502 0Total
11/12/2014 805
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
RichmondUrban
PROGRAM/SYSTEM
RTE 271 - SIDEWALK (NEW CONSTRUCTION)
PROJECT
UPC NO.:
ROUTE:
105660
NFO0271
FY2015
SCHEDULE
125
ESTIMATED COST (000's)
JURISDICTION:
NUCKOLS RD/POUNCEY TRACT RDSTREET NAME:
PEHenrico County
FY2019 650CN
FY2017FROM: HEATHERFORD DR TO: OLD WYNDHAM DR
(1.4000 MI)
DESCRIPTION: 40RW
PROJECT LENGTH: 1.4000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 815
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 400 0Revenue Sharing Funds: Local Match
0 0 0 0 0 400 0Revenue Sharing Funds: State Match
15 0 0 0 0 0 800 0Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
SHADY GROVE RD, OLD NUCKOLS RD - ADD
SIDEWALK
PROJECT
UPC NO.:
ROUTE:
104277
NFO9999
Underway
SCHEDULE
25
ESTIMATED COST (000's)
JURISDICTION:
SHADY GROVE ROAD and OLD NUCKOLS ROADSTREET NAME:
PEHenrico County
FY2014 113CNFROM: 500 FT S OLD NUCKOLS RD TO: 300 FT E
SHADY GROVE RD (0.1500 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.1500 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 138
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 25Local Project Contributions: Local
0 0 0 0 0 0 69Revenue Sharing Funds: Local Match
0 0 0 0 0 0 69Revenue Sharing Funds: State Match
-25 0 0 0 0 0 0 163Total
MPO Area
Tri-CitiesUrban
PROGRAM/SYSTEM
CATTAIL CREEK DRAINAGE CHANNEL -
IMPROVE DRAINAGE
PROJECT
UPC NO.:
ROUTE:
104278
NFO0000
FY2014
SCHEDULE
42
ESTIMATED COST (000's)
JURISDICTION:
VARIOUSSTREET NAME:
PEHopewell
FY2015 280CN
FROM: S 20TH ST (UNDER NS RR) TO: ELM STDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Reconstruction w/o Added Capacity TO 322
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 161Revenue Sharing Funds: Local Match
0 0 0 0 0 0 161Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 322Total
806 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
Tri-CitiesUrban
PROGRAM/SYSTEM
E BROADWAY - REHABILITATE BRIDGE
PROJECT
UPC NO.:
ROUTE:
104509
NFO0000
Underway
SCHEDULE
19
ESTIMATED COST (000's)
JURISDICTION:
EAST BROADWAYSTREET NAME:
PEHopewell
FY2014 124CNFROM: GRADE CROSSING CONNECTION FROM
RIVERVIEW AVE TO: RAMSEY STREET (0.0400 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.0400 MISCOPE OF WORK: Bridge Rehab w/o Added Capacity TO 143
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 98Local Project Contributions: Local
0 0 0 0 0 0 22Revenue Sharing Funds: Local Match
0 0 0 0 0 0 22Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 143Total
MPO Area
Tri-CitiesUrban
PROGRAM/SYSTEM
SOUTH 6TH AVE - REHABILITATE BRIDGE
PROJECT
UPC NO.:
ROUTE:
104510
NFO0000
Underway
SCHEDULE
12
ESTIMATED COST (000's)
JURISDICTION:
SOUTH 6TH AVENUESTREET NAME:
PEHopewell
FY2014 60CNFROM: GRADE CROSSING CONNECTION FROM SO
7TH AVE TO: LAPRADE ST (0.0500 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.0500 MISCOPE OF WORK: Bridge Rehab w/o Added Capacity TO 72
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 50Local Project Contributions: Local
0 0 0 0 0 0 11Revenue Sharing Funds: Local Match
0 0 0 0 0 0 11Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 72Total
MPO Area
Tri-CitiesUrban
PROGRAM/SYSTEM
RTE 10 - IMPROVE INTERSECTION
PROJECT
UPC NO.:
ROUTE:
12955
NFO0010
MPO Project.REPORT NOTE:
Underway
SCHEDULE
330
ESTIMATED COST (000's)
JURISDICTION:
E. Randolph RoadSTREET NAME:
PEHopewell
FY2015 651CN
UnderwayFROM: 0.162 MI West Hummel Ross Road TO: 0.09 MI
East Hummel Ross Road (0.2520 MI)
DESCRIPTION: 482RW
PROJECT LENGTH: 0.2520 MISCOPE OF WORK: Safety TO 1,462
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 816CMAQ: Federal
61 0 0 0 0 341 152CMAQ: MPO - Federal
15 0 0 0 0 85 38CMAQ: MPO - State Match
0 0 0 0 0 0 136CMAQ: State Match
-184 0 0 0 0 77 427 1,143Total
11/12/2014 807
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
Tri-CitiesUrban
PROGRAM/SYSTEM
RTE 36 - INTERSECTION IMPROVEMENT
PROJECT
UPC NO.:
ROUTE:
100500
NFO0036
MPO Project.REPORT NOTE:
Underway
SCHEDULE
75
ESTIMATED COST (000's)
JURISDICTION:
Oaklawn BoulevardSTREET NAME:
PEHopewell
FY2017 377CNFROM: .2 miles west of Route 630 TO: .2 miles east of
Rotue 630 (0.4000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.4000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 451
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
40 0 0 0 257 4 58CMAQ: MPO - Federal
10 0 0 0 64 1 15CMAQ: MPO - State Match
2 0 0 0 322 50 5 73Total
MPO Area
Tri-CitiesUrban
PROGRAM/SYSTEM
CEDAR LEVEL RD - WIDENING
PROJECT
UPC NO.:
ROUTE:
90018
NFO9047
PE and RW only. Accruing funds for CN.REPORT NOTE:
Underway
SCHEDULE
400
ESTIMATED COST (000's)
JURISDICTION:
Cedar Level RoadSTREET NAME:
PEHopewell
FY2018 12,100CN
FY2014FROM: COBBLESTONE PKWY TO: UR-9036 (MILES
AVE) (0.5190 MI)
DESCRIPTION: 1,000RW
PROJECT LENGTH: 0.5190 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 13,500
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1Federal Formula STP: Federal
0 0 0 0 0 0 53Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 1Residue Parcel Revenue: State
0 0 0 0 0 0 640RSTP (STP Regional): Federal
374 0 1,144 788 1,260 0 0RSTP (STP Regional): MPO - Federal
94 0 286 197 315 0 0RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 160RSTP (STP Regional): State Match
0 0 0 0 0 0 1,869Urban Formula: Federal
0 0 0 0 0 0 287Urban Formula: State
0 0 0 0 0 0 423Urban Formula: State Match
5,611 0 1,430 985 1,575 468 0 3,432Total
MPO Area
Tri-CitiesUrban
PROGRAM/SYSTEM
BOSTON STREET - RECONSTRUCTION
PROJECT
UPC NO.:
ROUTE:
105654
NFOU000
FY2015
SCHEDULE
14
ESTIMATED COST (000's)
JURISDICTION:
BOSTON STREETSTREET NAME:
PEHopewell
FY2016 84CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Reconstruction w/o Added Capacity TO 98
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 49 0Revenue Sharing Funds: Local Match
0 0 0 0 0 49 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 98 0Total
808 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
Tri-CitiesUrban
PROGRAM/SYSTEM
LIBERTY AVENUE - RECONSTRUCTION
PROJECT
UPC NO.:
ROUTE:
105656
NFOU000
FY2015
SCHEDULE
25
ESTIMATED COST (000's)
JURISDICTION:
LIBERTY AVENUESTREET NAME:
PEHopewell
FY2016 149CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Reconstruction w/o Added Capacity TO 173
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 87 0Revenue Sharing Funds: Local Match
0 0 0 0 0 87 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 173 0Total
MPO Area
Tri-CitiesUrban
PROGRAM/SYSTEM
GRANBY ST - RECONSTRUCTION
PROJECT
UPC NO.:
ROUTE:
105708
NFOU000
FY2015
SCHEDULE
30
ESTIMATED COST (000's)
JURISDICTION:
GRANBY STREETSTREET NAME:
PEHopewell
FY2016 200CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Reconstruction w/o Added Capacity TO 230
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 115 0Revenue Sharing Funds: Local Match
0 0 0 0 0 115 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 230 0Total
MPO Area
NonMPOUrban
PROGRAM/SYSTEM
TOWN OF KENBRIDGE - SRTS - KENBRIDGE
ES - PED SIGNAL IMP.
PROJECT
UPC NO.:
ROUTE:
105234
NFO0000
Underway
SCHEDULE
14
ESTIMATED COST (000's)
JURISDICTION:
BROAD STREETSTREET NAME:
PEKenbridge
FY2017 33CNFROM: 3 LOC - FIFTH ST, SIXTH ST, TO: MAIN ST
(0.1000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.1000 MISCOPE OF WORK: Safety TO 47
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 47Safe Routes to School: Federal 0
11/12/2014 809
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
Tri-CitiesUrban
PROGRAM/SYSTEM
RIVES ROAD - INTERSECTION
IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
15832
NFO
Locally Administered. State Funds - AC for future federal conversion. Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
839
ESTIMATED COST (000's)
JURISDICTION:
RIVES ROADSTREET NAME:
PEPetersburg
FY2015 3,039CN
FY2014FROM: Route 301 TO: 0.1 Mile East Rte 301 (0.3900 MI)DESCRIPTION: 1,275RW
PROJECT LENGTH: 0.3900 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 5,153
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 459Federal Formula STP: Federal
0 0 0 0 0 0 10Federal Formula STP: State Bond Match
0 0 0 0 0 0 58Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 39Residue Parcel Revenue: State
0 0 0 0 0 0 20State Formula: Urban - Local Match
0 0 0 0 0 0 1,582Urban Formula: Federal
0 0 0 0 0 0 1,360Urban Formula: State
0 0 0 0 0 0 460Urban Formula: State Match
1,165 0 0 0 0 0 0 3,988Total
MPO Area
Tri-CitiesUrban
PROGRAM/SYSTEM
DOWNTOWN TRAFFIC SIGNAL OPTIMIZATION
- VARIOUS STREETS
PROJECT
UPC NO.:
ROUTE:
77537
NFO
MPO project. Excess funds to be redistributed by MPO. Locally Administered.REPORT NOTE:
Underway
SCHEDULE
325
ESTIMATED COST (000's)
JURISDICTION:
VARIOUSSTREET NAME:
PEPetersburg
CNFROM: N Jefferson St / S Jefferson St TO Perry St AND
TO: Wythe St / Halifax St TO: Bollingbrook St/ Bank St
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 325
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 326CMAQ: Federal
-1 0 0 0 0 0 0 326Total
810 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
Tri-CitiesUrban
PROGRAM/SYSTEM
RTE 36 - UPGRADE SIGNAL + EXTEND LTL
PROJECT
UPC NO.:
ROUTE:
101030
NFO
MPO Project. Locally Administered. Excess funds to be redistributed by MPO.REPORT NOTE:
Underway
SCHEDULE
155
ESTIMATED COST (000's)
JURISDICTION:
WASHINGTON STREETSTREET NAME:
PEPetersburg
FY2015 598CNFROM: 0.114 MI W RTE 9038 (PUDDLEDOCK RD) TO:
0.010 MI W RTE 9038 (PUDDLEDOCK RD) (0.1040 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.1040 MISCOPE OF WORK: Safety TO 753
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 100Accounts Receivable: Local
0 0 0 0 0 0 80RSTP (STP Regional): Federal
0 0 0 0 0 0 534RSTP (STP Regional): MPO - Federal
0 0 0 0 0 0 134RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 20RSTP (STP Regional): State Match
-115 0 0 0 0 0 0 868Total
MPO Area
Tri-CitiesUrban
PROGRAM/SYSTEM
PUDDLEDOCK RD - IMPROVE INTERSECTION
PROJECT
UPC NO.:
ROUTE:
101289
NFO
MPO Project. Revised estimate required.REPORT NOTE:
Underway
SCHEDULE
100
ESTIMATED COST (000's)
JURISDICTION:
PUDDLEDOCK ROADSTREET NAME:
PEPetersburg
FY2016 422CNFROM: 0.08 MI N RTE 36 (WASHINGTON ST) TO: 0.25
MI N RTE 36 (WASHINGTON ST) (0.1700 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.1700 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 522
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 38CMAQ: MPO - Federal
0 0 0 0 0 0 10CMAQ: MPO - State Match
0 0 0 0 0 0 122Local Project Contributions: Local
0 0 0 0 0 0 2Non-Formula: State
0 0 0 0 0 0 42Non-Formula: Statewide
0 0 0 0 0 0 292RSTP (STP Regional): Federal
0 0 0 0 0 0 71RSTP (STP Regional): State Match
0 0 0 0 0 0 168RSTP (STP Regional): Statewide
-222 0 0 0 0 0 0 744Total
MPO Area
Tri-CitiesUrban
PROGRAM/SYSTEM
RTE 460 - PAVEMENT OVERLAY
PROJECT
UPC NO.:
ROUTE:
105665
NFO
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
COUNTY DRIVESTREET NAME:
PEPetersburg
FY2015 3,500CNFROM: HICKORY HILL RD TO: PETERSBURG CITY
LIMITS (2.4000 MI)
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Resurfacing TO 3,500
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 1,750 0Revenue Sharing Funds: Local Match
0 0 0 0 0 1,750 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 3,500 0Total
11/12/2014 811
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
Tri-CitiesUrban
PROGRAM/SYSTEM
UPGRADE SIGNALS - VARIOUS LOCATIONS
PROJECT
UPC NO.:
ROUTE:
104868
NFO0000
MPO Project. Revised schedule required. Balance to be provided by MPO.REPORT NOTE:
FY2019
SCHEDULE
200
ESTIMATED COST (000's)
JURISDICTION:
VARIOUSSTREET NAME:
PEPetersburg
FY2020 1,400CNFROM: VARIOUS LOCATIONS TO: VARIOUS
LOCATIONS
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Traffic Management/Engineering TO 1,600
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 240 0 0 0 0 0CMAQ: MPO - Federal
0 60 0 0 0 0 0CMAQ: MPO - State Match
1,300 300 0 0 0 0 0 0Total
MPO Area
Tri-CitiesUrban
PROGRAM/SYSTEM
UPGRADE SIGNALS - VARIOUS LOCATIONS
PROJECT
UPC NO.:
ROUTE:
104869
NFO0000
MPO Project. Revised schedule required.REPORT NOTE:
FY2016
SCHEDULE
150
ESTIMATED COST (000's)
JURISDICTION:
VARIOUSSTREET NAME:
PEPetersburg
FY2017 300CNFROM: VARIOUS LOCATIONS TO: VARIOUS
LOCATIONS
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Traffic Management/Engineering TO 450
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 240 120 0 0 0CMAQ: MPO - Federal
0 0 60 30 0 0 0CMAQ: MPO - State Match
0 0 300 150 0 0 0 0Total
MPO Area
Tri-CitiesUrban
PROGRAM/SYSTEM
RTE 301 - UPGRADE SIGNALS
PROJECT
UPC NO.:
ROUTE:
101033
NFO0301
MPO Project. Excess funds to be redistributed by MPO.REPORT NOTE:
Underway
SCHEDULE
100
ESTIMATED COST (000's)
JURISDICTION:
CRATER ROADSTREET NAME:
PEPetersburg
FY2015 255CN
UnderwayFROM: 0.0220 MI NORTH OF WALNUT BLVD TO: 0.0070
MI SOUTH OF WALNUT BLVD (0.0290 MI)
DESCRIPTION: 349RW
PROJECT LENGTH: 0.0290 MISCOPE OF WORK: Safety TO 704
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 638RSTP (STP Regional): Federal
0 0 0 0 0 0 159RSTP (STP Regional): State Match
-94 0 0 0 0 0 0 797Total
812 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
Tri-CitiesUrban
PROGRAM/SYSTEM
SOUTH CRATER ROAD AREA - SIGNAL
COORDINATION
PROJECT
UPC NO.:
ROUTE:
101039
NFO0301
MPO Project. Locally Administered. Project linked to UPC 90019.REPORT NOTE:
Underway
SCHEDULE
132
ESTIMATED COST (000's)
JURISDICTION:
South Crater RoadSTREET NAME:
PEPetersburg
FY2017 528CN
FROM: FLANK RD TO: RIVES RD (1.4000 MI)DESCRIPTION: RW
PROJECT LENGTH: 1.4000 MISCOPE OF WORK: Safety TO 660
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 400 22 106 0CMAQ: MPO - Federal
0 0 0 100 6 26 0CMAQ: MPO - State Match
0 0 0 500 28 0 132 0Total
MPO Area
Tri-CitiesUrban
PROGRAM/SYSTEM
RTE 301 - EXTEND LTL (BOTH NB & SB) S.
