PRIME Antenna Inc. Antenna Test Team Adam Straubinger Alan Condino Thanh Hong Ronnie Berg Sam...

Post on 19-Dec-2015

217 views 1 download

Tags:

Transcript of PRIME Antenna Inc. Antenna Test Team Adam Straubinger Alan Condino Thanh Hong Ronnie Berg Sam...

PRIME Antenna Inc.PRIME Antenna Inc.

Antenna Test TeamAntenna Test Team

Adam StraubingerAdam Straubinger

Alan CondinoAlan Condino

Thanh HongThanh Hong

Ronnie BergRonnie BergSam GregorioSam Gregorio

Background Information

•Antennas

•Serves as a “transducer”

RequirementsRequirements• Test: Test: Power vs Power vs radiation angle radiation angle

Power vsPower vsfrequency patternsfrequency patterns

• Compare results with Compare results with established dataestablished data

Major Tasks/System Major Tasks/System ComponentsComponents

• Design and build an anechoic test Design and build an anechoic test chamberchamber

• Power SupplyPower Supply

• Motor and Motor DriverMotor and Motor Driver

• Integrate test equipment into the Integrate test equipment into the anechoic test chamberanechoic test chamber

• Test, gather, analyze and interpret Test, gather, analyze and interpret datadata

SYSTEM COMPONENTS

•Anechoic Test Chamber•Motor and Motor Driver Power Supply•Power Supply•Computer/Hardware Interface•Testing Program•Test Equipment and Interface

Antenna Range Block Antenna Range Block diagramdiagram

• Anechoic• Wooden Box

TEST CHAMBER

ROTARY TURNTABLE

•Height adjustable from 12”–24”

•4” machinist’s rotary table

Motor DriveMotor Drive Stepper MotorStepper Motor

Block Diagram of Motor Block Diagram of Motor DriveDrive

MODE 0

B-

POWER TRANSISTOR

MODE 1

UNIPOLAR STEPPERMOTOR

Q1TIP122

SENSERESISTORS

0

10VPIC16F628

M+

A-

Q1TIP122

SCALE RESISTORS

Q1TIP122

B+Q1TIP122

123

4 5 6

A+

DIRECTIONSTEP

Manual Manual Motor Motor

ControlControl

SW SPDT

STEP

0

DIRECTION

MANUAL

PIC12F675

PCCONTROL

SW PUSHBUTTON

R2

FORWARD

VCC

VCC

REVERSE

MOTOR DRIVE

Power SupplyPower Supply

• The Power supply The Power supply converts 115V 60 Hz converts 115V 60 Hz input from a wall input from a wall socket and is socket and is connected to a step connected to a step down transformer down transformer module, rectified and module, rectified and filtered to +10V and filtered to +10V and +5V.+5V.

Block Diagram of Power Block Diagram of Power SupplySupply

OUTPUT

0

+12V

J 1

P L U G A C M A L E

1 2

3

D 1L T1 0 2 9

ACTIVE

LT1085-5

0

NEUTRAL

F 1

1 2 0 V 4 A

R 2

1 k0

FRONTPANEL

C 41 0 0 u F

+5 V O U T

LT1085-5

D 2

0

C 22 2 u F

5VREGULATOR

R 1

3 9 00

10VREGULATOR

0

S W 1

S P S T

115V60Hz

C 31 0 u F

INPUT

C 11 0 u F

12VUNREGULATED

0

+1 0 V O U T

D 3

Block Diagram of Optical Block Diagram of Optical SensorSensor

+ 5V

R

C 2

. 1 u FTCYS5201

1

2

3

V OLTA GE OUT

Blocked path=5V

Unblocked path=0.5V

path

(see note)

note

AND

R 1

1 k

Graphic User Graphic User InterfaceInterface

• Automated antenna testing through Automated antenna testing through LabVIEW graphic user interface (GUI).LabVIEW graphic user interface (GUI).

• Antenna position and GPIB control for Antenna position and GPIB control for data acquisition.data acquisition.

• Test data collected is processed and Test data collected is processed and displayed graphically. displayed graphically.

• Laboratory Virtual Instrument Laboratory Virtual Instrument Engineering Workbench. Engineering Workbench. http://www.ni.comhttp://www.ni.com

Graphic User InterfaceGraphic User Interface

Automated Antenna Automated Antenna TestingTesting

• Start by selecting Start by selecting test frequency test frequency and power.and power.

• Select azimuth Select azimuth test parameters. test parameters.

• Ready to TestReady to Test

Automated Antenna Automated Antenna TestingTesting

• Select desired Select desired instrumentation.instrumentation.

• Select data Select data achieving achieving options. options.

Automated Automated Antenna Antenna TestingTesting

• Begin Auto TestBegin Auto Test

• Measured Power Measured Power and testing and testing progress is progress is displayed.displayed.

Automated Antenna Automated Antenna TestingTesting

• End End of of TestTest

Single Single StepStep Mode Mode

• Press STEP Press STEP for each for each step. step.

• Test Test equipment equipment is controlled is controlled manuallymanually

Error CheckingError Checking

• Press Press STEP for STEP for each each step. step.

• Test Test equipmeequipment is nt is controlled controlled manuallymanually

Test Signal Test Signal Reference Reference

• Signal Signal generatiogeneration to 3.2 n to 3.2 GHzGHz

• Power Power output output from -136 from -136 to +10 to +10 dBm.dBm.

Power Measurement Power Measurement

• Signal Signal measurememeasurement to 6.2 nt to 6.2 GHzGHz

• -166 dBm -166 dBm sensitivity.sensitivity.

Review of ExpensesReview of Expenses

Chamber/ContructionChamber/Contruction $380$380

Rotary Table Rotary Table $129$129

Stepper Control Stepper Control $40$40

RF Cables/Connectors RF Cables/Connectors $50$50

Total Costs Total Costs $599$599

Subsidized Costs Subsidized Costs $349$349

Final ExpensesFinal Expenses $250$250

Microsoft Project Document

ConclusionsConclusions

AccomplishmentsAccomplishments

•A viable automated RF testing A viable automated RF testing chamberchamber

•Accurate automated testing Accurate automated testing system system

Questions?Questions?