A CASE STUDY PRESENTATIONPRESENTED BY :SUPER GROUP, UWATUTORIAL : FRIDAY, 1 PMUNIT: PROJECT MANAGEMENTFRANCE,MILLAU VIADUCTPROJECT MANAGER: CHRISTIAN LEYRITTCHIEF ARCHITECT: NORMAN FOSTER & MICHEL VIRLOGEUXPROJECT DURATION : 17 YEARS (1987-2004)THE TALLEST BRIDGE IN THE WORLDPROJECT MEMBERS:SHOBHIT SHEKHAR 21777517HARSH PATEL 21804443DEVYN JACKAMARRA 20761794KHADIJA BEGUM 21822517XIOFAN WU 21795582ERIC TANG 21929169ZIYING ZHANG 20933753
AN OVERVIEW!why DO WE NEED the MILLAU VIADUCT ?INTRODUCTION TO FRANCE, MILLAU VIADUCT
PRESENTER: SHOBHIT SHEKHAR, GROUP COORDINATOR
DUE TO THE MISSING LINK IN BETWEEN PARIS & SPAIN
NEED TO CONSTRUCT THE TALLEST BRIDGE
Route Image by ArchitectsSatellite image of route before bridge construction
LETS SEE WHAT IT FEELS LIKE TO CONSTRUCT THE TALLEST BRIDGE IN THE WORLDSource: https://www.youtube.com/watch?v=a1ycF4uqXNs
Challenges & RecommendationConceptualizationFRANCE, MILLAU VIADUCT
PREPARED BY HARSH PATEL
CHOICE BETWEEN THE HIGH AND THE LOW SOLUTION
DIS-SUPPORTIVE NATURE OF THE STATE LEVEL AUTHORITY
LACK OF PUBLIC FUNDING
PROBLEMS FACED DURING CONCEPTUALIZATION
NEED TO COMMUNICATE WITH GEOLOGICAL ENGINEERS
CO-OPERATION OF STATE AUTHORITY WAS REQUIRED
COMPLETE ANALYSIS OF PROJECTIN TERMS OF FINANCIAL ASPECT.
recommendations to conceptualization
Challenges & RecommendationplanningFRANCE, MILLAU VIADUCT
PREPARED BY Devyn jackamarra
Processes to find the solution:Use focus groups
Risks involved in partnership:comprehensive risk identificationIdentification toolsassign accountability CHALLENGES & RECOMMENDATIONS
Challenges & RecommendationEXECUTIONFRANCE, MILLAU VIADUCT
Prepared by Khadija Begum
Was it a good idea to push the deck onto the pillars ?
What if the launching system failed ?
What could be the back-ups if anything beyond calculation happened ?THE GREATEST RISK FACTOR EVER
Risk management for prototype test
Local supplier over International one POSSIBLE ALTERNATIVES
(Source: Hartley 2008,2014)
TimeCostRisk
Challenges & Recommendation
FinalizationFrance, Millau Viaduct
Presenter: Xiaofan Wu
Landscape Restoration
Unexpectedly High Traffic Flows
Safety Issue
FINALISATIONChallenges and Recommendations
Reforestation
Extend Toll Barriers of Lanes, Update Maintenance Plan
Redisgn Siderail
Challenges & Recommendation
Gantt Chart & ScheduleFrance, Millau Viaduct
Presented by Eric Tang
What is a Gantt chart?Why is a Gantt chart used?Gantt chart
Four main parts:Feasibility studies and research
Project design and conception
Procurement
Project delivery and construction
Millau viaduct schedule
Millau viaduct schedule
The material the deck of the bridge was to made of was not specified (steel or concrete) and left to Eiffage to decide.
recommendations
Challenges & Recommendation
management strategy analysisFRANCE, MILLAU VIADUCT
presented by ziying zhang
Human Resource ManagementEngineers ArchitectsLawyers Local authoritiesGovernmentManagement Strategy Analysis
Risk Management
The financial riskSelf financing
The construction risksafetyeconomic
Management Strategy Analysis( cont. )
PercentGraph showing the risk factor in stages
Cost Management
completed within budget
BOT concessionaire procurement
Management Strategy Analysis (cont.)
A FINAL OVERVIEWCONCLUSION AND PROJECT LESSONSFrance, Millau Viaduct
Presented by Shobhit Shekhar
24
LESSONS LEARNTCONCEPT & PLANNING PHASEEXECUTION PHASEFINALIZATION PHASE
UWA
UNIT: PROJECT MANAGEMENT(GENG5505)
SUPER GROUP
UNIT COORDINATOR:DR. COSIMO FAIELLO
TUTOR:VERONICA BONNARTHANK YOU !QUESTIONS PLEASE ??A CASE STUDY PRESENTATION MADE BY:SUPER GROUP