CRATER RD @ MORTON RD
PROJECT
UPC NO.:
ROUTE:
104870
NFO0301
MPO Project.REPORT NOTE:
FY2018
SCHEDULE
100
ESTIMATED COST (000's)
JURISDICTION:
S. CRATER RD.STREET NAME:
PEPetersburg
FY2019 450CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Reconstruction w/ Added Capacity TO 550
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 360 80 0 0 0CMAQ: MPO - Federal
0 0 90 20 0 0 0CMAQ: MPO - State Match
0 0 450 100 0 0 0 0Total
MPO Area
Tri-CitiesUrban
PROGRAM/SYSTEM
RTE 301 - EXTEND SB LTL ON S. CRATER RD.
@ MED PARK BLVD.
PROJECT
UPC NO.:
ROUTE:
104878
NFO0301
MPO Project. Revised schedule required.REPORT NOTE:
FY2018
SCHEDULE
50
ESTIMATED COST (000's)
JURISDICTION:
S. CRATER RD.STREET NAME:
PEPetersburg
FY2019 285CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Reconstruction w/ Added Capacity TO 335
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 228 40 0 0 0 0CMAQ: MPO - Federal
0 57 10 0 0 0 0CMAQ: MPO - State Match
0 285 50 0 0 0 0 0Total
11/12/2014 813
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
RichmondUrban
PROGRAM/SYSTEM
GERMAN SCHOOL ROAD - MAJOR WIDENING
PROJECT
UPC NO.:
ROUTE:
15835
NFO
CN on ARRA UPC 93530REPORT NOTE:
Underway
SCHEDULE
2,090
ESTIMATED COST (000's)
JURISDICTION:
GERMAN SCHOOL RDSTREET NAME:
PERichmond
CN
UnderwayFROM: 0.130 KILOMETER NORTH OF WARWICK ROAD
TO: 0.008 KILOMETER NORTH OF GLENWAY DRIVE
EAST (1.7240 KM)
DESCRIPTION: 3,161RW
PROJECT LENGTH: 1.7240 KMSCOPE OF WORK: Reconstruction w/ Added Capacity TO 5,251
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 76Accounts Receivable: Local
0 0 0 0 0 0 32Bond Match: State Bond Match
0 0 0 0 0 0 128Federal STP: Federal
0 0 0 0 0 0 29Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 1,040Minimum Guarantee: Federal
0 0 0 0 0 0 50State Formula: Urban - Local Match
0 0 0 0 0 0 2,811Urban Formula: Federal
0 0 0 0 0 0 500Urban Formula: State
0 0 0 0 0 0 550Urban Formula: State Match
34 0 0 0 0 0 0 5,217Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
WHITEHEAD ROAD - MAJOR WIDENING
PROJECT
UPC NO.:
ROUTE:
15954
NFO
Urban Construction Initiative Project - Matching funds provided in quarterly payment. Partial PE
only. Complete estimate and schedule required
REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
WHITEHEAD ROADSTREET NAME:
PERichmond
CNFROM: WARWICK ROAD TO: ROUTE 360 AND
ELKHARDT ROAD (2.0000 KM)
DESCRIPTION: RW
PROJECT LENGTH: 2.0000 KMSCOPE OF WORK: Reconstruction w/ Added Capacity TO 0
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 4Local Project Contributions: Local
0 0 0 0 0 0 76(X) Local Project Contributions: State Match
0 0 0 0 0 0 337Urban Formula: Federal
-417 0 0 0 0 0 0 417Total
814 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
RichmondUrban
PROGRAM/SYSTEM
COMMERCE ROAD IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
15958
NFO
Urban Construction Initiative Project - Matching funds provided in quarterly payment.REPORT NOTE:
Underway
SCHEDULE
2,092
ESTIMATED COST (000's)
JURISDICTION:
COMMERCE ROADSTREET NAME:
PERichmond
FY2015 11,768CN
FY2014FROM: BELLS ROAD (SOUTH JUNCTION) TO:
BELLEMEADE ROAD (2.0000 MI)
DESCRIPTION: 600RW
PROJECT LENGTH: 2.0000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 14,460
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 6,896Local Project Contributions: Local
0 0 0 0 0 0 1,063(X) Local Project Contributions: State Match
0 0 0 760 880 0 0RSTP (STP Regional): MPO - Federal
0 0 0 190 220 0 0RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 5,636Urban Formula: Federal
-1,184 0 0 950 1,100 0 0 13,595Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
JAHNKE ROAD - 2 LANE IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
19035
NFO
MPO Project. Excess funds to be redistributed by MPO. Locally Administered.REPORT NOTE:
Underway
SCHEDULE
2,000
ESTIMATED COST (000's)
JURISDICTION:
JAHNKE ROADSTREET NAME:
PERichmond
FY2015 9,699CN
UnderwayFROM: BLAKEMORE RD TO: FOREST HILL AVE
(1.6000 MI)
DESCRIPTION: 2,000RW
PROJECT LENGTH: 1.6000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 13,699
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 866CMAQ: MPO - Federal
0 0 0 0 0 0 216CMAQ: MPO - State Match
0 0 0 0 0 0 6Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 170Non-Formula: State
0 0 0 0 0 0 4,401RSTP (STP Regional): Federal
0 0 3,200 0 0 0 2,503RSTP (STP Regional): MPO - Federal
0 0 800 0 0 0 626RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 930RSTP (STP Regional): State Match
0 0 0 0 0 0 253Urban Formula: Federal
0 0 0 0 0 0 57Urban Formula: State Match
-329 0 4,000 0 0 0 0 10,029Total
11/12/2014 815
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
RichmondUrban
PROGRAM/SYSTEM
FOREST HILL AVENUE IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
19036
NFO
MPO Project. Locally Administered.REPORT NOTE:
Underway
SCHEDULE
1,997
ESTIMATED COST (000's)
JURISDICTION:
FOREST HILL AVENUESTREET NAME:
PERichmond
FY2015 8,679CN
UnderwayFROM: HATHAWAY RD TO: POWHITE PARKWAY
(0.7400 MI)
DESCRIPTION: 2,025RW
PROJECT LENGTH: 0.7400 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 12,701
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 400CMAQ: MPO - Federal
0 0 0 0 0 0 100CMAQ: MPO - State Match
0 0 0 0 0 0 8Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 313Non-Formula: State
0 0 0 0 0 0 7,460RSTP (STP Regional): Federal
0 0 0 0 0 0 2,000RSTP (STP Regional): MPO - Federal
0 0 0 0 0 0 500RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 1,552RSTP (STP Regional): State Match
0 0 0 0 0 0 300Urban Formula: Federal
0 0 0 0 0 0 68Urban Formula: State Match
0 0 0 0 0 0 0 12,701Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
CITY OF RICHMOND - MAIN STREET STATION
CAPITAL FUNDS
PROJECT
UPC NO.: 64219
NFOTown/City-wide
MPO project.REPORT NOTE:
FROM: (PAYMENT FOR MAINSTREET STATION -
MONITORING OF FUNDS TO: ONLY)
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 12,486CMAQ: Federal
640 0 0 0 1,600 0 0CMAQ: MPO - Federal
160 0 0 0 400 0 0CMAQ: MPO - State Match
0 0 0 0 0 0 3,576CMAQ: State Match
0 0 0 0 0 0 13,705Local Project Contributions: Local
0 0 0 0 0 0 7Local Project Contributions: Urban - Local
Match
2,400 0 0 0 0 0 0RSTP (STP Regional): MPO - Federal
0 0 0 0 0 2,400 0(X) RSTP (STP Regional): MPO - Federal
(DRPT)
600 0 0 0 0 0 0RSTP (STP Regional): MPO - State Match
0 0 0 0 0 600 0(X) RSTP (STP Regional): MPO - State
Match (DRPT)
0 0 0 0 0 0 330Urban Formula: State Match
0 0 0 2,000 3,800 3,000 30,104Total
816 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
RichmondUrban
PROGRAM/SYSTEM
CITY OF RICHMOND - TRANSPORTATION
PLAN UPDATE
PROJECT
UPC NO.:
ROUTE:
64222
NFO
MPO project. Locally Administered. Excess funds to be redistributed by MPO.REPORT NOTE:
Underway
SCHEDULE
448
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PERichmond
CNFROM: (PAYMENT FOR TRANSPORTATION PLAN
UPDATE - TO: MONITORING OF FUNDS ONLY)
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Preliminary Engineering TO 448
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 30Non-Formula: State
0 0 0 0 0 0 400RSTP (STP Regional): Federal
0 0 0 0 0 0 70RSTP (STP Regional): State Match
-52 0 0 0 0 0 0 500Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
CITY OF RICHMOND - MAIN STREET STATION
OPERATIONS
PROJECT
UPC NO.: 66857
NFOTown/City-wide
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,820CMAQ: Federal
0 0 0 0 0 0 163CMAQ: State Match
0 0 0 0 0 0 292(X) Local Project Contributions: State Match
0 0 0 0 0 0 2,275Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
CITY OF RICHMOND - TRAFFIC CONTROL &
SAFETY ENHANCEMENTS
PROJECT
UPC NO.:
ROUTE:
70591
NFO
MPO project. Locally Administered.REPORT NOTE:
Complete
SCHEDULE
1,805
ESTIMATED COST (000's)
JURISDICTION:
VARIOUS ROUTESSTREET NAME:
PERichmond
Underway 3,510CN
(MPO PROJECT)DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 5,315
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 300CMAQ: Federal
0 0 0 0 0 0 127Local Project Contributions: Local
0 0 0 0 0 0 216Non-Formula: State
0 0 0 0 0 0 3,910RSTP (STP Regional): Federal
0 0 0 0 0 0 761RSTP (STP Regional): State Match
0 0 0 0 0 0 0 5,315Total
11/12/2014 817
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
RichmondUrban
PROGRAM/SYSTEM
CITY OF RICHMOND - SIGNAL SYSTEM
ENHANCEMENT
PROJECT
UPC NO.:
ROUTE:
70593
NFO
MPO project. Locally Administered. 100% Fed CMAQ funded project. Excess funds to be
redistributed by MPO.
REPORT NOTE:
Complete
SCHEDULE
1,389
ESTIMATED COST (000's)
JURISDICTION:
VARIOUS ROUTESSTREET NAME:
PERichmond
Underway 1,288CN
FROM: North Side TO: North SideDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 2,676
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 3,251CMAQ: Federal
-574 0 0 0 0 0 0 3,251Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
CITY OF RICHMOND - FORMULA CITY
PAYMENT
PROJECT
UPC NO.: 71786
NFOReport Req'd
To be distributed in quarterly payments - Urban Construction Initiative.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0Local Project Contributions: Local
0 0 0 0 0 0SAFETEA-LU Earmarks: State Bond Match
0 0 0 0 0 0SAFETEA-LU Earmarks: State Match
0 0 0 0 0 0Urban Formula: Federal/State
0 0 0 0 0 0Urban Formula: State
0 0 0 0 0 0Urban Formula: State Match
0 0 0 0 0 0Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
CITY OF RICHMOND - PAINTING &
REHABILITATION
PROJECT
UPC NO.:
ROUTE:
72706
NFO
Urban Construction Initiative Project - Matching funds provided as part of the quarterly paymentREPORT NOTE:
Complete
SCHEDULE
218
ESTIMATED COST (000's)
JURISDICTION:
MANCHESTER BRIDGSTREET NAME:
PERichmond
Underway 8,683CNFROM: MCDONOUGH STREET TO: EAST BYRD
STREET
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Restoration and Rehabilitation TO 8,900
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,602(X) Local Project Contributions: State Match
0 0 0 0 0 0 7,398Urban Formula: Federal
-100 0 0 0 0 0 0 9,000Total
818 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
RichmondUrban
PROGRAM/SYSTEM
RTE 60-CURB EXTENSIONS, ENHANCE
LIGHTING & PAVEMENT MARKINGS
PROJECT
UPC NO.:
ROUTE:
81251
NFO
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
102
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PERichmond
Underway 224CN
Various LocationsDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 327
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 446Highway Safety Improvements: Federal
0 0 0 0 0 0 50Highway Safety Improvements: State Match
-168 0 0 0 0 0 0 495Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
GRACE STREET-UPGRADE EXIST SIGNAL,
ENHANCE PAVEMENT MARKINGS
PROJECT
UPC NO.:
ROUTE:
81252
NFO
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
77
ESTIMATED COST (000's)
JURISDICTION:
W. GRACE STREETSTREET NAME:
PERichmond
Underway 451CNFROM: 250 FEET EAST OF N. BELVIDERE STREET TO:
250 FEET WEST OF N. LOMBARDY STREET
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 528
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 466Highway Safety Improvements: Federal
0 0 0 0 0 0 52Highway Safety Improvements: State Match
0 0 0 0 0 0 11Local Project Contributions: Local
0 0 0 0 0 0 0 528Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
FRANKLIN STREET-UPGRADE EXIST SIGNAL,
ENHANCE PVMT MARKINGS
PROJECT
UPC NO.:
ROUTE:
81253
NFO
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
33
ESTIMATED COST (000's)
JURISDICTION:
East FRANKLIN STREETSTREET NAME:
PERichmond
Underway 240CNFROM: 250 FEET WEST OF N. 4TH STREET TO: 250
FEET EAST OF N. 6TH STREET
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 273
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 253Highway Safety Improvements: Federal
0 0 0 0 0 0 28Highway Safety Improvements: State Match
-8 0 0 0 0 0 0 281Total
11/12/2014 819
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
RichmondUrban
PROGRAM/SYSTEM
CONDUCT PLANNING & ENGINEERING FOR
MAYO BRIDGE
PROJECT
UPC NO.:
ROUTE:
82110
FO
Urban Construction Initiative Project - Match funds provided in quarterly payment & includes
SAFETEA-LU match funds.
