Post on 30-Dec-2015
description
Revised Proposed EVR Timeline
Dotted box: time between start of 4-year clock and operative date
Start of solid bar: date required for new or modified facilities (operative date)
End of solid bar: date required for existing facilities (installed before start of bar)
Not required for existing dispensers (installed before April 2003)
February 2003
2001 2003 2005 20072002 2004 2006 2008Ap ril Ap ril Ap ril Ap rilAp ril Ap ril Ap ril Ap ril
J uly O c tO c t O c t
ISD ( 600,000 gal/yr)>
ORVR
Spitting
Spillage
Dripless Nozzle
Liquid Retention - 350 ml
100 ml
Phase I EVR System
Phase II Standards & Specifications
In-Station Diagnostics (>1.8 million gal/yr)
Unihose Dispenser