REVIEWED RESUBMIT REVISE AND AND COMMENT FOR …...submittal review approved revise and resubmit not...

Post on 26-Sep-2020

0 views 0 download

Transcript of REVIEWED RESUBMIT REVISE AND AND COMMENT FOR …...submittal review approved revise and resubmit not...

SUBMITTAL REVIEW

APPROVED

REVISE ANDRESUBMIT

NOT APPROVED

BY DATEchardison 8/5/2019

APPROVAL OF SHOP DRAWINGS AND SUBMITTALS BY CONSTRUCTIONMANAGER, ARCHITECT, OR ENGINEER WILL NOT RELIEVE SUPPLIER OFRESPONSIBILITY FOR DIMENSIONAL ACCURACY, QUANTITIES, ORCONFORMANCE TO THE CONTRACT DOCUMENTS. CHANGES INVOLVINGEXTRA COST DUE TO REVIEW COMMENTS REQUIRE WRITTEN APPROVALPRIOR TO PROCESSING.

REVIEWED

✔ APPROVED ASNOTEDFOR REVIEWAND COMMENT

NO EXCEPTIONSTAKEN

REVISE & RESUBMIT

REJECTEDAPPROVED ASNOTED

Corrections or comments made on the shop drawings during this review donot relieve contractor from compliance with requirements of the drawingsand specifications. This check is only for review of general conformancewith the design concept of the project. The contractor is responsible forconfirming and correlating all quantities and dimensions; selectingfabrication processes and techniques of construction; coordinating his workwith that of all other trades; and performing his work in a safe andsatisfactory manner

CT CONSULTANTS, INC.

PROJECT #:

DATE: BY:

C. Knight8/26/2019

160681 133419-1.0

This is from a past RFI and only is listed to provide an understanding of material procurement

2.9-B6