REPORT NOTE:
Underway
SCHEDULE
1,705
ESTIMATED COST (000's)
JURISDICTION:
Mayo BridgeSTREET NAME:
PERichmond
CN
MAYO BRIDGE OVER JAMES RIVERDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Preliminary Engineering TO 1,705
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 358(X) Local Project Contributions: State Match
0 0 0 0 0 0 1,433SAFETEA-LU Earmarks: Federal
-86 0 0 0 0 0 0 1,791Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
ARRA RICHMOND GERMAN SCHOOL ROAD
WIDENING/C&G/WALKS/DRAINAGE
PROJECT
UPC NO.: 93530
NFOARRA09
PE and RW on UPC 15835. ARRA Parent - UPC 93530; ARRA Child - UPC 95226.REPORT NOTE:
FROM: 0.130 KILOMETER N OF WARWICK RD TO:
0.008 KILOMETER N OF GLENWAY DR EAST (1.7240
KM)
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 3,337American Recovery and Reinvestment Act:
Flexible
0 0 0 0 0 0 190Local Project Contributions: Local
0 0 0 0 0 0 146Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 1,991Minimum Guarantee: Federal
0 0 0 0 0 0 123Non-Formula: State
0 0 0 0 0 0 493RSTP (STP Regional): Federal
0 0 0 0 0 0 285Soft Match: Federal
0 0 0 0 0 0 4,733Urban Formula: Federal
0 0 0 0 0 0 1,122Urban Formula: State
0 0 0 0 0 0 1,287Urban Formula: State Match
0 0 0 0 0 0 13,706Total
820 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
RichmondUrban
PROGRAM/SYSTEM
CITY OF RICHMOND BIKE SHARED LANE
PAVEMENT MARKINGS-E/W RTE
PROJECT
UPC NO.:
ROUTE:
100490
NFO
MPO Project. Excess funds to be redistributed by MPO. Locally Administered.REPORT NOTE:
Complete
SCHEDULE
31
ESTIMATED COST (000's)
JURISDICTION:
VariousSTREET NAME:
PERichmond
Underway 5CNFROM: Westhampton Way TO: Williamsburg Road
(11.0000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 11.0000 MISCOPE OF WORK: Safety TO 36
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 189CMAQ: Federal
0 0 0 0 0 0 47CMAQ: State Match
-200 0 0 0 0 0 0 237Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
CITY OF RICHMOND BIKE SHARED LANE
PVMT MARKINGS-BICYCLE RT 1
PROJECT
UPC NO.:
ROUTE:
100491
NFO
MPO Project. Excess funds to be redistributed by MPO. Locally Administered.REPORT NOTE:
Complete
SCHEDULE
37
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PERichmond
Underway 97CNFROM: NCL RICHMOND - Hermitage road TO: SCL
RICHMOND - Cherokee road (15.0000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 15.0000 MISCOPE OF WORK: Safety TO 135
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 120CMAQ: Federal
0 0 0 0 0 0 30CMAQ: State Match
-15 0 0 0 0 0 0 150Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
CITY SIGNAL SYSTEMS SOUTH OF JAMES
RIVER
PROJECT
UPC NO.:
ROUTE:
100498
NFO
MPO Project. Excess funds to be redistributed by MPO. Locally Administered.REPORT NOTE:
Underway
SCHEDULE
1,500
ESTIMATED COST (000's)
JURISDICTION:
Chippenham parkway and othersSTREET NAME:
PERichmond
FY2015 8,500CN
FROM: James River TO: City's South limit (0.8000 MI)DESCRIPTION: RW
PROJECT LENGTH: 0.8000 MISCOPE OF WORK: Safety TO 10,000
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 934CMAQ: Federal
2,000 0 0 0 1,200 1,603 2,000CMAQ: MPO - Federal
500 0 0 0 300 401 500CMAQ: MPO - State Match
0 0 0 0 0 0 566CMAQ: State Match
-4 0 0 0 1,500 2,500 2,003 4,001Total
11/12/2014 821
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
RichmondUrban
PROGRAM/SYSTEM
SHOCKOE STREET REVERSAL
PROJECT
UPC NO.:
ROUTE:
101854
NFO
MPO project. Excess funds to be redistributed by MPO. Locally Administered.REPORT NOTE:
Underway
SCHEDULE
50
ESTIMATED COST (000's)
JURISDICTION:
VARIOUSSTREET NAME:
PERichmond
FY2014 568CN
FROM: 19TH ST TO: 17TH ST (0.5000 MI)DESCRIPTION: RW
PROJECT LENGTH: 0.5000 MISCOPE OF WORK: Safety TO 618
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 25Non-Formula: State
0 0 0 0 0 0 501RSTP (STP Regional): Federal
0 0 0 0 0 0 100RSTP (STP Regional): State Match
-9 0 0 0 0 0 0 626Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
BELVIDERE ST - REPLACE DECK
PROJECT
UPC NO.:
ROUTE:
102961
NFO
Underway
SCHEDULE
3
ESTIMATED COST (000's)
JURISDICTION:
BELVIDERE STREETSTREET NAME:
PERichmond
FY2015 2,197CN
BRIDGE OVER CSXDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 2,200
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,100Revenue Sharing Funds: Local Match
0 0 0 0 0 0 1,100Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 2,200Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
7TH ST - REPLACE BRIDGE
PROJECT
UPC NO.:
ROUTE:
102962
NFO
Underway
SCHEDULE
150
ESTIMATED COST (000's)
JURISDICTION:
7TH STREETSTREET NAME:
PERichmond
FY2015 1,200CN
AT LEIGH STDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 1,350
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 675Revenue Sharing Funds: Local Match
0 0 0 0 0 0 675Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 1,350Total
822 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
RichmondUrban
PROGRAM/SYSTEM
MULTIMODAL IMPROVEMENT TO FRANKLIN
ST
PROJECT
UPC NO.:
ROUTE:
103899
NFO
MPO Project. Locally administered. Administered by DRPT.REPORT NOTE:
FY2013
SCHEDULE
225
ESTIMATED COST (000's)
JURISDICTION:
FRANKLIN STREETSTREET NAME:
PERichmond
FY2013 2,275CN
FROM: 14TH STREET TO: 18TH STREETDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Reconstruction w/o Added Capacity TO 2,500
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2,000RSTP (STP Regional): Federal
0 0 0 0 0 0 500RSTP (STP Regional): State Match
0 0 0 0 0 0 0 2,500Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
SIGNAL SYSTEM - EAST, NORTH AND WEST
OF CITY
PROJECT
UPC NO.:
ROUTE:
105890
NFO
MPO Project. Locally administered. Balance to be provided by MPO.REPORT NOTE:
FY2017
SCHEDULE
1,000
ESTIMATED COST (000's)
JURISDICTION:
VARIOUSSTREET NAME:
PERichmond
FY2018 5,312CN
VARIOUSDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 6,312
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 1,770 1,200 1,200 400 0 0CMAQ: MPO - Federal
0 442 300 300 100 0 0CMAQ: MPO - State Match
600 2,212 1,500 1,500 500 0 0 0Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
GRACE ST - TRAFFIC SIGNAL
MODERNIZATION PROJECT
PROJECT
UPC NO.:
ROUTE:
86556
NFO0000
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
31
ESTIMATED COST (000's)
JURISDICTION:
Grace StreetSTREET NAME:
PERichmond
Underway 207CN
FROM: 200ft W of 1st St TO: 200ft E of 2nd StDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 238
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 304Highway Safety Improvements: Federal
0 0 0 0 0 0 34Highway Safety Improvements: State Match
-100 0 0 0 0 0 0 338Total
11/12/2014 823
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
RichmondUrban
PROGRAM/SYSTEM
HSIP PROACTIVE SAFETY PROJECTS CITY OF
RICHMOND
PROJECT
UPC NO.: 86733
NFODistrict-wide
City of Richmond Safety ImprovementsDESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 55Accounts Receivable: Local
0 0 0 0 0 0 1,332Highway Safety Improvements: Federal
0 0 0 0 0 0 155Highway Safety Improvements: State Match
0 0 0 0 0 0 43Local Project Contributions: Local
0 0 0 0 0 0 1,585Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
DOWNTOWN (VCU MAIN CAMPUS) - PED
COUNTDOWN INDICATORS
PROJECT
UPC NO.:
ROUTE:
96731
NFO0000
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
54
ESTIMATED COST (000's)
JURISDICTION:
Various StreetsSTREET NAME:
PERichmond
Underway 321CN
VARIOUS LOCATIONS ON VCU MAIN CAMPUSDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 375
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 338Highway Safety Improvements: Federal
0 0 0 0 0 0 38Highway Safety Improvements: State Match
0 0 0 0 0 0 0 375Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
CITY OF RICHMOND - UPGRADE SIGNALS
PROJECT
UPC NO.:
ROUTE:
100564
NFO0000
Locally administered.REPORT NOTE:
Complete
SCHEDULE
134
ESTIMATED COST (000's)
JURISDICTION:
6 LOCATIONSSTREET NAME:
PERichmond
Underway 1,020CN
6 LOCATIONSDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 1,154
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,047Highway Safety Improvements: Federal
0 0 0 0 0 0 116Highway Safety Improvements: State Match
-10 0 0 0 0 0 0 1,164Total
824 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
RichmondUrban
PROGRAM/SYSTEM
CITYWIDE - INSTALL SIDEWALK
PROJECT
UPC NO.:
ROUTE:
104215
NFO0000
Revised schedule required.REPORT NOTE:
FY2014
SCHEDULE
50
ESTIMATED COST (000's)
JURISDICTION:
CITYWIDESTREET NAME:
PERichmond
FY2015 1,250CN
FROM: VARIOUS TO: VARIOUSDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 1,300
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 650Revenue Sharing Funds: Local Match
0 0 0 0 0 0 650Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 1,300Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
LOMBARDY ST - BRIDGE IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
104216
NFO0000
Revised schedule required.REPORT NOTE:
FY2014
SCHEDULE
150
ESTIMATED COST (000's)
JURISDICTION:
LOMBARDYSTREET NAME:
PERichmond
FY2015 1,350CN
LOMBARDY OVER CSX RAILROADDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Bridge Rehab w/o Added Capacity TO 1,500
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 750 0Revenue Sharing Funds: Local Match
0 0 0 0 0 750 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 1,500 0Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
LYNNHAVEN ST - BRIDGE IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
104217
NFO0000
Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
50
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PERichmond
FY2014 550CN
LYNHAVEN OVER BROAD ROCK CREEKDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Bridge Rehab w/o Added Capacity TO 600
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 300Revenue Sharing Funds: Local Match
0 0 0 0 0 0 300Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 600Total
11/12/2014 825
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
RichmondUrban
PROGRAM/SYSTEM
INSTALL SIDEWALK & CROSSWALK -
CITYWIDE
PROJECT
UPC NO.:
ROUTE:
104218
NFO0000
Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
200
ESTIMATED COST (000's)
JURISDICTION:
CITYWIDESTREET NAME:
PERichmond
FY2014 1,740CN
FROM: VARIOUS TO: VARIOUSDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 1,940
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 970Revenue Sharing Funds: Local Match
0 0 0 0 0 0 970Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 1,940Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
CITYWIDE - TRAFFIC CALMING
PROJECT
UPC NO.:
ROUTE:
104279
NFO0000
Underway
SCHEDULE
75
ESTIMATED COST (000's)
JURISDICTION:
VARIOUSSTREET NAME:
PERichmond
FY2015 325CN
VARIOUS LOCATIONSDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Traffic Management/Engineering TO 400
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 200Revenue Sharing Funds: Local Match
0 0 0 0 0 0 200Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 400Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
CITYWIDE - INSTALL TRAFFIC CONTROL
PROJECT
UPC NO.:
ROUTE:
104280
NFO0000
Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
75
ESTIMATED COST (000's)
JURISDICTION:
VARIOUSSTREET NAME:
PERichmond
FY2014 325CN
VARIOUS LOCATIONSDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Traffic Management/Engineering TO 400
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 200Revenue Sharing Funds: Local Match
