Post on 07-Apr-2018
8/3/2019 q3 Bahadurgarh Baseline
1/39
BAHADURGARH Baseline July to Sep 2011
GSM
CDMA
8/3/2019 q3 Bahadurgarh Baseline
2/39
confidential
Overview
Coverage footprint comparison
On Road coverage
Network performance (KPI)
Baseline summary
Coverage and Quality
2 of 84
8/3/2019 q3 Bahadurgarh Baseline
3/39
confidential
Summary
3 of 84
Drivetest Results
From TTI
Target RCOM GSM RCOM CDMA
Technology GSM CDMABand of operation (Mhz) 1800 800
Route covered (km) 70 70
No. of Sites 16 7
% of route with good outdoor coverage(Rx level/MTx) >-85dBm/=98% 100 100
Call Drop (%) 1.5% 0 0
Rx Quality DL(=96% 100 100
Call Setup time (Sec) 3.63 2.02
TargetRCOM GSM
TargetRCOM CDMA
48 21
SDCCH Completion Rate (BBH) >=98% >=90% 48 Paging Channel Occupancy =90% 21
TCH Completion Rate (BBH) >=97.5% >=90%47
TCH Call Completion Rate (BBH) >=98%>=90% 21Handover Success Rate (BBH) >=95% >=90% 45 Handover Success Rate (BBH) >=97% >=90% 21
SDCCH Assignment Success (BBH) >=99% >=90% 48 Forward SCH Data Rate (DBBH > 70 Kpbs * ) >=90% 21
TCH Assignment Success (BBH) >=97% >=90% 48 Call Setup Success rate (BBH) >=97% >=90% 21
RX Quality DL (0-5) (BBH) >=94% >=90% 47 RF ASSIGNMENT success rate (BBH) >=98% >=90% 21
Random Access Success Rate (BBH) >=95% >=90% 48 Call Quality (RFER) =90% 19
Average BBH traffic/ cell 7.60 Average BBH traffic/ sector 26.88
8/3/2019 q3 Bahadurgarh Baseline
4/39
Drive test results
Idle mode footprint
CSSR
Call Drops
Handover Success Rate
Rx Quality
8/3/2019 q3 Bahadurgarh Baseline
5/39
confidential
Route
Route driven (km) : 70
Date of testing: 08,09 Aug -2011
Sites :RCOM GSM : 16
GSM Route
5 of 84
RCOM GSM Site
8/3/2019 q3 Bahadurgarh Baseline
6/39
confidential
Route
Route driven (km) : 70
Date of testing: 08,09 Aug -2011
Sites :RCOM CDMA : 07
RCOM CDMA Site
CDMA Route
6 of 84
8/3/2019 q3 Bahadurgarh Baseline
7/39confidential
7 of 84
On Air Status during Drive Test
Circle Town Name GSM/CDMA/COLO Site Name On Air Status Remarks
Haryana Bahadurgarh COLO Dayanand Nagar Yes NA
Haryana Bahadurgarh COLO HARI NAGAR Yes NA
Haryana Bahadurgarh COLO Mie Area Yes NA
Haryana Bahadurgarh COLO Near Anand nagar Yes NA
Haryana Bahadurgarh COLO Near Sabji mandi Yes NA
Haryana Bahadurgarh COLO Near Shastri colony Yes NA
Haryana Bahadurgarh COLO SEC 6 Yes NA
Haryana Bahadurgarh GSM LINE PARK Yes NA
Haryana Bahadurgarh GSM Sector 9 Yes NA
Haryana Bahadurgarh GSM NN ROAD BAHADURGARH Yes NA
Haryana Bahadurgarh GSM Verdhman Jewelers Yes NA
Haryana Bahadurgarh GSM Jheel Mohalla, Yes NA
Haryana Bahadurgarh GSM Anaj Mandi Yes NA
Haryana Bahadurgarh GSM Bahadurgarh arcade Yes NA
Haryana Bahadurgarh GSM hari nagar Yes NA
Haryana Bahadurgarh GSM Sankhol Yes NA
8/3/2019 q3 Bahadurgarh Baseline
8/39
Drive test results
Idle mode footprint
8/3/2019 q3 Bahadurgarh Baseline
9/39confidential
RCOM GSM
Coverage Plot
9 of 84
RCOM CDMA
Delhi Road
8/3/2019 q3 Bahadurgarh Baseline
10/39confidential
Coverage Comparison
10 of 84
8/3/2019 q3 Bahadurgarh Baseline
11/39
confidential
Call Metrics
11 of 84
8/3/2019 q3 Bahadurgarh Baseline
12/39
confidential
Action Plan:
RCOM Support requirement:
CSSR
Call drop
Action Plan:RCOM Support requirement:
Call Metrics Action plan
12 of 84
8/3/2019 q3 Bahadurgarh Baseline
13/39
confidential
Handover & Rx Quality
13 of 84
Handover success Rate Rx Quality DL / FFER
Action Plan:
Action Plan:
Rx Qual=No. of bins
8/3/2019 q3 Bahadurgarh Baseline
14/39
Drive test results
Call Drops
Call Blocking
FER
C/I
Rx Quality
8/3/2019 q3 Bahadurgarh Baseline
15/39
confidential
Sankhol
Sec 6
Anaj Mandi
Sec 9 Road
Mie Area
The Overall good quality bins is 96%
RCOM GSM
Rx Quality Plot
15 of 84
RCOM CDMA
8/3/2019 q3 Bahadurgarh Baseline
16/39
confidential
RCOM GSM
C/I average Plot
16 of 84
RCOM CDMA
Sec 9 RoadDelhi Road
Sec 9 Road
Sankhol
Bahadurgarh Arcade
8/3/2019 q3 Bahadurgarh Baseline
