PROJECT TRACKER

Shana Thomas and Grace Richey

2

What is Project Tracker?

Transportation Code Section 201.807 states that the department should

have a centralized location on the Internet to list projects in all

transportation plans and programs available to the public.

Senate Bill 1420 was passed during the 82nd Legislative Session- TxDOT

to become a more accountable, informative, and transparent agency. To

achieve this goal, TxDOT created a website named Project Tracker for the

general public and stakeholders to track TxDOT transportation projects.

As a result of these requirements, Project Tracker was created as a web

based portal that showcases TxDOT’s transportation projects, including

annual reports for other modes such as Aviation, Rail, Maritime, Major

Transportation Projects and Public Transportation Projects.

3

Project Tracker-In the News

Statesman- March 26, 2015

Salado Bridge Collapse

4

Project Tracker-On The Web

Landing Page:

http://www.txdot.gov/inside-txdot/projects/project-tracker.html

Project Tracker from TxDOT Home Page:

http://www.txdot.gov

Application Link:

http://apps.dot.state.tx.us/apps-cq/project_tracker/

5

Project Tracker-Navigation

6

Project Tracker-Phases

Plan

Develop Construct

In-Construction

7

Project Tracker-Data Sources

DCIS

Design and Construction Information

System

Project Table

Project Summary

Programmed Funding

AGO

ArcGIS Online

Map

Status

TIER

Strategic & Total Score

Site Manager

Project Construction

Contact Information

P6

Primavera 6

Project Milestones

PeopleSoft

Financial Information

8

Project Tracker-Resources

Export Data- Projects can be exported in PDF, XLSX or XML format. All of the

detailed information from the site is available.

Help- This link opens the Project Tracker User Guide in a new tab. It provides

general information about navigating Project Tracker as well as a glossary of

terms and a small FAQ question.

About- This link opens in a new tab and directs the user to the Project Tracker

landing page.

UTP Links- Information on non-highway projects can be accessed in the UTP

document. Each icon launches a new tab containing a PDF of the latest version of

the UTP, which opens to the corresponding section.

9

Project Tracker Weekly Hits

1,223

1,430

1,105

1,488

952

1,452

197

2,320 2,425

2,578

3,048

2,183

1,713

2,077 1,971

2,470

2,062

0

500

1,000

1,500

2,000

2,500

3,000

3,500

10/3/2015 11/3/2015 12/3/2015 1/3/2016 2/3/2016 3/3/2016 4/3/2016 5/3/2016

Nu

mb

er

of

We

ek

ly H

its f

or

Pro

ject

Tra

cke

r

Source: Project Tracker analytics provided by website services as of 5/31/2016

10

Current

Filters

Updated

Filters

What’s New–Filter by Highway Name

11

What’s New–Highlighted Boundaries

Current Map

Viewer

Updated Map

Viewer

12

What’s New–Project Class & PID Fields added

13

What’s New–Project Construction Details

Field “Percent Project Complete” is updated to percent budget used, because

this field in Site Manager represents the amount of allotted budget used for the

project.

Project Construction table will only display projects in “Construction Scheduled”

phase.

14

What’s New–Financial Information Details

Detailed information of Comptroller Object Codes (COBJs) or Comptroller of

Public Accounts (CPA) Codes are shown under recorded expenditure.

15

What’s New–Project Milestones and Help Links

Project Milestone table will only display projects

in “Finalizing for Construction” phase.

Clicking on the Table Title or the Map Legend will

link you directly to the Help Document.

16

Project Summary-Count by Phase

Source: Project Tracker

17

Project Summary- Dollar Volume by Phase

13.3 13.2

15.7

34.6

17.1 16.9

42.6

20.0

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

40.0

45.0

Construction Scheduled Finalizing for Construction Under Development Long Term Planning

Co

nstr

ucti

on

Co

st

in U

SD

$B

Project Phase

Total 9/1/2015 Total 6/3/2016Source: Project Tracker

THANK YOU!