0 0 0 0 0 0 200Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 400Total
826 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
RichmondUrban
PROGRAM/SYSTEM
DEEPWATER TERMINAL RD - EXTEND
EXISTING ROADWAY
PROJECT
UPC NO.:
ROUTE:
104281
NFO0000
Underway
SCHEDULE
250
ESTIMATED COST (000's)
JURISDICTION:
DEEPWATER TERMINAL ROADSTREET NAME:
PERichmond
FY2016 1,600CN
FY2015FROM: END EXISTING DEEPWATER TERMINAL RD TO:
GOODES ST (0.6900 MI)
DESCRIPTION: 150RW
PROJECT LENGTH: 0.6900 MISCOPE OF WORK: New Construction Roadway TO 2,000
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,450Local Project Contributions: Local
0 0 0 0 0 0 250Revenue Sharing Funds: Local Match
0 0 0 0 0 0 250Revenue Sharing Funds: State Match
50 0 0 0 0 0 0 1,950Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
SOUTH KINSLEY - IMPROVE DRAINAGE
PROJECT
UPC NO.:
ROUTE:
104282
NFO0000
Revised schedule required.REPORT NOTE:
FY2014
SCHEDULE
5
ESTIMATED COST (000's)
JURISDICTION:
KINSLEYSTREET NAME:
PERichmond
FY2015 1,195CN
VARIOUS LOCATIONSDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Reconstruction w/o Added Capacity TO 1,200
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 600Revenue Sharing Funds: Local Match
0 0 0 0 0 0 600Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 1,200Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
WILLOW OAKS - IMPROVE DRAINAGE
PROJECT
UPC NO.:
ROUTE:
104283
NFO0000
Underway
SCHEDULE
5
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PERichmond
FY2015 253CN
VARIOUS LOCATIONSDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Reconstruction w/o Added Capacity TO 258
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 130Revenue Sharing Funds: Local Match
0 0 0 0 0 0 130Revenue Sharing Funds: State Match
-2 0 0 0 0 0 0 260Total
11/12/2014 827
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
RichmondUrban
PROGRAM/SYSTEM
FRANKLIN ST - STREETSCAPE
PROJECT
UPC NO.:
ROUTE:
104284
NFO0000
Underway
SCHEDULE
5
ESTIMATED COST (000's)
JURISDICTION:
FRANKLIN STREETSTREET NAME:
PERichmond
FY2015 2,493CN
FROM: 14TH ST TO: 18TH ST (0.3000 MI)DESCRIPTION: RW
PROJECT LENGTH: 0.3000 MISCOPE OF WORK: Safety TO 2,498
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,250Revenue Sharing Funds: Local Match
0 0 0 0 0 0 1,250Revenue Sharing Funds: State Match
-2 0 0 0 0 0 0 2,500Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
CITYWIDE - OVERLAY PAVEMENT
PROJECT
UPC NO.:
ROUTE:
104507
NFO0000
Underway
SCHEDULE
50
ESTIMATED COST (000's)
JURISDICTION:
VARIOUSSTREET NAME:
PERichmond
FY2015 9,950CN
VARIOUS LOCATIONSDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Resurfacing TO 10,000
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 6,905Local Project Contributions: Local
0 0 0 0 0 0 1,548Revenue Sharing Funds: Local Match
0 0 0 0 0 0 1,548Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 10,000Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
DEEPWATER TERMINAL RD - EXTEND
EXISTING ROADWAY
PROJECT
UPC NO.:
ROUTE:
104882
NFO0000
MPO Project. Complete estimate & schedule required. Locally AdministeredREPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
DEEPWATER TERMINAL ROADSTREET NAME:
PERichmond
CNFROM: END EXISTING DEEPWATER TERMINAL RD
TO: GOODES ST (0.6900 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.6900 MISCOPE OF WORK: New Construction Roadway TO 0
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 1,400 0 0 0 0 0RSTP (STP Regional): MPO - Federal
0 350 0 0 0 0 0RSTP (STP Regional): MPO - State Match
-1,750 1,750 0 0 0 0 0 0Total
828 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
RichmondUrban
PROGRAM/SYSTEM
RTE 360 - REHAB MAYO BRIDGE
PROJECT
UPC NO.:
ROUTE:
104888
NFO0000
MPO Project. Revised schedule required. Locally AdministeredREPORT NOTE:
FY2019
SCHEDULE
500
ESTIMATED COST (000's)
JURISDICTION:
MAYO BRIDGESTREET NAME:
PERichmond
FY2020 2,000CN
EAST 14TH STREET @ JAMES RIVER (0.2600 MI)DESCRIPTION: RW
PROJECT LENGTH: 0.2600 MISCOPE OF WORK: Bridge Rehab w/o Added Capacity TO 2,500
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 1,600 0 0 0 0 0RSTP (STP Regional): MPO - Federal
0 400 0 0 0 0 0RSTP (STP Regional): MPO - State Match
500 2,000 0 0 0 0 0 0Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
HUGUENOT ROAD CORRIDOR
IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
104959
NFO0000
MPO Project. Balance to be provided for by MPO.REPORT NOTE:
Underway
SCHEDULE
118
ESTIMATED COST (000's)
JURISDICTION:
HUGUENOT ROADSTREET NAME:
PERichmond
FY2017 666CN
FY2015FROM: 0.15 MILE WEST OF RIVER ROAD TO: 0.70
MILE EAST ON RIVER ROAD (0.2200 MI)
DESCRIPTION: 110RW
PROJECT LENGTH: 0.2200 MISCOPE OF WORK: Safety TO 894
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
320 0 0 0 0 320 56CMAQ: MPO - Federal
80 0 0 0 0 80 14CMAQ: MPO - State Match
24 0 0 0 0 400 400 70Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
CITY OF RICHMOND - SRTS - FOX
ES/MUNFORD ES - BIKE/PED IMP
PROJECT
UPC NO.:
ROUTE:
105235
NFO0000
Locally Administered.REPORT NOTE:
Underway
SCHEDULE
21
ESTIMATED COST (000's)
JURISDICTION:
VARIOUSSTREET NAME:
PERichmond
FY2017 139CN
FROM: N WILETTA DR TO: S WILETTA DR (0.1000 MI)DESCRIPTION: RW
PROJECT LENGTH: 0.1000 MISCOPE OF WORK: Safety TO 160
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 160Safe Routes to School: Federal 0
11/12/2014 829
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
RichmondUrban
PROGRAM/SYSTEM
RTE 1 - MAJOR WIDENING
PROJECT
UPC NO.:
ROUTE:
15955
NFO0001
PE and RW only, accruing funds for CN.REPORT NOTE:
Underway
SCHEDULE
2,540
ESTIMATED COST (000's)
JURISDICTION:
JEFF DAVIS HWYSTREET NAME:
PERichmond
FY2020 22,950CN
UnderwayFROM: 0.010 KM SOUTH OF CHESTERMAN AVENUE
TO: 0.016 KM NORTH OF DECATUR STREET (1.7250
KM)
DESCRIPTION: 4,039RW
PROJECT LENGTH: 1.7250 KMSCOPE OF WORK: Reconstruction w/ Added Capacity TO 29,529
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,138CMAQ: Federal
0 0 0 0 0 0 284CMAQ: State Match
0 0 0 0 0 0 118Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 4Residue Parcel Revenue: State
0 0 0 0 0 0 49State Formula: Urban - Local Match
0 0 0 0 0 0 4,202Urban Formula: Federal
0 0 0 0 0 0 979Urban Formula: State
0 0 0 0 0 0 1,117Urban Formula: State Match
21,637 0 0 0 0 0 0 7,892Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
5TH ST - REPLACE BRIDGE
PROJECT
UPC NO.:
ROUTE:
102963
NFO0005
Underway
SCHEDULE
150
ESTIMATED COST (000's)
JURISDICTION:
5TH STREETSTREET NAME:
PERichmond
FY2015 1,200CN
@ LEIGH STDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 1,350
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 675Revenue Sharing Funds: Local Match
0 0 0 0 0 0 675Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 1,350Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
CONSTRUCT ROUNDABOUT AT NINE MILE RD,
25TH ST. AND FARIMOUNT
PROJECT
UPC NO.:
ROUTE:
93350
NFO0033
Locally Administered. Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
152
ESTIMATED COST (000's)
JURISDICTION:
Nine Mile RoadSTREET NAME:
PERichmond
FY2014 1,003CN
UnderwayFROM: 250' West of 25th and S Street TO: 250' East of
25th and S Street
DESCRIPTION: 67RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 1,222
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,100Highway Safety Improvements: Federal
0 0 0 0 0 0 122Highway Safety Improvements: State Match
0 0 0 0 0 0 0 1,222Total
830 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
RichmondUrban
PROGRAM/SYSTEM
RTE 60 - RECONSTRUCTION
PROJECT
UPC NO.:
ROUTE:
15834
NFO0060
Complete
SCHEDULE
4,230
ESTIMATED COST (000's)
JURISDICTION:
MIDLOTHIAN TURNPIKESTREET NAME:
PERichmond
Underway 37,633CN
UnderwayFROM: 0.058 KILOMETER EAST OF WEST RICHMOND
CITY LIMITS TO: 2.850 KILOMETERS EAST OF WEST
RICHMOND CITY LIMITS (2.7900 KM)
DESCRIPTION: 7,051RW
PROJECT LENGTH: 2.7900 KMSCOPE OF WORK: Reconstruction w/ Added Capacity TO 48,915
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 481Accounts Receivable: Local
0 0 0 0 0 0 173Bond Match: State Bond Match
0 0 0 0 0 0 2,548Concession Funds: State
0 0 0 0 0 0 1,535Highway Safety Improvements: Federal
0 0 0 0 0 0 171Highway Safety Improvements: State Match
0 0 0 0 0 0 815Local Project Contributions: Local
0 0 0 0 0 0 405Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 6,094Minimum Guarantee: Federal
0 0 0 0 0 0 572NHPP: Statewide - Federal
0 0 0 0 0 0 143NHPP: Statewide - Soft Match
0 0 0 0 0 0 24Residue Parcel Revenue: State
0 0 0 0 0 0 1,351Soft Match: Federal
0 0 0 0 0 0 148State Formula: Urban - Local Match
0 0 0 0 0 0 24,113Urban Formula: Federal
0 0 0 0 0 0 3,475Urban Formula: Federal/State
0 0 0 0 0 0 810Urban Formula: State
0 0 0 0 0 0 5,085Urban Formula: State Match
974 0 0 0 0 0 0 47,941Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
RTE 60 - INTERCHANGE STUDY
PROJECT
UPC NO.:
ROUTE:
19001
NFO0060
MPO project. Locally AdministeredREPORT NOTE:
Underway
SCHEDULE
300
ESTIMATED COST (000's)
JURISDICTION:
MIDLOTHIAN TURNPSTREET NAME:
PERichmond
CN
AT BELT BOULEVARDDESCRIPTION: RW
PROJECT LENGTH: 0.0000 KMSCOPE OF WORK: Preliminary Engineering TO 300
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 240RSTP (STP Regional): Federal
0 0 0 0 0 0 60RSTP (STP Regional): State Match
0 0 0 0 0 0 0 300Total
11/12/2014 831
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
RichmondUrban
PROGRAM/SYSTEM
RTE 60 - BRIDGE REHABILITATION
PROJECT
UPC NO.:
ROUTE:
104887
NFO0060
MPO Project. Locally Administered. Revised schedule required.REPORT NOTE:
FY2014
SCHEDULE
300
ESTIMATED COST (000's)
JURISDICTION:
MIDLOTHIAN TURNPIKESTREET NAME:
PERichmond
FY2015 1,728CN
AT RTE 161 (BELT BLVD) (0.1900 MI)DESCRIPTION: RW
PROJECT LENGTH: 0.1900 MISCOPE OF WORK: Bridge Rehab w/o Added Capacity TO 2,028
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 80 1,542RSTP (STP Regional): MPO - Federal
0 0 0 0 0 20 386RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 100 1,928Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
RTE 147 - INSTALL PED X-WALKS, ADA
RAMPS AND PAVE MARKINGS
PROJECT
UPC NO.:
ROUTE:
100562
NFO0147
Locally administered.REPORT NOTE:
Complete
SCHEDULE
10
ESTIMATED COST (000's)
JURISDICTION:
Cary StreetSTREET NAME:
PERichmond
Underway 492CN
FROM: Nansemond Street TO: Colonial AvenueDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 502
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 585Highway Safety Improvements: Federal
0 0 0 0 0 0 65Highway Safety Improvements: State Match
-148 0 0 0 0 0 0 650Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
RTE 197 - UPGRADE SIGNAL DESIGN AND ADD
LEFT TURN LANE
PROJECT
UPC NO.:
ROUTE:
89940
NFO0197
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
100
ESTIMATED COST (000's)
JURISDICTION:
Laburnum AveSTREET NAME:
PERichmond
Underway 513CN
FROM: 300' W of Brook Road TO: 300' S of Brook RoadDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 613
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 552Highway Safety Improvements: Federal
0 0 0 0 0 0 61Highway Safety Improvements: State Match
0 0 0 0 0 0 0 613Total
832 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
RichmondUrban
PROGRAM/SYSTEM
RTE 360 - MAJOR WIDENING
PROJECT
UPC NO.:
ROUTE:
15959
NFO0360
Urban Construction Initiative Project - Matching funds provided in quarterly payment. PE only,
accruing funds for RW & CN. Complete schedule and estimate required from City.
