Post on 13-Nov-2015
PIPE DIA (MM)
DESCRIPTION
??? MAIN LINE
??? TANKER LINE
??? BYPASS LINE
??? SUCTION LINE
??? TEST LINE
??? OVER FLOW LINE
??? DRAIN PIPE
NOTE:
REV. DESCRIPTIONDATE
FIRST SUBMISSION0 11-12-2014
0
M.U
SARAN
N.T.S
11-12-2014
QJ 116-ME-GL-01
MECHANICALDRAWN
CHECKED
SCALE
APPROVED
DRG. TITLE
REV.
DRG. NO.
REV. DESCRIPTIONDATE
P.O. Box 7777 Tel 44308888 Fax 44319920
Email: xxxxx@woqod.com.qa
FAX.No. 44877205
DESIGNERS
ARCHITECTS
TEL:No. 44877629 / 44877269
ENGINEERS
E.mail : sketchcons@qatar.net.qa
DATE
CONDO BUILDING CONTRACTING WLL
TEL- +974 44763781, FAX- :+974 44763909WEB SITE: www.thecondorgroup.com
E-mail : mail.qatar@condor.ae
P.O Box 21934, DOHA, QATAR.
DISCIPLINE
NEW AL RAYYAN
BIJU
FIRE FIGHTING WATER TANK-PLAN
? ALL DIMENSIONS GIVEN ON THIS DRAWINGS AREIN MILLIMETERS AND LEVELS ARE IN METERS