Emergency Evacuation Drill - 28.06.2018
Situation Inside Guardhouse ERT arrived at Guardhouse Evacuation route is clear
Main assembly area with signages displayed
PREPARATION BEFORE THE EVACUATION DRILL
ACTIVATION OF FIRE ALARM AND EVACUATION SIREN TOGETHER WITH ARRIVAL OF BOMBA OFFICERS
Arrival of BOMBA Officers Briefing to BOMBA Officer, Encik Aszahari on the situation
Fire “happened” and alarm activated.Location of fire shown in
Mimic Diagram - A Block.
ERT rush to the fire location – A Block.
Activation of evacuation siren by Electrical section
DURING THE EMERGENCY EVACUATION DRILL
Employees walking towards the Main Assembly Area
Evacuees gathered at Main Assembly Area Reporting of evacuees from various section
Evacuation drill situation observed by Bomba Officers.
Safety Chairman observing evacuation by employees
ANNOUNCEMENT , OPENING ADDRESS & DISPERSAL OF THE EMERGENCY EVACUATION DRILL
All sections have assembled. Speech by Safety Chairman
Comment by BOMBA Officer , En. Aszahari
Drill ended by Safety Call ‘Zero Fire! OK!’
Opening speech by Safety Personnel
Speech by Managing Director
AFTER THE DRILL
Post-mortem meeting attended by Bomba officers, Safety Officer, Electrical section, and ERT.
Bomba officer commented overall evacuation drill is conducted in a good and orderly manner.