Project Server 2010 - configuracion de tiempo y tareas

Post on 12-Jan-2015

1.387 views 4 download

Tags:

description

Sesión de configuración de tiempo y tareas en Microsoft Project 2010 Server.

Transcript of Project Server 2010 - configuracion de tiempo y tareas

Configuración de tiempo y tareas en Project Server 2010

Quien soy?

Basic Entities and Relationships

Project

Task Assignment Resource

Custom

Fields

Lookup

Tables

Timesheet

Resource

Plans

Issues and

Risks

SharePoint

Site

Time and Task Tracking Entities

Timesheet

Timesheet

Line

Time Reporting

PeriodFiscal Period

Resource /

User

Administrative

Time

Project

Assignment

Timesheet Line

ClassificationProject Task

Project

Tracking Configuration

To configure Project Server 2010 for tracking, you mustspecify your organization’s settings in each of the followingareas:

• Financial periods

• Time periods for timesheets

• Timesheet options

• Default method of tracking task progress

Agenda•

Server Settings

Fiscal Periods

Fiscal Periods

Time Reporting Periods

Time Reporting Periods

Timesheet Adjustment

Line Classifications

Double Entry Mode

Task Update

Entry

Timesheet

Entry

Project

Manager

Timesheet

Manager

Single Entry Mode

Timesheet

Entry

Project

Manager

Timesheet

Manager

Project Tasks All Entries

Timesheet Settings and Defaults

Administrative Time

Task Settings and Display

Close Tasks to Update

Demos

Configuración de tiempo y tareas en Project Server 2010

Configuración de tiempo y tareas en Project Server 2010

Additional Resources

• www.bsgrupo.com

BS GRUPO

• https://www.facebook.com/#!/groups/sqlpassperu/

SQL PASS PERU

• www.sqlpass.org

PASS HQ

© 2008 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names are or may be registered trademarks and/or trademarks in the U.S. and/or other countries.

The information herein is for informational purposes only and represents the current view of Microsoft Corporation as of the date of this presentation. Because Microsoft must respond to changing market

conditions, it should not be interpreted to be a commitment on the part of Microsoft, and Microsoft cannot guarantee the accuracy of any information provided after the date of this presentation.

MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION.