PROJECT SITE PLAN DOWNTOWN BERKELEY BART PLAZA AND ...

Post on 14-Feb-2017

217 views 0 download

Transcript of PROJECT SITE PLAN DOWNTOWN BERKELEY BART PLAZA AND ...

PROJECT SITE PLANDOWNTOWN BERKELEY BART PLAZA AND TRANSIT AREAIMPROVEMENT PROJECT- 65% DESIGN ILLUSTRATIONS

ENTRANCE #1

ENTRANCE #2

ENTRANCE #3

ENTRANCE #4

ENTRANCE #5

ENTRANCE #6

PLAZA LANDSCAPE PLANDOWNTOWN BERKELEY BART PLAZA AND TRANSIT AREAIMPROVEMENT PROJECT- 65% DESIGN ILLUSTRATIONS

CONCRETE PAVERSWITH EXPOSED GRANITE AGGREGATEOF DIFFERENT TEXTURES AND COLORS

BIORETENTION AREAS

ARMSTRONG MAPLES

LONDON PINES

CATENARY LIGHTSABOVE PLAZA

SEATING CUBEWITH LIGHT

PLAZA SITE PLANWAYFINDING, UTILITY STUBOUTSAND FUTURE ART ELEMENTS

DOWNTOWN BERKELEY BART PLAZA AND TRANSIT AREAIMPROVEMENT PROJECT- 65% DESIGN ILLUSTRATIONS

INTERCHANGEABLE METAL PANELSFOR FUTURE ART INSTALLATION

OVERHEADSTATION ID SIGN

SANITARY SEWER LATERAL &CLEANOUT FOR FUTURE CONNECTION

WATER HOSE BIBSIN LOCK BOXES

OVERHEADSTATION ID SIGN

DIRECTIONAL WAYFINDING, TRANSIT INFODESTINATION MAP & REAL-TIME DISPLAY

TRANSIT INFO KIOSK

REMOVE EXISTINGPLANTER, INSTALLNEW BIKE RACKS

REMOVE EXISTINGPLANTER, INSTALLNEW BIKE RACKS

REMOVE EXISTING PLANTER, INSTALL

REMOVE EXISTING PLANTER, INSTALL

REMOVE EXISTINGGUARDRAILS

REMOVE PORTIONS OFINTERIOR BRICK FACADE

REMOVE EXISTING STRUCTURE

EXISTING ESCALATORSTO REMAIN

SECTIONPLAN

EXISTING ENTRANCE 3 DEMOLITION PLAN AND SECTION

DOWNTOWN BERKELEY BART PLAZA AND TRANSIT AREAIMPROVEMENT PROJECT- 65% ILLUSTRATIONS

NEW GLASS TREADSTAIRS

NEW GLASS ANDSTEEL SIDE WALLS

NEW GLASS FLOORING

ENTRANCE 3 HEADHOUSEFLOOR PLAN

DOWNTOWN BERKELEY BART PLAZA AND TRANSIT AREAIMPROVEMENT PROJECT- 65% ILLUSTRATIONS

GLASS OVERHANG

SOUTH ELEVATION WEST ELEVATION

EAST ELEVATIONNORTH ELEVATION

NEW GLASS ANDSTEEL SIDE WALLS

NEW GLASS ANDSTEEL SIDE WALLS

NEW ROLLUP GATE

NEW ROLLUP GATE

NEW ROLLUP GATE

NEW GLASS ROOF

NEW GLASS ROOFNEW GLASS ROOF

NEW GLASS ROOF

NEW LED DISPLAYSCREENS

ENTRANCE 3 HEADHOUSEELEVATIONS

DOWNTOWN BERKELEY BART PLAZA AND TRANSIT AREAIMPROVEMENT PROJECT- 65% ILLUSTRATIONS

ENTRANCE 3 HEADHOUSELONGITUDINAL SECTION

NEW GLASS ANDSTEEL SIDE WALLS

NEW GLASS ROOF

NEW ROLL UP DOOR

NEW STAIRS

DOWNTOWN BERKELEY BART PLAZA AND TRANSIT AREAIMPROVEMENT PROJECT- 65% ILLUSTRATIONS

NEW GLASS ANDSTEEL SIDEWALLSNEW

ROLL UPGATE

NEWROLL UPGATE

NEW METALPANEL SYSTEM

NEW CEMENTICIOUSCOATING OVER BRICK

NEW METAL PANELSYSTEM -INTERCHANGABLEFOR FUTURE ARTINSTALLATION

UTILTIYPANELS ACCESS

NEW ENTRY STAIRS ATENTRANCE 3 HEADHOUSE

DOWNTOWN BERKELEY BART PLAZA AND TRANSIT AREAIMPROVEMENT PROJECT- 65% ILLUSTRATIONS

ELECTRICAL &COMMUNICATIONS OUTLETS IN BASEFOR FUTURE ART, SOUND & LIGHTING INSTALLATIONS

SITE FURNISHINGSDOWNTOWN BERKELEY BART PLAZA AND TRANSIT AREAIMPROVEMENT PROJECT- 65% ILLUSTRATIONS

BIORETENTION AREA TO CAPTURE AND TREAT STORMWATER RUN OFF