TaylorWayRehabilitation

ProjectPRE‐CONSTRUCTION OPEN HOUSE

MAY 27, 2020

ZOOM WEBINAR

Project goals include:• Replace failing pavement with new concrete roadway

• Reduce congestion at the SR 509/Taylor Way intersection

• Improve pedestrian and bicycle access and mobility

• Reduce freight delays along Taylor Way

• Improve emergency response times to the peninsula

ProjectOverview

ProjectOverview

TaylorWay– BeforeandAfter

SR509/TaylorWayIntersection– BeforeandAfter

SR509/TaylorWayIntersection– BeforeandAfter

TAYLORWAYREHABILITATIONLane Restriction Examples

Taylor Way:• SR 509‐Lincoln Ave• Does not include 

weekend RR closures (~Sat. midnight‐Mon. 5am)

SR 509 NB & SB:• Does not include 6‐8 

weekends of intersection reconstruction 

Thank You.Questions and Answer Session to Follow WSDOT SR 167 Presentation.

TAYLORWAYREHABILITATION