17/39
confidential
The Overall good quality bins is 96%
RCOM GSM
GSM Call drop Plot
17 of 84
RCOM_CDMA
No Call Drop No Call Drop
8/3/2019 q3 Bahadurgarh Baseline
18/39
confidential
Poor Coverage patches
18 of 84
8/3/2019 q3 Bahadurgarh Baseline
19/39
confidential
Executive Summary
19 of 84
8/3/2019 q3 Bahadurgarh Baseline
20/39
confidential
RCOM CDMA RCOM GSM
Total Cells 21 48
15% to 30% to 50% to 70% to 90% to 100% 2 2
Action Plan:Temporary congetion on Dayanand Nagar(Alpha)& SEC 6(Gama)
RCOM Support requirement:
Action Plan:Temporary congetion on Sec 6(Beta) &Sankhol(Gama) Sites
RCOM Support requirement:
Capacity Utilization
20 of 84
8/3/2019 q3 Bahadurgarh Baseline
21/39
confidential
GSM Call setup Time
21 of 84
8/3/2019 q3 Bahadurgarh Baseline
22/39
confidential22 of 84
CDMACall setup Time
8/3/2019 q3 Bahadurgarh Baseline
23/39
Detailed analysis
For each drive test stretch
8/3/2019 q3 Bahadurgarh Baseline
24/39
confidential24 of 84
GSM-Location of call blocking
High utilized cell
Call attempt failuresPlanned sites
No Call Blocked
8/3/2019 q3 Bahadurgarh Baseline
25/39
8/3/2019 q3 Bahadurgarh Baseline
26/39
confidential26 of 84
GSM - Location of call drops
No Call Drop
8/3/2019 q3 Bahadurgarh Baseline
27/39
confidential27 of 84
CDMA - Location of call drops
No Call Drop
8/3/2019 q3 Bahadurgarh Baseline
28/39
confidential28 of 84
GSM_Detail Analysis of Drop Call
No Call Drop
8/3/2019 q3 Bahadurgarh Baseline
29/39
confidential29 of 84
GSM_Detail Analysis of Rx Quality
Sankhol
Sec 6
Anaj Mandi
Sec 9 Road
Mie Area
Time Lat.Lon
.
Cell
ID
(28
bit)
C/I
RxL
ev
sub
AR
FC
N
BSI
CLAC
RA
C
RX
Q
sub
BSI
C,
BC
CH
FER
subTA RLT
AM
R
mo
de
DL
Area
Na
me
Remarks
8/9/1
1
7:21
PM
28.
696
97
76.
907
93
300
42
11.
9-90 867 46
705
11 0
56,
8670 2 36
NB
7.9
5
San
khol
Weak
Coverage,N
o site
Nearby
8/8/1
1
8:41
PM
28.
687
76.
913
85
330
635.4 -73 875 0
705
11 6
0,
8750 2 36
NB
5.9
Sec
6
Weak
Coverage,N
o site
Nearby
8/8/1
1
8:00PM
28.
70074
76.
93161
163
92
19.
7 -58 871 12
705
1 1 0
14,
871 0 0 36
NB
12.2
Anaj
Mandi
Weak
Coverage
8/8/1
1
6:55
PM
28.
675
32
76.
936
84
163
923.4 -76 871 12
705
11 6
14,
8710 3 36
NB
4.7
5
Sec
9
Roa
d
Weak
Coverage
8/9/1
1
2:23
PM
28.
684
03
76.
946
32
311
42
20.
8-72 866 11
705
11 3
13,
8660 1 36
NB
12.
2
Mie
Area
Weak
Coverage
8/3/2019 q3 Bahadurgarh Baseline
30/39
confidential30 of 84
CDMA_Detail Analysis of FFER
8/3/2019 q3 Bahadurgarh Baseline
31/39
confidential31 of 84
Detail Analysis of Handover
No HO Fail
8/3/2019 q3 Bahadurgarh Baseline
32/39
Drive test results
KPI Comparison footprint between previous quarter
8/3/2019 q3 Bahadurgarh Baseline
33/39
confidential
Differentiate Analysis
33 of 84
8/3/2019 q3 Bahadurgarh Baseline
34/39
confidential
Differentiate Analysis
34 of 84
Diff i A l i
8/3/2019 q3 Bahadurgarh Baseline
35/39
confidential
Differentiate Analysis
35 of 84
Diff i A l i
8/3/2019 q3 Bahadurgarh Baseline
36/39
confidential
Differentiate Analysis
36 of 84
Diff i A l i
8/3/2019 q3 Bahadurgarh Baseline
37/39
confidential
Differentiate Analysis
37 of 84
8/3/2019 q3 Bahadurgarh Baseline
38/39
confidential38 of 84
SWOT A l i
8/3/2019 q3 Bahadurgarh Baseline
39/39
Strength Weakness
Reliance has established a relatively strong overallcompetitive position in the core urban market and also thecluster2. If it works on its coverage in outskirts (cluster 3and 4), it can further improve on its competitive position.
The Over all sample Quality is 96%
The overall c/I is having 94% good samples
So only 6% area is having poor interference
CDMA has Good Accessibility & Retainibility
Reliance has the lowest coverage score in theouter area of city. Outskirts are key focus areaswith predominant attention required.
Opportunity Threat
A network is having 100% good quality bins
And 100% good samples on C/I samples
cant be having to many threa.ts as such
SWOT Analysis