Project 6: Project Development
Issued by: Dr Radzi Ismail
Contents Outline Introduction Objectives Project Requirements General Project Requirements and Information
INTRODUCTION Project development
– three stages: 1) Pre-development stage 2) Construction stage 3) Post construction stage
Players in construction industry- Architect - Interior Designer- Project Manager - Engineers- Quantity Surveyor - Land Surveyor- Building Surveyor - Landscape
Architect- Planner - Etc.
OBJECTIVES To expose students to the process that
involved in project development To make sure all students know their roles
and responsibilities in project development
PROJECT REQUIREMENTS All students are required to prepare a mind
mapping complete with all relevant charts and figures from inception stage until occupation stage based on Royal Institute of British Architects (RIBA) plan of work 2007 .
The mind mapping should present the process and your role in project development stage.
Use your own creativity to develop the mind mapping.
All mind mapping are should be submitted in one A3 size.
RIBA Outline Plan of Work 2007
GENERAL PROJECT REQUIREMENTS AND INFORMATION Individual project; Handwritten; Project duration is 1 week, from Monday,
October 15th to Monday, 22nd October, 2012; Students must submit their works to the
Studio Master on 22nd October 2012 at 9.00am
Paper Format – landscape