REPORT NOTE:
Underway
SCHEDULE
1,221
ESTIMATED COST (000's)
JURISDICTION:
HULL STREETSTREET NAME:
PERichmond
CNFROM: ELKHARDT ROAD TO: DIXON STREET (2.2400
MI)
DESCRIPTION: RW
PROJECT LENGTH: 2.2400 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 1,221
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 76Local Project Contributions: Local
0 0 0 0 0 0 683(X) Local Project Contributions: State Match
0 0 0 0 0 0 24State Formula: Urban - Local Match
0 0 0 0 0 0 3,035Urban Formula: Federal
0 0 0 0 0 0 1,197Urban Formula: State
-3,794 0 0 0 0 0 0 5,015Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
RTE 360 - IMPROVE INTERSECTION
PROJECT
UPC NO.:
ROUTE:
93395
NFO0360
Locally AdministeredREPORT NOTE:
Complete
SCHEDULE
143
ESTIMATED COST (000's)
JURISDICTION:
HULL STREET ROADSTREET NAME:
PERichmond
Underway 1,720CN
UnderwayFROM: 1288' W of Elkhardt Rd/Hull St. Rd Intersection
TO: 348' E of Orcutt Ln/Hull St. Rd Intersection (0.2100
MI)
DESCRIPTION: 137RW
PROJECT LENGTH: 0.2100 MISCOPE OF WORK: Safety TO 2,000
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,807Highway Safety Improvements: Federal
0 0 0 0 0 0 193Highway Safety Improvements: State Match
0 0 0 0 0 0 0 2,000Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
MAIN STREET STATION
PROJECT
UPC NO.:
ROUTE:
57008
NFO9999
Revised estimate requiredREPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
MAIN STREET STATIONSTREET NAME:
PERichmond
Underway 4,885CNFROM: MAIN STREET STATION TO: MAIN STREET
STATION
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Other TO 4,885
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 4,395State Formula: Urban - State 490
11/12/2014 833
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
RichmondUrban
PROGRAM/SYSTEM
SIGNALS & TRAFFIC SERVICES
PROJECT
UPC NO.:
ROUTE:
105652
NFO9999
N/A
SCHEDULE
0
ESTIMATED COST (000's)
JURISDICTION:
FULTON COMMERCIAL CORRIDOR IMPROVEMENTSSTREET NAME:
PERichmond
FY2016 200CNFROM: GOVERNMENT ROAD & NATIONAL STREET TO:
CREEDMORE STREET & CARLISLE AVENUE (0.1400
MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.1400 MISCOPE OF WORK: Safety TO 200
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 100 0Revenue Sharing Funds: Local Match
0 0 0 0 0 100 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 200 0Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
INTERSECTION IMPROVEMENT
PROJECT
UPC NO.:
ROUTE:
105653
NFO9999
FY2015
SCHEDULE
80
ESTIMATED COST (000's)
JURISDICTION:
MONUMENT AVE & ALLEN AVESTREET NAME:
PERichmond
FY2015 520CN
FROM: MONUMENT AVE & ALLEN AVE TO: 0DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Reconstruction w/o Added Capacity TO 600
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 300 0Revenue Sharing Funds: Local Match
0 0 0 0 0 300 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 600 0Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
DRAINAGE IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
105684
NFO9999
N/A
SCHEDULE
0
ESTIMATED COST (000's)
JURISDICTION:
YORKTOWN AVENUESTREET NAME:
PERichmond
FY2015 370CN
FROM: 0 TO: 0DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Reconstruction w/o Added Capacity TO 370
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 185 0Revenue Sharing Funds: Local Match
0 0 0 0 0 185 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 370 0Total
834 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
RichmondUrban
PROGRAM/SYSTEM
DRAINAGE IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
105686
NFO9999
N/A
SCHEDULE
0
ESTIMATED COST (000's)
JURISDICTION:
YORKTOWN AVENUESTREET NAME:
PERichmond
FY2015 920CN
FROM: 0 TO: 0DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Reconstruction w/o Added Capacity TO 920
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 460 0Revenue Sharing Funds: Local Match
0 0 0 0 0 460 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 920 0Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
DRAINAGE IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
105687
NFO9999
N/A
SCHEDULE
0
ESTIMATED COST (000's)
JURISDICTION:
YORKTOWN AVENUESTREET NAME:
PERichmond
FY2015 410CNFROM: BROAD ROCK CREEK (NORTH), LYNHAVEN
AVE (EAST) TO: LUMKIN AVE (SOUTH), JEFFERSON
DAVIS HIGHWAY (WEST)
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Reconstruction w/o Added Capacity TO 410
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 205 0Revenue Sharing Funds: Local Match
0 0 0 0 0 205 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 410 0Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
RECONSTRUCTION
PROJECT
UPC NO.:
ROUTE:
105691
NFO9999
FY2015
SCHEDULE
25
ESTIMATED COST (000's)
JURISDICTION:
EAST 37TH STREETSTREET NAME:
PERichmond
FY2016 475CN
FROM: McRAND STREET TO: HULL STREET (0.2500 MI)DESCRIPTION: RW
PROJECT LENGTH: 0.2500 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 500
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 250 0Revenue Sharing Funds: Local Match
0 0 0 0 0 250 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 500 0Total
11/12/2014 835
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
RichmondUrban
PROGRAM/SYSTEM
GUARDRAIL
PROJECT
UPC NO.:
ROUTE:
105693
NFO9999
Underway
SCHEDULE
0
ESTIMATED COST (000's)
JURISDICTION:
RIVERSIDE DRIVESTREET NAME:
PERichmond
FY2015 540CNFROM: WESTOVER HILLS BOULEVARD TO: REEDY
CREEK PARK ENTRANCE (1.0500 MI)
DESCRIPTION: RW
PROJECT LENGTH: 1.0500 MISCOPE OF WORK: Safety TO 540
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 270 0Revenue Sharing Funds: Local Match
0 0 0 0 0 270 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 540 0Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
MAIN STREET STATION SITE IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
105701
NFO9999
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
MAIN STREET STATIONSTREET NAME:
PERichmond
FY2015 3,500CNFROM: MAIN STREET STATION TO: MAIN STREET
STATION
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Other TO 3,500
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,500Bond Proceeds: CPR Bonds
2,000 0 0 0 0 0 0CTB Formula: High Priority - State
0 0 0 0 0 2,000 0 1,500Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
SIDEWALK (NEW CONSTRUCTION)
PROJECT
UPC NO.:
ROUTE:
105709
NFO9999
FY2015
SCHEDULE
25
ESTIMATED COST (000's)
JURISDICTION:
TERMINAL AVENUE/EAST BELT BOULEVARD SIDEWALKSTREET NAME:
PERichmond
FY2016 375CNFROM: 3000 BLOCK OF EAST BELT BOULEVARD TO:
2801 TERMINAL AVENUE (0.7500 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.7500 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 400
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 200 0Revenue Sharing Funds: Local Match
0 0 0 0 0 200 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 400 0Total
836 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
RichmondUrban
PROGRAM/SYSTEM
CITYWIDE - RECONSTRUCTION
PROJECT
UPC NO.:
ROUTE:
105649
NFOU000
FY2015
SCHEDULE
50
ESTIMATED COST (000's)
JURISDICTION:
CITYWIDESTREET NAME:
PERichmond
FY2016 1,150CN
FROM: VARIOUS TO: VARIOUSDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Reconstruction w/o Added Capacity TO 1,200
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 600 0Revenue Sharing Funds: Local Match
0 0 0 0 0 600 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 1,200 0Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
CITYWIDE - PAVEMENT OVERLAY
PROJECT
UPC NO.:
ROUTE:
105666
NFOU000
FY2015
SCHEDULE
50
ESTIMATED COST (000's)
JURISDICTION:
CITYWIDESTREET NAME:
PERichmond
FY2016 5,450CN
FROM: VARIOUS TO: VARIOUSDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Resurfacing TO 5,500
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 2,750 0Revenue Sharing Funds: Local Match
0 0 0 0 0 2,750 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 5,500 0Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
CITYWIDE - SIGNALS/TRAFFIC SERVICES
PROJECT
UPC NO.:
ROUTE:
105668
NFOU000
N/A
SCHEDULE
0
ESTIMATED COST (000's)
JURISDICTION:
CITYWIDESTREET NAME:
PERichmond
FY2015 400CN
FROM: VARIOUS TO: VARIOUSDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 400
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 200 0Revenue Sharing Funds: Local Match
0 0 0 0 0 200 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 400 0Total
11/12/2014 837
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Urban
MPO Area
RichmondUrban
PROGRAM/SYSTEM
BRIDGE REPLACEMENT - RECONSTRUCTION
PROJECT
UPC NO.:
ROUTE:
105678
NFOU000
N/A
SCHEDULE
0
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PERichmond
FY2015 1,900CN
FROM: 0 TO: 0DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 1,900
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 550 0Revenue Sharing Funds: Local Match
0 0 0 0 0 550 0Revenue Sharing Funds: State Match
800 0 0 0 0 0 1,100 0Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
BIKEWAY/TRAILS
PROJECT
UPC NO.:
ROUTE:
105680
NFOU000
Underway
SCHEDULE
0
ESTIMATED COST (000's)
JURISDICTION:
RICHMOND RIVER FRONTSTREET NAME:
PERichmond
FY2015 5,000CNFROM: SOUTH 5TH AND TREDEGAR STREET TO:
WEST 12TH STREET AND RIVERSIDE PARKWAY
(0.5000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.5000 MISCOPE OF WORK: Safety and Education of Pedestrians /Bicyclisits TO 5,000
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 2,500 0Revenue Sharing Funds: Local Match
0 0 0 0 0 2,500 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 5,000 0Total
MPO Area
RichmondUrban
PROGRAM/SYSTEM
FRANKLIN STREET - RECONSTRUCTION
PROJECT
UPC NO.:
ROUTE:
105682
NFOU000
N/A
SCHEDULE
0
ESTIMATED COST (000's)
JURISDICTION:
FRANKLIN STREETSTREET NAME:
PERichmond
FY2015 1,000CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Reconstruction w/o Added Capacity TO 1,000
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 500 0Revenue Sharing Funds: Local Match
0 0 0 0 0 500 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 1,000 0Total
838 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Enhancement
MPO Area
RichmondEnhancement
PROGRAM/SYSTEM
LANDSCAPING ON VARIOUS SITES
PROJECT
UPC NO.:
ROUTE:
13791
NFO
Complete
SCHEDULE
307
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PERichmond
Underway 629CNVARIOUS LOCATIONS WITHIN THE CITY OF
RICHMOND
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Landscaping/Beautification TO 937
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 195TAP: MPO - Federal
0 0 0 0 0 0 915Transportation Enhancement Funds:
Federal
0 0 0 0 0 0 277(X) Transportation Enhancement Funds:
Local
-451 0 0 0 0 0 0 1,387Total
MPO Area
RichmondEnhancement
PROGRAM/SYSTEM
LOWER FALLING CREEK GREENWAY
ENHANCEMENT
PROJECT
UPC NO.:
ROUTE:
16086
NFO
Complete
SCHEDULE
148
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEChesterfield County
Underway 569CN
UnderwayFROM: CONSTRUCT A PEDESTRIAN PARK WITH
MULTI-PURPOSE TRAILS AND TO: HISTORICAL
INTERPRETIVE AREAS.
DESCRIPTION: 105RW
PROJECT LENGTH: _SCOPE OF WORK: Scenic or Historic Highway Programs TO 823
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 216Project Contributions: Various Sources
0 0 0 0 0 0 545Transportation Enhancement Funds:
Federal
0 0 0 0 0 0 136(X) Transportation Enhancement Funds:
Local
-74 0 0 0 0 0 0 897Total
MPO Area
NonMPOEnhancement
PROGRAM/SYSTEM
BATTLE OF REAM'S STATION
PROJECT
UPC NO.:
ROUTE:
70326
NFO
Underway
SCHEDULE
2
ESTIMATED COST (000's)
JURISDICTION:
N/ASTREET NAME:
PEDinwiddie County
CN
UnderwayFROM: 0 TO: 0DESCRIPTION: 239RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Rehabilitation of Historic Bldgs/Facilities TO 241
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 22Project Contributions: Various Sources
0 0 0 0 0 0 175Transportation Enhancement Funds:
Federal
0 0 0 0 0 0 44(X) Transportation Enhancement Funds:
Local
0 0 0 0 0 0 0 241Total
11/12/2014 839
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Enhancement
MPO Area
NonMPOEnhancement
PROGRAM/SYSTEM
SOUTH HILL DOWNTOWN REVITALIZATION -
PHASE I
PROJECT
UPC NO.:
ROUTE:
75264
NFO
Complete
SCHEDULE
104
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PESouth Hill
Underway 1,075CN
UnderwayFROM: THREE PHASE IMPROVEMENT PROJECT -
REMOVE OVERHEAD UTILITIES, TO: INSTALL
STREETLIGHTS & LANDSCAPE FOR PED. &
BICYCLIST
DESCRIPTION: 448RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 1,626
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 33Project Contributions: Various Sources
0 0 0 0 0 0 1,355Transportation Enhancement Funds:
Federal
0 0 0 0 0 0 339(X) Transportation Enhancement Funds:
Local
-100 0 0 0 0 0 0 1,726Total
MPO Area
Tri-CitiesEnhancement
PROGRAM/SYSTEM
CITY OF COLONIAL HEIGHTS - STREETSCAPE
AT GOVERNMENT CENTER
PROJECT
UPC NO.:
ROUTE:
78222
NFO
Underway
SCHEDULE
47
ESTIMATED COST (000's)
JURISDICTION:
BoulevardSTREET NAME:
PEColonial Heights
FY2011 274CN
FROM: A Avenue TO: Charlotte Aveune (0.2800 MI)DESCRIPTION: RW
PROJECT LENGTH: 0.2800 MISCOPE OF WORK: Landscaping/Beautification TO 321
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 325TAP: MPO - Federal
0 0 0 0 0 0 43TAP: Statewide - Federal
0 0 0 0 0 0 225Transportation Enhancement Funds:
Federal
0 0 0 0 0 0 148(X) Transportation Enhancement Funds:
Local
-421 0 0 0 0 0 0 741Total
840 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Enhancement
MPO Area
NonMPOEnhancement
PROGRAM/SYSTEM
TOWN OF LA CROSSE - LACROSSE HOTEL
RENOVATION
PROJECT
UPC NO.:
ROUTE:
78226
NFO
Complete
SCHEDULE
186
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PELa Crosse
Underway 1,373CNFROM: RENOVATION OF HISTORIC HOTEL FOR USE
AS A TRAILHEAD TO: FACILITY, VISITOR CENTER AND
TRANSPORTATION MUSEUM
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 1,559
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 77Project Contributions: Various Sources
0 0 0 0 0 0 155TAP: Statewide - Federal
0 0 0 0 0 0 1,026Transportation Enhancement Funds:
Federal
0 0 0 0 0 0 295(X) Transportation Enhancement Funds:
Local
5 0 0 0 0 0 0 1,554Total
MPO Area
NonMPOEnhancement
PROGRAM/SYSTEM
TOBACCO HERITAGE TRAIL (PHASE ONE,
TRAIL 1 AND 2A)
PROJECT
UPC NO.:
ROUTE:
78247
NFO
Complete
SCHEDULE
950
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PELawrenceville
Underway 2,451CNFROM: Trail 1: Brodnax to Lacrosse/Centennial Park (3.27
Miles) TO: Trail 2A: L'ville Public Works to Sta. 95+85.29
(1.01 Mi) (5.0900 MI)
DESCRIPTION: RW
PROJECT LENGTH: 5.0900 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 3,401
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 125Local Project Contributions: Local
0 0 0 0 0 0 787TAP: Statewide - Federal
0 0 0 0 0 0 1,716Transportation Enhancement Funds:
Federal
0 0 0 0 0 0 626(X) Transportation Enhancement Funds:
Local
147 0 0 0 0 0 0 3,254Total
11/12/2014 841
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Enhancement
MPO Area
NonMPOEnhancement
PROGRAM/SYSTEM
AMELIA COUNTY - SIDEWALKS, PARKING,
STREETLIGHTS, BIKE RACKS
PROJECT
UPC NO.:
ROUTE:
81760
NFO
Complete
SCHEDULE
39
ESTIMATED COST (000's)
JURISDICTION:
VARIOUS LOCATIONSSTREET NAME:
PEAmelia County
Underway 137CNDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 176
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 40Open Container Funds: Bike/Ped
0 0 0 0 0 0 75Transportation Enhancement Funds:
Federal
0 0 0 0 0 0 118(X) Transportation Enhancement Funds:
Local
-57 0 0 0 0 0 0 233Total
MPO Area
RichmondEnhancement
PROGRAM/SYSTEM
NEW KENT COUNTY - SIGNAGE FOR 7
BICYCLE RTES
PROJECT
UPC NO.:
ROUTE:
81762
NFO
Complete
SCHEDULE
1
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PENew Kent County
Underway 34CNFROM: NEAR TALLEYSVILLE TO: VARIOUS
LOCATIONS
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety and Education of Pedestrians /Bicyclisits TO 34
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 5Non-Formula: State Match
0 0 0 0 0 0 20RSTP (STP Regional): Federal
0 0 0 0 0 0 10Transportation Enhancement Funds:
Federal
0 0 0 0 0 0 3(X) Transportation Enhancement Funds:
Local
-3 0 0 0 0 0 0 38Total
MPO Area
RichmondEnhancement
PROGRAM/SYSTEM
PATRICK HENRY- ROAD TO REVOLUTION
TRAIL, SIGNAGE & BROCHURES
PROJECT
UPC NO.:
ROUTE:
91207
NFO
Complete
SCHEDULE
20
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHanover County
Underway 240CN
FROM: Hanover County TO: Hanover CountyDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 260
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 43Project Contributions: Various Sources
0 0 0 0 0 0 150Transportation Enhancement Funds:
Federal
0 0 0 0 0 0 37(X) Transportation Enhancement Funds:
Local
29 0 0 0 0 0 0 231Total
842 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Enhancement
MPO Area
Tri-CitiesEnhancement
PROGRAM/SYSTEM
APPOMATTOX RIVER GREENWAY TRAIL
PROJECT
UPC NO.:
ROUTE:
91208
NFO
Complete
SCHEDULE
90
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEColonial Heights
Underway 932CN
FROM: 2175 feet from Roslyn Park TO: I-95 BridgeDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 1,022
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 228TAP: Statewide - Federal
0 0 0 0 0 0 831Transportation Enhancement Funds:
Federal
0 0 0 0 0 0 265(X) Transportation Enhancement Funds:
Local
-301 0 0 0 0 0 0 1,323Total
MPO Area
RichmondEnhancement
PROGRAM/SYSTEM
ARRA CHARLES CITY/HENRICO 5 VA CAPITAL
TRAIL CONSTRUCTION
PROJECT
UPC NO.: 93199
NFOARRA09
PE & RW on UPC 86279.REPORT NOTE:
FROM: Long Bridge Road TO: Rte 658 - Kimages Rd.
