Rethinking Level of Service

NACTO – Designing Cities

October 29, 2013

Tom Maguire

Assistant Commissioner

New York City Department of Transportation

Three Streets

Level of Service?

B! B!

B!

Intersection LOS is a measure of delay aggregated across a group of drivers under specific traffic conditions… so it’s good for evaluating engineering decisions:

• How well have I allocated signal time and phases at an intersection?

• How well have I allocated vehicle lanes among competing drivers?

Engineering or Planning?

Intersection LOS is a measure of delay aggregated across a group of drivers under specific traffic conditions… so it’s bad for evaluating planning decisions:

• How safe is this street?

• How well does this street work for pedestrians, bus riders, and cyclists?

• How well does this street work for all drivers?

Engineering or Planning?

Why do we use a metric suited to engineering individual intersections to plan entire streets, an even entire cities?

Engineering or Planning?

Our Metrics Must Evolve

Our Metrics Must Evolve

Mobility – Automobile

Safety

Access/Mobility – Multimodal

Public Health

Economic Development

Environmental Quality

Livability/Quality of Life

• Volumes (ATR, MTC, class’n) • Vehicular LOS (delay, V/C, etc)

METRICS

• Crash Total (all, by mode, etc) • Exposure (crashes/volume)

• Multimodal volumes & LOS • Curb/parking availability

• Minutes/physical activity/day • Rates of obesity, diabetes, etc

• # of businesses, employment • Retail sales, visitor spending

• Air quality, water quality • Urban heat island, energy

• User satisfaction • “Staying” activities, events

Crash reduction

Better metrics: For all users

West 181st Street,

Manhattan

Crash reduction

Better metrics: For all users

Transit ridership

Better metrics: For all users

First Avenue,

Manhattan

Transit ridership

Better metrics: For all users

Transit ridership

Better metrics: For all users

Economic benefits

Better metrics: For all users

Vanderbilt Avenue, Brooklyn

Economic benefits

Better metrics: For all users

0

50

100

150

200

250

300

350

400

450

500

Y0

7Q

2

Y0

7Q

3

Y0

7Q

4

Y0

8Q

1

Y0

8Q

2

Y0

8Q

3

Y0

8Q

4

Y0

9Q

1

Y0

9Q

2

Y0

9Q

3

Y0

9Q

4

Y1

0Q

1

Y1

0Q

2

Y1

0Q

3

Y1

0Q

4

Y1

1Q

1

Y1

1Q

2

Y1

1Q

3

Y1

1Q

4

Sal

es I

ndex

(Y

07

Q2

= 1

00

)

Improvement Site

Neighborhood Comp's

Borough

Accessibility

Better metrics: For drivers

Accessibility

Better metrics: For drivers

Reliability

Better metrics: For drivers

Fifth Avenue, Manhattan

Same street, same block, same peak, same day… which will you experience?

Reliability

Better metrics: For drivers

0

5

10

15

20

25

30

35

40

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Ave

rag

e H

ou

rly S

peed (

mp

h)

Hour of the day

5th Avenue [49th St to 42nd St] Non-holiday weekdays | September - November 2011

Reliability

Better metrics: For drivers

0

5

10

15

20

25

30

35

40

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Ave

rag

e H

ou

rly S

peed (

mp

h)

Hour of the day

5th Avenue [49th St to 42nd St] Non-holiday weekdays | September - November 2011

In rush hours, speeds are slow, but variability is very low (the “bad” days are not very different from the typical days)

Reliability

Better metrics: For drivers

0

5

10

15

20

25

30

35

40

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Ave

rag

e H

ou

rly S

peed (

mp

h)

Hour of the day

5th Avenue [49th St to 42nd St] Non-holiday weekdays | September - November 2011

Mid-days are more variable at both high and low speed ends, but most days (25th-75th percentiles) stay within fairly tight bands.

Reliability

Better metrics: For drivers

0

2

4

6

8

10

12

14

16

18

20

3:00 PM 3:30 PM 4:00 PM 4:30 PM 5:00 PM 5:30 PM 6:00 PM 6:30 PM 7:00 PM

Ave

rag

e T

rave

l S

pee

d (

mp

h)

Time of Day

5th Avenue [49th St to 42nd St] – PM PEAK

Questions? Tom Maguire tmaguire@dot.nyc.gov