Rev0

Post on 01-Feb-2016

215 views 0 download

description

dwg

Transcript of Rev0

NOTESIT

SH

AL

L N

OT

BE

RE

PR

OD

UC

ED

OR

LE

NT

WIT

HO

UT

TH

E A

GR

EE

ME

NT

OF

TH

E C

OM

PA

NY

A1

CSSP-ITT-03

SCALE:

DRAWING NUMBER

DRAWING TITLE:

PROJECT TITLE

REV.SHT.CONTRACTOR No.:

CAD FILE NAME:

CLASS:DWG SIZE:

CONTRACT No.

NO

TIC

E:T

HIS

DR

AW

ING

AN

D T

HE

IN

FO

RM

AT

ION

IT

CO

NT

AIN

S I

S T

HE

SO

LE

PR

OP

ER

TY

OF

SO

UT

H O

IL C

OM

PA

NY

(S

OC

)

COMPANY

CONSULTANT CONTRACTOR SUB CONTRACTOR

REV DATE DESCRIPTION APP'DCHK'DPREP'DCOMPANY

APP'D

NA 1- KEY

01/01

SEAWATER TREATMENT FACILITY FEED

M

0002

01-54-TI

0001

01-54-PDI

FC

S

0003

01-54-TI

0001

01-54-PI

M

00041

01-54-TI

M

FROM COLD WATERSUPPLY HEADER

1120

0003

01-54-RO

0001

01-54-TW

0001

01-54-RO

0001

01-54-PDT

0001

01-54-PT

TO WET AIRRECEIVER

1127 FEDF-01-54-PR21-0003

0002

01-54-RO

01-54-XV

0001

01-54-SDV

0001

01-54-XV

0002

01-54-YCV

0002

01-54-YCV

0001

01-54-PCV

0001

01-54-PCV

0006

01-54-PSV

0001

P0457-FEDF-01-54-PR21-0001

SEAWATER TREATMENT FACILITY

FEDF-01-54-PR21-0001_P&ID_Rev0.dwg

FEDF-01-54-PR21-0001

PIPING & INSTRUMENTATION DIAGRAMPLANT AIR COMPRESSOR 1

0

28.08.15 MGJSJJSISSUED FOR EPC0

PROCESS DRAIN

ALARM AT

49 DEG. C

SERVICE AT

0.05 BAR

INLET AIR

FILTER

ATMSET AT

XX BAR

SET AT

XX BAR

OPEN AT

45 BARG

1. FOR GENERAL NOTES, SYMBOLS, LEGEND AND INSTRUMENTATION DETAILS,

SEE DOCUMENT FEDF-01-99-PR21- 0001/0002/0003.

01-54-A-0001

VENDOR PACKAGE

0001

01-54-TT

0002

01-54-TT

0003

01-54-TT

CV-540003 CV-540004

CV-540001 CV-540002

MV

-540001

CV-540005

MV

-540002

MV

-540003

MV

-540004

MV

-540005

MV

-540007

MV

-540008

MV

-540006

3"-CWR-AG20-540001-NI

N4

N1

3"-CWS-AG20-540001-NI

N3

N2

01-54-E-0001AAIR COMPRESSOR INTERCOOLER 1

01-54-S-0001BCONTROL AIR FILTER 2

01-54-S-0001AMOISTURE SEPARATOR 1

01-54-E-0001BAIR COMPRESSOR AFTERCOOLER 2

01-54-K-0001AIR COMPRESSOR 1

3"

2"

2"

3"

HOLD

2"-PD-AG20-540001-NI

2"-PD-AG20-540002-NI

PROCESS DRAIN

2. COMPRESSOR INTERCOOLDER AND AFTERCOOLER SHALL BE WATER OR AIR COOLED.

Description: Plant Air Compressor PackageCapacity@Suction Conditions: 2305.0 m^3/hrPressure Suction/Discharge: 10.0 bargMOC: Epoxy-Coated Carbon SteelMotor Power:

01-54-A-0001VENDOR PACKAGE

PLANT AIR COMPRESSOR SYSTEM

0001

01-54-HS

0002

01-54-HS

0007

01-54-HS

0007

01-54-MC

HOA

MV

-540009

TBD

MV

-540204

MV

-540203

p008271b
Callout
this should be discharge, excluding purge losses
p008271b
Cross-Out
p008271b
Line
p008271b
Line
p008271b
Pencil
p008271b
Callout
remove cloud
p008271b
Text Box
NOTE-2 & 3
p008271b
Cross-Out
p008271b
Text Box
3. The quality of water required for the cooling shall be as per vendor recommendation during the EPC stage.