(10.0000 MI)
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 8,184American Recovery and Reinvestment Act:
Enhancement
0 0 0 0 0 0 2,841Bond Proceeds: CPR Bonds
0 0 0 0 0 0 11,025Total
MPO Area
NonMPOEnhancement
PROGRAM/SYSTEM
ARRA - TOBACCO HERITAGE TRAIL
PROJECT
UPC NO.: 93204
NFOARRA09
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 6,000American Recovery and Reinvestment Act:
Enhancement
11/12/2014 843
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Enhancement
MPO Area
NonMPOEnhancement
PROGRAM/SYSTEM
LAWRENCEVILLE DOWNTOWN STREETSCAPE
ENHANCEMENT
PROJECT
UPC NO.:
ROUTE:
97815
NFO
Complete
SCHEDULE
29
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PELawrenceville
Underway 197CNFROM: SOUTH & NEW STREETS TO: SHARP & HICKS
STREETS
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Landscaping/Beautification TO 226
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 13Project Contributions: Various Sources
0 0 0 0 0 0 307TAP: Statewide - Federal
0 0 0 0 0 0 150Transportation Enhancement Funds:
Federal
0 0 0 0 0 0 114(X) Transportation Enhancement Funds:
Local
-359 0 0 0 0 0 0 584Total
MPO Area
RichmondEnhancement
PROGRAM/SYSTEM
LANDSCAPE INTERSTATE I-95 GATEWAYS
INTO THE CITY OF RICHMOND
PROJECT
UPC NO.:
ROUTE:
97840
NFO
Complete
SCHEDULE
91
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PERichmond
Underway 2,722CNFROM: Franklin Street TO: Martin Luther King Bridge
(0.4600 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.4600 MISCOPE OF WORK: Landscaping/Beautification TO 2,813
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 88State: State Match
0 0 0 0 0 0 283TAP: MPO - Federal
0 0 0 0 0 0 421TAP: Statewide - Federal
0 0 0 0 0 0 1,350Transportation Enhancement Funds:
Federal
0 0 0 0 0 0 566(X) Transportation Enhancement Funds:
Local
105 0 0 0 0 0 0 2,708Total
MPO Area
NonMPOEnhancement
PROGRAM/SYSTEM
BRUNSWICK BYWAYS VISITOR AND
INTERPRETIVE CENTER
PROJECT
UPC NO.:
ROUTE:
101588
NFO
Underway
SCHEDULE
250
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEBrunswick County
FY2014 548CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Scenic or Historic Highway Programs TO 798
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 160Local Project Contributions: Local
0 0 0 0 0 0 638Scenic Byway Grants: Federal
0 0 0 0 0 0 0 798Total
844 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Enhancement
MPO Area
RichmondEnhancement
PROGRAM/SYSTEM
RTE 638 (COGBILL ROAD) - PROVIDE
SIDEWALK
PROJECT
UPC NO.:
ROUTE:
103608
NFO
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
Cogbill RoadSTREET NAME:
PEChesterfield County
FY2016 440CN
UnderwayFROM: Rt. 639 (HOWELL DR) TO: EXISTING SIDEWALK
AT MEADOWBROOK HS (0.2000 MI)
DESCRIPTION: 35RW
PROJECT LENGTH: 0.2000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 475
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 380TAP: MPO - Federal
0 0 0 0 0 0 95(X) Transportation Enhancement Funds:
Local
0 0 0 0 0 0 0 475Total
MPO Area
Tri-CitiesEnhancement
PROGRAM/SYSTEM
CITY OF PETERSBURG, SOUTHSIDE DEPOT
RESTORATION
PROJECT
UPC NO.:
ROUTE:
104036
NFO
Underway
SCHEDULE
68
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEPetersburg
FY2015 433CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Restoration and Rehabilitation TO 500
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 200TAP: MPO - Federal
0 0 0 0 0 0 400TAP: Statewide - Federal
0 0 0 0 0 0 152(X) Transportation Enhancement Funds:
Local
-252 0 0 0 0 0 0 752Total
MPO Area
RichmondEnhancement
PROGRAM/SYSTEM
RTE 2770 - ADD SIDEWALK
PROJECT
UPC NO.:
ROUTE:
105192
NFO
Underway
SCHEDULE
80
ESTIMATED COST (000's)
JURISDICTION:
SMOKETREE DRIVE (RT 2770)STREET NAME:
PEChesterfield County
FY2015 483CN
FY2015FROM: YARROW LANE (RTE 3400) TO: 500 FT W RTE
653 (COURTHOUSE RD) (0.3700 MI)
DESCRIPTION: 40RW
PROJECT LENGTH: _SCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 603
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 470TAP: MPO - Federal
0 0 0 0 0 0 118(X) Transportation Enhancement Funds:
Local
15 0 0 0 0 0 0 588Total
11/12/2014 845
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Enhancement
MPO Area
RichmondEnhancement
PROGRAM/SYSTEM
FLOYD AVE BIKE BOULEVARD - PE ONLY
PROJECT
UPC NO.:
ROUTE:
105209
NFO
Underway
SCHEDULE
50
ESTIMATED COST (000's)
JURISDICTION:
FLOYD AVESTREET NAME:
PERichmond
N/A 0CNFROM: VARIOUS LOCATIONS TO: VARIOUS
LOCATIONS
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 50
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 457TAP: MPO - Federal
0 0 0 0 0 104 10(X) Transportation Enhancement Funds:
Local
-522 0 0 0 0 0 104 467Total
MPO Area
RichmondEnhancement
PROGRAM/SYSTEM
RTE 5 - SCENIC BYWAYS - INTERPRETIVE SITE
PROJECT
UPC NO.:
ROUTE:
54758
NFO0005
Balance of funds to be provided by Henrico County.REPORT NOTE:
Complete
SCHEDULE
150
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHenrico County
Underway 425CNFROM: SPOT LOCATION, NORTH SIDE OF RTE 5 EAST
OF I-295 TO: AT FOUR MILE CREEK PARK
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: New Construction Roadway TO 575
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 94Local Match: Local Match
0 0 0 0 0 0 375Scenic Byway Grants: Federal
106 0 0 0 0 0 0 469Total
MPO Area
RichmondEnhancement
PROGRAM/SYSTEM
MAIN ST & FRANKLIN ST - CYCLE TRACK
PROJECT
UPC NO.:
ROUTE:
106182
NFOEN14
FY2015
SCHEDULE
60
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PERichmond
FY2017 240CN
FROM: 9TH STREET TO: LAUREL STREETDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 300
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 240 0TAP: Statewide - Federal
0 0 0 0 0 60 0(X) Transportation Enhancement Funds:
Local
0 0 0 0 0 0 300 0Total
846 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Enhancement
MPO Area
RichmondEnhancement
PROGRAM/SYSTEM
VIRGINIA CAPITAL TRAIL - DOREY PARK
CONNECTION
PROJECT
UPC NO.:
ROUTE:
106184
NFOEN14
FY2015
SCHEDULE
15
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHenrico County
FY2017 114CNFROM: DOREY PARK LOWER PARKING LOT TO:
VIRGINIA CAPITAL TRAIL, PARK PHASE
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 130
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 104 0TAP: Statewide - Federal
0 0 0 0 0 26 0(X) Transportation Enhancement Funds:
Local
0 0 0 0 0 0 129 0Total
MPO Area
Tri-CitiesEnhancement
PROGRAM/SYSTEM
NORTH ES - SIDEWALKS
PROJECT
UPC NO.:
ROUTE:
106188
NFOEN14
FY2015
SCHEDULE
40
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEColonial Heights
FY2018 356CN
FY2017FROM: VARIOUS TO: VARIOUSDESCRIPTION: 36RW
PROJECT LENGTH: _SCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 433
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 151 0TAP: MPO - Federal
0 0 0 0 0 195 0TAP: Statewide - Federal
0 0 0 0 0 87 0(X) Transportation Enhancement Funds:
Local
0 0 0 0 0 0 433 0Total
MPO Area
RichmondEnhancement
PROGRAM/SYSTEM
LEGORDON DR - SIDEWALKS
PROJECT
UPC NO.:
ROUTE:
106201
NFOEN14
FY2015
SCHEDULE
85
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEChesterfield County
FY2018 275CN
FY2017FROM: CHARTER COLONY PARKWAY TO:
MIDLOTHIAN WOOD BLVD (0.1900 MI)
DESCRIPTION: 15RW
PROJECT LENGTH: _SCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 375
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 300 0TAP: MPO - Federal
0 0 0 0 0 75 0(X) Transportation Enhancement Funds:
Local
0 0 0 0 0 0 375 0Total
11/12/2014 847
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Enhancement
MPO Area
RichmondEnhancement
PROGRAM/SYSTEM
CANNON CREEK GREENWAY
PROJECT
UPC NO.:
ROUTE:
106246
NFOEN14
FY2015
SCHEDULE
210
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PERichmond
FY2017 490CNFROM: VALLEY ROAD TO: HOSPITAL ROAD (AT
OLIVER HILL WY)
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 700
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 180 0Revenue Sharing Funds: Local Match
0 0 0 0 0 180 0Revenue Sharing Funds: State Match
0 0 0 0 0 160 0TAP: MPO - Federal
0 0 0 0 0 160 0TAP: Statewide - Federal
0 0 0 0 0 80 0(X) Transportation Enhancement Funds:
Local
-60 0 0 0 0 0 760 0Total
MPO Area
RichmondEnhancement
PROGRAM/SYSTEM
MUNFORD ES & FOX ES - SIDEWALKS
PROJECT
UPC NO.:
ROUTE:
106247
NFOEN14
FY2015
SCHEDULE
15
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PERichmond
FY2017 209CN
FROM: VARIOUS TO: VARIOUSDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 223
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 19 0TAP: MPO - Federal
0 0 0 0 0 301 0TAP: Statewide - Federal
0 0 0 0 0 80 0(X) Transportation Enhancement Funds:
Local
-177 0 0 0 0 0 400 0Total
848 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Public Transportation
MPO Area
RichmondPublic Transportation
PROGRAM/SYSTEM
GRTC REPLACEMENT BUSES
PROJECT
UPC NO.:
ROUTE:
T11907
NFO
MPO Project.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PERichmond
FY2013 4,219CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Transit TO 4,219
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 3,375RSTP (STP Regional): MPO - Federal
0 0 0 0 0 0 844RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 0 4,219Total
MPO Area
RichmondPublic Transportation
PROGRAM/SYSTEM
ARRA - GRTC BUS REPLACEMENT
PROJECT
UPC NO.: T9879
NFOARRA09
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 3,120American Recovery and Reinvestment Act:
Urbanized Area > 200K
MPO Area
RichmondPublic Transportation
PROGRAM/SYSTEM
MECHANICSVILLE COMMUTER TRANSIT
SERVICE
PROJECT
UPC NO.:
ROUTE:
T9717
NFO
MPO Project. Balance to be provided by MPO.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEMulti-jurisdictional: Richmond MPO
FY2012 639CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Transit TO 639
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 315CMAQ: Federal
0 0 0 0 0 0 68CMAQ: MPO - Federal
0 0 0 0 0 0 17CMAQ: MPO - State Match
239 0 0 0 0 0 0 400Total
11/12/2014 849
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Public Transportation
MPO Area
RichmondPublic Transportation
PROGRAM/SYSTEM
GRTC BUS REPLACEMENT
PROJECT
UPC NO.:
ROUTE:
T9678
NFO
MPO Project.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEMulti-jurisdictional: Richmond MPO
FY2011 2,100CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Transit TO 2,100
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,680RSTP (STP Regional): Federal
0 0 0 0 0 0 420RSTP (STP Regional): State Match
0 0 0 0 0 0 0 2,100Total
MPO Area
Tri-CitiesPublic Transportation
PROGRAM/SYSTEM
HOPEWELL CIRCULATOR BUS ROUTE
PROJECT
UPC NO.:
ROUTE:
T9443
NFO
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHopewell
FY2011 1,394CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Transit TO 1,394
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 988CMAQ: Federal
0 0 0 0 0 0 406CMAQ: State Match
0 0 0 0 0 0 22Local Project Contributions: Local
-22 0 0 0 0 0 0 1,416Total
MPO Area
RichmondPublic Transportation
PROGRAM/SYSTEM
TELEWORK!VA
PROJECT
UPC NO.: T3406
NFOProject Report Req'd
Telework!VADESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 400CMAQ TERMS: Federal
0 0 0 0 0 0 100CMAQ TERMS: State Match
0 0 0 0 0 0 500Total
MPO Area
RichmondPublic Transportation
PROGRAM/SYSTEM
GLOBAL POSITIONING SYSTEM/AUTO
VEHICLE LOCATION/AUTO PASSENG
PROJECT
UPC NO.: T998
NFOPublic Transportation
MPO ProjectREPORT NOTE:
FROM: GPS Auto Vehicle Location TO: Auto Passenger
Counting
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 3,726CMAQ: Federal
0 0 0 0 0 0 868CMAQ: State Match
0 0 0 0 0 0 4,594Total
850 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Public Transportation
MPO Area
Tri-CitiesPublic Transportation
PROGRAM/SYSTEM
NONATTAINMENT AREA
PROJECT
UPC NO.: T204
NFOPublic Transportation
Tri-Cities MPO Air Quality Maintenance AreaDESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 178CMAQ: Federal
28 28 28 28 28 28 29CMAQ: MPO - Federal
7 7 7 7 7 7 3CMAQ: MPO - State Match
0 0 0 0 0 0 10Non-Formula: Statewide
0 0 0 0 0 0 40RSTP (STP Regional): Statewide
