Review of developments in Australasia and mainland Asia Steven Tingay Swinburne University of...

Post on 18-Jan-2016

218 views 4 download

Tags:

Transcript of Review of developments in Australasia and mainland Asia Steven Tingay Swinburne University of...

Review of developments in Australasia and mainland Asia

Steven TingaySwinburne University of Technology

Next Generation correlator meeting, JIVE27 - 29 June, 2006

http://astronomy.swin.edu.au

1. Current correlator developments in Australasia

• CABB (Ferris: Day 1)• SKAMP (Bunton: Day 3; de Souza: Day

3)• NTD/xNTD (Bunton: Day 3) - Langman: Day 3• LFD (Bunton: Day 3)

• VLBI/eVLBI (Deller: Day 2)

2. Current correlator developments in mainland Asia

• PAST• FAST• VLBI/CE-1 (Zhang: Day 1; Weimin: Day 2)• GMRT (Gupta: Day 1)

Horses for courses………

Compact Array Broadband Backend (CABB)

First major upgrade to ATCA correlator since construction in 1988 (CABB funded under MNRF2001)

Current ATCA correlator:• 6 antenna inputs;• 2 dual polarisation (linear) IFs (∆MAX = 128 MHz);• XF;• max number of channels = 4096;• ASIC-based.

CABB:• 8 inputs (2 extra for VLBI or RFI mitigation);• 2 dual polarisation (linear) IFs (∆MAX = 2 GHz);• polyphase digital filter bank for channelisation,

then cross-multiply; • max number of channels = 2000 (initially);• FPGA-based.

Phased introduction of operational system over next 2 Years

Dick Ferris to present details (http://www.atnf.csiro.au/projects/mnrf2001)/

SKA Molonglo Prototype (SKAMP)www.physics.usyd.edu.au/astrop/ska/ (John Bunton/Ludi de Souza)

– 96 stations (feeds), digital filterbank FX, FPGA-based;;– Stage 1: continuum, ∆ = 3 MHz @ 843 MHz;– Stage 2: 2048 channel spectral line, ∆ = 30 MHz @ 843 MHz;– Final: 2048 channel spectral line, ∆ = 100 MHz @300 - 1400 MHz

(Extended) New Technology Demonstrator (NTD/xNTD) www.atnf.csiro.au/projects/ska/xntd.html (John Bunton)

– 20 x 15m dishes, FPA with >30 beams;– 22800 baseline/polarisation products, ∆ = 256 MHz ;– Spectral-line, FPGA-based (same correlator board as SKAMP??);– Very similar instrument to KAT (Alan Langman);– Located at Mileura station in Western Australia.

Low Frequency Demonstrator (LFD)www.haystack.mit.edu/ast/arrays/mwa/LFD/index.html (John Bunton)

– 500 tile array with full stokes, ∆ = 32 MHz , 4000 channels;– Common correlation engine with SKAMP and NTD/xNTD;– CSIRO/MIT/University joint project;

DiFX software correlator

astronomy.swin.edu.au/ska (Adam Deller)www.atnf.csiro.au/vlbi/documentation/VLBI_National_Facility_upgrade.html

Complements new high data rate disk-based recording system

• 300 processor Beowulf cluster/Cray XD-1/Cray XT-3;• FX correlator (filter bank option);• Services Australian and global VLBI arrays;• Six antennas up to 1 Gbps (∆ <= 128 MHz);

• Currently offered as part of ATNF (high sensitivity, high spectral resolution, niche experiments);

• Will replace ATNF S2 correlator (<128 Mbps and <4096 channels) within 12 months;

• Natural compatibility with all other disk-based recorders (Mark5, K5, PC-EVN etc);

• Used for eVLBI tests and real-time fringe checking;

• Promotes collaboration in non-traditional but important areas.

Primeval Structure Telescope (PAST)web.phys.cmu.edu/~past/overview.html

– Observe the epoch of reionisation at redshift 6 - 20;– 80 phased arrays x 127 antennas per phased array;– 10,000 log periodic antennas in the Ulastai Valley, China;– Software correlator using ~100 COTS PCs.

Five hundred metre Aperture Spherical Telescope (FAST)

– Multi-beam receivers for surveys;– Wide bandwidth, full polarisation;

VLBI spacecraft tracking/Chang’E-1 Lunar missionReal-time software correlator (Zheng Weimin, XiuzhongZhang)

– Determination of lunar orbiter position, lunar gravity field;– Correlation in software a la Huygens VLBI experiments;– Real-time correlation with COTS PC cluster.

Giant Metrewave Radio Telescope (GMRT)(Yashwant Gupta)

– 30 x 45m antennas, 150 - 1420 MHz;– Bandwidth upgrade from 32 MHz to 400 MHz;– Upgrade of current 30 antenna, 256 channel, FX

correlator required -> 32 antenna, 8192 channel;– Enhanced beamforming capabilities for multi-beam pulsar

searching;– Software vs hardware ???

Summary

• A lot of diverse activity across the region.

• Large and small developments, upgrades (e.g. CABB, SKAMP, GMRT) and new facilities (e.g. xNTD, FAST, LFD);

• SKA demonstrators (CABB, SKAMP, xNTD, LFD, FAST);

• Niche facilities (Software correlators for VLBI);

• Specialised experiments (PAST);

• Other small developments (e.g. Uni.Tas. FPGA developments)

• Other planned/proposed developments (e.g. Australian geodetic VLBI array using software correlator.)