35 35 35 35 35 35 260Total
MPO Area
RichmondPublic Transportation
PROGRAM/SYSTEM
REGIONWIDE AIR POLLUTION REDUCTION
PROGRAM - RIDEFINDERS
PROJECT
UPC NO.: T203
NFOPublic Transportation
Regionwide Air Pollution Reduction ProgramDESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 9,796CMAQ: Federal
400 0 0 0 400 400 1,153CMAQ: MPO - Federal
100 0 0 0 100 100 288CMAQ: MPO - State Match
0 0 0 0 0 0 174CMAQ: State Match
0 0 0 0 0 0 141Non-Formula: Statewide
0 0 0 0 0 0 563RSTP (STP Regional): Statewide
0 0 0 500 500 500 12,115Total
MPO Area
RichmondPublic Transportation
PROGRAM/SYSTEM
VANPOOL FLEET EXPANSION
PROJECT
UPC NO.: T201
NFOPublic Transportation
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 50CMAQ: Federal
MPO Area
NonMPOPublic Transportation
PROGRAM/SYSTEM
RENOVATION
PROJECT
UPC NO.: T43
NFOPublic Transportation
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 6,058TEA-21 High Priority Funds: Statewide
MPO Area
RichmondPublic Transportation
PROGRAM/SYSTEM
RENOVATION OF TRANSPORTATION FACILITY
PROJECT
UPC NO.: T41
NFOPublic Transportation
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 3,786TEA-21 High Priority Funds: Statewide
11/12/2014 851
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Public Transportation
MPO Area
RichmondPublic Transportation
PROGRAM/SYSTEM
EXPANSION OF CURRENT MAINTENANCE
FACILITY
PROJECT
UPC NO.: T40
NFOPublic Transportation
Administered by DRPTREPORT NOTE:
GRTC Service AreaDESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,437Non-Formula: Statewide
0 0 0 0 0 0 11,828RSTP (STP Regional): Federal
0 0 0 0 0 0 1,520RSTP (STP Regional): State Match
0 0 0 0 0 0 14,785Total
MPO Area
Tri-CitiesPublic Transportation
PROGRAM/SYSTEM
CONSTRUCTION OF MULTI-MODAL CENTER
PROJECT
UPC NO.: 76618
NFOPublic Transportation
DRPT administered.REPORT NOTE:
FROM: SOUTH UNION STREET TO: WEST
WASHINGTON STREET
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 455Non-Formula: State
0 0 0 0 0 0 82Non-Formula: Statewide
0 0 0 0 0 0 2,146RSTP (STP Regional): Federal
0 0 0 0 0 0 2,683Total
MPO Area
RichmondPublic Transportation
PROGRAM/SYSTEM
BIKE SHARE SYSTEM - CITYWIDE
PROJECT
UPC NO.:
ROUTE:
105889
NFO
MPO Project.REPORT NOTE:
FY2014
SCHEDULE
200
ESTIMATED COST (000's)
JURISDICTION:
VARIOUSSTREET NAME:
PERichmond
FY2016 2,800CN
VARIOUSDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 3,000
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 314 538CMAQ: MPO - Federal
0 0 0 0 0 78 134CMAQ: MPO - State Match
0 0 0 0 0 0 1,936Local Project Contributions: Local
0 0 0 0 0 0 392 2,608Total
MPO Area
RichmondPublic Transportation
PROGRAM/SYSTEM
RICHMOND GRTC - PURCHASE 15 TRANSIT
BUSES
PROJECT
UPC NO.: T4314
NFOPublic Transportation
RICHMOND GRTC - PURCHASE 15 TRANSIT BUSESDESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,060Project Contributions: Various Sources
0 0 0 0 0 0 4,240RSTP (STP Regional): Federal
0 0 0 0 0 0 5,300Total
852 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Public Transportation
MPO Area
RichmondPublic Transportation
PROGRAM/SYSTEM
EXPANSION OF BUS SERVICE
PROJECT
UPC NO.: T2131
NFOProject Report Req'd
Complete schedule & estimate required.REPORT NOTE:
Expansion of Bus ServiceDESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 828CMAQ TERMS: Federal
0 0 0 0 0 0 207CMAQ TERMS: State Match
0 0 0 0 0 0 1,560Primary Formula: State
0 0 0 0 0 0 2,596Total
MPO Area
RichmondPublic Transportation
PROGRAM/SYSTEM
NEW MARKING CAMPAIGN: EDUCATE USERS
ABOUT TRANSIT TECHNOLOGY
PROJECT
UPC NO.: T1806
NFOPublic Transportation
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 215CMAQ: Federal
0 0 0 0 0 0 54CMAQ: State Match
0 0 0 0 0 0 269Total
MPO Area
RichmondPublic Transportation
PROGRAM/SYSTEM
TRANSIT INFORMATION SOFTWARE
PROJECT
UPC NO.: T240
NFOPublic Transportation
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 300CMAQ: Federal
MPO Area
RichmondPublic Transportation
PROGRAM/SYSTEM
ALTERNATIVE FUEL TROLLEY VEHICLE
REPLACEMENT
PROJECT
UPC NO.: T206
NFOPublic Transportation
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 180CMAQ: Federal
MPO Area
RichmondPublic Transportation
PROGRAM/SYSTEM
MARKETING CAMPAIGN TO ATTRACT CHOICE
RIDERS
PROJECT
UPC NO.: T198
NFOPublic Transportation
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 817CMAQ: Federal
0 0 0 0 0 0 40Non-Formula: Statewide
0 0 0 0 0 0 160RSTP (STP Regional): Statewide
0 0 0 0 0 0 1,017Total
11/12/2014 853
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Public Transportation
MPO Area
RichmondPublic Transportation
PROGRAM/SYSTEM
BUS TRANSFER STATION ON BROAD STREET
BETWEEN 7TH AND 8TH ST
PROJECT
UPC NO.: T39
NFOPublic Transportation
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 20Non-Formula: Statewide
0 0 0 0 0 0 80RSTP (STP Regional): Statewide
0 0 0 0 0 0 100Total
MPO Area
RichmondPublic Transportation
PROGRAM/SYSTEM
GASKINS ROAD PARK AND RIDE FACILITY -
RESURFACE
PROJECT
UPC NO.:
ROUTE:
104511
NFO9999
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
GASKINS RDSTREET NAME:
PEHenrico County
Underway 228CN
AT 2900 GASKINS RDDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Resurfacing TO 228
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 118Local Project Contributions: Local
0 0 0 0 0 0 55Revenue Sharing Funds: Local Match
0 0 0 0 0 0 55Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 228Total
854 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Rail
MPO Area
Tri-CitiesRail
PROGRAM/SYSTEM
NEPA STUDY - MULTIMODAL FACILITY
PROJECT
UPC NO.:
ROUTE:
105462
FO9999
FY2014
SCHEDULE
500
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEMulti-jurisdictional: Tri-Cities MPO
CNFROM: VARIOUS LOCATIONS TO: VARIOUS
LOCATIONS
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Transit TO 500
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 200Local Project Contributions: Local
0 0 0 0 0 0 6Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 240Urban Formula: Federal
0 0 0 0 0 0 54Urban Formula: State Match
0 0 0 0 0 0 0 500Total
11/12/2014 855
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Miscellaneous
MPO Area
RichmondMiscellaneous
PROGRAM/SYSTEM
RICHMOND MPO CMAQ BALANCE ENTRY
PROJECT
UPC NO.: 70719
NFOBalance Entry
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 171CMAQ: Federal
0 0 0 0 0 0 418CMAQ: State Match
0 0 0 0 0 0 589Total
MPO Area
RichmondMiscellaneous
PROGRAM/SYSTEM
RICHMOND MPO REGIONAL STP (RSTP)
BALANCE ENTRY
PROJECT
UPC NO.: 70721
NFOBalance Entry
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 150Non-Formula: State Match
0 0 0 0 0 0 589RSTP (STP Regional): Federal
0 0 0 0 0 0 65RSTP (STP Regional): State Match
0 0 0 0 0 0 804Total
MPO Area
Tri-CitiesMiscellaneous
PROGRAM/SYSTEM
RSTP TRANSPORTATN PLANNING
SUPPLMENTL FUNDING FOR CRATER PDC
PROJECT
UPC NO.: 72904
NFODistrict-wide
MPO Project.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 413RSTP (STP Regional): Federal
0 20 20 0 0 0 57RSTP (STP Regional): MPO - Federal
0 5 5 0 0 0 14RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 103RSTP (STP Regional): State Match
25 25 0 0 0 0 588Total
MPO Area
RichmondMiscellaneous
PROGRAM/SYSTEM
ASHLAND TROLLEY LINE TRAIL SECTION 2
PROJECT
UPC NO.:
ROUTE:
97689
NFO
MPO Project.REPORT NOTE:
Underway
SCHEDULE
5
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEAshland
CNFROM: End of Pavement on Walder Road TO: End of
Town Limits (0.2400 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.2400 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 5
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 53RSTP (STP Regional): Federal
0 0 0 0 0 0 13RSTP (STP Regional): State Match
-62 0 0 0 0 0 0 66Total
856 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Miscellaneous
MPO Area
RichmondMiscellaneous
PROGRAM/SYSTEM
PROJECT PRESCOPING - RICHMOND
PROJECT
UPC NO.: 99581
NFOBalance Entry
FROM: Various TO: VariousDESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
1,035 1,130 1,105 1,082 1,058 919 3,023Prescoping Funds: State
MPO Area
RichmondMiscellaneous
PROGRAM/SYSTEM
CITY OF RICHMOND: EMPLOYEE
TRIPREDUCTION PROGRAM
PROJECT
UPC NO.: T1811
NFOPublic Transportation
MPO Project.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,677CMAQ: Federal
0 0 0 0 0 0 480CMAQ: MPO - Federal
0 0 0 0 0 0 120CMAQ: MPO - State Match
0 0 0 0 0 0 419CMAQ: State Match
0 0 0 0 0 0 2,696Total
MPO Area
RichmondMiscellaneous
PROGRAM/SYSTEM
RIDEFINDERS - REGIONWIDE
PROJECT
UPC NO.: 50650
FOProject Report Req'd
RIDEFINDERS - RICHMOND REGIONWIDEDESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 3,558CMAQ TERMS: Federal
0 0 0 0 0 0 888CMAQ TERMS: State Match
0 0 0 0 0 0 4,446Total
MPO Area
RichmondMiscellaneous
PROGRAM/SYSTEM
HSIP DISTRICTWIDE ROADWAY SAFETY
ASSESSMENT
PROJECT
UPC NO.: 81373
NFODistrict-wide
VARIOUS LOCATIONSDESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
428 0 0 0 0 0 1,202Highway Safety Improvements: Federal
48 0 0 0 0 0 32Highway Safety Improvements: Soft Match
0 0 0 0 0 0 101Highway Safety Improvements: State Match
0 0 0 0 476 0 1,335Total
11/12/2014 857
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Miscellaneous
MPO Area
RichmondMiscellaneous
PROGRAM/SYSTEM
HSIP DISTRICTWIDE TRAFFIC SIGNALS AND
ITS
PROJECT
UPC NO.: 81388
NFODistrict-wide
VARIOUS LOCATIONSDESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 3,144Highway Safety Improvements: Federal
0 0 0 0 0 0 349Highway Safety Improvements: State Match
0 0 0 0 0 142 143(X) Maintenance Funds: Statewide
0 0 0 0 0 142 3,637Total
MPO Area
RichmondMiscellaneous
PROGRAM/SYSTEM
HSIP DISTRICTWIDE HIGH RISK RURAL
ROADS - RICHMOND
PROJECT
UPC NO.: 86684
NFODistrict-wide
FROM: To be detemined TO: To be determinedDESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 828High Risk Rural: Federal
0 0 0 0 0 0 92High Risk Rural: State Match
0 0 0 0 0 0 920Total
MPO Area
RichmondMiscellaneous
PROGRAM/SYSTEM
BERKLEY PROJECT
PROJECT
UPC NO.:
ROUTE:
88477
NFO0000
Underway
SCHEDULE
786
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PERichmond
CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Preliminary Engineering TO 786
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
784 0 0 0 0 0 0Prescoping Funds: State 3
MPO Area
RichmondMiscellaneous
PROGRAM/SYSTEM
TOWN OF ASHLAND - SRTS - HENRY CLAY ES
- ADD SIDEWALK
PROJECT
UPC NO.:
ROUTE:
102834
NFO0000
Underway
SCHEDULE
64
ESTIMATED COST (000's)
JURISDICTION:
DUNCAN ST, EARLY ST, STEBBINS STSTREET NAME:
PEAshland
FY2015 396CNFROM: 3 LOCATIONS - TO: DUNCAN ST, EARLY ST,
STEBBINS ST (0.9000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.9000 MISCOPE OF WORK: Safety TO 460
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 7Local Project Contributions: Local
0 0 0 0 0 0 519Safe Routes to School: Federal
-66 0 0 0 0 0 0 527Total
858 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Miscellaneous
MPO Area
Tri-CitiesMiscellaneous
PROGRAM/SYSTEM
CITY OF COLONIAL HEIGHTS - SRTS - COL
HTS MS - ADD SIDEWALK
PROJECT
UPC NO.:
ROUTE:
102836
NFO0000
Revised schedule requiredREPORT NOTE:
Underway
SCHEDULE
14
ESTIMATED COST (000's)
JURISDICTION:
Conduit Road and Colonial/Lafayette/Elko AvesSTREET NAME:
PEColonial Heights
FY2014 160CN
FY2014FROM: 500 Conduit Road TO: VariousDESCRIPTION: 6RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 179
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 221Safe Routes to School: Federal -42
MPO Area
RichmondMiscellaneous
PROGRAM/SYSTEM
ASHLAND TROLLEY LINE TRAIL/PARK
PROJECT
UPC NO.:
ROUTE:
103393
NFO0000
MPO Project. Revised estimate & schedule required. Excess funds to be redistributed by MPO.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEAshland
FY2014 179CNFROM: Maple Street Extended TO: Trolley Line Trail Park
(0.2700 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.2700 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 179
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
400 0 0 0 480 0 0RSTP (STP Regional): MPO - Federal
100 0 0 0 120 0 0RSTP (STP Regional): MPO - State Match
-921 0 0 0 600 500 0 0Total
MPO Area
Tri-CitiesMiscellaneous
PROGRAM/SYSTEM
RETIMING SIGNALS - VARIOUS LOCATIONS
PROJECT
UPC NO.:
ROUTE:
104877
NFO0000
MPO Project. Revised schedule required.REPORT NOTE:
FY2019
SCHEDULE
45
ESTIMATED COST (000's)
JURISDICTION:
VARIOUSSTREET NAME:
PEPetersburg
FY2020 135CNFROM: VARIOUS LOCATIONS TO: VARIOUS
LOCATIONS
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Traffic Management/Engineering TO 180
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 37 107 0 0 0CMAQ: MPO - Federal
0 0 9 27 0 0 0CMAQ: MPO - State Match
0 0 46 134 0 0 0 0Total
11/12/2014 859
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Miscellaneous
MPO Area
RichmondMiscellaneous
PROGRAM/SYSTEM
VIRGINIA PORT AUTHORITY - CRANE
PROCUREMENT
PROJECT
UPC NO.:
ROUTE:
104891
NFO0000
MPO Project.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
PORT OF RICHMONDSTREET NAME:
PERichmond
FY2015 4,184CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Other TO 4,184
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 2,056 1,292CMAQ: MPO - Federal
0 0 0 0 0 514 323CMAQ: MPO - State Match
0 0 0 0 0 0 2,570 1,615Total
MPO Area
RichmondMiscellaneous
PROGRAM/SYSTEM
GREEN OPERATOR (GO) RICHMOND DRAYAGE
TRUCK REPLACEMENT PROG
PROJECT
UPC NO.:
ROUTE:
104892
NFO0000
MPO Project.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
PORT OF RICHMONDSTREET NAME:
PERichmond
FY2015 1,543CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Other TO 1,543
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 400 0 400 434CMAQ: MPO - Federal
0 0 0 100 0 100 109CMAQ: MPO - State Match
0 0 0 500 0 0 500 543Total
MPO Area
RichmondMiscellaneous
PROGRAM/SYSTEM
PARK AND RIDE LOTS AT PRIORITY
LOCATIONS - PE ONLY
PROJECT
UPC NO.:
ROUTE:
106304
NFO0000
FY2016
SCHEDULE
125
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEMulti-jurisdictional: Richmond MPO
CNFROM: VARIOUS LOCATIONS TO: VARIOUS
LOCATIONS
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Preliminary Engineering TO 125
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
100 0 0 0 0 0 0CMAQ: MPO - Federal
25 0 0 0 0 0 0CMAQ: MPO - State Match
0 0 0 0 0 125 0 0Total
860 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Miscellaneous
MPO Area
NonMPOMiscellaneous
PROGRAM/SYSTEM
COMMITTED SAFETY PROJECTS-RICHMOND
PROJECT
UPC NO.:
ROUTE:
106554
NFO0000
NEW PROJECT
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PERichmond District-wide
N/A 0CN
FROM: various TO: variousDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 0
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 4,453 3,116 2,489 2,477 0 0Highway Safety Improvements: Federal
0 495 346 277 275 0 0Highway Safety Improvements: Soft Match
-13,927 4,947 3,463 2,765 2,752 0 0 0Total
MPO Area
NonMPOMiscellaneous
PROGRAM/SYSTEM
I95 CORR TECH ADV US1 SIGNAL COMM CAM
- CAROL TO COL HGTS
PROJECT
UPC NO.:
ROUTE:
105369
NFO0001
Underway
SCHEDULE
525
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PERichmond District-wide
CNFROM: Caroline CL TO: Colonial Heights Corp Limits
(42.9700 MI)
DESCRIPTION: RW
PROJECT LENGTH: 42.9700 MISCOPE OF WORK: Safety TO 525
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
375 0 0 0 0 150 0CTB Formula: ITS - State 0
MPO Area
RichmondMiscellaneous
PROGRAM/SYSTEM
RTE 604 PARK AND RIDE AT I-64 (EXIT 214)
PROJECT
UPC NO.:
ROUTE:
106300
NFO0604
Complete estimate and schedule requiredREPORT NOTE:
N/A
SCHEDULE
0
ESTIMATED COST (000's)
JURISDICTION:
POINDEXTER ROADSTREET NAME:
PENew Kent County
FY2015 325CNFROM: IN FRONT OF COUNTY BUILDING TO: IN FRONT
OF COUNTY BUILDING
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Other TO 325
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 320 0RSTP (STP Regional): MPO - Federal
0 0 0 0 0 80 0RSTP (STP Regional): MPO - State Match
-75 0 0 0 0 0 400 0Total
11/12/2014 861
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Miscellaneous
MPO Area
RichmondMiscellaneous
PROGRAM/SYSTEM
RTE 638 - ADD SIDEWALK
PROJECT
UPC NO.:
ROUTE:
86561
NFO0638
Complete
SCHEDULE
257
ESTIMATED COST (000's)
JURISDICTION:
COGBILL ROADSTREET NAME:
PEChesterfield County
Underway 250CN
UnderwayFROM: RTE 847 (LIVINGSTONE AVE) TO: RTE 770
(CHESTERWOOD DR) (0.2940 MI)
DESCRIPTION: 40RW
PROJECT LENGTH: 0.2940 MISCOPE OF WORK: Safety TO 547
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 576Highway Safety Improvements: Federal
0 0 0 0 0 0 64Highway Safety Improvements: State Match
-93 0 0 0 0 0 0 640Total
MPO Area
RichmondMiscellaneous
PROGRAM/SYSTEM
HSIP RICHMOND DISTRICTWIDE
PROJECT
UPC NO.: T6521
NFODistrict-wide
Various locationsDESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,893Highway Safety Improvements: Federal
0 0 0 0 0 0 210Highway Safety Improvements: State Match
0 0 0 0 0 0 64Local Project Contributions: Local
0 0 0 0 0 0 2,168Total
MPO Area
RichmondMiscellaneous
PROGRAM/SYSTEM
CRAC "CELL LOTS"
PROJECT
UPC NO.:
ROUTE:
84348
NFO9999
MPO Project - Match to be provided by Capitol Region Area Commission.REPORT NOTE:
Underway
SCHEDULE
4
ESTIMATED COST (000's)
JURISDICTION:
CRAC "Cell Phone Parking Lot"STREET NAME:
PEHenrico County
CN
FROM: Parking lots - RIC TO: Parking lots - RICDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: New Construction Roadway TO 4
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 307CMAQ: Federal
0 0 0 0 0 0 1Local Project Contributions: Local
-304 0 0 0 0 0 0 308Total
862 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Miscellaneous
MPO Area
RichmondMiscellaneous
PROGRAM/SYSTEM
RICHMOND MPO MULITMODAL LRP
PROJECT
UPC NO.:
ROUTE:
86357
FO9999
MPO project - balance to be provided by MPO.REPORT NOTE:
FY2010
SCHEDULE
1,300
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEMulti-jurisdictional: Richmond MPO
CNDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 1,300
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 240RSTP (STP Regional): Federal
0 0 0 0 0 0 60RSTP (STP Regional): State Match
1,000 0 0 0 0 0 0 300Total
MPO Area
RichmondMiscellaneous
PROGRAM/SYSTEM
HSIP PROACTIVE SAFETY - HENRICO COUNTY
PROJECT
UPC NO.: 86683
NFODistrict-wide
HSIP Proactive Safety Projects Henrico CountyDESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2,237Highway Safety Improvements: Federal
0 0 0 0 0 0 46Highway Safety Improvements: Soft Match
0 0 0 0 0 0 202Highway Safety Improvements: State Match
0 0 0 0 0 0 1Primary Formula: State
0 0 0 0 0 0 11Safety Funds: Hazard Elimination
0 0 0 0 0 0 2,498Total
MPO Area
RichmondMiscellaneous
PROGRAM/SYSTEM
MARINE HWY PROGRAM:
RICHMOND-HAMPTON ROADS BARGE
SERVICE
PROJECT
UPC NO.:
ROUTE:
90354
NFO9999
To be administered by Virginia Port Authority;REPORT NOTE:
Underway
SCHEDULE
3,915
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PERichmond District-wide
CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Historic Preservation TO 3,915
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2,857CMAQ: Federal
0 0 0 0 0 0 1,057CMAQ: State Match
0 0 0 0 0 0 0 3,915Total
11/12/2014 863
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Miscellaneous
MPO Area
RichmondMiscellaneous
PROGRAM/SYSTEM
RICHMOND REGION-WIDE
TRAFFIC/OPERATIONS IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
101492
NFO9999
MPO Project. Revised schedule required. Balance to be provided by MPO.REPORT NOTE:
FY2014
SCHEDULE
1,000
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEMulti-jurisdictional: Richmond MPO
FY2015 18,312CN
FROM: N/A TO: N/ADESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 19,312
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
355 1,346 701 455 450 105 0CMAQ: MPO - Federal
89 336 175 114 112 26 0CMAQ: MPO - State Match
746 4,402 922 922 1,830 168 0RSTP (STP Regional): MPO - Federal
187 1,101 231 231 458 42 0RSTP (STP Regional): MPO - State Match
3,809 7,185 2,029 1,722 2,850 1,376 341 0Total
MPO Area
NonMPOMiscellaneous
PROGRAM/SYSTEM
TRAFFIC SIGNAL CLEARANCE INTERVALS
EVALUATIONS (PE ONLY)
PROJECT
UPC NO.:
ROUTE:
104663
NFO9999
Underway
SCHEDULE
1,800
ESTIMATED COST (000's)
JURISDICTION:
VARIOUSSTREET NAME:
PERichmond District-wide
CN
FROM: VARIOUS LOCATIONS TO: VariousDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 1,800
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
540 0 0 0 0 540 540Highway Safety Improvements: Federal
60 0 0 0 0 60 60Highway Safety Improvements: Soft Match
0 0 0 0 0 600 600 600Total
MPO Area
RichmondMiscellaneous
PROGRAM/SYSTEM
REPLACE SIGNALS - VARIOUS
INTERSECTIONS
PROJECT
UPC NO.:
ROUTE:
104664
NFO9999
Underway
SCHEDULE
1,050
ESTIMATED COST (000's)
JURISDICTION:
VARIOUSSTREET NAME:
PERichmond District-wide
FY2016 3,270CN
UnderwayFROM: VARIOUS LOCATIONS TO: VARIOUS
LOCATIONS
DESCRIPTION: 2,170RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 6,490
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
1,890 0 0 0 1,890 1,116 945Highway Safety Improvements: Federal
210 0 0 0 210 124 105Highway Safety Improvements: Soft Match
0 0 0 0 2,100 2,100 1,240 1,050Total
864 11/12/2014
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Miscellaneous
MPO Area
NonMPOMiscellaneous
PROGRAM/SYSTEM
I64 CORR TECH ADV US 250 - SIGNAL COMM
CAM - RICH TO LOUISA
PROJECT
UPC NO.:
ROUTE:
105366
NFO9999
HB2 ADJUSTMENT
FY2016
SCHEDULE
645
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PERichmond District-wide
CN
FROM: Richmond Corp Limits TO: Lousia CL (25.2200 MI)DESCRIPTION: RW
PROJECT LENGTH: 25.2200 MISCOPE OF WORK: Safety TO 645
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 0Accounts Receivable: Local 645
MPO Area
RichmondMiscellaneous
PROGRAM/SYSTEM
INSTALL SIGNALS - VARIOUS
INTERSECTIONS
PROJECT
UPC NO.:
ROUTE:
106238
NFO9999
Revised schedule requiredREPORT NOTE:
FY2014
SCHEDULE
100
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PERichmond District-wide
FY2016 400CN
FROM: VARIOUS TO: VARIOUSDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 500
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
450 0 0 0 0 0 0Highway Safety Improvements: Federal
50 0 0 0 0 0 0Highway Safety Improvements: Soft Match
0 0 0 0 0 500 0 0Total
MPO Area
RichmondMiscellaneous
PROGRAM/SYSTEM
DISTRICTWIDE - PROVIDE PEDESTRIAN
ACCOMODATIONS
PROJECT
UPC NO.:
ROUTE:
106240
NFO9999
FY2016
SCHEDULE
450
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PERichmond District-wide
FY2017 1,000CN
FROM: VARIOUS TO: VARIOUSDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 1,450
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
405 0 0 0 900 0 0Highway Safety Improvements: Federal
45 0 0 0 100 0 0Highway Safety Improvements: Soft Match
0 0 0 0 1,000 450 0 0Total
11/12/2014 865
RICHMOND DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 REVISED FINAL Miscellaneous
MPO Area
RichmondMiscellaneous
PROGRAM/SYSTEM
VA CAPITAL TRAIL - HENRICO RIVERFRONT
PROJECT
UPC NO.:
ROUTE:
106468
NFO9999
FY2015
SCHEDULE
92
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHenrico County
FY2015 308CN
N/AFROM: RICHMOND CITY LIMITS TO: 0.36 MI S
RICHMOND CITY LIMITS (0.3600 MI)
DESCRIPTION: 0RW
PROJECT LENGTH: 0.3600 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 400
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 400Open Container Funds: Statewide 0
MPO Area
Tri-CitiesMiscellaneous
PROGRAM/SYSTEM
RICHMOND TRI-CITIES CMAQ BALANCE
ENTRY
PROJECT
UPC NO.: 70722
NFOBalance Entry
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
16 15 19 16 16 0 0CMAQ: MPO - Federal
4 4 5 4 4 0 0CMAQ: MPO - State Match
18 24 20 20 19 0 0Total
MPO Area
Tri-CitiesMiscellaneous
PROGRAM/SYSTEM
RICHMOND TRI-CITIES REGIONAL STP (RSTP)
BALANCE ENTRY
PROJECT
UPC NO.: 70725
NFOBalance Entry
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,434RSTP (STP Regional): Federal
57 110 108 96 100 0 0RSTP (STP Regional): MPO - Federal
14 27 27 24 25 0 0RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 359RSTP (STP Regional): State Match
137 135 120 125 71 0 1,793Total
866 11/12/2014